Loading...
HomeMy WebLinkAboutSW8051110_HISTORICAL FILE_20060411STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 051110 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS N HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 Oou 04 � � YYYYMMDD Michael F Easley Governor William G Ross Jr Secretary North Carolina Department of Environment and Naarral Resources Alan W Klimek PE Director Division of Water Quality April 11, 2006 Ronald Koebbe, President Calvary Assembly of God Church, Inc 3980 Gum Branch Road Jacksonville, NC 28540 Subject Stormwater Permit No SW8 051110 Calvary Assembly of God Church High Density Project Onslow County Dear Mr Koebee The Wilmington Regional Office received a complete Stormwater Management Permit Application for Calvary Assembly of God Church on February 20, 2006 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 051110 dated April 11, 2006, for the construction of the subject project This permit shall be effective from the date of issuance until April 11, 2016, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adtudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Rhonda Hall, or me at (910) 796-7215 Sinc rely, / 776Z 3 1 Ed Beck Regional Supervisor Surface Water Protection Section ENB/rbh S \WOS\STORMWAT\PERMIT\051110 apr06 cc David Newsom, PE, Crystal Coast Engineering , P A Onslow County Building Inspections Rhonda Hall Wilmington Regional Office Central Files Noe`hCarolma �1 aturalljl North Carolina Division of Water Quarry 127 Cardinal Drive Extension Phone (910) 796 7215 Customer Service 1 877 623 6748 Wilmington Regional Office Wilmington NC 28405 Fax (910)3502004 Internet "w ncwaternuality ore An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10 % Post Consumer Paper State Stormwater Management Systems Permit No SW8 051110 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ronald Koebee, Calvary Assembly of God Church, Inc Calvary Assembly of God Church Onslow County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until April 11, 2016, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 249,956 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans The built -upon area for the future development is limited to 94,436 square feet 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 8 State Stormwater Management Systems Permit No SW8 051110 6 The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times Pond 1 Pond 2 a Drainage Area, acres 1003 238 Onsite, ft2 436,926 103,743 Offsite, ft2 None None b Total Impervious Surfaces, ft2 180,490 69,466 Buildings,ft 12,321 21,364 Roads/Parking, ft2 67,715 41,304 Sidewalks, ft 7,018 5,798 Future, ft 93,436 1,000 c Pond Depth, feet 7 6 d TSS removal efficiency 90 90 e Design Storm, inches 1 1 f Permanent Pool Elevation, FMSL 4450 440 g Permitted Surface Area @ PP, ft2 6,451 6,086 h Permitted Storage Volume, ft3 15,478 8,933 1 Storage Elevation, FMSL 4651 4531 1 Controlling Orifice 1 5" fit pipe 1" fd pipe k Permanent Pool Volume, ft3 16,049 15,419 1 Forebay Volume, ft3 3,492 3,198 m Maximum Fountain Horsepower 1/8 1/8 n Receiving Stream/River Basin UT of New River UT of New River o River Basin White Oak White Oak p Stream Index Number 19-(1) 19-(1) q Classification of Water Body C, NSW C, NSW II SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately Page 3 of 8 State Stormwater Management Systems Permit No SW8 051110 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowin.9 and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for the fountain's pump is based on the permanent pool volume The maximum pump power for a fountain in Wet Detention Pond 1 is 1/8 horsepower The maximum pump power for a fountain in Wet Detention Pond 2 is 1/8 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any Page 4 of 8 State Stormwater Management Systems Permit No SW8 051110 modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition Page 5 of 8 State Stormwater Management Systems Permit No SW8 051110 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 11 th day of April, 2006 NORTH CAR INA ENVIRONMENTAL MANAGEMENT COMMISSION ' 42,(4 - (or Alan W Klimek, P E ,Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 IL OFFICE USE ONLY Date Received Fe(. Paid I Permit -Number s-2a)5 "sr) Ze. V- J / 2�/ 1 /6-12-2605 cony State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM 7lus form mats be photocopied for use as an original GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, mdiNidual etc who owns the project) Calvary Assembly of God Church, Inc 2 Print Owner/Signing Official's name and title ( erson legally responsible for facility and compliance) Ronald. ko2—bbe Presle enfi 3 Mailing Address for person listed in item 2 above 398o Gum (3rarlch Road City Jacksonville Telephone Number 910 1.346 1114 State N C 38- r7o(-7 Zip 28540 4 Project Namc (Subdivision, facility, or establishment name - should bc, consistent with project name on plans specifications, letters operation and maintenance agreements, etc) L ian coo ,fiic Q-0-\ V c<C cpo�tt Lam. rc� 5 Location of Project (street address) Gum Branch Rd between its intersection with Hunting Green Or & Maynard Blvd Citi Jacksonville Township County Onslow 6 Directions to project (from ❑carest major mterscetion) From intersection of US 17 & Gum Branch Rd (SR 13 7 Latitude 340 48' 29" N Longitude North on Gum Branch Rd 770 26' 49" W 8 Contact person who can answer questions about the protect Name John L Pierce (John L Pierce & Associates, PA) Telephone Number L 11 PERMIT INFORMATION I Specify whether protect is (check one) X New Renewal Form SWU 101 Version 3 99 Page I of 4 3 6 miles to site on of project 910 1346-9800 Modification 1, 2 If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number NIA and its issue date (if known) 3 Specify the type of project (check one) _Low Densitv _X High Density _Redevelop _General Permit _Other 4 Additional Project Requirements (check applicable blanks) _CAMA Major X Sedimentation /Erosion Control 404t401 Permit __NPDES Stormwater Information on required State permits can be obtained by contacting the Customer Service Center at l 877 623 6748 III PROJECT INFORMATION I In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project Wet Detention Basins 2 Stormwater runoff from this project drains to the White Oak (New River) River basin 3 Total Project Area 2005 acres 4 Project Built Upon Area � How many drainage areas does the project have? 2 2862 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below tBas_i Tn_for"matmn�Drat is e Aiea�l� 7 "' x gn2 -..` - y , Drainage Area 2?e Receiving Stream Name UT of New River UT of New River Receiving Stream Class C,NSW C,NSW Drainage Area 436,926 sf 103,743 sf Existing Impervious* Area 17,589 sf 60,472 sf Proposed Impervious*Area 162,901 sf 8,994 sf "% Impervious* Area (total) 41 3 % 66 7 % 'Impervious* S-urtace�Area F „ .. Di- n-a--'TAre-MN `-'�,. DratnageJA'i a 2!�*,""Z--*Q On -site Buildings fF 12,321sf 21,364 sf On -site Streets On -site Parking 67,715 sf 41,304 sf On -site Sidewalks 7,018 sf 5,798 sf Other on -sue -0- Of -Hite (Reserve for future) 93,436 sf 1,000 sf Total 180,490 sf Total 69,466 sf `impervious area is defined as the built upon area Including but not limited to buildings toads parking areas, sdeivalks gravel areas etc Fonn SW J-101 Version 3 99 Page 2 of 4 n/" How was the off -site impervious area listed above derivedoN/A IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment I The follow ng covenants are intended to ensw a ongoing compliance with state stormwater management permit number N/A as issued bi the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 Vo more than N/A square feet of anv lot shall be covered by structures of impervious mateirals Impervious matenah include asphalt, gravel concrete brick stone slate of similar mates ml but do not include wood decking or the water surface of swimming pools 3 Swales shall not be filled in piped or altered except as necessary to provide driveway crossings 4 Built -upon area in excess of the permitted amount requires a state stormwatei management permit modification prior to constriction i All peinnited runofffrom outparcels orfiuure development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permuted By your signature below, you certify that the recorded deed restrictions and protectiNe covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5053 for the status and availability of these forms Form SWU-102 Wet Detention Basic Supplement Form SWU-103 Infiltration Basic Supplement Form SWU 104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-103 Neuse River Basin Supplement Form SWU 109 Innovative Best Management Practice Supplement Form SWU-i01 Version 3 99 Page 3 of 4 VI SUBMITT41, REQUIREMENTS Only complete application packages will be accepted and reviewed b� the Division of Water Quality (DWQ) 4 complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office 1 Please indicate that you have provided the following required information by initialing in the ~pace provided next to each item Initials Original and one copy of the Stormwater Management Permit Application Form J'�(.✓i/ • One copy of the applicable Supplement Form(s) for each BMP Permit application processing fee of $420 (payable to NCDENR) J Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications including - Development/Project name - Engineer and firm -Legend North arrow - Scale - Revision number & date - Mean high water line - Dimensioned propertv/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations finished floor elevations - Details of roads drainage features, collection systems and stormwater control measures - Wetlands delineated or a note on plans that none exist - Existing drainage (including off -sue) drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on vour behalf, please complete this section Designated agent (individual or Firm) Crystal Coast Engineering, PA Mailing Address 3817-3 Freedom Way City Hubert State NC Zip 28539 Phone [ _910 ) 325-0006 Fax ( 910 )325-0060 VIII APPLICANT'S CERTIFICATION I (print or type name of person listed in Geneia! Information item 2) RORald Koebbe e President certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21 l lam,_ Signature Form SVU 101 Version 3 99 Page 4 of 4 E&WIMME C rystalCoastE ng i neering 3817-3 Freedom Way Hubert NC 28539 Tel (910) 3250006 Fax (910)325-0060 910-325-0060 p1 To Rhonda Hall From Sara for David K Newsom Fax. 350-2004 Pages 13 Phone Date 2/20/2006 Re Calvary Assembly of God Church cc ❑ Urgent ❑ For Review O Please Comment ❑ Please Reply ❑ Please Recycle One (1) copy of the design calculations for Calvary Assembly of God Church (Pond #1 and Pond #2) Feb 20 06 01 55p "4 C rysta I C o a stE n g i n e e ring 910-325-0060 p 2 1 PROJECT DESCRIPTION Design Calculations Stormwater Treatment Facilities for Calvary Assembly of God Church located in Onslow County POND #1 ` QpF S l 2 Fn! sins - d vGir1FEP 0�:. 5, The Project consists of exist church/school on a 13 6 acre tract and associated sitework 2 COMPUTE POND AREA REQUIRED a Compute Percent Impervious Impervious Areas On -Site Buildings OrrSile Streets On -Site Parking On-Sde Sidewalks Other on -site Off -site Sub -Total FUTURE FUTURE(reserved) Total Total Area Drainage to Pond Percent Impervious = b Compute Pond Surface Area Existma Proposed Future Total _3,32 = 9>LKi9 ' 3Q,CC0 42 921 SF 0 SF 120 880 SF 11 689 SF �' a<t (1 �) a^� M69465 0 17,589 88436 175490SF 0 0 5 000 5 000 SF 17 589 69,465 93 436 180 490 SF 0 413 or 41 3 % 436926 SF Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming -`s '; ; gy7 toot pond depth SA/DA= ;p,4$5S%(interpolated) Therefore Surface Area = SA/DA x Drainage Area Feb 20 06 01 55p CiystalCoastEngineering 910-325-0060 6 403 SF say SF c Compute Minimum Pond Dimensions Assume rectangular shape with 3 1 Length (L) to Width (W) Ratio Length = 139 10 feet Width = 46 37 feet Site conditions however dictate irregular shaped pond Hydr Length=r '4fi14xfeet so Hydr Width 42 9 feet (avg) Actual L/W = 3 5 (irregular shape) 3 DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM Using Schuler "Simple Method Rv = 0 05 + 0 009(I) where I = percent impervious Rv = 0 422 inhn Control Volume = Design Rainfall x Rv x Drainage Area Control Volume = 15,357 CF sayz"- t5,5 CF 4 DETERMINE REQUIRED STORAGE DEPTH Assume 3 1 side slopes solving for depth (d) by trial & error d= 202 5 DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day - 5 day period Using orifice equation, solve for Diameter (D) that results in 3-1/2 day period D=(Q10026(h)s)s Where 0 = (Control Volume / 3 5 days x 86 400 sec/day) = 0 051 cfs h=d12 = 101 p3 Feb 20 06 01 56p CrystalCoastEngineering 910-325-0060 p 4 Solving for D D = 1 40 Use '_ pipe Actual Drawdown with actual drawdown pipe diameter (using onfice equation) Q= 0 059 cfs Draw Down Period = 3 05 days OK < 5 0 6 SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of Q10 flow <1 0 feet Using Rational Formula (Q=CIA) where __ Cimper £_ f Cpery = S- Ccum = 0 33 A=µ 1003ac Q10 = 24 70 cfs Assuming 1/2 circumference is used as weir and using Francis Formula (0=3 33LH' s) to solve for L such that H = 1 0 L = 7 42 Feet Min 60 inch diameter outlet structure Use 72 inch diameter outlet structure 7 DETERMINE Q10 STAGE 010 = 24 70 cfs Using Francis Formula (0=3 331-1-1' S) solve for H H 10 = 0 85 feet 8 DETERMINE Q100 STAGE (ELEV OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA) where Ccum = 033 1100=' k'gSC0,in/hr A= 1003 ac 0100 = 2799 Using Francis Formula (0=3 33LH' 5) solve for H Feb 20 06 01 56p CrystalCoastEngineering 910-325-0060 p 5 H 100 = 0 93 feet 9 DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV ) Assume pnmary spillway blocked (i a emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthern weir designed to pass 100 year storm Using broad crested weir equation H = (QlCw x L) 03 where Q = 0100 27 99 cfs Cw=30 Length = H = 0 21 feet 10 FOREBAY SIZING Compute Actual Pond Volumes (using average end method) Avg Incr Incr Cum Volume Elevatton Are) A E Depth (ED Vol (CF) Vol (CFI Main Bay Pond Bottom 3750 F78 ` 2 2fg 1,169 533 6,228 6 228 Bottom Veg Shelf '''42,83t dA 50 4,321, 3 790 167 6,329 12 557 Normal Pond Main Bay Volume = 12,557 CF Eorebay Volume Elevation Area Area ($E) Depth IFTI Vol (CQ Vol (CF) Pond Bottom Normal Pond 3850 34, 4450 1,130 582 600 3 492 3 492 Forebay Volume = 3 492 CF Total Pond Volume = 16,049 CF Forebay Volume equates to 218 % of Total Volume Temp SMragP Volume Elevation Area (SF) Area (SF Depth (FT) Vol (GFl Vol (QE) Normal Pond 4450 6,451 ; 46-510° 3,950 7 701 2 01 15,478 15,478 Temp Pond Level _ Temp Pool Volume = 15 478 CF 10 Yr Storage Volume Elevation ALea (SFl ALga.(5Q pgjAh (FTl Vol (CFI Vol (CFI Temp Pond Level 4651 8 950 Feb 20 06 01 56p CrystalCoastEngineering 910-325-0060 p 6 Temp Pond Level Temp Pool Volume = 100 Yr Storage Volume . Temp Pond Level Temp Pond Level Temp Pool Volume = 11 SUMMARY Pond Elevations - = 47 10 (157 9,504 085 8,101 a 101 8,101 CF Elevation Area 1SFl Area (SF 1 Depth (FT VQI_XID c� l (CFI 4651 8,950 t 4744 10164 9 557 093 8,855 8 B55 8,855 CF Top Berm (minimum) H= 0 21 100-Yr Flood H100= 093 10-Yr Flood HIO = 0 85 1-inch Storage storage depth = 2 01 Permanent Pool pond depth = 7 Pond Bottom 12 WET DETENTION BASIN SUPPLEMENT Basin Bottom Elevation 3750 Perm Pool Elevation 4450 Temp Pool Elevation 4651 Penn Pool Surface Area 6 451 SF Drainage Area 10 03 AC Impervious Area 4 14 AC Perm Pool Volume 16,049 CF Temp Pool Volume 15,478 CF Forebay Volume 3 492 CF SAIDA 1 4655 Diameter of Office 150 Relative Actual 1014 4764 994 47 44 (emerg weir elev) 986 4736 901 46 51 (primary weir elev) 700 44 50 (invert out elev) 0 a , 9!'S Feb 20 06 01 57p CrystalCoastEngineering 910-325-0060 p 8 P�H CAAO4 Design Calculations Stormwater Treatment Facilities L for f8148 Calvary Assembly of God Church - iocated in ';09 FNriti Onslow County O K NE`Ii' POND #2 1 PROJECT DESCRIPTION The Project consists of exist church school on a 13 6 acre tract and associated sdework 2 COMPUTE POND AREA REQUIRED a Compute Percent Impervious Impervious Areas On -Site Buildings On-Srte Streets On-Sde Parking On -Site Sidewalks Other on -site Off -site sub -Total J rt 60 472 x 7 994 Total 321 364 SF Y,� 0 SF If 41,304 SF { 5.798 SF E�jy3 0 0 0 68,466 SF FUTURE r Yl..ti SLAT .^xLx "F.vAe €= ��-< Q FUTURE(reserved) ..Y 0 0 1,000 1,000 SF 60 472 7,994 1 000 69,466 SF Total ' t, yy�. � "(.^^A j 9 y6..L...e ^ 103 743 SF Total Area Drainage to Pond Percent Impervious = 0 670 or 670 % b Compute Pond Surface Area Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming c�� ',r B,foot pond depth SA/DA = q r>u?4 % (interpolated) Therefore Surface Area = SAlDA x Drainage Area Feb 20 06 01 58p CrystalCoastEngineering 3 888 SF c Compute Minimum Pond Dimensions Assume rectangular shape with 3 1 Length (L) to Width (W) Ratio Length = 108 17 feet Width = 36 06 feet Site conditions, however, dictate irregular shaped pond Hydr Length = a M_ m feet so Hydr Width 27 7 feet (avg) Actual UW = 5 1 (irregular shape) 3 DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM Using Schuler "Simple Method" Rv = 0 05 + 0 009(I) where I = percent impervious Rv = 0 653 inhn Control Volume = Design Rainfall x Rv x Drainage Area Control Volume = 5,642 CF 4 DETERMINE REQUIRED STORAGE DEPTH Assume 3 1 side slopes solving for depth (d) by trial & error d= 131 5 DETERMINE ORIFICE SIZE u 910-325-0060 says: t3: SF say ": ` f+ CF Control Volume must be drawn down over a 2 day - 5 day penod Using onfice equation solve for Diameter (D) that results in 3-1/2 day period D = (Q 10 026 (h) ) s Where Q = (Control Volume / 3 5 days x 86,400 sec/day) 0 020 cfs h=d12 = 0 66 11 Feb 20 06 01 58p CrystalCoastEngineering 910-325-0060 p 10 Solving for D D = 097 Use= z °` .=I"QfA " pipe Actual Drawdown with actual drawdown pipe diameter (using orifice equation) Q= 0 021 cfs Draw Down Period = 3 30 days OK < 5 0 6 SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of 010 flow <1 0 feet Using Rational Formula (Q=CIA) where Cimper Cpery = A Ccum = 021 110 == s=` yOminlhr A= 238ac Q10 = 3 68 cfs Assuming 112 circumference is used as weir and using Francis Formula (0=3 33LH' S) to solve for L such that H = 1 0 L= Min Use 7 DETERMINE Q10 STAGE Q10= 1 10 Feet 24 inch diameter outlet structure 30 inch diameter outlet structure 3 68 cfs Using Francis Formula (0=3 331-1-1' 5) solve for H H10 = 0 43 feet 9 DETERMINE 0100 STAGE (ELEV OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA) where Ccum = 021 1100 = ty $iP inlhr A= 238ac 0100 = 417 Using Francis Formula (Q=3 33LH' S) solve for H Feb 20 06 01 58p CrystalCoastEngineering 910-325-0060 p 11 H100 = 0 47 feet 9 DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV ) Assume primary spillway blocked (i e , emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthem weir designed to pass too year storm Using broad crested weir equation H = (Q/Cw x L)23 where Q = 0100 4 17 cfs Cw=30 Length = : z `y `'+'20 feet H = 0 17 feet 10 FOREBAY SIZING Compute Actual Pond Volumes (using average end method) Incr Avg Incr Elevation re S Area (,5 Depth (FT) VVoL{CE) Man l Volume . ; >: 3fi Do " ' 662 42 33 2,25T, 1 410 433 6,103 Pond Bottom Bottom Veg Shelf . a 44'04 307Q 3 664 1 67 6,118 Normal Pond ," Man Bay Volume = Forebai Volume . Pond Bottom Normal Pond Forebay Volume = Total Pond Volume = Forebay Volume equates to Temp Storage Volume Normal Pond Temp Pond Level Temp Pool Volume = 10 YE Volume Temp Pond Level 12 221 CF CCu'm Vol ^C` ol F, 6 103 12,221 Flevatton Area (SFl Area (SF-D%p_tlb-CM VolC Vol (CFl 38 00 5Q 4400 <1,01a 533 600 3,198 3,198 3,198 CIF 15 419 CIF 20 7 %, of Total Volume Flevation Area (SF, e F j Depth (FT1 Vol.(.CE.) VOWM 4400 6 086 45 31b ' 7„55? 6 819 131 8 933 8,933 8 933 CIF Elevation Area (SF) Area ( Depth (ET I Voi.j Vol (CE) 4531 7,552 Feb 20 06 01 59p CrystalCoastEngineering 910-325-0060 p 12 Temp Pond Level Temp Pool Volume = 100 Yr 5toraae Volume Temp pond Level Temp Pond Level Temp Pool Volume = 11 SUMMARY 45 74- • 8;954 7 803 043 3,345 3,348 CF .f a4 Elevatto Area sF 1 SF D 'b-CM Ys QQ c il I'l I as 78 $; A02 7 827 047 3 651 3 651 3 651 OF Pond Elevations Top Berm (minimum) H= 0 17 100-Yr Flood 4100 = 0 47 10-Yr Flood H10= 043 1-inch Storage storage depth = 1 31 Permanent Pool pond depth = 6 Pond Bottom 12 WET DETENTION BASIN SUPPLEMENT Basin Bottom Elevation 3800 Perm Pool Elevation 4400 Temp Pool Elevation 4531 Perm pool surface Area 6 086 SF Drainage Area 2 38 AC 1 59 AC Impervious Area Perm Pool Volume 15 419 CF Temp Pool Volume 8 933 CF -I'l I Y°""" 3,198 CF Selma Actual 795 4595 778 45 78 (emerg weir elev) 774 4574 731 45 31 (primary weir elev) 600 44 00 (invert out elev) 0 Crystal Coast Engineering, PA 3817-3 Freedom Way Hubert, N C 28539 Tel (910) 325-0006 Fax (910) 325-0060 Email crystalooasteng@baec rt com January 26, 2006 Ms Rhonda Hall N C Division of Water Quality 127 Cardinal Drive Extension Wilmington, N C 28405 Re Stormwater Project No SW8 051110 Calvary Assembly of God Church (formerly Living Water Christian School) Onslow County Dear Ms Hall, We are in receipt of your Fax dated January 12, 2006 for the referenced project We provide the following information to allow you to continue the stormwater review (Item' numbers correspond to your onginal Fax) 1 Added note concerning roof drainage 2 Added note concerning wetlands 3 Revised Vicinity Map as requested Please note the name change on the drawings The new name, Calvary Assembly of God Church, should match the previously submitted Stormwater Application & Supplements which were sent 10/27/06 (copy attached) We are hopeful that this response addresses all concerns and that the permit can be issued in the near future Should you have questions or additional concerns, please feel free to contact me CRYSTAL COAST ENGINEERING P 1 * * COMMUNICATION RESULT REPORT ( SAN 12 2006 12 5OPM ) * TTI FILE MODE OPTION ADDRESS (GROUP) RESULT --------------------------------------------------------------------------------- 112 MEMORY TX 919103250060 OK REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER ) r --I * * NCDENR WIRO PAGE -------------- P 1/1 E-2) BUSY E-4) NO FACSIMILE CONNECTION Michael F Easley, Governor William G Ross, Jr, Secretary North Carolina Department of Environment and Natural Resources NII�Y Alan W KimeX, P E Director Division of Water Quality Date: January 12, 2006 To: David K. Newsom Company. Crystal Coast Eng FAX: 91032"060 FAX COVER SHEET No. of Pages: 1 From: Rhonda Hall Water Quality Section Stormwater Fax #. 910350.2004 Phone #- 910-706-7401 DWQ Stormwater Project Number: SWB 051110 Project Name: Living Water Christian School, Inc MESSAGE David The Wilmington Regional Office received a Stormwater Management Permit Application for LIvma Water r'hmfinn Q^knnl In, ..� o nnnc . _ , ATFq Michael F Easley, Governor QG William G Ross, Jr, Secretary North Carolina Department of Environment and Natural Resources 1 Alan W Klimek, P E Director dw Division of Water Quality Date January 12, 2006 To David K Newsom Company Crystal Coast Eng FAX 910-325-0060 FAX COVER SHEET No of Pages 1 From Rhonda Hall Water Quality Section Stormwater Fax # 910-350-2004 Phone # 910-796-7401 DWQ Stormwater Project Number SW8 051110 Project Name Living Water Christian School, Inc MESSAGE David The Wilmington Regional Office received a Stormwater Management Permit Application for Living Water Christian School, Inc on November 3, 2005 A preliminary review of that information has determined that the application is not complete The following information is needed to continued the stormwater review 1 Please add a note to the plans that all roof drainage must be directed to the forebay of the proposed ponds 2 Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist 3 Please add the nearest intersection of two major roads to the vicinity map A major road is any 1, 2, or 3 digit NC, US or interstate highway ENB\rbh S\WQS\STORMWAT\ADDINFO\2006\051110 jan06 North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer Servicel 877-623-6748 9 Wilmington Regional Office Wilmington NC 28405 3845 FAX (919) 733 2496 Internet h2o enrstate nc us , �°�C ,Carolina vatttratty An Equal Opportunity/Affirmative Acton Employer — 50%Recycled/10%Post Consumer Paper JOHN L PIERCE & ASSOCIATES, P A LAND SURVEYING -LAND PLANNING - MAPPING PO Box 1685 409 Johnson Blvd Jacksonville NC 28541 Office (910)346-9800 Fax No (910) 346-1210 TO Ms Linda Lewis N C Department of Environment dLid Natural Resources 127 Cardinal drive Extension Wilmington, NC 28405 WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ COPY OF LETTER ❑ PRINTS ��pv\ \ letter of transmittal DATE JOB NO October 31, 2005 ATTENTION Linda Lewis Bi Living Water Christian School Inc ❑ UNDER SEPARATE COVER VIA ❑ PLANS ❑ SAMPLES ❑ CHANGE ORDER ❑ THE FOLLOWING ITEMS SPECIFE'ATIONS COPIES DATE NUMBER DESCRIPTION 2 Stormwater Plan (Parking Lot Expansion 1 Cover letter from Engineer Revised li / NOV 5 THESE ARE TRANSMITTED as checked below ❑ For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ For bids due ❑ Prints returned after loan to us REMARKS SIGNED Crystal Coast Engineering, PA 3817-3 Freedom Way Hubert, N C 28539 Tel (910) 325-0006 Fax (910) 325-0060 Email crystalcoasteng@b¢ec rr com October 27, 2005 RECEIVED Ms Linda Lewis N C Division of Water Quality NOV 0 3 2005 127 Cardinal Dnve Extension Wilmington, N C 28405 DWQ �ROJ # Re Living Water Christian School, Inc Onslow County Dear Ms Lewis, We are in receipt of your FAX dated October 19, 2005 for the referenced project We provide the following information to allow you to continue the stormwater review (item numbers correspond to your original FAX) Drainage area delineation attached It is the proposed parking lot expansion which is tnggenng stormwater water requirements In my opinion however, protect name should be "Living Water Christian Church" as the stormwater plan accommodates the entire property, including the existing buildings as well as the proposed parking lot I have changed the project name on the Application and Supplements to reflect this The Title Block on the construction drawings already reflect this protect name We are hopeful that this response addresses all concerns and that the permit can be issued in the near future Should you have questions or additional concerns, please feel free to contact me CRYSTAL COAST ENGINEERING PA cc John L Pierce & Associates Calvary Assembly of God Parking Lot Exp aka Living Water Christ Subject Calvary Assembly of God Parking Lot Exp aka Living Water Christian School From Linda Lewis <hnda lewis@ncmatl net> Date Wed, 19 Oct 2005 16 32 18 -0400 To Betty Bullock <bettybjlp@blzec rr com> John/Betty The Division received an incomplete stormwater application for the subject project on October 12, 2005 The application cannot be accepted for review until the following items are provided/addressed 1 Delineate the drainage area to each pond 2 The calculations are titled for Living Water Christian School, but the application says a Parking Lot expansion What is the correct project name to be put on the permit's Linda I of 1 10/19/2005 4 34 PM JOHN L PIERCE & ASSOCIATES, PA RECEIVE LAND SURVEYING -LAND PLANNING - MAPPING OCT 1 2 2005 PO Box 1685 409Johnson Blvd Jacksonville NC 28541 Office (910)346-9800 Fax No (910) 346-1210 V TO Ms Linda Lewis N C Department of Environment esources 127 Cardinal Drive Extension Wilmington, NC 28405 WE ARE SENDING YOU ❑ DRAWINGS ❑ ATTACHED ❑ COPY OF LETTER ❑ PRINTS ❑ CHANGE ORDER DATE JOB NO October 10, 2005 ATTENTION Linda Lewis RE Calvary Assembly of God Church Inc Parking Lot Expansion ❑ UNDER SEPARATE COVER ❑ PLANS THE FOLLOWING ITEMS ❑ SAMPLES SPECIf[F§ATIONS COPIES DATE NUMBER DESCRIPTION 2 Sets of plans 2 Sets of Stormwater a lications narratives & design calculations 1 Check in the amount of 420 00 THESE ARE TRANSMITTED as checked below ❑ For approval ❑ For your use ❑ As requested ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ For review and comment ❑ For bids due ❑ Prints returned after loan to us REMARKS Should you need any additional information, please let us know, SIGNED Stormwater Treatment & Erosion Control Narrative Calvary Assembly of God Church, Inc Calvary Assembly of God Church Inc (Formerly Living Water Christian School, Inc ) proposes to construct a new building and expand their existing parking lot on their 20 05 acre tract located on Gum Branch Rd in the Jacksonville Township, Onslow County, N C Existing structures include two large buildings (a school and a gymnasium), several small sheds an outdoor covered area, parking and sidewalks The expansion includes a 9,000 sf building, 63,550 sf of additional parking and 4,909 sf of new sidewalks The ponds are sized as to accommodate the proposed expansion as well as future improvements which are estimated to include as much as 94,436 sf of impervious surfaces The project site is located approximately 0 22 miles from an UT of New River (C,NSW) in the White Oak Basin The proposed development activities are high density (percent impervious > 25 %), therefore, stormwater treatment facilities are required The attached Stormwater Plan includes two stormwater ponds, each sized to accommodate all proposed and anticipated impervious surfaces within each ponds respective drainage area The proposed ponds are sized for 90% TSS removal The ponds do not incorporate pretreatment, other than the forebays The ponds do not include vegetated filters at the outlet All stormwater emanating from new impervious surfaces that is generated on -site shall be collected and directed to the front of the site by a system of sheet drainage, grassed swales and storm drainage pipes The treatment system will require periodic maintenance Maintenance frequency shall be dictated by pond depths Pond depths shall be checked by the owner on a quarterly basis Site topography is generally gently sloping (0 — 6%) with the lowest elevations towards the southwesterly boundary of the tract Soils are loamy sand/sandy loam The entire area designated within "Clearing Limits" will be disturbed during initial construction, and will include grading for parking, swales and storm drainage -RECEIVED OCT 12 2005 DWQ VROJ# Design Calculations Stormwater Treatment Facilities for Living Water Christian School located in Onslow County P_(A CAROB''. �O - SSrOti ��,-; 9� EAL 8143 cINEF'?' i0 K NEN ''> POND #1 1 PROJECT DESCRIPTION (�( The Project consists of exist church/school on a 13 6 acre tract and associated sdework 2 COMPUTE POND AREA REQUIRED a Compute Percent Impervious Impervious Areas On -Site Buildings On -Site Streets On -Site Parking On -Site Sidewalks Other on -site Off -site Sub -Total FUTURE FUTURE(reserved) Total Total Area Drainage to Pond Percent Impervious = b Compute Pond Surface Area Existing Proposed Future Total _>34 T, _ >t3QQ 30,9£r#` 42,921 SF it'' Ei ;iI 0SF i`1�54f <r$S6 s3,985 120,880 SF "2,tf39 - 0, 4,90$ 11 689 SF 0 i3 m ut# U 0 17,589 69 465 88,436 175,490 SF -- 0 0 0 5,000 5,000 SF 17,589 69,465 93,436 180 490 SF 0 413 or 413 % 436,926 SF Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming 7 foot pond depth SA/DA = mYr sy % (interpolated) Therefore Surface Area = SA/DA x Drainage Area a 6,403 SF say $,460SF c Compute Minimum Pond Dimensions Assume rectangular shape with 3 1 Length (L) to Width (W) Ratio Length = 139 10 feet Width = 46 37 feet Site conditions, however, dictate irregular shaped pond Hydr Length = 150_4 feet so, Hydr Width 42 9 feet (avg) Actual LIW = 3 5 (irregular shape) 3 DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM Using Schuler "Simple Method" Rv = 0 05 + 0 009(I) where I = percent impervious Rv = 0 422 in/in Control Volume = Design Rainfall x Rv x Drainage Area Control Volume = 15,357 CF say o 't5,5Q0 CF 4 DETERMINE REQUIRED STORAGE DEPTH Assume 3 1 side slopes solving for depth (d) by trial & error d= 202 5 DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day - 5 day penod Using onfice equation, solve for Diameter (D) that results in 3-1/2 day period D=(Q/0026(h)e)e Where Q = (Control Volume / 3 5 days x 86,400 sec/day) 0 051 cfs h=d/2 = 1 01 Solving for D D = 1 40 Use ° ;q#) pipe Actual Drawdown with actual drawdown pipe diameter (using orifice equation) Q= 0 059 cfs Draw Down Period = 3 05 days OK < 5 0 6 SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of Q10 flow <1 0 feet Using Rational Formula (Q=CIA) where Cimper = Cperv=<< 0 Ccum = 033 110 =' ? in/hr A= 1003ac Q10 = 24 70 cfs Assuming 1/2 circumference is used as weir and using Francis Formula (Q=3 33LH' S) to solve for L such that H = 1 0 L= Min Use 7 DETERMINE Q10 STAGE 7 42 Feet 60 inch diameter outlet structure 72 inch diameter outlet structure Q 10 = 24 70 cfs Using Francis Formula (Q=3 331-1-1' S) solve for H H 10 = 0 85 feet 8 DETERMINE Q100 STAGE (ELEV OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA) where Ccum = 033 I100 = ;, r-,m'W in/hr A = 10 03 ac Q100 = 2799 Using Francis Formula (Q=3 33LH' S) solve for H H 100 = 0 93 feet 9 DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV ) Assume primary spillway blocked (i e , emergency spillway to accommodate 0100) Emergency spillway shall be a broad crested earthem weir designed to pass 100 year storm Using broad crested weir equation H = (Q/Cw x L)213 where Q = Q100 27 99 cfs Cw=30 Length = 3(W feet H = 0 21 feet 10 FOREBAY SIZING Compute Actual Pond Volumes (using average end method) Main Bay Volume Pond Bottom Bottom Vag Shelf Normal Pond Main Bay Volume = Forebay Volume Pond Bottom Normal Pond Forebay Volume = Total Pond Volume = Forebay Volume equates to Imp, Storage Volume Normal Pond Temp Pond Level Temp Pool Volume = 10 YE Storage Volume Temp Pond Level Avg Incr Incr Cum Elevation Area (SF) Area (SF) Depth (FT Vol(CF) CF 37 50 78 42.83 2,250 1,169 533 6,228 6,228 44 50 5,321 3,790 167 6,329 12,557 12 557 CF Elevation re Area (SF 1 Depth (FT) Vol (CF) Vol (CF) 3850 34 4450 1,130 582 600 3,492 3 492 3,492 CF 16 049 CF 21 8 % of Total Volume Elevation Are SF Depth (FT) Vol (CF l CF 4450 6 451 46 51 8,060 7,701 201 15,478 15,478 15 478 CF Elevation Are Area (SF) Depth (FT 1 VgL(CF) Vol (CFI 4651 8,950 Temp Pond Level Temp Pool Volume = 100 Yr Storage Volume Temp Pond Level Temp Pond Level Temp Pool Volume = 11 SUMMARY Pond Elevations Top Berm (minimum) 100-Yr Flood 10-Yr Flood 1-inch Storage 4736 10,067 9 504 085 8,101 8 101 8 101 CF Elevation Area (SF) Area (SF) Depth (FT) Vol (CF) VolC 4651 8,950 4744 10,164 9,557 093 8 855 8,855 8,855 CF H= 0 21 H100 = 0 93 H10= 065 storage depth = 2 01 Permanent Pool pond depth = 7 Pond Bottom 12 WET DETENTION BASIN SUPPLEMENT Basin Bottom Elevation 3750 Perm Pool Elevation 4450 Temp Pool Elevation 4651 Perm Pool Surface Area 6 451 SF Drainage Area 10 03 AC Impervious Area 4 14 AC Perm Pool Volume 16 049 CF Temp Pool Volume 15 478 CF Forebay Volume 3,492 CF SA/DA 14655 Diameter of Orifice 1 50 Relative Actual 10 14 4764 994 47 44 (emerg weir elev) 986 4736 901 4651 (primary weir elev) 700 4450 (invert out elev) o <, 37,"50 Design Calculations Stormwater Treatment Facilities for Living Water Christian School located in Onslow County POND #2 1 PROJECT DESCRIPTION CAR O� F ssf�n �^^✓ - The Project consists of exist church/school on a 13 6 acre tract and associated sdework 2 COMPUTE POND AREA REQUIRED a Compute Percent Impervious Impervious Areas On -Site Buildings On -Site Streets On -Site Parking On -Site Sidewalks Other on -site Off -site Sub -Total FUTURE FUTURE(reserved) Total Total Area Drainage to Pond Percent Impervious = b Compute Pond Surface Area ExistingProposed Euture Total 21,364 SF 0 SF O, 41 304 SF f1 ; ID, 5,798 SF {I 0 t 0 60,472 7,994 0 68,466 SF 0 0 1,000 1,000 SF 60,472 7,994 1,000 69,466 SF 0 670 or 670 % 103 743 SF Using Surface Area to Drainage Area Ratio Chart for 90% TSS Removal (copy attached) and assuming _ N' _, c x foot pond depth SA/DA = ZJ,18 % (interpolated) Therefore Surface Area = SA/DA x Drainage Area 3,888 SF say a ,°3,9QD SF c Compute Minimum Pond Dimensions Assume rectangular shape with 3 1 Length (L) to Width (W) Ratio Length = 108 17 feet Width = 36 06 feet Site conditions, however dictate irregular shaped pond Hydr Length = ' iz a< I f4f,U feet so Hydr Width 27 7 feet (avg) Actual L/W = 5 1 (irregular shape) 3 DETERMINE VOLUME TO BE CONTROLLED FROM 1" STORM Using Schuler "Simple Method" Rv = 0 05 + 0 009(I) where I = percent impervious Rv = 0 653 in/in Control Volume = Design Rainfall x Rv x Drainage Area Control Volume = 5 642 CF say �,Qati CF 4 DETERMINE REQUIRED STORAGE DEPTH Assume 3 1 side slopes solving for depth (d) by trial & error d= 131 5 DETERMINE ORIFICE SIZE Control Volume must be drawn down over a 2 day - 5 day period Using onfice equation, solve for Diameter (D) that results in 3-1/2 day period D=(Q/0026(h)s)e Where Q = (Control Volume / 3 5 days x 86,400 sec/day) = 0 020 cfs h=d/2 = 0 66 Solving for D D= 097 Use `ll0"pipe i Actual Drawdown with actual drawdown pipe diameter (using orifice equation) Q= 0 021 cfs Draw Down Period = 3 30 days OK, < 5 0 6 SELECT OUTLET STRUCTURE DIAMETER Size outlet structure such that depth of Q10 flow <1 0 feet Using Rational Formula (Q=CIA) where Cimper = Cpery = f! F Ccum = 021 110= µF, 750,in/hr A= 238ac Q10 = 3 68 cfs Assuming 1/2 circumference is used as weir and using Francis Formula (Q=3 33LH' 5) to solve for L such that H = 1 0 L= Min Use 7 DETERMINE Q10 STAGE Q10= 1 10 Feet 24 inch diameter outlet structure 30 inch diameter outlet structure 3 68 cfs Using Francis Formula (Q=3 33LH' 5) solve for H H 10 = 0 43 feet 8 DETERMINE Q100 STAGE (ELEV OF EMERGENCY SPILLWAY) Using Rational Formula (Q=CIA) where Ccum = 021 1100 = , '" f&O-in/hr A = 2 38 ac Q100 = 417 Using Francis Formula (Q=3 33LH'') solve for H H 100 = 0 47 feet 9 DETERMINE Q100 STAGE OVER EMERGENCY SPILLWAY (TOP BERM ELEV ) Assume primary spillway blocked (i a, emergency spillway to accommodate Q100) Emergency spillway shall be a broad crested earthem weir designed to pass 100 year storm Using broad crested weir equation H = (Q/Cw, x L)23 where Q = Q100 4 17 cfs Cw=30 Length= k "20,feet H = 0 17 feet 10 FOREBAY SIZING Compute Actual Pond Volumes (using average end method) Avg Incr Incr Cum Main Bay Volume Elevation Area Area (SF) Depth (FT)Vol (CF) Vol (CF) Pond Bottom 38 OQ 602 Bottom Veg Shelf 4233 2,257 1,410 433 6,103 6,103 Normal Pond 4400 5,070 3,664 167 6,118 12221 Main Bay Volume = 12,221 CF Forebay Volume do Area (SQ Area (SQ Depth (FT 1 Vol (CFI Vol (CF) Pond Bottom 3800 60 Normal Pond 4400 1,016 533 600 3,198 3,198 Forebay-Volume = 3,198 CF Total Pond Volume = 15,419 CF Forebay Volume equates to 207 % of Total Volume Temp. Storage Volume. Elevation Area (SF) Area De tho (FT I Vol (CFI Vol (CF) Normal Pond 4400 6,086 Temp Pond Level 46.31 7,562 6,819 1 31 8,933 8,933 Temp Pool Volume = 8,933 CF 10 YE Storage Volume Elevation Area (SF) Area (SF l Depth (FT) Vol (CF) Vol (CF) Temp Pond Level 4531 7,552 Temp Pond Level Temp Pool Volume = 100 Yr Storage Volume Temp Pond Level Temp Pond Level Temp Pool Volume = 11 SUMMARY Pond Elevations 4514 8,454 7,803 043 3 348 3,348 3,348 CF Elevation Area (SF Area (SF) Depth (FT) Vol (CF Vol (CF) 4631 7,552 4578 8,1021 7 827 047 3,651 3,651 3,651 CF Top Berm (minimum) H= 017 100-Yr Flood H100 = 0 47 10-Yr Flood H10= 043 1-inch Storage storage depth = 131 Permanent Pool pond depth = 6 Pond Bottom 12 WET DETENTION BASIN SUPPLEMENT Basin Bottom Elevation 3800 Perm Pool Elevation 4400 Temp Pool Elevation 4531 Perm Pool Surface Area 6,086 SF Drainage Area 2 38 AC Impervious Area 1 59 AC Perm Pool Volume 15,419 CF Temp Pool Volume 8,933 CF Forebay Volume 3,198 CF SAIDA 3 748 Diameter of Orifice 1 00 Relative 795 Actual 4595 778 45 78 (emerg weir elev) 774 4574 731 45 31 (primary weir elev) 600 44 00 (invert out elev) 0 -3&04