Loading...
HomeMy WebLinkAboutSW8051045_HISTORICAL FILE_20190401STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO SW8 051045 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS EX HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE ZO19 014 U l YYYYMMDD / ROY COOPER Governor MICHAEL S REGAN Secretary S DANIEL SMITH Interim Director April 1 2019 NORTH CAROLINA Environmental Quality KG Plaza, LLC Ann Mr Jack J Carlisle, Manager 8620 River Road Wilmington, NC 28412 Subject Permit Modification and Request for Permit Renewal State Slormwater Management Permit No SW8 051045 The Reserve at Palmetto Creek High Density Subdivision Project Brunswick County Dear Mr Carlisle The Wilmington Regional Office received a complete modified State Stormwater Management Permit Application for the subject project on March 28 2019 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A \'CAC 2H 1000 effective January 1, 2017 We are forwarding modified Permit No SW8 051045 dated April 1, 2019, for the construction, operation and maintenance of the stormwater control measures (SCMs) built - upon areas, as well as the stormwater collection system and/or vegetated conveyance system associated with the subject project Please replace the previously approved plan sheets with the attached modified and approved versions Please replace the previous application documents with the enclosed versions/ electing this modification Permit Modification The following modifications are included and covered by this permit 1 Pond 1 This pond was previously permitted under the 1995 rules, and it has been redesigned under the 2017 rules because the impervious area increased It has also been reallocated as summarized in Attachment C 2 Ponds 2 and 3 The impervious area in Pond 2 was reallocated as summarized in Attachment C, but the previously -permitted total did not increase there was no change to Pond 3 Request for Permit Renewal This permit shall be effective from the date of issuance until April 21, 2020 A renewal application is to be submitted six months prior to that date which is October 21, 2019 Please submit the renewal application in the near future It shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required Please pay special attention to the permit conditions regarding the operation and maintenance of the SCMs, stormwater collection system, and/or vegetated conveyances, the limitation of built upon area, modification of the project the procedures for changing ownership of and/or transferring the permit, and the need to renew the permit Please also pay attention to the permit conditions that requires the recordation of deed restrictions and protective covenants, easements, and the maintenance agreement, which must all be provided along with certification upon completion of the project Failure to comply with these requirements will result in future compliance problems if any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH) The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431 3000 or visit their websrte at www NCOAH corn Unless such demands are made this permit shall be final and binding ®� North Carolina Department of Environmental Quality I Division of Energy Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington North Carolina 28405 rvamNcumurv. ` —� 9107967215 State Storm water Permit \c SWS 051045 Page 2 of 2 If you have any questions or need additional information concerning this matter please contact Kelly Johnson in the Wilmington Regional Office at (910) 796-7215 Sincerely Da,nI& th, Interim Director Division of Energy Mineral and Land Resources enclosures Attachment A Certification Forms for Pond 2 and 3 Attachment B Certification Form for Pond 1 Attachment C Impervious Allocation Summary Application Documents GDS/kpl \\\Stormwater\Permits & Projects\2005\051045 HD\2019 04 permit 051045 cc Mr Phil Trill PE, Tripp Engineering 419 Chestnut Street Wilmington NC 28401 Inspector Brunswick County Building Inspections Brunswick County Engineering Wilmington Regional Office Stormwater File STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143 General Statutes of North Carolina as amended and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO KG Plaza, LLC The Reserve at Palmetto Creek Palmetto Creek Way, Bolivia, Brunswick County FOR THE construction, operation and maintenance of three wet detention ponds in compliance with the provisions of 15A NCAC 2H 1000 effective September 1, 1995 (Ponds 2 and 3) and 15A NCAC 2H 1000 effective January 1 2017 (Pond 1) (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy Mineral and Land Resources (DEMLR) and considered a part of this permit This permit shall be effective from the date of issuance until April 21, 2020 and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 1 5 of this permit 3 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The following design elements have been permitted for the wet detention pond stormwater facilities and must be provided in the systems at all times Design Criteria Pond #1 Pond #2 Pond #3 a Drainage Area acres Onsile ft2 Offsite W 853 371 715 None 1583 689 745 None 1056 460 070 None b Total Impervious Surfaces ft2 (See Attachment C) 237 076 320,310 l 181 312 c Design Storm inches 1 5 10 1 0 d Pond Depth feet 5 5 5 e TSS removal efficiency 90 90 90 f Permanent Pool Elev FMSL 370 300 220 g Perm Pool Surface Area ft2 46 054 51 690 14 219 h Permitted Storage Volume ft3 53437 53 108 21 226 i Temporary Storage Elev FMSL 380 31 0 2335 l Controlling Or face 0 pipe l!ed 25 20 20 k Perm Forebay Volume ft3 31,365 52 073 9 189 I Receiving Stream/River Basin UT to Lockwoods Folly R / Lumber m Stream Index Number 15 25 1 (11 n Classificaton of Water Body Sc o Max horsepowerfor afountain 3/4 _ 3/4 1/6 II SCHEDULE OF COMPLIANCE 1 No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division 2 The permittee Is responsible for verifying that the proposed built -upon area for the entire lot Including driveways and sidewalks, does not exceed the allowable built -upon area Once the lot transfer Is complete, the built -upon area may not be revised without approval from the DEMLR, and responsibility for meeting the built -upon area limit Is transferred to the Individual property owner 3 If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit the plans reviewed must include all proposed built -upon area Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit 4 The permlttee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to the approved plans, regardless of size b Protect name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area e Further subdivision acquisition, or sale of all or part of the project area The protect area is defined as all property owned by the permlttee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan The Director may determine that other revisions to the protect should require a modification to the permit 1 6 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made 7 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 8 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 9 Upon completion of construction, prior to issuance of a Certificate of Occupancy and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification 10 If the stormwater system was used as an Erosion Control device it must be restored to design condition prior to operation as a stormwater treatment device and prior to occupancy of the facility 11 Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 12 Prior to the sale of any lot, the following deed restrictions must be recorded a The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 051045 as issued by the DEMLR under NCAC 2H 1000 b The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit c These covenants are to run with the land and be binding on all persons and parties claiming under them d The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina DEMLR e Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the DEMLR f The maximum built -upon area per lot is as follows Single Family, Lots 1-60 4 000sf/lot Townhomes, Lots 1-86 3,416sf/lot This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt concrete, gravel brick stone slate coquina and parking areas but does not include raised, open wood decking, or the water surface of swimming pools g Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations h All runoff from built upon area on the lot must drain into the permitted system This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street or grading perimeter swales and directing them into the pond or street Lots that will naturally drain into the system are not required to provide these measures Built -upon area in excess of the permitted amount will require a permit modification 13 A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots The recorded copy must contain all of the statements above the signature of the Permittee, the deed book number and page and the stamp/signature of the Register of Deeds 14 Wet Pond Fountain a Decorative spray fountains are allowed in the pond subject to the following criteria i The minimum permanent pool volume is 30 000 cubic feet u The fountain must draw its water from less than 2 below the permanent pool surface ui Separated units where the nozzle pump and intake are connected by tubing may be used only if they draw water from the surface in the deepest part of the pond IV The fountain may not be placed into the forebay v The falling water from the fountain must be centered in the main pond away from the shoreline vi The maximum horsepower for a fountain in this pond is HP horsepower b Decorative spray fountains will not be allowed in the stormwater treatment system, as the permanent pool volume is less than 30 000 cubic feet c Decorative spray fountains will not be allowed in the stormwater treatment system until calculations are provided documenting the permeant pool volume is greater than 30,000 cubic feet 15 Prior to transfer of the permit, the stormwater facilities will be inspected by DI-Ml,R personnel The facility must be in compliance with all permit conditions Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required 16 The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at design condition The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of side slopes d Immediate repair of eroded areas e Maintenance of side slopes in accordance with approved plans and specifications f Debris removal and unclogging of structures orifice, catch basins and piping g Access to all components of the system must be available at all times 17 Records of maintenance activities must be kept and made available upon request to authorized personnel of DEMLR The records will indicate the date, activity, name of person performing the work and what actions were taken 18 The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division 19 Built upon area includes, but is not limited to, structures, asphalt, concrete gravel, brick stone, slate coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools III GENERAL CONDITIONS 1 This permit is not transferable to any person or entity except after notice to and approval by the Director The permittee shall submit a completed and signed Permit Transfer Application accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events a Any ownership change including (Red text is for subdivisions only ) i The assignment of declarant rights to another individual or entity u The sale or conveyance of the common areas to a Homeowner's or Property Owners Association subject to the requirements of Session Law 2011-256 ni The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants iv Dissolution of the partnership corporate or LLC entity subject to NCGS 55-14- 05 or NCGS 57D-6-07, b Bankruptcy, c Foreclosure subject to the requirements of Session Law 2013-121 2 The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request 3 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the DEMLR, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 4 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local state and federal) which have jurisdiction 5 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 6 The permit may be modified revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Permittee grants permission to staff of the DEMLR to access the property for the purposes of inspecting the stormwater facilities during normal business hours 8 The permittee shall notify the Division of any name ownership or mailing address changes within 30 days 9 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 10 The permittee shall submit a completed Permit Information Update form to the Division at least 30 days prior to making any one or more of the following changes a A name change of the current permittee, b A name change of the project, c A mailing address change of the permittee, 11 The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request Neither the sale of the project in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit 12 The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification transfer renewal, or rescission however these actions do not stay any permit conditions Permit modified and reissued this the 151 day of April 2019 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 7-S Daniel Smith, Interim Director Division of Energy Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 051045 Attachment A Certification Form for Ponds 2 & 3 The Reserve at Palmetto Creek Page 1 of 2 Stormwater Permit No SW8 051045 Brunswick County Designer's Certification I, as a duly registered in the State of North Carolina having been authorized to observe (periodically/weekly/full time) the construction of the protect (Protect) for (Protect Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the protect construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form are a part of this Certification Noted deviations from approved plans and specifications SEAL Signature Registration Number Date Certification Requirements Page 2 of 2 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built - upon area 3 All the built -upon area associated with the protect is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short-circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided such as a vegetated shelf, a forebay, and the vegetated filter 15 The required dimensions of the system are provided, per the approved plan cc NCDEQ-DEMLR Regional Office Brunswick County Engineering Attachment 13 CGrtific ition Forms for Pond 1 I he following blank Dcstgncr Cerhficatton forms are included and spcwlic for this project • As -Built Permittee Certification • As -Built Designers Certification General MDC • As -Built Designers Certification for Wet Detention Pond Project A sepal ate certification is requiredfor each SCM I hose blank certification forms maybe copied and used as needed, for each SCM and/or as a pat nal certification to adds ess a section or phase of the project State Stormwater \lanagcmcnt Systuns Pcrmii \o SW8 051045 AS-13111 1 PI Rill) f I LF CLR I [FICA I ION —POND 1 I hcrcby state that I am the current permutce for the project named above and I certify by my signature below, that the project meets the below listed final Submittal Requirements found in \CAC 0211 1042(4) and the terms conditions and provisions listed in thepermn documents plans and specifications on file with or provided to the Division ❑ Check here if this is a partial certification Secuon/phasc/SCM 4? ❑_Chc`cc here ifthis is part of a Fast I rack As -built Package Submittal Printed County of Signature a \otary Public in the State of do hcrcby certifv that personally appeared before me this day of 20 and acknowledge the due execution of this as built certification (SEAL) Witness my hand and official seal My commission expires Permrttee s Certification NCAC 1042(4) CoProvidedmpleted/ I N/A A DEED RESTRICTIONS / BUA RECORDS 1 The deed restrictions and protective covenants have been recorded Y or NK and contain the necessary language to ensure that the project is maintained consistent with the stormwater regulations and with the permit conditions 2 A copy of the recorded deed restrictions and protective covenants Y or N has been provided to the Division 3 Records which track the BUA on each lot are being kept (See Note Y or N 1 B MAINTENANCE ACCESS 1 The SCMs are accessible for inspection maintenance and repair Y or N 2 The access is a minimum of 10 feet wide Y or N 3 The access extends to the nearest public right-of-way Y or C EASEMENTS 1 The SCMs and the components of the runoff collection / conveyance Y or N system are located in recorded drainage easements 2 A copy of the recorded plat(s) is provided Y or IN D SINGLE FAMILY RESIDENTIAL LOTS - Plats for residential lots that Y or N have an SCM include the following 1 The specific location of the SCM on the lot Y or N 2 A typical detail for the SCM Y or N 3 A note that the SCM is required to meet stormwater regulations and that the lot owner is subject to enforcement action as set forth in Y or N NCGS 143 Article 21 if the SCM is removed, relocated or altered without prior approval E OPERATION AND MAINTENANCE AGREEMENT Y or N 1 The O&M Agreement is referenced on the final recorded plat Y or N Page 12 of 18 State Stormwater Management Systems Perm n\o SW8051045 2 The O&M Agreement is recorded with the Register of Deeds and appears to the chain of title I Y or \T F OPERATION AND MAINTENANCE PLAN — maintenance records are being kept to a known set location for each SCM and are available for Y or N review G DESIGNER'S CERTIFICATION FORM — has been provided to the Y or N Division \otel Acceptable records include ARC approvals, as built surveys, and county tax records Provide an explanetton for every rcqutrcmcnt that was not mct and for every "'QA' below Attach additional sheets as needed Page 13 of 18 State Stormwater %lanagemcnt Systems Permit No S\W051045 AS -BOIL I DESIGNE►2'S CER 1 I6ICA FJON GENERAL NIDC - POND 1 I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all duc cart and dingcncc and that the project meets the below listed General MDC found in NCAC 021I 1050 in accordance with the permit documents plans and specifications on file with or provided to the Division, except as noted on the ` AS-i3UIL I' drawings such that the intent of the stonnwater rules and statutes has been preserved ❑ Chcck here if this is a partial certification Section/phase/SCM f� �Z Fcc-. E�rc iiT tfiiT is a part of a fast- I rack As -Built Package Submittal pper 1044(3) Chcck here if the designer did not observe the construction but is certifving the project Check here if pictures of the SCM are provided Printed Name NC Registration Number Date SEAL Signature Consultant s Mailing Address City/State/LIP Phone Number Consultant s Email address 0 Circle N if the as -built value differs from the Plan IfN is circled, provide an explanation on Page 2 OO N/L = not evaluated (provide explanation on page 2) 3-N/A = not applicable to this SC v1 or project Consultant's Certification NCAC 1003((3) & General MDC Oz N/ OO As -built (IN/A 1050 E A TREATMENT REQUIREMENTS 1 The SCM achieves runoff treatment Y or N 2 The SCM achieves runoff volume match Y or N 3 Runoff from offsite areas and/or existing BUA is Y or N bypassed I 4 Runoff from offsite areas and/or existing BUA is directed Y or Nt into the permitted SCM and is accounted for at the full build -out potential 5 The project controls runoff through an offsite permitted Y or N SCM that meets the requirements of the MDC 6 The net area of new BUA increase for an existing project Y or N has been accounted for at the appropriate design storm level 7 The SCM(s) meets all the specific minimum design I y or N criteria B VEGETATED SETBACKS / BUA 1 The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW line of tidal waters, or the top of bank of each side of rivers or streams Page 14 of 18 State Stormwatci Management Systems PermitNo S` 8 051045 2 The vegetated setback is maintained in grass or other Y or \' vegetation meets the of NCGS 143-214 7 I y or N 2hat )(2s located the setback 4 BUA that does not meet the requirements of NCGS 143- Y or \ 214 7 (b2)(2) is located within the setback and is limited to a Publicly funded linear projects (road, greenway sidewalk) b Water -dependent structures c Minimal footprint uses (utility poles signs, security fighting and appurtenances 5 Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the setback as dispersed flow tOAs-built G / ON/A. C STORMWATER OUTLETS — the outlet handles the peak y N flow from the 10 year storm with no downslo a erosion or D VARIATIONS 1 A variation (alternative) from the stormwater rule Y provisions has been implemented or 2 The variation provides equal or better stormwater control y and equal or better protection of surface waters or E COMPLIANCE WITH OTHER REGULATORY PROGRAMS y N has been met or F SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required Y or N storm depth -- G CONTAMINATED SOILS — infiltrating SCM's are not Y or N located in or on areas with contaminated soils H SIDE SLOPES 1 Vegetated side slopes are no steeper than 3H 1 V Y or N 2 Side slopes include retaining walls gabion walls or y or N other surfaces that are steeper than 3H 1 V 3 Vegetated side slopes are steeper than 3H 1 V (provide Y or \ supporting documents for soils and vegetation) I EROSION PROTECTION 1 The inlets do not cause erosion in the SCM Y or N 2 The outlet does not cause erosion downslope of the y or N discharge point during the peak flow from the 10 year storm J EXCESS FLOWS — An overflow / bypass has been y N provided or K DEWATERING —A method to drawdown standing water has Y or N been provided to facilitate maintenance and inspection L CLEANOUT AFTER CONSTRUCTION — the SCM has been Y or N cleaned out and converted to its approved design state M MAINTENANCE ACCESS 1 The SCM is accessible for maintenance and repair Y or IN 2 The access does not include lateral or incline slopes y or N >3 1 N DESIGNER QUALIFICATIONS (FAST -TRACK PERMIT) — The designer is licensed under Chapters 89A 89C, 89E, or Y or N 89F of the General Statutes Provide an explanation for every A4DC that was not met and for every item marked 'N/A or "\/E" below Attach additions( pages as needed Page 15 of 18 Statc Stormwater Management Systems PermitAo SW8051045 AS-13UIL 1 DTSIGN I R'S Cl R 1 [FICA I iON I,OR WE 1 DT, 11 \ I [ON POND PRO ICC 1 Pond 1 I hereby state that I am a licensed professional and I certify by my signature and seal below that I have observed tht, construction of the project named above to the best of my abilmcs with all duc care and diligence and that the project meets all of the MDC found in N'CAC 02I 11053 in accordance with the permit documents plans and specifications on file with or provided to the Division except as noted on the ` AS -BULL P drawings, such that the mtcnt of the stormwater rules and the general statutes has been preserved ❑ Chcck hcrc if this is a partial ccrtiftcation Section/phasc/SCM �v TER —here iTtfiis is part of a fast -track As -Built Package Submittal per 1044(3) Chcck here if thc, Dcsigncr did not observe the construction but is certifying the project Chcck here if pictures of the SC%M are provided Printed Name NC Registration SEAL Signature Consultant's Mailing Address City/State/ZIP Phone \umber Consultant's Email address O Circle N if the as -built value differs from the Pla permit IfN is mrcicd provide an explanation on page 2 ONX, = not evaluated (provide explanation on page 2) ON/A = not applicable to this project or SCM I his Certification must be completed in conjunction with the Gencral MDC certification under NCAC 02H 1050 Consultant's Certification (MDC 1053) iOAs-built ON/E ON/A A Forebay / Depths / Fountain 1 The available Sediment storage is consistent with the y , approved plan and is a minimum of 6 in or i 2 Water flow over the forebay berm into the main pond y NI 1 occurs at a non -erosive velocity or 3 The provided Forebay Volume is 15%-20% of the main y N pool volume or 4 The Forebay entrance elevation is deeper than the exit Y 'Nelevation into the and or 5 The Average Design Depth of the main pond below the permanent pool elevation is consistent with the permitted Y or value? 6 Fountain documentation is provided Y or IN B Side slopes / Banks / Vegetated Shelf awidth of the Vegetated Shelf is consistent with the y N approved plans and is a minimum of 6 feet or 2 The slope of the Vegetated Shelf is consistent with the y N,a roved plans and is no steeper than 6 1 or C As -built Main Pool / Areas / Volumes I Elevations 1 The permanent pool surface area provided is consistent y NI thepermitted value or Page 16 of 18 State Stormwater Dianagcment Systems I'crinit\o SW8051045 2 The Temporary Pool Volume provided is consistent with the permitted value t r 3 The permanent pool elevation is consistent with the I Y N permitted value or 4 The temporary pool elevation is consistent with the } permitted value or OAs-built ON/E ON/A D Inlets / Outlet / Drawdown 1 The design volume draws down in 2-5 days Y or N 2 The size of the Orifice is consistent with the permitted Y N I� value or 3 A trash rack is provided on the outlet structure Y or IN 4 Hydrologic impacts to the receiving channel are minimized Y N from the 1 T 24 hr storm discharge? or 5 The inlets and the outlet location are situated per the Y \ approved plan and avoid short-circuiting or E Vegetation 1 The vegetated shelf has been planted with a minimum of 3 I Y N diverse species or 2 The vegetated shelf plant density is consistent with the approved plans and is no less than 50 plants per 200 sf or Y or N no less than 24 inches on center Provide an explanation for every MDC that was not met and for every item marked N/A or N/E below Attach additional pages as ncedcd Page 17 of 18 State Stormwatcr Vlanagcnunt Systuns Permit \o S\i8 051045 Utachment C imncntous Allocitton Summan Pond 1 Pond 2 Pond 3 Permit 4/21/06 & 10/15/18 4/1/2019 Permit 4/21/06 & 10/13/18 4/1/2019 Permit 4/21/06, 10/15/18, & 4/1/19 Impervious 194,129 237,076 320,310) 320,310 181,312 Onsite Buildings 109,988 181,173 211,100 224,320 140,000 Onsite Streets/Parking 72,794 47,247 97,756 75,721 37,282 Onsite Sidewalks 0 8,656 0 19,243 4,030 Other Onsite 11,347 0 11,454 0 0 Future 0 0 0 1,026 0 Offsite 0 0 0 0 0 Page 18 of 18 DEMLR USE ONLY D to coved Fee Paid Permit Number, bI *- (601 506 1 sta 05 ID Applicable Poled ❑ Coastal SW -1995 ❑ Coastal SW - (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Other WQ M mt Plan 2008 ❑ Ph II - Post Construction ❑ Universal Stormwater Management Plan State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM Tlns form may be photocopied for use as art original [ GENERAL INFORMATION 1 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc ) The Reserve at Palmetto Creek 2 Location of Project (street address) 1108 Palmetto Creek Way SE City Bolivia County Brunswick Zip 28422 3 Directions to project (from nearest major intersection) From the intersection of US 17 and NC 211, travel approximately 3 75 miles southeast on NC 211 4 Lahtude 33° 59' 38" N Longitude 78' 13' 02' W of the main entrance to the project II PERMIT INFORMATION 1 a Specify whether project is (check one) ❑New ®Modification ❑ Renewal w/ Modificationt tReneurals unth modifications also requires SWU-102 - Reneioal Application Form b If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 051045 , its issue date (if known)04/21/06 and the status of construction ❑Not Started ®Partially Completed* ❑ Completed* *provide a desigmcr's ccrtificahon 2 Specify the type of project (check one) ❑Low Density ®High Density ❑Drams to an Offsite Stormwater System []Other 3 If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the pievious name of the project, if different than currently proposed, 4 a Additional Project Requirements (check applicable blanks, information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748) ❑LAMA Major ®Sedimentation/Erosion Control ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit Proposed Impacts b If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit 5 Is the project located within 5 miles of a public airport? ®No ❑Yes s - k-- If yes, sec S L 2012-200, Part VI http //portal ncdenr cn g/web/h/tules and -regulations OCT 16 2 (116 1 Form SWU-101 Version Oct 31, 2013 Page I of III CONTACT INFORMATION 1 a Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc who owns the project) Applicant/ Organization Signing Official & Title L b Contact information for person listed in item la above Street Address 8620 River Road City Wilmington State NC Zip 28412 Mailing Address (if applicablc) City Phone (910 ) 520-6011 Email buyhorizonhomes@gmall corn State Fax Zip Please check the appropriate box The applicant listed above is ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below ) 2 a Print Property Owner's name and title below, if you are the lessee, purchaser or developer (This is the person who owns the property that the project is located on) Property Owner/Organization Signing Official & Title b Contact information for person listed in item 2a above Street Address City Mailing Address (if applicable) State Zip City State Zip Phone j ) Fax j ) Email 3 a (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project Other Contact Person/Organization Signing Official & Title b Contact information for person listed in item 3a above Mailing Address City State Phone ( ) Fax Email 4 Local jurisdiction for budding permits Point of Contact Phone # Form SWU-101 Version Oct 31, 2013 Page 2 of 6 Zip EC VE OCT 16 ?^111 e} 6Y IV PROJECT INFORMATION 1 In the space provided below, bnefly summarize how the stormwater runoff will be treated Three wet detention ponds 2 a If claiming vested rights, identify the supporting documents provided and the date they were approved ❑ Approval of a Site Specific Development Plan or PUD Approval Date ❑ Valid Building Permit Issued Date ❑ Other Date b If claiming vested rights, identify the regulahon(s) the project has been designed in accordance with ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3 Stormwater runoff from this project drams to the Lumber River basin 4 Total Property Area 42 41 acres 5 Total Coastal Wetlands Area 0 acres 6 Total Surface Water Area 0 acres 7 Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area' 42 41 acres Total project area shall be calculated to exclude the following the nornial pool of unppounded structures, the area between the banks of streanis and rivers, the area below the Nornial High Water (NM lute or Mean High Water (MHW) line, and coastal wetlands landward front the NHW (or MHI9 line The resultant project area is used to calculate overall percent built upon area (BUA) Non -coastal wetlands landward of the NHW (or MHW) line nmy be included in the total project area 8 Project percent of impervious area (Total Impervious Area / Total Project Area) X 100 = 40 0 % 9 How many drainage areas does the project have?3 (For high densihj, count 1 for each proposed engineered stonmwater BMP For low density and other projects, use 1 for the whole properhj area) 10 Complete the following information for each drainage area identified in Project Information item 9 If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information Drama e Area 1 Drama e Area 2 —Draina— ge Area 3 Drainage Area Receiving Stream Name Scotts Branch Scotts Branch Scotts Branch _ Stream Class * C,Sw C,Sw C,Sw Stream Index Number * 15-25-1-10 15-25-1-10 15-25-1-10 Total Drainage Area (so 371,715 689,745 460,070 On -site Drainage Area (so 371,715 689,745 460,070 Off -site Drainage Area (so 0 0 0 Proposed Impervious Area** (so 1 237,076 320,310 181,312 % Impervious Area** total 638 464 394 Impervious- Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area On -site Buildings/Lots (so 181,173 224,320 140,000 _ On -site Streets (so 47,247 75,721 37,282 On -site Parking (so - - - On -site Sidewalks (so 8,656 19,243 4,030 Other on -site (so - - - Future (so 1,026 Off -site (so - Existing BUA*** (so 1 - Total (so 237,076 320,310 o rcuat cuss unu inaex wiuniber can be determnied at httpllpoi tal ncdenr org(u�'f s csu clnssificahoit " Impervious area is defined as the built upon area including' gLQ"but not hunted to, buddin .ram t��� r re s, sidewalks gravel areas etc "* Report only that aniount of existing BUA that will renunni after dcvelopincnt Do ioogreport any existing B f A that is to be removed and which will be replaced by new BUA BY Form SWU-101 Version Oct 31, 2013 Page 3 of 6 IV PROJECT INFORMATION 1 In the space provided below, bnefly summarize how the stormwater runoff will be treated Three wet detention ponds 2 a If claiming vested rights, identify the supporting documents provided and the date they were approved ❑ Approval of a Site Specific Development Plan or PUD Approval Date ❑ Valid Building Permit Issued Date ❑ Other Date b If claiming vested rights, identify the regulation(s) the project has been designed in accordance with ❑ Coastal SW -1995 ❑ Ph II - Post Construction 3 Stormwater runoff from this project drams to the Lumber River basin 4 Total Property Area 42 41 acres 5 Total Coastal Wetlands Area 6 Total Surface Water Area 0 7 Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Area' 4241 acres Total project area shall be calculated to exclude the followtn the norinal pool of nunpounded structures the area between the banks of streanis and rivers, the area below the Norinal High Water (NM lure or Mean igh Water (MHW) line, and coastal wetlands landward front the NHW (or MHW) It The resultant project ea is used to calculate overall percent built upon area (BUA) Non -coastal wetlands landward of the NHW (or HW) line only be included in the total project area 8 Project percent of impervious area (Total Impervious Area / Total Project Area) X 100 396 % 9 How many drainage areas does the project have?3 (For high densitili, count 1 for each pr posed engintercd stormwater BMP For low densihj and other pro]ects, use 1 for the whole property area) 10 Complete the following information for each drainage area identified in Project formation item 9 If there are more than four drainage areas in the project, attach an addihoi sheet wi the information for each area provided in the same format as below Basin Information Drainage Area 1 Drainage Area 2 rama e Area 3 Drainage Area Receiving Stream Name Scotts Branch Scotts Branch Scotts Branch _ Stream Class * C,Sw C,Sw C Sw Stream Index Number * ]5-25-1-10 15-25-1- 15-25-1-10 Total Drainage Area (so 371,715 689,7 5 460,070 On -site Drainage Area (so 371,715 68 ,745 460,070 Off -site Drainage Area (so 0 0 0 Proposed Impervious Area** s 230,140 Z320,310 181,312 % Impervious Area** total 619 46 4 394 Impervious— Surface Area Drama e Area Drama e Area 2 Drama e Area 3 Drama e Area On -site Buildings/Lots (so 174,237 219,560 140,000 _ On -site Streets (so 47,247 75,721 37,282 On -site Parking (so - - - On -site Sidewalks (so 656 19,243 4,030 Other on -site (sf) 7 - _ _ Future(so - 5,786 Off -site (so - - Total (sf) 330,140 1 320,310 181,312 Srreann uass and index Number can be determined at httP((poi tal ncdunr ors web rn s csi classt ucahons Innpervious area is defined as the built upon area including, but not hunted to, buildings, roadrypev!ti gyi 1E^ sidewalks gravel areas, etc Report only that anwunt of existing BUA that will remain after developincut Do not report at�g Bu� � � 4at is to be removed and which will be replaced by new BUA a Form SWU-101 Version Oct 31, 2013 Page 3 of 6 11 How was the off -site impervious area listed above determined? Provide documentation NPr Protects in Union County Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15A NCAC 02B 0600 V SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project The latest versions of the forms can be downloaded from http //portal ncdenr ore/web/wo/ws/su/bmp-manual VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR) A complete package includes all of the items listed below A detailed application instruction sheet and BMP checklists are available from http//poitaiiicdenrorg/web/wq/WS/SLI/statesw/foinis does The complete application package should be submitted to the appropriate DEMLR Office (The appropriate office may be found by locating project on the interactive online map at http //portal ncdenr org/web/wq/ws/su/maps ) Please indicate that the following required information have been provided by initialing in the space provided for each item All original documents MUST be signed and initialed in blue ink Download the latest versions for each submitted application package from http //portal ncdenr org/web/wn/ws/su/statesw/forms does i als 1 Original and one copy of the Stormwater Management Permit Application Form 2 Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form (if required as per Part VII below) 3 Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M ea:— agreement(s) for each BMP 4 Permit application processing fee of $505 payable to NCDENR (For an Express review, refer to http //www envhelp org/pages/onestopexpress html for information on the Express program and the associated fees Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting ) 5 A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project This is required in addition to the brief summary provided in the Project Information, item 1 6 A USGS map identifying the site location If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile the map 7 Sealedd,, signed and dated calculations (one copy) 8 Two sets of plans folded to 8 5" x 14' (sealed, signed, & dated), mclud a Development/ Project name FIVE b Engineer and firm t c Location map with named streets and NCSR numbers QCT� b 9^ d Legend e North arrow l f Scale BY g Revision number and dates It Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters and any coastal wetlands landward of the MHW or NHW lines • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters i Dimensioned property/project boundary with bearings & distances j Site Layout with all BUA identified and dimensioned k Existing contours, proposed contours, spot elevations, finished floor elevations 1 Details of roads, drainage features, collection systems, and stormwater control measures in Wetlands delineated, or a note on the plans that none exist (Must be delineated by a qualified person Provide documentation of qualifications and identify the person who made the determination on the plans n Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations o Drainage areas delineated (included in the main set of plans, not as a separate document) Form SWU-101 Version Oct 31, 2013 Page 4 of 6 p Vegetated buffers (where required) 9 Copy of any applicable soils report with the associated SHWT elevations (Please identify Nla elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs Include an 8 5 xll" copy of the NRCS County Soils map with the project area clearly delineated For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate (Infiltration Devices submitted to WiRO Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378 ) 10 A copy of the most current property deed Deed book 3731 Page No 372 194 11 For corporations and limited liability corporations (LLC) Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H 1003(e) The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned http //www secretary state nc us/Corporations/CSearch aspxx VII DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form The appropriate deed restrictions and protective covenants forms can be downloaded from hap //portal ncdenr org/web/Ir/state-stormwater- forms does Download the latest versions for each submittal In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot VIII CONSULTANT INFORMATION AND AUTHORIZATION Applicant Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information) Consulting Engineer Phillip G Tripp, P E Consulting Firm Tripp Engineering Mailing Address 419 Chestnut Street City Wilmington State NC Zip 28401 Phone (910 ) 763-5100 Email office@trippen mg eering com Fax (910 ) 763-5631 IX PROPERTY OWNER AUTHORIZATION (if Contact Information, itcin 2 has been filled ont, complete this section) I, (print or hype name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (petit or type name of person listed in Contact Information, item la) with (print or hype name of organization listed in Contact Inforination, item la) to develop the project as currently proposed A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system ®EC EIV Eh OCT 16 nl 3 1 BY Form SWU-101 Version Oct 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days, otherwise I will be operating a stormwater treatment facility without a valid permit I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-2151 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215 6 Signature a Notary Public for the State of do hereby certify that before me this _ day of Date County of personally appeared , and acknowledge the due execution of the application for a stormwater permit Witness my hand and official seal, SEAL My commission X APPLICANT'S CERTIFICATION I, (print or hjpe nanie of person listed in Contact Infonnahon, itun la) lack I Carlisle certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covens is will be record d t t the proposed project complies with the requirements of the applicable storm wate r es a 15 C H 1000 and any other applicable state stormwater requirements Signature Date I-A0 / I, a Notary Public for the State of , 4 County of do hereby certify that /1; S personally appeared before me this _ ay of ,±seal,/ nd a wled the d xe�n oft phc oa for a stormwater permit Witness my hand and officLy �'t�(n ►EMELLE E cry E NOTAW KUX WLNTY, NC SEAL My commission expires Z�) -y- ` 0 �5_ zoZ( ECIE I W OCT 16 2^' } ' BY �— Form S WU-101 Version Oct 31, 2013 Page 6 of 6 TRIPP ENGINEERING, P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone (910) 763-5100 • FAX (910) 763-5631 March 28, 2019 NCDEQ Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn Ms Kelly Johnson Re The Reserve at Palmetto Creek Permit No SW8 051045 TE 16029 Dear Kelly MAR 2 9 a0li9 1 In response to your comments dated February 28, 2019, we offer the following 1 As we discussed via March 1511 phone conversation, we are proposing a 6' wide shelf on the existing 3 1 side slopes We have added the top and bottom elevations of the vegetated shelf to the detail sheet 2 Property ]me metes and bounds have been added to the plan Please review for approval and contact us with any questions, comments or if you need additional information Thank you PC Phillip G Tripp, P E PGT dcb Enc ROY COOPER Governor MICHAEL S REGAN Secretary surc�,,� • �QWrVNP• WILLIAM E (TOBY) VINSON JR NORTH CAROLINA Interim Director Environmental Quality I'cbruary 28, 2019 Via email only buthorizonhomeaamad eom KG Plaia, LLC Arm Mr Jack Carlisle, Manager 8620 River Road Wilmington, AC 28412 Subject Request for Additional information Stormwatcr Project -o S'*8'8 051045 I he RCtiLrVL At Palmetto Crctk Brunswick County Dear Mr Carlisle I he Wilmington Regional Office received and accepted a modified StatL Stormwater Management Permit Application for the subject project on October 16, 2018 A request for additional information was mailed on December 12, 2018, and a response was received on 1'ebruary 20 2019 A preliminary in-depth review of that information has determined that the application is not complete and that additional information is needed I o continue the revicw, please provide the following additional information Clarification It appears that only Pond 1 s design is changing to accommodate the increase in impervious area Pond 2 has impervious that is being reallocated and there are no changes to Pond 3 I'or Pond 1, the calculations show that the bottom of the vegetated shelf is at 36 Omsl, the PP is at 37 Omsl and the top of the vegetated shelf is at 38 Omsl I he elevations of the vegetated shelf are not shown on the plans, but the 1 Oft shelf is shown to have a 3 1 slope (which appears to be a typo) it appears that the 1 Oft shelf is intended have a bottom elevation of 36 5msl and a top elevation of 37 5msh Please verify that this is correct and make any necessary corrections to the plans calculations, and supplement (If the supplement is revised, please send the revised copy both in hard copy and email I have not run the calculations 1 will do so upon re -submittal) Project Area [15A NCAC 02H 1042(2)(g)(n)] a 12/12/18 Letter Please provide dimensioned project or project phase boundary with bearings and distances b 2/20/19 Letter We can provide a copy of the final plats recorded by the surveyor We respectfully request waiving a metes and bounds plat of the drainage areas c 2/28/19 Unfortunately i cannot waive the requirement to have the bearing and distance Imes for the project area It is a requirement in the regulations which read, `rhe applicant shall submit a nonrefundable permit application fee in accordance with G S 143-215 31) and two signed hard copies and one electronic copy of each of the following signed, scaled, and dated plans of the entire site that are a minimum of 22 inches by 34 inches in sve and are at a legible scale All plan packages shall include dimensioned project or project phase boundary with bearings and distances (Note that the metes and bounds are not needed for the drainage areas) Pleasc remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans Please also remember to provide two hard copies of any updated documents per 15A \CAC 0211 1042(2) D_E QJ� North Carolina Department of Environmental Quality I Division of Ener% Mineral and Land Resources \ Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 1rHwx y 91079b 7215 State Stormwater Permit No SWS 051045 Page 2 of f I he requcstcd information should be received in this Officc prior to March 15, 2019 or the application vv ill be returned as incomplete If the project is returned and you wish to re -submit later you will need to resubmit all required ituns at that time including the application fee If additional time is needed to submit the requested information please e-mail, mail or fax your extension request, prior to the original due date to the Division using the contact information avadablc in this Icttcr I he extension request must include a Justification and a date of when the requcstcd information will be submiacd to the Division Plcase remember that extension requests delay the issuance of the final permit I he Division is allowed 90 days from the receipt of a complete application to issue the permit I he construction of any impervious surfaces other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of -',,CGS 143-215 1 and is subject to enforcement action pursuant to ACGS 143-215 6A Plcase reference the State assigned application number on all correspondence Ifyou have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at kclly pjohnson@ncdenr gov Sincerely z4 fa&tdog Kelly Johnson Environmental Engineer GDS/kpj \\\Stormwater\Permits & Projects\2005\051045 I ID\2018 12 addinfo 051045 cc Phil I ripp via email only, office@trippengmccnng cont Wilmington Regional Office Stormwater Fill, Johnson, Kelly From Johnson Kelly Sent Thursday, February 28 2019 1049 AM To office@tnppengineenng com buyhonzonhomes@gmail com Subject RE SW8 051045, The Reserve at Palmetto Creek Attachments 2019 02 addinfo 051045 docx Please see the attached Request for Additional Information Thanks, Kelly From Johnson, Kelly____ _---� ___---- --- -� � - - Sent Wednesday, December 12, 2018 11 20 AM To 'office@tnppengineering com' <office@trippengineering com>, 'buyhonzonhomes@gmail com' <buyhorzonhomes@gmail com> Subject SW8 051045, The Reserve at Palmetto Creek Please see the attached Request for Additional Information Thanks, Kelly f"tUwDkV1,sm' Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Phone 910 796 7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Aoo TRIPP ENGINEERING, P.C. i 419 Chestnut Street Wilmington, North Carolina 28401 Phone (910) 763-5100 • FAX (910) 763-5631 February 20, 2019 NCDEQ Division of Energy, Mineral and Land Resources 127 Cardinal Drive Wilmington, NC 28405-3845 Attn Ms Kelly Johnson Re The Reserve at Palmetto Creek Permit No SW8 051045 TE 16029 Dear Kelly FEB 10 2019 Mlt ---- In response to your comments dated December 12, 2018, we offer the following 1 General Which rule(s) are each pond designed under? I believe you had told me that the pond(s) had to be redesigned because they were constructed with incorrect elevations (I am not sure if <sOqS that was all three ponds, or just one or two of theme) The impervious area for Pond 1 increased by 36,011 sf, which could trigger it into a major modification to be designed under the 2017 rules 31� A if the pond had to be redesigned to accommodate that new volume The impervious to Ponds 2 and 3 did not increase All three drainage areas remained the same All three ponds have been Q� designed for 1 5" as opposed to taking the previously -permitted impervious at 1 0", and so it appears that you are designing for the 2017 rules? However, the average depth equations and the forebay percentages appear to match the 2008 rule (18-22% of the whole pond) rather than the 2017 rule (15-20% of the main pond) Please advise [I have not yet compared the elevations in the calculations against the elevations in the plans I have also not yet reviewed the design for the 2017 rules ( 1050/General MDCs for all SCMs, or 1053/Wet Pond SCMs), or the 2008 Rule design standards 1 will do so upon resubmittal ] u Ponds were redesigned under the 2017 rules 2 Project Area [15A NCAC 02H 1042(2)(g)(n)] Please provide dimensioned project or project phase boundary with bearings and distances e We can provide a copy of the final plats recorded by the surbeyor We respectfully request waiving creating a metes and bounds plat of the drainage areas ye Contours [15A NCAC 02H 1042(2)(g)(iv)] Please provide proposed contours and drainage k patterns Some spot elevations are provided, but the direction of the drainage is not clear for all v'Oy(acp� S areas of the project Please provide contours in support of the drainage area plan L �,tP 0 Drainage direction has been clarified with flow arrows Typical Townhouse Footprint [15A NCAC 02H 1042(2)(g)(v)] Please show the site layout for all existing and proposed built -upon areas Please provide atypical townhouse footprint with dimensions on this sheet or a detail sheet, and also clarify which direction the downspouts will dram G Typical townhouse footprint is provided Note has been added "Downspouts dram towards front of the lot" O&M Agreements [ 15A NCAC 02H 1042(2)0)] Please provide a signed and notarized operation and maintenance agreement that meets the requirements of 1050(11) and (12) • Signed O&M Agreement was provided with permit transfer A copy is enclosed 6 Deed Restrictions [I 5A NCAC 02H 1003(7) and 1042(2)(k)] Deed restrictions have been submitted showing that both the single family homes and the townhomes will have a maximum impervious area per lot Will the townhomes have a "yard" sold with them, or will the property owner only buy the footprint of their unit in the building? If there is no yard, then the townhomes do not need to be deed restricted (because the owner doesn't own land to build any impervious on) But, if there is a "yard" please show the lot lines for the townhomes on the plans in order to specify where the deed restricted impervious is to be located for each townhor W • Townhomes will not be sold with yards Vr Collection System [ 15A NCAC 02H 1042(2)(g)(vu)] Please provide the details of the stormwater collection system, including the inverts of the piped collection system c Inverts have been labeled Wetlands Note [15A NCAC 02H 1042(2)(g)(ui)] Please provide the boundaries of all surface waters, wetlands, regulatory flood zones, protected vegetated setbacks, and protected riparian buffers, or a note on the plans that none exist e Note that no wetlands exist on site has been added to the plan Pond 1 Please ensure that all inlet pipes enter the pond through the forebay i Maui pool inlet pipe to be plugged 10 Typo Please check the incremental volumes for Pond 3 for elevation 22 v • Revised calculations are enclosed \.K�Supplement [15A NCAC 02H 1042(2)] Please email the supplement form to the email address provided below so that it can be preserved electronically per the regulatory requirements • Supplement will be emailed Please review for approval and contact us with any questions, comments or if you need additional information Thank you PGT dcb Eric TE 16029 Stormwater & Erosion Control Narrative The Reserve at Palmetto Creek Brunswick County, NC The Reserve at Palmetto Creek is a residential site consisting of 60 single-family lots and 86 townhome lots in Brunswick County, owned by KG Plaza, LLC The project area is approximately 42 41 acres No wetlands exist on the site The Reserve at Palmetto Creek previously proposed 60 single-family lots and 88 townhomes The project now proposes to construct 60 single-family houses and 86 townhomes for a total of 146 units, asphalt roadway with curbing, concrete sidewalks, three (3) existing wet detention basins, and utility extensions All outflow from the drainage basins will dram to Scotts Branch, classification C,Sw, Index No 15-25-1-10, in the Lumber River Basin All built up areas (BUAs) will be collected and routed to the wet detention pond The site has three (3) drainage areas Drainage Area 1 is approximately 8 53 acres There are 51 townhome units at 3,552 sf per unit within the drainage area as well as 47,247 sf of streets and 8,656 sf of concrete sidewalk The total impervious area for DA 1 is 5 44 acres Drainage Area 2 is approximately 15 83 acres There are 35 townhome units at 3,552 sf per unit and 25 single family homes at 4,000 sf each within the drainage area as well as 75,721 sf of streets, 19,243 sf of concrete sidewalk and 1,026 sf for future impervious The total impervious area for DA 2 is 7 35 acres Drainage Area 3 is approximately 10 56 acres There are 35 single family homes at 4,000 sf each within the drainage area as well as 37,282 sf of streets and 4,030 sf of concrete sidewalk The total impervious area for DA 3 is 4 16 acres The project will be treated by erosion control measures such as drop inlets with inlet protection, temporary silt fence, and gravel construction entrance Three (3) wet detention basins provides sufficient storm water management to meet the State's 1 5" requirement An emergency spillway has been designed for the 100-year storm assuming the principal spillway is obstructed or not operating properly ECEIVE R FEB 2 0 2019 BY 02/20/19 PGT Total Drainage Area s ft acres 371 7' 8 53 The Reserve at Palmetto Creek Stormwater Pond Calculations Pond 1 Impervious Area Land Use sq It acres Proposed Building „ 181 17:,,. 4 16 Proposed Streets 47 247 1 08 Proposed Sidewalk / Concrete 8 656 020 Future Impervious ; 0 000 000 Total 237 076 544 Time of Concentration Hydraulic Length (L) = ' 960 ft change in Height (H) = s 5 ft Tc = (1_3 /H) 3e5 / 128 11 70 min Flow for 1 year 24 hour Storm (Qt) QPRE _ (CPRE) x (It) x (Area) = 6 23 cfs QPosT = (CPosT) x (It) x (Area) 29 09 cfs Detention Pond Design Does Area Drain to SA Waters? r n 1 % impervious = 0 638 = 63 8% CPRE= 015 CPOST = (% imp )( 95)+(1 % imp )( 25) 070 11 = 4 87 in/hr ,to 723 in/hr Flow for 10 year 24 hour Storm (Qto) QPRE _ (CPRE) x (110) x (Area) = 9 25 cfs QPosT = (CPosT) x (Ito) x (Area) 43 19 cfs State Surface Area Renuired at normal nnnl Pond side slopes = 3 1 Depth b/w Bot of V S & 400 Bot Pool = SA/DA = 00468 Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter) Red SA = SAIDA x Total Drainage Area 17 396 sq ft Provided SA - 55 307 sq ft Pond Size ft ) (so It c c ft s c c Top of Bank V140 00; 1j ,y > ,48 546 90 516 291 529 Top of Bank ^ 4000 9 943' 19 539 60 671 Temp Pool 3800 ��r '41 970' 0 201 013 Temp Pool ' 38 00= 9 596 9 425 41 132 Top of V S 'F38 00.P,1s. .� 41 970 r 44 012 201 013 Perm Pool 3700 �9 253 8 726 31 708 Perm Pool d+37 00 ,7 ;t` b 46 054 t* 50 171 157 001 Bot of V S . 36 001 '8 198- 22 982 22 982 Bot of V S ' 36 00 34 `146 , 106 830 106 830 'Sed Elev +, 32 00 3 293_ 0 0 Sed Elev _ 32 00 19 269 ` 0 0 Sediment Removal Elevation = 1 higher than Bott of Pon( SHGWT 433650 w Bottom SA = 19 269 sq It Bottom of VS SA= 34 146 sq ft Permanent Pool SA = 46 054 sq It Vol = [((PP SA + Bottom VS SA)/2) x (PP el Bottom VS at )] F + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el Bottom Pool el )] I. 146 930 cu It Fore bay Provided Normal Forebay Pond Volume Bottom of Pool SA= 3 293 sq ft Permanent Pool SA = 9 253 sq ft Vol = [(P P SA + Bottom SA) / 21 x (P P at Bottom at ) 31 365 cu It Depth= 5 00 It Required Forebay Volume 15% 20% required) Vol = 20% of Permanent Pool volume of Pond and Forebay 35 659 cu It Volume required to contain from design storm(ft3)= 28 994 Therefore maximum sta a is between stages and cumulative volumes (main pond plus forebay) Stage Cuml Volume 37 00 0 40 00 163 492 16029 'FIVE T8 2 0 2019 Total Provided PP Volume = 178 295 cu It Using Interpolation to determine stage at volume = 28 994 Maximum Stage (feet) = 3753 Therefore set Temporary Pool Elevation at or higher than Maximum of Forebay = 1759 16029 DENR Wet Detention Suppl B Pond 1 Calc 08 01 17 1 of 4 Z•fo' 1q GREGOR,�%0' f/11111111� 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations P Provided Main Pond Storage Volume and 1 Vol = [((PP SA + Top of VS SA)/2) x (Top of VS Elev — PP Elev)] + [((Top of VS SA+TP SA)/2) x (TP Elev Top of VS Elev )] = 44 012 cu ft Provided Forebay Storage Volume 137 Permanent Pool SA= 9 253 sq ft 38 -1 Temp Pool SA= 9 596 sq ft Vol = [((PP SA + Temp Pool SA)/2) x (Temp Pool Elev — PP Elev)] 9 425 cu R Total Provided Storage Volume Vol = 53 437 cu ft State Volume Req for Storage of first 1 5 runoff RV = 05+ 009(% Imp) = 0 624 V= (Design rainfall)(Rv)(Drainage Area) 1. 28 994 cu ft Outlet Structure Design Flow for 2 day drawdown for Min Volume required of stormwater Q = Min Vol Req / 172 800 sec (2-days) 0168 cfs Required Area of Pipe for 2-day drawdown A= Q/ [Cd x SQRT(2 x g x h)] Cd= 06 g = 322 ft /s2 h = (T P elev - N P Elev ) /3 0 33 ft A = 00604 sq It Diameter of Pipe for 2-day drawdown DIA = SQRT[(A x 4) / pl] = 0 2772 It 333 in Drawdown Calculation Orifice Used= 2 5 in Drawdown rate= 0 095 cfs Drawdown time= 3 54 days Outlet Structure Check Using a 4 x 4 Basin Perimeter L = 16 ft Q = CIA C = (% imp )( 95) + (1 % imp )( 25) = 070 I = 7 23 in for a 10 yr Storm A = 8 53 Acres 4319 cfs Flow for 5 day drawdown for Min Volume required of stormwater Q = Temp Pool Vol / 432 000 sec (5-days) 0 124 cfs nor o A= U/[Gdx6QRf(2xgxh)] Cd= 06 9 = 322 ft /52 h= (F P elev N P Elev) / 3 = 0 333333 ft A = 00445 sq ft Diameter of Pipe for 5 day drawdown DIA = SQRT[(A x 4) / pi] = 0 2380 ft 286 in Q= CwxLx H1 H = [Q / (Cw x L)]213 Cw = 3 093ft Peak elevation = Flood pool elevation + H = 38 93 ft 16029 DENR Wet Detention Suppl B Pond 1 Calc 08 01 17 2 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stonnwater Pond Calculations Pond 1 Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (RV) (Drainage Area) where Rv= 0 05+0 009(IA) RV = Runoff Coefficient = storm runoff (Inches) / storm rainfall (Inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) IA= 638 % Rv= 0624 Design Rainfall Depth = 1 50 Drainage Area = 853 acres Volume = 28 994 ft3 16029 DENR Wet Detention Suppl 8 Pond 1 Calc 08 01 17 3 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations Pond 1 Average Depth Calculated Permanent Pool Volume (ft') 178 295 0 Permanent Pool Area (ft') 55 307 0 Option 1 Average Depth (ft) 322 Bottom Vegetated Shelf Area (ft') 423440 Permanent Pool Area (ft') 553070 Bottom Pond Area (ft) 192690 Depth (ft) 40 Option 2 - Average Depth (ft) 335 Average Depth for use in Table (ft) 335 Round to nearest 0 5 for SA/DA (ft) _ 3 00_ 16029 DENR Wet Detention Suppl 8 Pond 1 Cale 08 01 17 4 of 4 02/20/19 PGT Total Drainage Area s ft acres 689 745 1 15 83 The Reserve at Palmetto Creek Stormwater Pond Calculations Pond No 2 Im ervious Area Land Use sq ft acres Proposed Building 224 320 515 Proposed Streets 75 721 1 74 Proposed Sidewalk / Concrete 19 243 044 Future Impervious 1 026 002 000 Total 320 310 735 atormwater t;alculatlons Time of Concentration Hydraulic Length (L) = 800 ft change in Height (H) = 5 It Tc = (La /H) 3e5 / 128 948 min Flow for 1 year 24 hour Storm (01) QPRE _ (CPRE) X (1) x (Area) 11 57 cfs QPOST = (CPosT) x (11) x (Area) 44 73 cfs Detention Pond Design Does Area Dram to SA Waters? r n j % Impervious = 0 464 = 46 4% CPRE= 015 CPOST = (% Imp )( 95)+(1 % Imp )( 25) = 058 11 = 487 m/hr 11o= 7 231 m/hr Flow for 10 year 24 hour Storm (Qto) QPRE _ (CPRE) x (110) x_(Area) = 1717 cfs QPOST = (CPOST) x (Ito) x (Area) 66 40 cfs Stale Surface Area R6ninnRd nt nnrmal nnnl Pond side slopes = 3 1 Depth b/w Bot of V S & 600 Bot Pool = SA/DA = 00225 Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Filter) Red SA = SA/DA x Total Drainage Area 15 519 sq ft Provided SA - 58 956 sq It Pond Size ncr i vN vi oenn _ oo uv r e1 0. uo1 1 uo 464 396 190 Top of Bank 3300 r 12 237 23 487 93 749 Temp Pool 31 00 ; 50 433 0 290 706 Temp Pool 31 00 11 250 10 918 70 262 Top of V S 3100 ,50 433 49 402 290 706 Perm Pool a 3000 10 586 10 279 59 344 Perm Pool 3000 48 370+ 50 171 241 304 180t of V S 2900 9 972 49 065 49 065 Bot of V S 2900 1 46 337 191 133 191 133 'Sed Elev 1 2300 6 383 0 0 'Sed Elev r23 00 i 17 374 "�' 0 0 'Sediment Removal Flevahon = 1 hinher than Rnff of Pnnr Bottom SA = 17 374 sq It Bottom of VS SA= 46 337 sq ft Permanent Pool SA = 48 370 sq It Vol = [((PP SA + Bottom VS SA)/2) x (PP at Bottom VS el )] + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el Bottom Pool el )j 238 487 cu ft Fore bay Provided Normal Forebav Pond Volume Bottom of Pool SA= 6 383 sq It Permanent Pool SA = 10 586 sq It Vol = [(P P SA + Bottom SA) / 2) x (P P el Bottom at ) 59 392 cu ft Depth= 7 00 It Required Forebay Volume it5% 20% required) Vol = 20% of Permanent Pool volume of Pond and Forebav 59 576 cu It Volume required to contain from design storm(ft')= 40 346 Therefore maximum sta a is between stages and cumulative volumes (main pond plus forebay) Sta a 30 00 E 33 00 Total Provided PP Volume = 297 878 cu ft Actual % of Forebay Volume = 1994 Using Interpolation to determine stage at volume = 40 346 Maximum Stage (feet) = 3064 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 16029 16029 DENR Wet Detention Suppl & Pond 2 Calc 08 01 17 1 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations P Provided Main Pond Storage Volume and No 2 Vol = [((PP SA + Top of VS SA)/2) x (Top of VS Elev - PP Elev )] + [((Top of VS SA+TP SA)/2) x (TP Elev Top of VS Elev )] = 49 402 cu ft Provided Forebay Storage Volume �30 I Permanent Pool SA= 10 586 sq ft 31 ° Temp Pool SA= 11 250 sq ft Vol = [((PP SA + Temp Pool SA)/2) x (Temp Pool Elev - PP Elev )] = 10 918 cu ft Total Provided Storage Volume Vol = 60 320 cu ft State Volume Req for Storage of first 1 5 runoff Rv = 05+ 009(% Imp) 0 468 V= (Design ramfalp(Rv)(Drainage Area) 40 346 cu It Outlet Structure Design Flow for 2-day drawdown for Min Volume required of stormwater Q = Min Vol Req / 172 800 sec (2 days) 0 233 cfs Required Area of Pipe for 2 day drawdown A= Q/ [Cd x SQRT(2 x g x h)] Cd= 06 9 = 322 ft /s2 h = (T P elev N P Elev ) /3 = 0 33 ft A = 00840 sq ft Diameter of Pipe for 2-day drawdown DIA = SQRT[(A x 4) / pQ 0 3270 ft - 3 92 in Drawdown Calculation _ Orifice Used= 3 in Drawdown rate= 0 136 cfs Drawdown time= 342 days Outlet Structure Check Using a 4 x 4 Basin Perimeter (L) = 16 ft Q = CIA C = (% imp )( 95) + (1 % imp )( 25) 058 1 = 7 23 in for a 10 yr Storm A = 15 83 Acres 6640 cfs Flow for 5 day drawdown for Min Volume required of stormwaler Q = Temp Pool Vol / 432 000 sec (5 days) - 0 140 cfs Required Area of Pipe for 5 day drawdown A= Q/[CdxSQRT(2xgxh)] Cd= 06 g = 322 ft /S2 h= (F P elev N P Elev) / 3 = 0 333333 ft A = 00502 sot ft Diameter of Pipe for 5-day drawdown DIA = SQRT[(A x 4) / pi] 0 2529 ft 3 03 a1 Q= CwxLx H' H = [Q / (Cw x L)]M Cw = 3 1 24 ft Peak elevation = flood pool elevation + H 32 24 ft 16029 DENR Wet Detention Supp18 Pond 2 Calc 08 01 17 2 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations Pond No 2 Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv= 0 05+0 009(Q Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (Inches) Ip = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) Iq= 464 % Rv= 0468 Design Rainfall Depth = 1 50 in Drainage Area = 1583 acres Volume = 40 346 ft3 15029 DENR Wet Detention Suppl 8 Pond 2 Calc 08 01 17 3 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations Pond No 2 Average Depth Calculated Permanent Pool Volume (fta) 297 878 0 Permanent Pool Area (ft') 58 956 0 Option 1 Average Depth (ft) 505 Bottom Vegetated Shelf Area (ft) 563090 Permanent Pool Area (ft2) 589560 Bottom Pond Area (ft) 173740 Depth (ft) 60 Option 2 Average Depth (ft) 441 Average Depth for use in Table (ft) 505 Round to nearest 0 5 for SA/DA (ft) r 16029 DENR Wet Detention Suppl B Pond 2 Calc 08 01 17 4 of 4 02/20/19 PGT Total Draina a Area s ft acres 460 070 1 1056 The Reserve at Palmetto Creek Stormwater Pond Calculations Pond 3 Im ervious Area Land Use sq ft acres Proposed Building 140 000 3 21 Proposed Streets 37 282 086 Proposed Sidewalk / Concrete 4 030 0 09 Future Impervious 0 000 000 Total 181 312 4 16 Time of Concentration Hydraulic Length (L) = 850 ft change in Height (H) = z 10 ft To = (L3 /H) 315 / 128 7 79 min Flow for 1 year 24 hour Storm (Q1) QPRE _ (CPRE) x (11) x (Area) = 7 72 cfs QPosT = (CPOST) x (11) x (Area) 27 26 cfs Detention Pond Design Does Area Drain to SA Waters? n—I % impervious = 0 394 = 39 4% CPRE= 015 CPOST = (% imp )( 95)+(1 % IMP )( 25) 053 11 = 87 m/hr 110 = " 7'23 in/hr Flow for 10 year 24 hour Storm (Q1ti) QPRE _ (CPRE) x (110) x (Area) = 11 45 cfs QPosT = (CPOST) x (110) x (Area) = 40 47 cfs State Surface Area Reaured at normal ooni Pond side slopes = 3 1 Depth b/w Bot of S 8 400 Bot Pool = SA/DA = 00296 Chart for 90%TSS Removal for Wet Detention Pond without Vegetative Filler) Red SA = SA/DA x Total Drainage Area 13 618 sq It Provided SA - 14 644 sq ft Size I op or banK 2O uu , ,, +113 422 16 796 80 779 Top of Bank 25 00 3 250 2 964 16 069 Temp Pool 24 00, �>�`r w1 �15 170 , r- 14 475 63 983 Temp Pool 2400 2 677 5 110 13 106 Top of V S '23 00 413 780 12 996 49 508 Perm Pool 2200 42433 2 292 7 996 Perm Pool r22 00 ± �`12 211 11 278 36 512 Pot of V S 21 00 _ 2 150 5 704 5 704 Bot of V S 00„g r,110 344 ' r� 25 234 25 234 Sec Elev 1700 702 0 0 'Sed Elev �21 17 002 273' _ 0 0 Sediment Removal Elevahon = 1 higher than Bott of Pon( SHGWT `19 00 Bottom SA = 2 273 sq ft Bottom of VS SA= 10 344 sq ft Permanent Pool SA = 12 211 sq It Vol = [((PP SA + Bottom VS SA)/2) x (PP el Bottom VS el )j + [((Bottom VS SA + Bottom Pool SA)/2) x (Bottom VS el Bottom Pool el )] = 36 512 cu It Fore bay Provided Normal Forebav Pond Volume Bottom of Pool SA= 702 sq ft Permanent Pool SA = 2 433 sq ft Vol = [(P P SA + Bottom SA) / 2] x (P P el Bottom el ) 7 838 cu ft Depth= 5 00 ft Required Forebay Volume 15% 20% required) Vol = 20% of Permanent Pool volume of Pond and Forebay 8 870 cu ft Volume required to contain from design storm(ft3)= 23 273 Therefore maximum stage Is between stages and cumulative volumes (main pond plus forebay) Stage Cuml Volume 22 00 0 2500 52 340 Total Provided PP Volume - 44 349 cu ft Actual % of Forebay Volume 1767 Using Interpolation to determine stage at volume = 23 273 Maximum Stage (feet) = 2333 Therefore set Temporary Pool Elevation at or higher than Maximum Stage 16029 16029 DENR Wet Detention Suppl 8 Pond 3 Calc 08 01 17 1 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations Pond 3 Provided Main Pond Storage Volume Vol = [((PP SA + Top of VS SA)/2) x (Top of VS Elev — PP Elev)] + [((Top of VS SA+TP SA)/2) x (TP Elev - Top of VS Elev )] 27 471 cu ft Provided Forebay Storage Volume I22 Permanent Pool SA= 2 433 sq It 23 Temp Pool SA= 2 677 sq ft Vol = [((PP SA + Temp Pool SA)/2) x (Temp Pool Elev — PP Elev )] = 5 110 cu It Total Provided Storage Volume Vol = 32 581 cu ft State Volume Req for Storage of first 1 5 runoff RV = 05+ 009(% imp) 0 405 V= (Design rainfall)(Rv)(Drainage Area) 23 273 cu ft Outlet Structure Design Flow for 2-day drawdown Flow for 5-day drawdown for Min Volume required of stormwater for Min Volume required of stormwater Q = Min Vol Req / 172 800 sec (2 days) Q = Temp Pool Vol / 432 000 sec (5-days) 0 135 cfs = 0 075 cfs Required Area of Pipe for 2 day drawdown A= Q/ [Cd x SQRT(2 x g x h)] Cd= 06 9= 322 ft/s' h = (T P elev N P Elev ) /3 = 0 67 ft A = 00343 sq ft Required Area of Pipe for 5 day drawdown A= Q/ [Cd x SQRT(2 x g x h)] Cd= 06 9= 322 ft/s' h= (F P elev - N P Elev) / 3 = 0 666667 ft A= 00192 sq ft Diameter of Pipe for 2 day drawdown Diameter of Pipe for 5 day drawdown E IA = SQRT[(A x 4) / pil DIA = SQRT[(A x 4) / pi] 0 2089 ft = 0 1563 ft 251 in= 1 88 in Drawdown Calculation Orifice Used= ` 21m Drawdown rate= 0 086 cfs Drawdown hme= 3 14 days Outlet Structure Check Using a 5 x 5 Basin Perimeter (L) = 20 ft Q = CIA C = (% Imp )( 95) + (1 % Imp )( 25) = 053 1 = 7 23 in for a 10 yr Storm A = 10 56 Acres 4047 cfs Q= CwxLxH" H = [Q / (Cw x L)I"3 Cw= 3 0 77 ft Peak elevation = flood pool elevation + H 24 77 ft 16029 DENR Wet Detention Septet 8 Pond 3 Calc 08 01 17 2 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Stormwater Pond Calculations Pond 3 Storage Volume - Non SA Waters - Minimum Volume Required Volume of Runoff = V = (3630) (Design Rainfall Depth) (Rv) (Drainage Area) where Rv = 0 05+0 009(Q Rv = Runoff Coefficient = storm runoff (inches) / storm rainfall (Inches) IA = Impervious Fraction = Impervious portion of the drainage area (acres) / Drainage area (acres) 1"= 394 % R, = 0 405 Design Rainfall Depth = 1 50 Drainage Area = 1056 acres Volume = 23 273 ft3 16029 DENR Wet Detention Suppl B Pond 3 Calc 08 01 17 3 of 4 02/20/19 The Reserve at Palmetto Creek 16029 PGT Slormwater Pond Calculations Pond 3 Average Death Calculated Permanent Pool Volume (ft3) 44 349 0 Permanent Pool Area (ft) 14 644 0 Option 1 Average Depth (ft) 303 Bottom Vegetated Shelf Area (ft') 124940 Permanent Pool Area (ft) 146440 Bottom Pond Area (ft2) 22730 Depth (ft) 40 Option 2 Average Depth (ft) 283 Average Depth for use in Table (ft) 303 Round to nearest 0 5 for SA/DA (ft) _ 3 00 —! 16029 DENR Wet Detention Suppl 8 Pond 3 Colt; 08 01 17 4 of 4 Johnson, Kel 7e/�srorJ From Johnson Kelly Sent Wednesday, February 6, 2019 3 53 PM To ptrlpp@trippengineering com Subject RE [External] FW SW8 051045, The Reserve at Palmetto Creek That isn't good I hope you feel better I will put this down for 2/20/19 Thanks, Kelly From ptnpp@tnppengineenng com [mailto ptrlpp@tnppengineering com] Sent Wednesday, February 6, 2019 3 17 PM To Johnson, Kelly <kelly p johnson@ncdenr gov> Subject RE [External] FW SW8 051045, The Reserve at Palmetto Creek o External email Do not click finks or open attachments unless you verify Send all suspicious email as an attachment to re on ss am`i ncs ov Kelly, I got sick along the way and lost some valuable work time for everyone Can you please grant me an additional two weeks? Thank you, PHil From ptrlpp@tnppengmeering com <ptrlpp@trlppengineering com> Sent Friday, January 4, 2019 8 44 AM To 'Johnson, Kelly' <kelly p lohnson@ncdenr Rov> Subject RE [External] FW SW8 051045, The Reserve at Palmetto Creek Thank you too From Johnson, Kelly <kelly P lohnson@ncdenr gov> Sent Friday, January 4, 2019 8 41 AM To ptrlpp@trippeneineering com Subject RE [External] FW SW8 051045, The Reserve at Palmetto Creek OK Let's revise the date to 2/6/19 Thanks, Kelly From ptrlpp@tnppengineering com [mailto ptrlpp@trlppengineenng com] Sent Friday, January 4, 2019 8 29 AM To Johnson, Kelly <kelly p lohnson@ncdenr gov> Subject [External] FW SW8 051045, The Reserve at Palmetto Creek u o External,emad Do not dick Imks onopen attachments unless you venhed Send all suspiaous email as ar(attachment to fePOrt SRam[n1nC�kbV� }C+. *'� a:«`s`.e°?>.^r rc `9v^>'z r £ �. .t z' c n- Kelly, We are in receipt of your December 12 RFI correspondence for the Reserve at Palmetto Creek We respectfully request an additional 30 days to resubmit Please contact us with questions, comments or if you need additional information Thank you, Phil Johnson, Kelly From Johnson Kelly Sent Friday January4 2019841 AM To ptripp@trippengineering com Subject RE [External] FW SW8 051045, The Reserve at Palmetto Creek OK Let's revise the date to 2/6/19 Thanks, Kelly From ptripp@trippengineering com [mailto ptripp@trippengineering com] Sent Friday, January 4, 2019 8 29 AM To Johnson, Kelly <kellypJohnson@ncdenrgov> Subject [External] FW SW8 051045, The Reserve at Palmetto Creek e External email Do not click finks or open attachments unless you verified Seridalirsuspmous er'nad�a�stlan attachment to Kelly, We are in receipt of your December 12 RFI correspondence for the Reserve at Palmetto Creek We respectfully request an additional 30 days to resubmit Please contact us with questions, comments or if you need additional information Thank you, Phil i Johnson, Kelly From Johnson, Kelly Sent Wednesday December 12, 2018 11 20 AM To off ice@trippengineering com, buyhonzonhomes@gmail com Subject SW8 051045, The Reserve at Palmetto Creek Attachments 2018 12 addinfo 051045 docx Please see the attached Request for Additional Information Thanks, Kelly K.eLLl�ohwsovi,' Kelly Johnson Environmental Engineer NC Division of Energy, Mineral and Land Resources Stormwater Permitting 127 Cardinal Drive Extension Wilmington, INC 28405-3845 Phone 910 796 7331 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties ROY COOPER Gasernor MICHAELS REGAN Secretary l?" > C�xrE�rsl�Ns ctreue ry Qur�JN,p• WILLIAM E (TOBY) VINSON JP NORTH CAROLINA Interim Director Environmental Quality December 12 2018 Via email only huyhorizonhomes(a)Qmaileom KG Plara, LLC Arm Mr Jack Carlisle, Manager 8620 River Road Wilmington, AC 28412 Subject Request for Additional Information Stormwatcrl'rolectiNo SW8051045 The Reserve at i'almetto Creek Brunswick County Dear Mr Carlisle I he Wilmington Regional Office received and accepted a modified State Stormwater Management Permit Application for the subject project on October 16, 2018 A preliminary in-depth revicw of that information has determined that the application is not complete and that additional information is needed 10 continue the revicw, please provide the following additional information General Which ruiC(S) are each pond designed under`) I believe you had told me that the pond(s) had to be redesigned because they were constructed with incorrect elevations (i am not sure if that was all three ponds, or just one or two of them?) I he impervious area for Pond 1 increased by 36 011 sf, which could trigger it into a major modification to be designed under the 2017 rules if the pond had to be redesigned to accommodate that new volume. The impervious to fonds 2 and 3 did not increase All three drainage areas remained the same All three ponds have been designed for 1 5" as opposed to taking the previously -permitted impervious at 1 0", and so it appears that you are designing for the 2017 rules? I Iowever the average depth equations and the forcbay percentages appear to match the 2008 rule (18-22% of the whole pond) rather than the 2017 rule (15-20% of the main pond) Please advise [i have not vet compared the elevations in the calculations against the elevations in the plans I have also not yet reviewed the design for the 2017 rules ( 1050/General MDCs for all SCMs, or 1053/Wet Pond SCMs), or the 2008 Rule design standards I will do so upon resubmittal J 2 Project Area 1 15A NCAC 0211 1042(2)(g)(n)] Please provide dimensioned project or project phase boundary with bearings and distances 3 Contours [15A \CAC 02H 1042(2)(g)(iv)] Please provide proposed contours and drainage patterns Some spot elevations are provided, but the direction of the drainage is not clear for all areas of the project Please provide contours in support of the drainage area plan 4 1 ypical 1 ownhouse Footprint [ 15A \CAC 0211 1042(2)(g)(v)] Please show the site layout for all existing and proposed built -upon areas Please provide a typical townhouse footprint with dimensions on this sheet or a detail sheet, and also clarifv which direction the downspouts will dram 5 O&M Agreements 115A NCAC 0211 1042(2)0)J Please provide a signed and notarized operation and maintenance agreement that meets the requirements of 1050(1 1) and (12) D_E QJ� North Carolina Department of Environmental Quality I Division of Energy Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington North Carolina 28405 /'� 9107967215 State Stormwater Permit No SW8 051045 Page 2 of 2 6 Dccd Rcstricuons 115A \CAC 0211 1003(7) and 1042(2)(k)] Dced restrictions have been submitted showing that both the single family homes and the townhomes will have a maximum impervious area per lot Will the townhomes have a `yard sold with them, or will the property owner only buy the footprint of their unit in the building9 If there is no yard, then the townhomes do not need to be deed restricted (because the owner doesn t own land to build any impervious on) But, if there is a yard' please show the lot Imes for the townhomes on the plans in order to specify where the deed restricted impervious is to be located for each townhome 7 Collection System 115A \CAC 0211 1042(2)(g)(vu)] Please provide the details of the stormwater collection system including the inverts of the piped collection system 8 Wetlands \ote [15A \CAC 0211 1042(2)(g)(uQ] Please provide the boundaries of all surface waters wetlands regulatory flood /ones protected vegetated setbacks, and protected riparian buffers or a note on the plans that none exist 9 fond 1 Please ensure that all inlet pipes enter the pond through the forebay I0 1 ypo Please check the incremc ntal volumes for Pond 3 for elevation 22 11 Supplement 1 15A \CAC 0211 1042(2)] Please email the supplement form to the email address provided below so that it can be preserved clectronieally per the regulatory requirements Please remember to confirm that any revised information is presented consistently throughout the application documents including calculations, supplements, narrative, and plans Please also remember to provide two hard copies of any updated documents per 15A \'CAC 0211 1042(2) I he requested information should be received in this Office prior to Tanuan 6 2019, or the application will be returned as incomplete If the project is returned and you wish to re -submit later, you will need to resubmit all required items at that time, including the application fee If additional time is needed to submit the requested information please e-mail, mail or fax your cxtension request prior to the original due date to the Division using the contact information available in this letter I he extension request must include a justification and a date of when the requested information will be submitted to the Division Please remember that extension requests delay the issuance of the final permit I he Division is allowed 90 days from the receipt of a complete application to issue the permit I he construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of\CGS 143-215 1 and is subject to enforcement action pursuant to \CGS 143-215 6A Please reference the State assigned application number on all correspondence if you have any questions concerning this matter, please feel free to call me at (910) 796-7215 or email me at kelly p johnson@ncdenr gov Sincerely 5� Kelly Johnson Environmental Engineer GDS/kpj \\\Stormwater\Permits & Projects\2005\051045 I ID\2018 12 addinfo 051045 cc Phil Tripp, via email onlyy, office@trippenpmeenng com Wilmington Regional Officc Stormwater I ile