Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8010706_HISTORICAL FILE_20051011
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 U10-lU�o DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS Sp HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2 cUo 51 o I I YYYYMMDD r (1. t.. OF wArF90 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources O Alan W. Klimek, P.E. Director Division of Water Quality October 11, 2005 Mr. D. Logan, Managing Member DLBE Commercial Investments, LLC© 6740 Netherlands Drive, Suite F Wilmington, NC 28405 Subject: Permit No. SW8 010706 Modification Waterford Commercial Phase II & III (formerly Magnolia Business Park) High Density Subdivision Stormwater Project Brunswick County Dear Mr. Logan: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Waterford Commercial Phase II & III (formerly Magnolia Business Park) on October 6, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 010706 Modification, dated October 11, 2005, for the construction of the project, Waterford Commercial Phase II & III. This permit modifies Permit No. SW8 010706, issued November 21, 2001, and modified September 23, 2004 as follows: (a) changes ownership from Waterford Commercial Investment, LLC to DLBE Commercial Investments, LLC; (b) changes the project name from Magnolia Business Park to Waterford Commercial Phase II & III; (c) changes the Lot configuration from 4 lots at 500,688 ft2 to 15 lots at 817,186 ft2 of impervious area; (d) increases the drainage area from 15.24 acres to 23.3 acres; and (e) modifies the wet detention pond design. This permit shall be effective from the date of issuance until October 11, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Paul Bartlett, or me at (910) 796-7215. Sincere )% Edward ec%�B Regional Supervisor Surface Water Protection Section ENB/ptb S:\WQS\STORMWATER\PERMIT\0107O6Mod.octO5 cc: F. Comer Lyons, P.E., Cape Fear Engineering, Inc. Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Paul T. Bartlett, P.E. Wilmington Regional Office Central Files North Carolina Division or Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Services-877-623-6748 One Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: h2o.encstate nc us NQrthCaro/l/ina 1 An Equal Opportunity/AffirmativeAction Employer —50%Recycled/10%Post Consumer Paper Xatumll State Stormwater Management Systems Permit No. SW8 010706 Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO D. Logan & DLBE Commercial Investments, LLC Waterford Commercial Phase II & 111 (formerly Magnolia Business Park) Brunswick County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 11, 2015 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This permit modifies Permit No. SW8 010706, issued November 21, 2001, and modified September 23, 2004 as follows: (a) changes ownership from Waterford Commercial Investment, LLC to DLBE Commercial Investments, LLC; (b) changes the project name from Magnolia Business Park to Waterford Commercial Phase II & III; (c) changes the Lot configuration from 4 lots at 500,688 ft to 15 lots at 81 186 ft2 of impervious area; (d) increases the drainage area from 15.24 acres to3 acres; and (e) modifies 23. the wet detention pond design. �,I e) l;Le 4° *D This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this perrr�it. The subdivision is permitted for 15 lots with a built-ypon area of 817,186 ft total. Overall impervious area for the project is 865,570 ft . Each lot is allowed a maximum amount of built - upon area, in square feet, as listed by Attachment A to this permit. The built -upon area for the 15 lots of this project replaces the previously permitted lot allotment of Lot 1 @ 202,855; Lot 2 @107,927; Lot 3 @110,431; and Lot 4 @79,475 ft . 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification 5. The following design criteria have been permitted for the wet detention pond and must be maintained in the system at all times: a. Drainage Area, 9cres: 23.3 Onsite, ft : 1,014,948 Offsite, ft2: Rerouted, per Engineer b. Total Imperviqus Surfaces, ft2: 865,570 Lots, ft : 817,186 Onsite streets, ft2: 47,946 Other onsite, ft2: 438 C. Design Storm, inches: 1.0 d. Pond Depth, feet: 7.0 e. TSS Removal Efficiency, %: 90 f. Permanent Pool Elevation, FMSL: 23.0 g. Permanent Pool Surface Area, ft2: 40,336 h. Temporary Storage Elevation, FMSL: 25.4 i. Permitted Storage Volume, ft3: 103,931 j. Controlling Orifice: 3.0" ¢ pipe k. Permitted Forebay Volume, ft3: 49,611 I. Receiving Stream / River Basin: Jackeys Creek / Cape Fear M. Stream Index Number: 18-77-3 n. Classification of Water Body: "C Sw" II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built - upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Committee (ARC) is required to review plans for compliance with the BUA limit, the plans reviewed must include sidewalks and driveways. Any approvals given by the ARC do not relieve the lot owner of the responsibility to maintain compliance with the permitted BUA limit. Page 3 of 9 i , State Stormwater Management Systems Permit No. SW8 010706 Modification The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit or the stormwater rules. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size, including built -upon area and stormwater management. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 6. The Director may determine that other revisions to the project should require a modification to the permit. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 10. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is % horsepower. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification 12. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. Prior to transfer of the permit, the stormwater facilities must be inspected by DWQ personnel, and determined to be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 14. The permittee shall at all times, provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, catch basins and piping. g. Access to the outlet structure must be available at all times. 15. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 16. Prior to the sale of any lot, deed restrictions must be recorded which limit the built - upon area per lot to the amount as shown on Attachment A to this permit. The recorded statements must follow the form: The maximum built -upon area per lot, in square feet, is limited to the amount listed on Attachment A to Stormwater Management Permit No. SW8 010706 Modification, issued October 11, 2005. This allotted amount includes any built - upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. b. The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the State. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the State. d. All runoff on the lot must drain into the permitted system. This may be accomplished through a variety of means including: a piped collection system which ultimately discharges into the stormwater facility; appropriate gradin g of the lot such that the built -upon surfaces drain into the facility; or graded swales which collect runoff and direct into the stormwater facility. e. Each lot within the subdivision whose ownership is not retained by the permittee, must submit a separate Offsite Stormwater Management Permit application package to the Division of Water Quality and receive a permit prior to any construction on the lot. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must bear the signature of the Permittee, the deed book number and page, and stamp/signature of the Register of Deeds. 18. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 19. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved, such as a copy of the deed of trust. Other supporting materials, such as a signed Operation and Maintenance plan in the case of engineered systems, will also be required. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 11th day of October 2005. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification ATTACHMENT A IMPERVIOUS AREA PER LOT WATERFORD COMMERCIAL PHASE II & III Lot Total Area, sq.ft. Total Area, ac. Impervious Area, sq.ft. Impervious Area, ac. % Impervious 2 30,928 0.71 26,572 0.61 85.9 3 129,809 2.98 110,642 2.54 85.2 4 93,654 2.15 79,279 1.82 84.7 5 30,492 0.70 26,136 0.60 85.7 6 63,162 1.45 54,450 1.25 86.2 7 43,124 0.99 37,462 0.86 86.9 7A 63,598 1 1.46 54,886 1.26 86.3 8 47,480 1.09 40,946 0.94 86.2 9 77,101 1.77 66,647 1.53 86.4 10 47,916 1.10 41,382 0.95 86.4 11 73,616 1.69 63,598 1.46 86.4 12 61,855 1.42 53,579 1.23 86.6 13 62,726 1.44 54,014 1.24 86.1 14 62,726 1.44 54,014 1.24 86.1 15 61,855 1.42 53,579 1.23 86.6 Totals 950,042 21.81 817,186 18.76 86.0 Page 7 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification Waterford Commercial Stormwater Permit No. Brunswick County Phase II & III SW8 010706 Modification Designer's Certification Page 1 of 2 i, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW8 010706 Modification Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. The outlet/bypass structure elevations are per the approved plan. 5. The outlet structure is located per the approved plans. 6. Trash rack is provided on the outlet/bypass structure. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 3:1. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. Required drawdown devices are correctly sized per the approved plans. 12. All required design depths are provided. 13. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 14. The overall dimensions of the system, as shown on the approved plans, are provided. cc: NCDENR-DWQ Regional Office Delaney Aycock, Brunswick County Building Inspections Jeff Phillips, Brunswick County Engineering Page 9 of 9 . ,. 10/6/b�Af�—llcdeeef�er�r,`�i7O�ls' State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION: 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): DLBE Commercial Investments, L.L.0 2. Print Owner/Signing Official's name and title (person legally es ponsible for facility and compliance): D. Agent Registered , Lo anRe A g g S 3. Mailing Address for person listed in item 2 6740 Netherlands Drive Suite F City: Wilmington State: NC Zip: Telephone Number: (910) 443-2869 28405 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Waterford Commercial Phase II & III 5. Location of Project (street address): City Belville County: Brunswick 6. Directions to project (from nearest major intersection): Located along the north right-of-way on Hwy 17 at the Poole Road intersection 7. Latitude: 34012'56" Longitude: 78001'23" 8. Contact person who can answer questions about the project: Name: D. 11. PERMIT INFORMATION: 1. Specify whether project is (check one): New Telephone Number: (910) 443-2869 of project Renewal X Modification 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number S W8 010706 And its issue date (if known) November 21, 2001 Form: SWU-101 Version3.99 Page I of 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater will be treated in a wet detention basin. 2. Stormwater runoff from this project drains to the 3. Total Project Area: 23.3 5. How many drainage basins does the project have? 1 Fear River basin. 4. Project Built Upon Area: 85.4 % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Jacke s Creek Receiving Stream Class C Sw Drainage Area 1,014,948 sf 23.3 ac. Existing Impervious* Area N/A Proposed Impervious* Area ja& 5_-(0 96G,844�f 19.9 ac. % Impervious* Area total 85.4 % Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings N/A On -site Streets 47,946 sf (I. I ac. On -site Parkin N/A On -site Sidewalks N/A Other on -site 817,624 sf I8.77ac. F See - Off site N/A Total: 865,5110 sf 19.9 ac.) Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 7. How was the off -site impervious area listed above derived? N/A Form: SWU-101 Version 3.99 Page 2 of 4 IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS (see d"J) The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than ** square feet of anv lot shall be covered by structures or impervious materials Impervious materials include asphab, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface ofswinuning pools. ** SeeW fquirentenl. pu 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess area of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runofffrom outparcels or fitture development shall be directed into the permitted stormwater control .system. These connections to the stornnvater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land , that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Form: SWU-101 Version 3.99 Page 3 of Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment /management • Two copies of plans and specifications, including: -Development/Project name -Engineer and firm -Legend -North Arrow -Scale -Revision number & date -Mean high water line -Dimensioned property / project boundary -Location map with named streets or NCSR numbers -Original contours, proposed contours, spot elevations, finished floor elevations -Details of roads, drainage features, collection systems, and stormwater control measures -Wetlands delineated, or a note on plans that none exist -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations -Drainage areas delineated -Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate submittal authority to another individual or firm so that they may provide information on you behalf, please complete this section: Designated agent (individual or firm): Cape Fear Engineering, Inc. Mailing Address: 151 Poole Road, Suite 100 City: Belville State: NC Phone: (910)383-1044 Fax: (910)383-1045 VIII. APPLICANT'S CERTIFICATION Zip: 28451 1, (print or type name ofperson listed in General Information, item 2) D. Logan r certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H. 1000. Signature: � =Z. �— Date: Form: SWU-101 Version3.99 Page 4of4 I of 2 INFORMATION PERTAINING TO DEED RESTRICTIONS AND PROTECTIVE COVENANTS In accordance with Title 15 NCAC 2H.1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Commercial Subdivisions where lots will be subdivided and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. The following deed restrictions and covenants must be recorded prior to the sale of any lot: The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 010706 MOD, as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not to �tt>ijb� the concurrence of the Division of Water Quality. OGT 06 6. The maximum allowable built -upon area per lot is as follows: Lot Total Area Total Area Impervious Area Impervious Area % Impe vious (sq. ft.) (ac.) (sq. ft.) (ac.) 2 30928 0.71 26572 0.61 85.9 3 129809 2.98 110642 2.54 85.2 4 93654 2.15 85000 1.95 90.7 5 30492 0.70 26136 0.60 85.7 6 63162 1.45 54450 1.25 86.2 7 43124 0.99 37462 0.86 86.9 7A 63598 1.46 47165 1.13 77.4 8 47480 1.09 40946 0.94 86.2 9 77101 1.77 66647 1.53 86.4 10 47916 1.10 41382 0.95 86.4 11 73616 1.69 63598 1.46 86.4 12 61855 1.42 53579 1.23 86.6 13 62726 1.44 54014 1.24 86.1 14 62726 1.44 54014 1.24 86.1 15 61855 1.42 53579 1.23 86.6 Total 950044 21.81 815186 18.71 These allotted amounts include any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 43 2 of 2 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including: a piped collection system, which ultimately discharges into the stormwater facility; appropriate grading of the lot such that the built -upon surfaces drain into the stormwater facility; or graded swales which collect runoff and direct it into the stormwater facility. 8. Each lot whose ownership is not retained by the permittee, is required to submit a separate stormwater permit application to the Division of Water Quality and receive a permit prior to construction. I acknowledge and agree by my signature below that the information stated above will govern stormwater controls for this development in so much as these controls may be subject to future modifications of design and / or governing statutes. Print name: D. Logan Title: Managing Member Address: 6740 Netherlands Drive Suite F, Wilmington, NC 28405 Phone: (910) 443-2869 Signature: -d ( / Date: / U —( —ys I, �� �. ooL(&,,,,�,a Notary Public for the State of /Vo7f% (3�✓n� A, County of JBRuK)Sv_)fcs do hereby certify that �• LOGAAJ personally appeared before me this 6n� day of &62.� , zaa,S ,and acknowledge the due execution of the foregoing wet detention basin maintenance requirements. Witness my hand and official seal, �OTA4- GO• -*&aoo • SEAL My commission expires J u 1, 1 q, 2 004 4FCAPE FEAR Engineering, Inc. October 4. 2005 Paul T. Bartlett. P.E. Environmental Engineer North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: 5tormwater Project No. 5W8 010.70G Modification Waterford Commercial Phase II d III Brunswick County Dear Mr. Bartlett Cape Fear Engineering has received the second request for additional information regarding the subject development. In response, please consider the following. Item # I : Plan sheet D-2 has been enclosed for your files. This sheet reflects the modified 5tormwater pond cross-section and design elevations as requested. Item #2: 5igne6 and notarized deed restrictions are enclosed. I believe these additional documents complete the permit package for 5W8 01070GMOD and allow for the subsequent permitting of Lot #8 at Waterford Commercial Phase II * III Please let our office know if any further information is required prior to approval of the subject application. 51ncerely, E. Comer Lyons cc : Pile (660-01) enclosures 151 Pooie Road, Suite 100 • 8elville, NC 28451 • TEL: (910)383-1044 • FAX (910)383-1045 www.capefearengineerino.com 11 b,M106BM11AA. I AAI01,MW l uurl"I17RCUl tr Ill I'otl„II I).4.n:dne P. 1 * * * COMMUNICATION RESULT REPORT ( OCT. 4.2005 10:45RM ) * * * FILE MODE --------------- 234 MEMORY TX TTI NCDENR WIRO OPTION ADDRESS (GROUP) RESULT PAGE ----------------------------------------------------------------- 45OK P. REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SWEET William G. Ross, Jr., Secretary Date: 10/4/05 No, of Pages: 5 (Incl. Cover) To: F. Comer Lyons From: Paul Bartlett Company: Cape Fear Eng. Water Quality Section Stormwater FAX #: (910) 383-1045 FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 010706 Modification Project Name: Waterford Commercial Phase it & III MESSAGE: Comer, A Request for Additional Information is attached for the subject project, The original will be mailed to Mr. Logan, and a copy will be mailed to you, State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor William G. Ross, Jr., Secretary FAX COVER SHEET Date: 10/4/05 No. of Pages: 5 (Incl. Cover) To: F. Comer Lyons From: Paul Bartlett Company: Cape Fear Eng. Water Quality Section - Stormwater FAX #: (910) 383-1045 FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 010706 Modification Project Name: Waterford Commercial Phase II & III MESSAGE: Comer, A Request for Additional Information is attached for the subject project. The original will be mailed to Mr. Logan, and a copy will be mailed to you. ENB\ptb: S:\WQS\STORMWATER\ADDINFO\2005\010706MOD.oct05 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Telephone (910) 796-7215 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer OF W ATF9 Michael F. Easley, Governor William G. Ross, Jr., Secretary co North Carolina Department of Environment and Natural Resources p Y Alan W. Klimek, P.E. Director Division of Water Quality October 4, 2005 Mr. D. I. Logan, Managing Member DLBE Commercial Investments, LLC 6740 Netherlands Drive, Suite F Wilmington, NC 28405 Subject: Request for Additional Information Stormwater Project No. SW8 010706 Modification Waterford Commercial Phase II & III Brunswick County Dear Mr. Logan: The Wilmington Regional Office received a Stormwater Management Permit Application for Waterford Commercial Phase I I & III on September 21, 2005, and a revised application on September 30, 2005. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater reviex1elevation Please provide a pond detail that illustrates the proposed temporary pool and outlet structure overflow elevation at 25.4 ft. Attached is a copy of / the existing details from Tripp Engineering Drawing C2, approved by DWQ on i p�b o November 21, 2001, for Permit No.SW8 010706 that can be revised to generate the requested details. V2.Please provide original, signed, and notarized Deed Restrictions and Protective Covenants using the attached shell. In Section 6, referring to the previously 10/G 05 submitted table of Page 3A of 4 is sufficient. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to October 11, 2005, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. North Carolina Division of Water Quality 127 Cardlna! Drive Extension Phone (910) 796-7215 Customer Servicel-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Interneth2o em state nc us An Equal OpportunitylAffirmative Acton Employer— 50% Recycled/10% Post Consumer Paper NNaoe Carolina turally Mr. D. I. Logan, Managing Member October 4, 2005 Stormwater Application No. SW8 010706 Modification The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301. SincQrely, � 1'�'ld 1, 7-/4, Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:\WQS\STORMWATER\ADDINFO\2005\010706MOD.oct05 cc: F. Comer Lyons, Cape Fear Engineering, Inc. Paul Bartlett MIN. .ir FOUNDATION MATERIAL ILE IRON PIPE Ls EMBANKMENT / 1 TED PLAN VEGETATED SHELF TO BE PLAN w11AN0 SPECIES, AS LISTED 0E1GY 7• x 1/B" BEARING BARS. FASTEN wi1H GA�V. n/I GRATING — 4 x 1-1 ♦ x1/4 GALVANIZED TYPE I CPS. ATTACH TO 1-1/ OUTLET STRUCTURE-7 ANGLL FWL MORTAR FRAME TO TOP / POO(� i's�-p TOP OF �� �1 E� 27.0 POOL EL. 23.0 NORMAL F1 224 1 6 Z MAIN POOL 20.0 1BOTTOM L. 3 EL. 16.1 CENTER fO BE PLANTED `NIV TMREE1 SO AR 1 PLANT `0 ,WE ES TYPES: COMMON E WILDRCNERRY DOCK ON ^, , POND WEED SEDGES O1. 36-RGP I I I 3 TEMPORARY r -r GRAVEL �1 •, ^, IF.y FILTER BOTTOIA 16.0 SECTION A - A DETENTION POND OUTLET STRUCTURE NTS s;v8 0(0'70C 41 4FCAPE FEAR Engineering, Inc. September 30. 2005 Paul T. Bartlett. P.E. Environmental Engineer North Carolina Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405-3845 Re: 5tormwater Project No. 5W8 01070G Modification =!—k Waterford Commercial Phase II t III Brunswick County Dear Mr. Bartlett: Cape Fear Engmeermg has received the request for additional information regarding the subject development. In response, the 5tormwater Plan has been revised to address the five comments therein. Responses are summarized as follows - Item # I : The temporary pool elevation was previously 25.0 ft, as illustrated on the pond and outlet structure that was approved November 2 1, 2001 for Permit No. 5W8 010706. 25.4 ft will be the temporary pool elevation upon approval of this modification. Our calculations show the pond can handle this additional water and the outlet modification was discussed and agreed upon in our pre -submittal meeting. Item #2: The storm drain schedule of invert and rim elevations was added to Drawing C-200. Item #3: A separate plan was drafted illustrating the built upon conditions at the site Item #4: A copy of the proposed deed restrictions per page 3A of the application is enclosed. Item #5: The power line easement was not added to Drawing C-200 511`Ce it has been relocated to run along U5 Highway 17 and no longer runs through the project boundary. An additional item of merit that I would like to note follows. Lot #4 was originally permitted with an impervious allocation of 79,475 561 ft. From the permit drawmgs approved 1 112 1 /01 , however, this lot had a proposed impervious of approximately 85,000 sq ft For this reason, I have reduced the impervious allocation to Lot #7A (the pond lot) and added this extra impervious to Lot #4, resolving this issue. This change is reflected on page 3A of 4 (enclosed) and on the Built Upon Conditions drawmg submitted herewith as Sheet 2. 1 believe that these changes address the 5tate'5 concerns. Please let our office know if any further information is required. Sincerely, F Comer Lyons cc : File (660-01) enclosures 151 Poole Road, Suite 100 • Belville, NC 28451 • TEL: (910)3,53-1044 • FAX (910)353-1045 www.capefearengineering.com o vwA fi60-0Ib,d Ii ITOR%I W I amI][ RYhv Mlnmvu Page 3A of 4 : Impervious Area Per Lot Lot Total Area (sq. ft. Total Area ac. Impervious Area sq. ft. Impervious Area ac. % Impervious 2 30928 0.71 26572 0.61 85.9 3 129809 2.98 110642 2.54 85.2 4 93654 2.15 85000 1.95 90.7 5 30492 0.70 26136 0.60 85.7 6 63162 1.45 54450 1.25 86.2 7 43124 0.99 37462 0.86 86.9 7A 63598 1.46 47165 1.13 77.4 8 47480 1.09 40946 0.94 86.2 9 77101 1.77 66647 1.53 86.4 10 47916 1.10 41382 0.95 86.4 11 73616 1.69 63598 1.46 86.4 12 61855 1.42 53579 1.23 86.6 13 62726 1.44 54014 1.24 86.1 14 62726 1.44 54014 1.24 86.1 15 61855 1.42 53579 1.23 86.6 Total 1 9500441 21.811 8151861 18.71 P:\660\660-01 \Admin\STORM WTR\impareaperlotbreakdown.xls Page 3A of 4 : Impervious Area Per Lot Lot Total Area (sq. ft. Total Area (ac. Impervious Area sq. ft.) Impervious Area (ac. % Impervious 2 30928 0.71 26572 0.61 85.9 3 129809 2.98 110642 2.54 85.2 4 93654 2.15 85000 1.95 90.7 5 30492 0.70 26136 0.60 85.7 6 63162 1.45 54450 1.25 86.2 7 43124 0.99 37462 0.86 86.9 7A 63598 1.46 47165 1.13 77.4 8 47480 1.09 40946 0.94 86.2 9 77101 1.77 66647 1.53 86.4 10 47916 1.10 41382 0.95 86.4 P:\660\660-01\Admin\STORMWTR\impareaperiotbreakdown.xls P. 1 u * * COMMUNICATION RESULT REPORT ( SEP.23.2005 4:09PM ) * TTI FILE MODE OPTION ADDRESS (GROUP) RESULT --------------------------------------------------------------------------------- 997 MEMORY TX 93831045 OK REASON FOR ERROR E-1) HANG UP OR LINE FAIL E-3) NO ANSWER 23� � t a��la r NCDENR WIRO PAGE -------------- P. 5/5 E-2) BUSY E-4) NO FACSIMILE CONNECTION State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F, Easley, Governor FAX COVER SHEET William G. Ross, Jr., Secretary Date: 9/23/05 No, of Pages: 5 (Incl. Cover) To: F. Comer Lyons From: Paul Bartlett Company: Cape Fear Eng. Water Quality Section - Stormwater FAX #; (910) 383-1045 FAX #: 910.360-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 010706 Modification Project Name: Waterford Commercial Phase II & III DWQ Stormwater Project Number: SW8 050909 Project Name: Waterford Commercial Lot 8 MESSAGE: Comer, State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Michael F. Easley, Governor FAX COVER SHEET William G. Ross, Jr., Secretary Date: 9/23/05 No. of Pages: 5 (Incl. Cover) To: F. Comer Lyons From: Paul Bartlett Company: Cape Fear Eng. Water Quality Section - Stormwater FAX #: (910) 383-1045 FAX #: 910-350-2004 Phone #: 910-796-7301 DWQ Stormwater Project Number: SW8 010706 Modification Project Name: Waterford Commercial Phase II & III DWQ Stormwater Project Number: SW8 050909 Project Name: Waterford Commercial Lot 8 MESSAGE: Comer, A Request for Additional Information is attached for the subject projects. The original will be mailed to Mr. Logan, and a copy will be mailed to you. /J ENB\ptb: S:\WQS\STORMWATER\ADDINFO\2005\010706MOD.sept05 127 Cardinal Drive Extension, Wilmington, NC 28405-3845 Telephone (910) 796-7215 FAX (910) 350-2004 An Equal Opportunity Affirmative Action Employer Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources --I September 23, 2005 Mr. D. I. Logan, Managing Member DLBE Commercial Investments, LLC 6740 Netherlands Drive, Suite F Wilmington, NC 28405 Subject: Request for Additional Information Stormwater Project No. SW8 010706 Modification Waterford Commercial Phase II & III Brunswick County Alan W. Klimek, P.E. Director Division of Water Quality L') c) �fr w/s Dear Mr. Logan: The Wilmington Regional Office received a Stormwater Management Permit Application for Waterford Commercial Phase II & III on September 21, 2005. A preliminary review of that information Pas determined that the application is not compI t The following information is needed to,c ntinue the stormwa er view: ✓rP�l Mp - rif thyt�ernpora eva on. esupplement and calculations list 25. and 5.0 rated for the pond and outlet structure on Drawings C1 o� ( s et 1 of anC2 (shee 2 of 2) that were a roved Nov r ��} ermit No.-SW8_010706. ase-revise e-pon detail pond -se o , andoulef structure detail on the drawino . P1ea�atld—a sto—Tm reschedule of invert and rim elevations to Drawing C-200. 3 l/Please provide a separate plan that illustrates existing conditions and built -upon �2�i3lo area at the site. 11 4. Please provide a copy of the proposed deed restrictions for the new lot 4 / configuration per page 3A of the application to include all required conditions and limitations. 5. �Kase add the power line easement to Drawing C-200. '0(��o ( " Q�r 'a" I g"�� 0-"- lli "r V Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to September 30, 2005, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Servicel-877-623-6748 One Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910)350-2004 Internet: h2oenrstatencus NorthCarolina An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper y/�(ltuwll y Mr. D. I. Logan, Managing Member September 23, 2005 Stormwater Application No. SW8 010706 Modification If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301. Since ely, Paul T. Bartlett, P.E. Environmental Engineer ENB/ptb: S:\WQS\STORMWATER\ADDINFO\2005\010706MOD.sept05 cc: F. Comer Lyons, Cape Fear Engineering, Inc. Paul Bartlett Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)807-2000 Corporations *Corporations Home *Important Notice OCorporate Forms/Fees "Corporations FAQ OTobacco Manufacturers *Dissolution Reports *Non -Profit Reports *Verify Certification "Online Annual Reports Links •Secretary Of State Home *Register for E-Procurement *Dept. of Revenue Legislation 01999 Senate Bills 02001 Bill Summaries *Annual Reports 1997 *Corporations 1997 •Other Legislation Search •By Corporate Name •For New Corporation •By Registered Agent Online Orders *Start An Order *New Payment Procedures Contact Us *Corporations Division *Secretary of State's web site Print •Printable Page Date: 9/22/2005 Click here to: View Document Filings I Print apre-populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC DLBE Commercial Legal ttica) vL c-x-e Investments, LLC NC Waterford Commercial Prev Legal Investments, LLC Limited Liability Company Information SOSID: FID: Status: Date Formed: Citizenship: State of Inc.: Duration: Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address: 0724917 Current -Active 5/7/2004 Domestic NC Perpetual Logan, D 1 6740 Netherlands Drive / Suite F ✓/ Wilmington NC 28405 6740 Netherlands Drive Suite F Wilmington NC 28405 6740 Netherlands Drive Suite F Wilmington NC 28405 Principal Mailing Address: No Address For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. http://www. secretary. state.nc. us/Corporations/Corp. aspx?Pitcmld=6467750 . 9/22/2005 C200509800245 ITED LIABILITY COMPANY (LLC) . Ivv UAL REF6ORT NAME OF LIMITED LIABILITY COMPANY: DLBE COMMERCIAL STATE OF OReAmu ION: NC f LLC 0724917 Date Filed: 5/17/2005 1:35:00 PM Elaine F. Marshall North Carolina Secretary of State C200508800245 SECRETARY OF STATE LLC. ID NUMBER: mm YEAR ENDING: 12 / 31 / 04 MOIRWOAY/YFAR FEDERAL EMPLOYER IO NU MBER: 201172164 IF TM 16 THE INITIALANNUAL REPORT FILING. PLEASE COMPLETE THE ENTIRE FORM. IF YOUR % LLCS INFORMATION W NOT CHANGEO SINCE THE PREVIOUS REPORT, PLEASE CIM THE BOX ND ACOMPLETE LIE 8 ONLY. 1. REGISTERED AGENT 6 REGISTERED OFFICE MAILING ADDRESS: —� - - --- - �- 3�13Fi.�._ (-_0.�,/h� �1�bUA-�(�►F,�l.Hu8E2 2. STREET ADDRESS AND COUNTY a REGISTERED OFFICE: %?�l0 - F AJ e�eo-(a u & Dr S. IF THE REGISTERED AGENT OMWO, 818NMTURE OF THE NEW AGENT: SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 4. ENTER PRINCIPAL OFFICE ADDRESS HERE: ADDRESS - 5. ENTER PRINCIPAL OFFICE TELEPHONE NUMBER HERE: r 10 � g �, -) (? 5- PLUM INCLUDE AREA CODE S. ElM WVAIE, TITLE, AND BUSINESS ADDRESS OF MANAGER($) HERE: 2) 150ef- Clan AP �y11FA1R�LAIET 7. BRIEFLY DESCRIBE THE NATURE OFF BUSINESS: S. CERTIFICATION OF ANNUAL REPORT MUBT BE COMPLETED SY ALL LIMITED LIABILITY COMMNIES �-is =°g , FORM MUBTBE SIGNED BY A MANAGER OF THE L.L.C. 11 DATE j 3 y 1- oa N nMANAGING MEMBER V TYPE OR PRAT NAME vTYPE OR PRINT TITLE ANNUAL REPORT FEE: $20000 MAIL 70: SeaW ry o1 ShL • Coipon0one DIMon • Past ORIce Box M25 • RtldDh, NC TTB26-0526 oamc� gagn CAPE FEAR 'r� Engineering, Inc. 151 Poole Boeq Suite 100 BeNille, NC 28451 TEL (910)383-1044 FAX (910) 383-1045 www.capefearengineering.com To: NCDENR 127 Cardinal Drive Extension Wilmington, NC 28405 Attn: Cameron Weaver Transmittal Date: 9-7-05 File: 660-01 Subject: SW8 010706 Waterford Commercial Phase II &III Stormwater Modification ❑ As Requested ❑ For Your Files ❑ For Distribution ® For your Review / Action / Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Stormwater Management Permit Fee (Check for $4,000.00) 2 Stormwater Management Permit Application 2 BMP Supplement (1 Wet Detention Pond: 2 Copies) 2 Design Narrative & Calculations 2 SETS Plans- Final Design Not For Construction REMARKS Ate- 0 at � -y r DW CC: o ✓ / Cape F r Engineedrig, Inc. File (660-01)�l`6 ,t t Signed 0 I I Omer LvQVs, P.E. d P\660\660-01Wdmin\STORMW R\trans DENR 9-7-05 doc CAPE FEAR Engineering, Inc. September 9. 2005 Paul Bartlett, P.E. Express Permitting NC DENR-Wilmington 127 Cardinal Drive Extension Wilmington, NC 25405-3845 Re: Waterford Commercial Phase II E III 5tormwater Express Permit Review Existing Permit Dear Mr. Bartlett Thank you for taking the time to meet with Cape Fear Engineering on September 7" concerning the subject express 5tormwater submittal. As a result of our conversation that day, certain changes have been made to the overall permit modification transmitted herewith. We have broken out an individual line item for impervious area to construct the double -lane, two-way street shown on the plan. This impervious area is not reflected in impervious allocation to individual lots,y� within the modified subdivision and may be built, partially or on whole, by the project owner ar�r,Vy l t , tenant(s). j'r��� In addition, we have returned the two existing lots. lying on the western edcje—of t ommeraal subdivision and built under existing permit numbers 5W8 01070G and 5W8 04090� to their apparent configuration and impervious allocations shown at the time of their permitting Furthermore, these lots have been numbered in accordance with the original permit documents for consistency and ease of review. Lastly, it is our understanding that the existing offsite permit for lot number three can remain valid by submitting this modification as described above and we agree this perspective should streamline the modification process and remove potential redundancy in the offsite permits. Please contact our office if you have any questions or concerns. 51ncerely, Y Comer Lyons. P.E. 4...Xil' Y E� SEP 2 Z005 j�Y: C) 0p3 'o(A 151 Poole Road, Suite 100 • Belville, NC 2e451 • TEL: (910)383-1044 • FAX: (910)383-1045 www.capefearengineering.com P«.nn,eeu.nlAAdm�19 MdAlWIR% I I II � uVun, P RnMu 0-a.0:dn, Q Storm Water / Erosion Control Design Narrative and Calculations Subject: Waterford Commercial Phase II & III Brunswick County, North Carolina Prepared for DLBL Commercial Investments, L.L.0 Wilmington, North Carolina Date: September 2005 Prepared by 1 sy 8 Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 (910) 383-1044 DESIGN NARRATIVE L GENERAL: The project site is located off of Hwy 17 at Gregory Road adjacent to the current Waterford Development. The project lies entirely within the city limits of Belville- Brunswick County, North Carolina. This development site is an existing Industrial subdivision that the client intends to recast as a commercial subdivision in complement to the Waterford residential. Approximately 23 acres comprises the subdivision with 5 acres having been previously built under existing permits. Subsequent to the existing development and permits, there is a substantial wet detention basin on site and this project will utilize the same for treatment of all existing and proposed impervious surfaces. 2. EXISTING SITE: Currently, two lots within the proposed subdivision have been built under the existing permit. The remainder of the site is relatively flat with slopes typically less than one (1) percent. The vegetation consists primarily of grasses and minor ground cover within the area of the future improvements. Subsurface soils are typically a mixture of sands, silty sands and organics. The stormwater pond for this site is now existing and stabilized. 3. PROPOSED IMPROVEMENTS: At this time, proposed improvements will consist solely of underground utilities- Stormwater Conveyance, Sanitary Sewer, Public Water Supply- to accommodate the desired commercial construction. The proposed utilities will be placed to allow future connections, from each individual lot, without the need to cross property lines. Additionally, the existing stormwater pond will be bulkheaded above the temporary pool to allow for future travel aisles around the area of the pond. 4. DRAINAGE CONSIDERATIONS: As this area was previously permitted and partially constructed, stormwater will be treated in the existing, on site pond. Via grate inlets and curb inlets, runoff from impervious areas will enter an engineered system and travel to the pond for detention. After treatment, stormwater will be routed through the pond's outlet structure to the existing discharge point along U.S. Highway 17. 5. EROSION CONTROL CONSIDERATIONS: The site will employ temporary and semi -permanent means to control erosion from the site. Silt fence and inlet protection will reduce sediment entering the conveyance system and the on site pond will act as storage for transported sediment. The area of disturbance is limited to that shown on the plans and graded slopes are not to exceed three (3) to one (1) with vegetative establishment a priority. 6. MAINTENANCE CONSIDERATIONS: During construction, the Contractor shall be required to inspect and repair as needed all erosion control devices after any significant rain event. Any measure found not performing its intended function, shall be repaired immediately. Upon completion of construction the establishment of permanent ground cover will be a priority. Erosion and Sedimentation Control 1.01 General: The contractor shall be responsible for erosion and sedimentation control within the construction limits; for prevention of sediment laden runoff leaving the construction limits or entering ditches, streams or water impoundments; and for implementation of necessary erosion and sedimentation control measures to meet the requirements of the North Carolina Department of Environment, Health, and Natural Resources. The Contractor shall also be responsible for all damages or fines resulting from erosion or sediment laden runoff in the execution of his contract. 1.02 Construction Sequence: While the use of erosion and sedimentation control devices is especially important on areas of steep topography, easily erodible soils and sites in close proximity to water courses throughout the construction period, the control measures should be installed prior to the commencement of land clearing and shall be fully maintained and periodically inspected until final restoration and stabilization is completed. Unrestored cleared areas shall be kept to a minimum. Disturbed areas ahead of construction shall only be accomplished on those segments for the shortest practical distance as required for continual progress. Final restoration shall not be delayed until completion of the project but will be carried out in phases as the work proceeds. Under no circumstances will any areas be left denuded for more than (30) thirty calendar days without some form of stabilization until final restoration is complete. 1.03 Sedimentation: Control Measures: The following are some of the sediment control devices or measures that may be required to prevent sedimentation of streams, water courses, or drainage structures: 1. Earth berms and/or diversion and intercept ditches. 2. Sediment traps 3. Filter berms 4. Filter inlets 5. Silt fences - not to be placed in streams or ditches perpendicular to flow. 6. Check dams gravel filter 7. Gravel construction exit 1.03.1 Erosion Control Measures: Some of the soil erosion control measures which may be required in this contract are: 1. Earth slope protection 2. Diagonal water break diversion berms 3. Diversion channels 4. Preservation of existing vegetation 5. Storm inlet protection 6. Stream crossings 7. Energy dissipators 8. Matting of re -seeded areas 1.03.2 Detail Drawing: Examples of sedimentation and erosion control details are shown in these plans for installation at locations designated in the plans or as otherwise required by the regulating agency, or the owner as work proceeds. 1.04 Stream Protection: Where construction activities are necessary in close proximity to streams, and other waterways, they shall be performed in a manner that does not contribute to degradation of or blockage of the stream -flow. In order to prevent possible degradation or blockages, the contractor shall be required to: 1. Keep all construction debris, excavated materials, brush, rocks, refuse and topsoil as far from these waterways as possible. Restrict machinery operation or stream crossings in waterways to the extent necessary for construction of utilities crossings. 2. If construction work areas are necessary in a waterway, they shall be protected as indicated on the plans. 3. If temporary roadways are essential for the construction activities, they shall be constructed of soils which are not highly erodible materials and must not span more than half way across the water course or wetland area at any one time unless otherwise approved by the Engineer. These temporary roadways shall be entirely removed as soon as their requirement is met. Work in these areas shall follow the requirements of the Corp of Engineers or CAMA permit, or plans as applicable. 1.05 Construction Access: The travel of equipment to and from the construction areas shall be minimized not only to protect areas that will not be denuded, but also to prevent the spreading of sediment within and outside of the construction areas. Therefore, special construction equipment travel corridors will be established for this use and instructions shall be issued for their use. Use of these corridors must be fully enforced. Other non- essential traffic will be restricted or discouraged. Indiscriminate and convenience traffic shall not be allowed. 1.06 Stockpile/Barrow Areas: The Contractor shall be responsible for selecting, obtaining and maintaining stockpile or borrow areas which he may require to complete the contract. He is also required to design and incorporate all necessary sediment and erosion controls measures necessary to prevent erosion and contribution of sediment to adjacent areas. The Contractor is responsible to obtain all necessary permits or approvals for borrow or spoil areas outside the construction limits. 1.07 Disposal of Excess Water From Excavations: The Contractor shall practice management of excess water pumped from excavation to reduce the production and spreading of sediment. Pumped water shall be discharged onto stabilized surfaces and allowed to filter through existing vegetation if possible, otherwise, additional control measures may be necessary. If ditches are required to remove pumped water from construction excavations, they shall be given the same consideration as any other man- made waterway and they shall be stabilized as to not degrade and produce sediment. 1.08 Excavation and Backfill: Excavation shall be closely controlled and all the material removed from the excavation shall be selectively stockpiled in areas where a minimum of sediment will be generated and where other damage will not result from the piled material. Drainage ways shall be protected at all times and the placement of material in Drainage ways for convenience shall not be allowed. Backfilling operations shall be performed in such a manner that remaining trees are not damaged. 1.09 Final Grading and Seeding: Finish grading, topsoiling, seeding and/or sodding shall be performed after the construction phase is complete. Permanent vegetation of the areas, that have been disturbed, shall be re-established as rapidly as possible. If the completion of the construction activities do not coincide with a season in which permanent vegetation can be generated, an interim or temporary program is required. This shall include soil conditioners and mulching as necessary for soil stabilization. In any case, sediment and erosion controls shall be installed promptly and their maintenance assured. 1.10 Approval: The approved Erosion Control Plan will be provided by the Owner. Any standard conditions relating to soil erosion and sediment control issued to the Contractor as a part of any permits shall be available at the job site at all times. CALCULATIONS PROJECT: WA-ra Fe ra> C04 N(GQc IAL - A I E IC ►� CLIENT: U V✓.p IrO C. SUBJECT - 'S Fi7 t lol e'A -r :2 i ,5xA 6 C DATE: PROJ. NO.: 6 L o -t) ( DESIGNED BY: 2-0 1— Oe Poole Road, nuke ioo CAPE FEAR 6dvtlle, NC ZB451 TEL (MO) W310" M- (MO) W-M045 Engineering, Inc. wwwxapeW remineednadom 3,56 11 zC P 139-9DIe�2 OF 2"E 2 uX, 2 . � l S'c Ile AEG 3 -t Afflendm NEW YORK DOT DISSIPATOR MEMOD FOR USE IN DEFINED CHANNELS (Source: Bank and channel Imbig procedures% New York DepmWW of ThnVortafian, Division of Design and Construction, 1971.) Note: To use the following chart you most know: (1) Q fell capacity (2) Qto (3) V full (4) Vto where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity Vo at culvert or paved channel outkL Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outkts. Do=Ao, where Ar crass -sectional aura of flow at oatleL For multiple culverts, use Do--11SxDo of single culvert. Step 3) For apron grades of 10%orsteeper, use recommendations For watt higher zone. (Cones 1 through 6). ml..artrt rtlQll.l. M....lart.l[m.11[rtrtrtO m..lQrtmmII.lm.i. DIImV I[rtmlrtrt[[[I[[rtl. rt...artam.a rtu.trtrtQQrtl[O WIYa.Y ai.al.a W I.rtII..IIaat.1W 4rtaia.a....rt.aall/ a.ul:L.vrtvaa urtrtn net. uvamu valve u ilv.mm.rtuurtu uurtuuvnaullv.vvu atvva\ay.�mvul[vla. W a.amuau uv nnur v.mum.vrtu.murt[.nmu.luvvll .am0m.m.alluvvlmv.W tmurt...vm sm��vmamu[umavl.m[Imu�l[u ucam.vaavvvvvnvm[v.[avvvrtvvv mtvrtvo• vv.ivuv vrt..v.am.v vvuuv iotn'vvvv.�vviv n [.vrt uuunvv[.urtav lRII 1...l..am.luaa....a. rt..QIIv..aaR..vO [ ®III�a....\ml[.I[[ Iml[I[.IilIIlrtmm[O amatII..��mlammrtaaW rt.I..rt.. Watl.m amO'lim.l�amm[.ml[rtm.rtrttm[mrt nr..vv®vaa.�..[tmva...vvv..l.uvv..v II.a Wa[.vrtrtata.amvvurt.mrtl. vvay.rtm+aavv..vv�vuvartrtvvrtv Wart.art o:uaaortu.matlartvv.rt mf[Ifl..v.rma®�vlivu iv.IlmvI.I.Wm mmamrtvvvu muav[u.ir i\laavtm�[[n;©uvn-..Icvvv.[u®vvc.vv vm�.[[amvrtemIIv.v...vu ,our• IIrtaaa.ml...I..�..t.aa.aav W mvvmm nmamt►�'vvllulr[ Taam.[Iv.vuvlimiv � a�•marta.®avuulnv..umiv.irtmm n�uu ell uvaa®-vuvul; v[mv u vv ul[rt u®mvmal.vs�.mm�-.au.m O DII�`I.rtmlamRla©rt W��RIrtrtLrtRll Wau..v rtQrtII.UWIQ�mQauL�lm[m� m[.IIula...IQLV..II..rtn .am.rtIIrt � W_ml.�_oII. W arm®v.m..v. ivvv v vavl.v.m.avv un,.avuatl[llimuvm[ vvuurtvuuv urt mm� m © o[iii i�uu.O.m miR.mi..l I.nf. taaL.a.lQrtrt R[W.4`a I.IW W.[Irtl....l v(�j.mvmaurt �.s•v[u.amvuvvvo vvvrv.ca.lulivvvul.rt �W W I.nrtull mrt llaml®\mQu.1l...rt..a'VIIIRI. rt..l. ml! tlPrtrt.mpVmlam.a[.[m��\Ila[.rtW. a.11,m-.mvi..._.rt..auW vl.nala�vl.v.... War mL.[.mm. V. W1.1rt.laam.f.V.IW. arm R.vL�.W1.Q.Il1VI..a...WII...II.�-1I1 a ( s I*= 8b&kl io, Is ar a DW+ETER (FL) a 3xz -6�f I :::. IZ dl ZS �is°leg. CL., s 6ME FUNS 04EAvv) CL 2 I s x D. I to x a I a srnuF Fuimm tHEAVn CL 2 I s x m to x D. I Fig. sz.h2 WA& = 3 tames pipe dia (mim.) DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVEIMENiS Step 1) Use figure 8A6b3 to determine mwdmam stone size (e g. far 12 Fps=20'or55016s. Step2) Use fig=&06.6.4todeteemiueameptaNesmerangeSw=w (for12FPShis m500I &far75%ofsbvaidthematamnm saidmiaimmrtsaageiowdgu daWbe25-S00 tsa Note:ln&wmmmgdiamdwlodtmforumbuiopand=vMiaiL= the folbwiog eoefixeiems Of musba= Diameter Mamin's KM thiclmess (inches) v of boas (inches) Hue 3 OA31 9 12 -�— Light 6 OA35 12 is Medmm 13 0.040 is 24 Heavy 23 0.044 30 36 (mil (mil e ..� Wv. t209 9 07 n uu 1 �L7•':S ii�li� 141 i. I�•jl 11 • I : It .•, a 40 .i:H—lm • 7- �fR! �. ! I t; 10111 ' rV..A. .�. lip-•��i...1�7fi'.7,�1 ... , . . - 1N .... 11. ..... �"""r""" • '• j �1 1.:17�. . 1i17 i1i1 Bitm7 I lit Dom. • • •• • 1 1 1 I I 0 2 4 6 8 10 12 14 is la Lit %%b ty in feetRSea. a Ii Based anlsbesflClxlle b 4Vcak3 u,c 115'66 ill^& 0 Fig. 8A6h3 Max. Stone Sure for Rip flap a a m m c 1,000 a$i 'o Soo s 250 3 100 so I ro 9 :F� C Maximum weight of shone required Minimum and maximum range in weight of stones Weight range of 75% of stones (lbs•) (1ts•) (tbs.) 150 25 - 150 50 - 150 200 25 - 200 50 - 200 250 25 - 250 50 - 250 400 25 - 400 100 - 400 600 25 - 600 150 - 600 800 25 - 800 200 - 800 1,000 50 - 1.000 250 - 1,000 1,300 50 - 1,300 325 - 1.300 1,600 50 - 1,600 400 - 1,600 2,000 75 - 2,000 600 - 2,000 2,700 100 - 2,700 800 - 2,700 Figure 8A6b4 Godation of Rip Rap So== Burk and 1d ti W Fowdmm "New Yo* Depmtmem of Tramp nom Di► um of Dsip mid Comhor" ign- Re[ 12M 8:06.7 WET POND DATA SHEET WATERFORD COMMERCIAL DESIGN POND # I DRAINAGE AREA (Ad) = IMPERVIOUS AREA (Ai): EXISTING: FUTURE ROADS FUTURE LOTS CONTINGENCY: TOTAL: PERCENT IMPERVIOUS (1): 23.3 ACRE5 4.3G ACRES 1. 10 ACRES 14.44 ACRES 0.00 ACRES 19.90 ACRE5 I = Ad/Ai = 85% F POND# I SHALL BE 7' DEEP AND DESIGNED TO REMOVE 90 % T55. SA/DA= 3.7 REQUIRED SURFACE AREA AT PERMANENT POOL: 5AF�EQ = 0.65045 AC. = 37045.G 5F SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 70)= 4033G SF SA PROV'D= 4033E ✓ > 37045.E =5A REQD ✓ OK ........................................................................................................................... MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009'(I) Rv= 0.815 VOLUME= I .5"RV'Ad = 2.373G9 AC -FT 103398 FT ^ 3 POND# I DATA SHEET PAGE I Of 4 AUGUST2005 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL EL. 5A (SF) VOL. (CF) VOL. (CF) 23 4033G 0 0 i, 24 42687 41511.5 41511.5 F(d� dw0/ -�25 45093 43890 8540 L.5 26 47553 46323 131725 5ET TEMP. POOL ELEVATION: REQ'D EL.= 25.3885 f-SAY (25:4 VOL. PROV ID = 103931 F-------------- ..................................................................................................................... VOL. PROV'D= 103931 > 103398 =VOL. REQ'D OK:: ........................................................................................................................... FOREBAY 51ZING: PERMANENT POOL VOLUME: EL. 5A (50 16 25445 17 27400 18 29412 19 31452 20 '336 Y0 21 3579G 22 38038, 23 40336 REQ'D VOLUME = 20% TOTAL = INCREM. TOTAL VOL. (CF) VOL. (CF) 0r 0 26422.5 26422.5 284OG 54828.5 30447 85275.5 3254G 117822 34703 152525 36917 189442 39157 228629� 4572G CF POND# I DATA 5HEET PAGE 2 OF 4 5EPTEMDER 2005 CHECK FOREBAY VOLUME: INCREM. TOTAL Ej— 5A (5F) VOL, (CF) VOL. (CF) 17 7128 Q Q 18 8175 7651.5 7651.5 19 9282 8728.5 16380 20 10447 9864.5 26244.5 21 IF1669 11055 37302.5 22 12947 12308 _ 49610.5 PROV'D VOLUME = 49G 10.5 CF (5' DEEP FOREBAY) ....................................................................................................................... VOL. PROV'D= 496 10.5 > 45726 ✓=VOL. REQ'D OK .......................................................................................................................... ORIFICE 51ZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.59837 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.23935 CFS (FOR 5 DAY DRAWDOWN) SELECT A 3.0 INCH CIRCULAR ORIFICE, EL. 45' (PERM. POOL EL.) Q PROV'D= Cd'A'(26jh)^ 1/2 WHERE: Cd= 0.6 A= 0.04909 5F g= 32.2 FP5/5 h= avg head: (2.4'-1 1.13175 Q PROV'D= 0.25144 ................................................................ 02> 0.25144 >05 OK ti................................................................... 571 2)/2 POND# I DATA 5HEET PAGE 3 OF: 4 5EPTEMDFP 2005 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) Return period (yrs) Inflow hyd(s) Maximum elevation (it) Maximum storage (cult) Hydrograph description 1 Rational 48.91 1 20 58,691 100 — Existing Condition 2 Rational 166.82 1 10 100,093 100 — Post Development 3 Reservoir 0.34 1 20 27,057 100 2 25.31 99.855 Post through Pond 4 Reservoir 0.34 1 20 26,825 100 2 25.31 99,858 Reality check post Proj. file: pre_post_8-9-05.GPWI OF file: BrunCo hydrograph1VeMMOate: 09-01-2005 Hydrograph Report Hyd. No. 1 Existing Conditions Page 1 English Hydrograph type = Rational Peak discharge = 48.91 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.3 Intensity = 7.00 in Time of conc. (Tc) = 20 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 58,691 cult Hydrograph Discharge Table Time — Outflow (hrs cfs) 0.32 46.46 0.33 48.91 << 0.35 46.46 0.37 44.02 ...End Hydrograph Report Hyd. No. 2 Post Development Page 1 English Hydrograph type = Rational Peak discharge = 166.82 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.84 Intensity = 8.52 in Time of conc. (Tc) = 10 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 100,093 cult Hydrograph Discharge Table Time -- Outflow (hrs cfs) 0.15 150.14 0.17 166.82 << 0.18 150.14 .End Hydrograph Report Hyd. No. 3 Post through Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 2 Max. Elevation = 25.31 ft storage Indication method used. Hydrograph Discharge Table Time Inflow (hrs) cfs 0.23 100.09 0.25 83.41 0.27 66.73 0.28 50.05 0.30 33.36 0.32 16.68 0.33 0.00 0.35 0.00 0.37 0.00 0.38 0.00 0.40 0.00 0.42 0.00 0.43 0.00 0.45 0.00 0.47 0.00 0.48 0.00 0.50 0.00 0.52 0.00 0.53 0.00 0.55 0.00 0.57 0.00 0.58 0.00 0.60 0.00 0.62 0.00 0.63 0.00 0.65 0.00 0.67 0.00 0.68 0.00 0.70 0.00 0.72 0.00 0.73 0.00 0.75 0.00 0.77 0.00 0.78 0.00 0.80 0.00 0.82 0.00 Peak discharge Time interval Reservoir name Max. Storage Page 1 English = 0.34 cfs = 1 min = Existing Pond = 99,855 cuft Total Volume = 27,057 cult Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow fit cfs cfs cfs cfs cfs cfs cfs cfs cfs 24.92 10.51 0.31 - - - - - - 0.31 25.04 11.44 0.32 - - - - - - 0.32 25.14 12.11 0.33 - - - - - - 0.33 25.22 12.60 0.33 - - - - - - 0.33 25.27 12.92 0.34 - - - - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.31 13.17 0.34 - - 0.00 - - - 0.34 << 25.31 13.16 0.34 - -- 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - -- 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 -- - 0.00 - - - 0.34 25.31 13.14 0.34 - -- 0.00 - - -- 0.34 25.31 13.14 0.34 -- - 0.00 - - - 0.34 25.31 13.14 0.34 - - 0.00 -- - - 0.34 25.31 13.14 0.34 -- - 0.00 -- - -- 0.34 25.31 13.13 0.34 - - 0.00 - - -- 0.34 25.31 13.13 0.34 - -- 0.00 -- --- -- 0.34 25.30 13.13 0.34 -- - 0.00 - - --- 0.34 25.30 13.13 0.34 - - 0.00 - - - 0.34 25.30 13.12 0.34 - - 0.00 - - - 0.34 25.30 13.12 0.34 - - 0.00 -- - - 0.34 25.30 13.12 0.34 - - 0.00 - - - 0.34 25.30 13.12 0.34 - - 0.00 - - - 0.34 25.30 13.12 0.34 - - 0.00 - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.30 13.10 0.34 - - 0.00 - - - 0.34 25.30 13.10 0.34 - - - -- - - 0.34 25.30 13.10 0.34 - - - -- - - 0.34 Continues on next page... Post through Pond Hydrograph Discharge Table Page 2 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.83 0.00 25.30 13.10 0.34 - --- -- -- -- - 0.34 0.85 0.00 25.30 13.09 0.34 -- -- --- -- - -- 0.34 0.87 0.00 25.30 13.09 0.34 --- - --- - - ----- 0.34 0.88 0.00 25.30 13.09 0.34 --- - -- - - -- 0.34 0.90 0.00 25.30. 13.09 0.34 - -- --- - - - 0.34 0.92 0.00 25.30 13.08 0.34 - -- - - - - 0.34 0.93 0.00 25.30 13.08 0.34 --- --- - - - -- 0.34 0.95 0.00 25.30 13.08 0.34 - - - - - - 0.34 0.97 0.00 25.30 13.08 0.34 - - - - - - 0.34 0.98 0.00 25.29 13.07 0.34 - - - - - - 0.34 1.00 0.00 25.29 13.07 0.34 - - - - - - 0.34 1.02 0.00 25.29 13.07 0.34 - - - - - - 0.34 1.03 0.00 25.29 13.06 0.34 - - - - - - 0.34 1.05 0.00 25.29 13.06 0.34 - - - - - - 0.34 1.07 0.00 25.29 13.06 0.34 - - - - - - 0.34 1.08 0.00 25.29 13.06 0.34 - - - - - - 0.34 1.10 0.00 25.29 13.05 0.34 --- - - - - - 0.34 1.12 0.00 25.29 13.05 0.34 -- - - - - - 0.34 1.13 0.00 25.29 13.05 0.34 - - - - - - 0.34 1.15 0.00 25.29 13.05 0.34 --- - - - - - 0.34 1.17 0.00 25.29 13.04 0.34 -- - - - - - 0.34 1.18 0.00 25.29 13.04 0.34 - - - - - - 0.34 1.20 0.00 25.29 13.04 0.34 - - -- - -- - 0.34 1.22 0.00 25.29 13.04 0.34 - - - - - - 0.34 1.23 0.00 25.29 13.03 0.34 - - - - - - 0.34 1.25 0.00 25.29 13.03 0.34 - - - - - - 0.34 1.27 0.00 25.29 13.03 0.34 - - - - - - 0.34 1.28 0.00 25.29 13.03 0.34 - - - - - - 0.34 1.30 0.00 25.29 13.02 0.34 - - - - - - 0.34 1.32 0.00 25.29 13.02 0.34 - - - - - - 0.34 1.33 0.00 25.29 13.02 0.34 - - - - - - 0.34 1.35 0.00 25.29 13.02 0.34 - - - - - - 0.34 1.37 0.00 25.28 13.01 0.34 - - - - - - 0.34 1.38 0.00 25.28 13.01 0.34 - -- - - - - 0.34 1.40 0.00 25.28 13.01 0.34 - - --- - - - 0.34 1.42 0.00 25.28 13.00 0.34 -- - --- - - - 0.34 1.43 0.00 25.28 13.00 0.34 -- - - - - -- 0.34 1.45 0.00 25.28 13.00 0.34 - - - - - 0.34 1.47 0.00 25.28 13.00 0.34 -- -- -- -- - -- 0.34 1.48 0.00 25.28 12.99 0.34 --- -- -- - -- -- 0.34 1.50 0.00 25.28 12.99 0.34 -- --- --- -- -- --- 0.34 1.52 0.00 25.28 12.99 0.34 - -- - - - -- 0.34 1.53 0.00 25.28 12.99 0.34 --- -- - - - - 0.34 1.55 0.00 25.28 12.98 0.34 -- -- - - - - 0.34 1.57 0.00 25.28 12.98 0.34 -- -- -- - - - 0.34 1.58 0.00 25.28 12.98 0.34 - - - - - - 0.34 1.60 0.00 25.28 12.98 0.34 -- - - - - - 0.34 1.62 0.00 25.28 12.97 0.34 --- -- - - - - 0.34 1.63 0.00 25.28 12.97 0.34 - - - - - - 0.34 Continues on next page... Post through Pond Hydrograph Discharge Table Page 3 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.65 0.00 25.28 12.97 0.34 - - - ---- -- - 0.34 1.67 0.00 25.28 12.97 0.34 - - --- -- -- - 0.34 1.68 0.00 25.28 12.96 0.34 - - - -- - -- 0.34 1.70 0.00 25.28 12.96 0.34 - - - - -- - 0.34 1.72 0.00 25.28 12.96 0.34 - - - - - - 0.34 1.73 0.00 25.28 12.96 0.34 - - - - - - 0.34 1.75 0.00 25.27 12.95 0.34 - - - - - - 0.34 1.77 0.00 25.27 12.95 0.34 - - - - - - 0.34 1.78 0.00 25.27 12.95 0.34 - - - - - - 0.34 1.80 0.00 25.27 12.94 0.34 - - - - - - 0.34 1.82 0.00 25.27 12.94 0.34 - - - - - - 0.34 1.83 0.00 25.27 12.94 0.34 - - - - - - 0.34 1.85 0.00 25.27 12.94 0.34 - -- - - - -- 0.34 1.87 0.00 25.27 12.93 0.34 - - - - - - 0.34 1.88 0.00 25.27 12.93 0.34 - - - - -- - 0.34 1.90 0.00 25.27 12.93 0.34 - - - - - - 0.34 1.92 0.00 25.27 12.93 0.34 - - - - - - 0.34 1.93 0.00 25.27 12.92 0.34 - - - - - - 0.34 1.95 0.00 25.27 12.92 0.34 - - - - - - 0.34 1.97 0.00 25.27 12.92 0.34 - - - - - - 0.34 1.98 0.00 25.27 12.92 0.34 - - - - - - 0.34 2.00 0.00 25.27 12.91 0.34 - - - - - - 0.34 2.02 0.00 25.27 12.91 0.34 - - - - - - 0.34 2.03 0.00 25.27 12.91 0.34 - - - - - - 0.34 2.05 0.00 25.27 12.91 0.34 - - - - - - 0.34 2.07 0.00 25.27 12.90 0.34 - - - - - - 0.34 2.08 0.00 25.27 12.90 0.34 - - - - - - 0.34 2.10 0.00 25.27 12.90 0.34 - - - - - - 0.34 2.12 0.00 25.27 12.90 0.34 - --- - --- - - 0.34 2.13 0.00 25.26 12.89 0.34 - - - -- - - 0.34 2.15 0.00 25.26 12.89 0.34 -- - - - - -- 0.34 2.17 0.00 25.26 12.89 0.34 - - - - - - 0.34 2.18 0.00 25.26 12.88 0.34 - - - - - - 0.34 2.20 0.00 25.26 12.88 0.34 - - - - - - 0.34 2.22 0.00 25.26 12.88 0.34 - - - - - - 0.34 2.23 0.00 25.26 12.88 0.34 - - - - - - 0.34 2.25 0.00 25.26 12.87 0.34 - - - - - - 0.34 2.27 0.00 25.26 12.87 0.34 - - - - - - 0.34 2.28 0.00 25.26 12.87 0.34 - - - - - - 0.34 2.30 0.00 25.26 12.87 0.34 - - - - - - 0.34 2.32 0.00 25.26 12.86 0.34 - - - -- - -- 0.34 2.33 0.00 25.26 12.86 0.34 --- - -- - -- -- 0.34 2.35 0.00 25.26 12.86 0.34 - - --- -- --- -- 0.34 2.37 0.00 25.26 12.86 0.34 - - - -- -- - 0.34 2.38 0.00 25.26 12.85 0.34 - --- --- -- - -- 0.34 2.40 0.00 25.26 12.85 0.34 - - -- - -- - 0.34 2.42 0.00 25.26 12.85 0.34 -- - -- - -- - 0.34 2.43 0.00 25.26 12.85 0.34 - -- - - - - 0.34 2.45 0.00 25.26 12.84 0.34 - - - - - - 0.34 Continues on next page... Post through Pond Hydrograph Discharge Table Page 4 Time Inflow Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cis cfs cfs cfs cfs cis cfs 2.47 0.00 25.26 12.84 0.34 - - -- - -- - 0.34 2.48 0.00 25.26 12.84 0.34 - -- --- - - -- 0.34 2.50 0.00 25.26 12.84 0.34 - -- -- - - -- 0.34 2.52 0.00 25.25 12.83 0.34 - --- -- --- - -- 0.34 2.53 0.00 25.25 12.83 0.34 - - -- --- - - 0.34 2.55 0.00 25.25 12.83 0.34 -- -- --- -- -- - 0.34 2.57 0.00 25.25 12.83 0.34 - -- - - - - 0.34 2.58 0.00 25.25 12.82 0.34 -- --- -- - - --- 0.34 2.60 0.00 25.25 12.82 0.34 - -- -- - -- -- 0.34 2.62 0.00 25.25 12.82 0.34 - -- -- - -- - 0.34 2.63 0.00 25.25 12.81 0.33 - --- --- - - -- 0.33 2.65 0.00 25.25 12.81 0.33 -- -- -- --- - - 0.33 2.67 0.00 25.25 12.81 0.33 --- -- -- - - -- 0.33 2.68 0.00 25.25 12.81 0.33 -- ----- -- - - -- 0.33 2.70 0.00 25.25 12.80 0.33 - -- -- - - -- 0.33 2.72 0.00 25.25 12.80 0.33 -- -- - - - -- 0.33 2.73 0.00 25.25 12.80 0.33 -- -- - - - - 0.33 2.75 0.00 25.25 12.80 0.33 - ---- - - - - 0.33 2.77 0.00 25.25 12.79 0.33 -- --- - - - - 0.33 2.78 0.00 25.25 12.79 0.33 - --- - - - - 0.33 2.80 0.00 25.25 12.79 0.33 -- -- - - - - 0.33 2.82 0.00 25.25 12.79 0.33 - - - -- - - 0.33 2.83 0.00 25.25 12.78 0.33 - -- - - - - 0.33 2.85 0.00 25.25 12.78 0.33 -- -- - - - - 0.33 2.87 0.00 25.25 12.78 0.33 - - - - - - 0.33 2.88 0.00 25.25 12.78 0.33 -- - - - - - 0.33 2.90 0.00 25.24 12.77 0.33 - - - - - - 0.33 2.92 0.00 25.24 12.77 0.33 - - - - - -- 0.33 2.93 0.00 25.24 12.77 0.33 - - - - - - 0.33 2.95 0.00 25.24 12.77 0.33 - - - - - - 0.33 2.97 0.00 25.24 12.76 0.33 -- - -- - - - 0.33 2.98 0.00 25.24 12.76 0.33 - - - - - -- 0.33 3.00 0.00 25.24 12.76 0.33 - - - - - -- 0.33 3.02 0.00 25.24 12.76 0.33 -- - - - - - 0.33 3.03 0.00 25.24 12.75 0.33 --- - -- --- - - 0.33 3.05 0.00 25.24 12.75 0.33 - - -- - - - 0.33 3.07 0.00 25.24 12.75 0.33 - - - -- - - 0.33 3.08 0.00 25.24 12.74 0.33 - - - --- -- - 0.33 3.10 0.00 25.24 12.74 0.33 -- -- -- -- - - 0.33 3.12 0.00 25.24 12.74 0.33 - - --- ---- -- -- 0.33 3.13 0.00 25.24 12.74 0.33 -- --- ---- ---- ---- 0.33 3.15 0.00 25.24 12.73 0.33 --- - -- -- - -- 0.33 3.17 0.00 25.24 12.73 0.33 - - -- --- -- -- 0.33 3.18 0.00 25.24 12.73 0.33 - -- - -- --- -- 0.33 3.20 0.00 25.24 12.73 0.33 - - --- ---- - -- 0.33 3.22 0.00 25.24 12.72 0.33 -- - -- --- --- --- 0.33 3.23 0.00 25.24 12.72 0.33 - -- - - -- -- 0.33 3.25 0.00 25.24 12.72 0.33 - -- --- --- - - 0.33 3.27 0.00 25.24 12.72 0.33 --- --- -- - -- ---- 0.33 Continues on next page... Post through Pond Hydrograph Discharge Table Page 5 Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.28 0.00 25.23 12.71 0.33 -- --- -- - - -- 0.33 3.30 0.00 25.23 12.71 0.33 - --- -- - --- -- 0.33 3.32 0.00 25.23 12.71 0.33 -- -- -- -- - --- 0.33 3.33 0.00 25.23 12.71 0.33 -- -- ---- - - -- 0.33 3.35 0.00 25.23 12.70 0.33 -- -- - - -- -- 0.33 3.37 0.00 25.23 12.70 0.33 -- --- --- - -- -- 0.33 3.38 0.00 25.23 12.70 0.33 - - -- -- -- -- 0.33 3.40 0.00 25.23 12.70 0.33 - -- - -- --- --- 0.33 3.42 0.00 25.23 12.69 0.33 - -- -- - -- -- 0.33 3.43 0.00 25.23 12.69 0.33 -- -- -- -- -- - 0.33 3.45 0.00 25.23 12.69 0.33 - ---- -- - -- --- 0.33 3.47 0.00 25.23 12.69 0.33 - -- - - -- --- 0.33 3.48 0.00 25.23 12.68 0.33 -- -- - -- --- -- 0.33 3.50 0.00 25.23 12.68 0.33 -- -- --- -- --- -- 0.33 3.52 0.00 25.23 12.68 0.33 --- - -- - -- - 0.33 3.53 0.00 25.23 12.68 0.33 -- -- -- - -- - 0.33 3.55 0.00 25.23 12.67 0.33 -- - -- -- -- - 0.33 3.57 0.00 25.23 12.67 0.33 -- - --- -- - -- 0.33 3.58 0.00 25.23 12.67 0.33 - - - - -- - 0.33 3.60 0.00 25.23 12.66 0.33 -- -- - - - - 0.33 3.62 0.00 25.23 12.66 0.33 -- - -- - - - 0.33 3.63 0.00 25.23 12.66 0.33 - - - - - - 0.33 3.65 0.00 25.23 12.66 0.33 - - - - - - 0.33 3.67 0.00 25.22 12.65 0.33 - - - - - - 0.33 3.68 0.00 25.22 12.65 0.33 -- - -- - -- - 0.33 3.70 0.00 25.22 12.65 0.33 -- - - - - - 0.33 3.72 0.00 25.22 12.65 0.33 - - - - - - 0.33 3.73 0.00 25.22 12.64 0.33 - - - - - - 0.33 3.75 0.00 25.22 12.64 0.33 -- - - - - - 0.33 3.77 0.00 25.22 12.64 0.33 -- - - - - - 0.33 3.78 0.00 25.22 12.64 0.33 - - - - - - 0.33 3.80 0.00 25.22 12.63 0.33 -- - - - - - 0.33 3.82 0.00 25.22 12.63 0.33 - - - - - - 0.33 3.83 0.00 25.22 12.63 0.33 -- - - - - - 0.33 3.85 0.00 25.22 12.63 0.33 -- -- - - - - 0.33 3.87 0.00 25.22 12.62 0.33 -- - - - - - 0.33 3.88 0.00 25.22 12.62 0.33 -- - - - - - 0.33 3.90 0.00 25.22 12.62 0.33 -- -- -- - - -- 0.33 3.92 0.00 25.22 12.62 0.33 ---- -- - - - - 0.33 3.93 0.00 25.22 12.61 0.33 --- - -- -- - -- 0.33 3.95 0.00 25.22 12.61 0.33 --- -- ---- - --- -- 0.33 3.97 0.00 25.22 12.61 0.33 --- --- -- -- - - 0.33 3.98 0.00 25.22 12.61 0.33 - - - -- -- ---- 0.33 4.00 0.00 25.22 12.60 0.33 --- --- --- - --- ---- 0.33 4.02 0.00 25.22 12.60 0.33 --- --- -- --- - - 0.33 4.03 0.00 25.22 12.60 0.33 -- -- -- - -- 0.33 4.05 0.00 25.21 12.60 0.33 -- - - --- ---- ----- 0.33 4.07 0.00 25.21 12.59 0.33 -- --- -- - -- --- 0.33 4.08 0.00 25.21 12.59 0.33 --- ---- --- --- ---- 0.33 Continues on next page... Post through Pond Hydrograph Discharge Table Page 6 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cis cis cis cfs cfs cis cis cfs cfs 4.10 0.00 25.21 12.59 0.33 - - - - - - 0.33 4.12 0.00 25.21 12.59 0.33 -- - -- - - - 0.33 4.13 0.00 25.21 12.58 0.33 - - - - - - 0.33 4.15 0.00 25.21 12.58 0.33 -- - - - - - 0.33 4.17 0.00 25.21 12.58 0.33 - - -- - - - 0.33 4.18 0.00 25.21 12.57 0.33 - - - - - - 0.33 4.20 0.00 25.21 12.57 0.33 - - --- -- - -- 0.33 4.22 0.00 25.21 12.57 0.33 - - - - - - 0.33 4.23 0.00 25.21 12.57 0.33 - - --- - - - 0.33 4.25 0.00 25.21 12.56 0.33 - - -- - -- - 0.33 4.27 0.00 25.21 12.56 0.33 - - -- - - - 0.33 4.28 0.00 25.21 12.56 0.33 -- -- -- - - - 0.33 4.30 0.00 25.21 12.56 0.33 - - -- - - - 0.33 4.32 0.00 25.21 12.55 0.33 - - -- -- - - 0.33 4.33 0.00 25.21 12.55 0.33 -- - - - - - 0.33 4.35 0.00 25.21 12.55 0.33 - - -- - - - 0.33 4.37 0.00 25.21 12.55 0.33 - -- --- - - - 0.33 4.38 0.00 25.21 12.54 0.33 - - - - - - 0.33 4.40 0.00 25.21 12.54 0.33 - - --- - - - 0.33 4.42 0.00 25.21 12.54 0.33 - - - - - - 0.33 4.43 0.00 25.21 12.54 0.33 - - - - - - 0.33 4.45 0.00 25.20 12.53 0.33 - - - - - - 0.33 4.47 0.00 25.20 12.53 0.33 - - - - - - 0.33 4.48 0.00 25.20 12.53 0.33 - - - - - - 0.33 4.50 0.00 25.20 12.53 0.33 - - - - - - 0.33 4.52 0.00 25.20 12.52 0.33 - - - - - - 0.33 4.53 0.00 25.20 12.52 0.33 - -- - - - - 0.33 4.55 0.00 25.20 12.52 0.33 - - - - - - 0.33 4.57 0.00 25.20 12.52 0.33 - -- - - - - 0.33 4.58 0.00 25.20 12.51 0.33 - - - - - - 0.33 4.60 0.00 25.20 12.51 0.33 - - - - - - 0.33 4.62 0.00 25.20 12.51 0.33 - - - - - -- 0.33 4.63 0.00 25.20 12.51 0.33 - - - - - - 0.33 4.65 0.00 25.20 12.50 0.33 -- - -- -- - - 0.33 4.67 0.00 25.20 12.50 0.33 - - - - - - 0.33 4.68 0.00 25.20 12.50 0.33 - -- - - - - 0.33 4.70 0.00 25.20 12.49 0.33 --- - - -- - - 0.33 4.72 0.00 25.20 12.49 0.33 - - - - - - 0.33 4.73 0.00 25.20 12.49 0.33 -- - - ---- -- - 0.33 4.75 0.00 25.20 12.49 0.33 -- - - - - - 0.33 4.77 0.00 25.20 12.48 0.33 -- - - --- -- - 0.33 4.78 0.00 25.20 12.48 0.33 -- - - --- -- - 0.33 4.80 0.00 25.20 12.48 0.33 - - - - - - 0.33 4.82 0.00 25.20 12.47 0.33 -- -- -- --- --- -- 0.33 4.83 0.00 25.19 12.47 0.33 - - - - - - 0.33 4.85 0.00 25.19 12.47 0.33 --- -- --- --- -- - 0.33 4.87 0.00 25.19 12.47 0.33 -- -- -- --- - - 0.33 4.88 0.00 25.19 12.46 0.33 - - - - - - 0.33 4.90 0.00 25.19 12.46 0.33 --- --- --- - --- - 0.33 Continues on next page... Post through Pond Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs 4.92 0.00 25.19 12.46 0.33 - - -- - - -- 0.33 4.93 0.00 25.19 12.45 0.33 - - -- - - - 0.33 4.95 0.00 25.19 12.45 0.33 - -- ---- - - -- 0.33 4.97 0.00 25.19 12.45 0.33 - - -- -- - - 0.33 4.98 0.00 25.19 12.45 0.33 - -- -- --- - --- 0.33 5.00 0.00 25.19 12.44 0.33 - --- --- - - --- 0.33 5.02 0.00 25.19 12.44 0.33 - -- - - -- - 0.33 5.03 0.00 25.19 12.44 0.33 - -- - - -- -- 0.33 5.05 0.00 25.19 12.43 0.33 - - - - -- - 0.33 5.07 0.00 25.19 12.43 0.33 -- -- - - - -- 0.33 5.08 0.00 25.19 12.43 0.33 - - - - - - 0.33 5.10 0.00 25.19 12.43 0.33 - - - - - - 0.33 5.12 0.00 25.19 12.42 0.33 - - - - - - 0.33 5.13 0.00 25.19 12.42 0.33 - - - - - - 0.33 5.15 0.00 25.19 12.42 0.33 - - - - - - 0.33 5.17 0.00 25.19 12.41 0.33 - - - - - - 0.33 5.18 0.00 25.19 12.41 0.33 - - - - - - 0.33 5.20 0.00 25.19 12.41 0.33 - - - - - - 0.33 5.22 0.00 25.19 12.41 0.33 - - - - - - 0.33 5.23 0.00 25.18 12.40 0.33 - - - - - - 0.33 5.25 0.00 25.18 12.40 0.33 - - - - - - 0.33 5.27 0.00 25.18 12.40 0.33 - - - - - - 0.33 5.28 0.00 25.18 12.40 0.33 - - - - - - 0.33 5.30 0.00 25.18 12.39 0.33 - - - - - - 0.33 5.32 0.00 25.18 12.39 0.33 - - - - - - 0.33 5.33 0.00 25.18 12.39 0.33 - - - - - - 0.33 5.35 0.00 25.18 12.38 0.33 - - - - - - 0.33 5.37 0.00 25.18 12.38 0.33 - - - - - -- 0.33 5.38 0.00 25.18 12.38 0.33 - - - - - --- 0.33 5.40 0.00 25.18 12.38 0.33 - - - - - -- 0.33 5.42 0.00 25.18 12.37 0.33 - - - - -- --- 0.33 5.43 0.00 25.18 12.37 0.33 - - - - - -- 0.33 5.45 0.00 25.18 12.37 0.33 - - - - - -- 0.33 5.47 0.00 25.18 12.36 0.33 - - - - - -- 0.33 5.48 0.00 25.18 12.36 0.33 - - - - -- - 0.33 5.50 0.00 25.18 12.36 0.33 - - - - - -- 0.33 5.52 0.00 25.18 12.36 0.33 - - - - - - 0.33 5.53 0.00 25.18 12.35 0.33 - - - - - - 0.33 5.55 0.00 25.18 12.35 0.33 - - - - - - 0.33 5.57 0.00 25.18 12.35 0.33 - - - - - - 0.33 5.58 0.00 25.18 12.34 0.33 - - - - - -- 0.33 5.60 0.00 25.18 12.34 0.33 - - - --- - - 0.33 5.62 0.00 25.17 12.34 0.33 - - - - - - 0.33 5.63 0.00 25.17 12.34 0.33 - - - - - - 0.33 5.65 0.00 25.17 12.33 0.33 - - - - - - 0.33 5.67 0.00 25.17 12.33 0.33 - - - - - - 0.33 5.68 0.00 25.17 12.33 0.33 - - - -- - - 0.33 5.70 0.00 25.17 12.32 0.33 - - - - - - 0.33 5.72 0.00 25.17 12.32 0.33 - - -- - - - 0.33 Continues on next page... Post through Pond Page 8 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 5.73 0.00 25.17 12.32 0.33 - - - - - - 0.33 5.75 0.00 25.17 12.32 0.33 - - - - - - 0.33 5.77 0.00 25.17 12.31 0.33 - - - - - - 0.33 5.78 0.00 25.17 12.31 0.33 - - - - - - 0.33 5.80 0.00 25.17 12.31 0.33 - - - - - - 0.33 5.82 0.00 25.17 12.30 0.33 - - - - - - 0.33 5.83 0.00 25.17 12.30 0.33 - - - - - - 0.33 5.85 0.00 25.17 12.30 0.33 - - -- - - - 0.33 5.87 0.00 25.17 12.30 0.33 - - - - -- - 0.33 5.88 0.00 25.17 12.29 0.33 - - - - - - 0.33 5.90 0.00 25.17 12.29 0.33 - - -- - -- - 0.33 5.92 0.00 25.17 12.29 0.33 - -- - - - - 0.33 5.93 0.00 25.17 12.28 0.33 - - -- - -- - 0.33 5.95 0.00 25.17 12.28 0.33 - -- -- - - - 0.33 5.97 0.00 25.17 12.28 0.33 - -- - - -- - 0.33 5.98 0.00 25.17 12.28 0.33 - -- - -- -- - 0.33 6.00 0.00 25.16 12.27 0.33 -- - - - - - 0.33 6.02 0.00 25.16 12.27 0.33 - - -- - - - 0.33 6.03 0.00 25.16 12.27 0.33 - - - - - - 0.33 6.05 0.00 25.16 12.27 0.33 - - - -- - - 0.33 6.07 0.00 25.16 12.26 0.33 - - - - - - 0.33 6.08 0.00 25.16 12.26 0.33 - - - - - - 0.33 6.10 0.00 25.16 12.26 0.33 - - - - - - 0.33 6.12 0.00 25.16 12.25 0.33 - - - - - - 0.33 6.13 0.00 25.16 12.25 0.33 - - - - - - 0.33 6.15 0.00 25.16 12.25 0.33 - - - - - - 0.33 6.17 0.00 25.16 12.25 0.33 - - - - - - 0.33 6.18 0.00 25.16 12.24 0.33 - - - - - - 0.33 6.20 0.00 25.16 12.24 0.33 - - - - - - 0.33 6.22 0.00 25.16 12.24 0.33 - - - - - - 0.33 6.23 0.00 25.16 12.23 0.33 - - - - - -- 0.33 6.25 0.00 25.16 12.23 0.33 - - - - - - 0.33 6.27 0.00 25.16 12.23 0.33 -- - - - - - 0.33 6.28 0.00 25.16 12.23 0.33 - - --- -- - - 0.33 6.30 0.00 25.16 12.22 0.33 - - --- - - - 0.33 6.32 0.00 25.16 12.22 0.33 -- - -- -- - - 0.33 6.33 0.00 25.16 12.22 0.33 - -- ---- --- - - 0.33 6.35 0.00 25.16 12.21 0.33 - -- - - - - 0.33 6.37 0.00 25.16 12.21 0.33 - -- - - -- -- 0.33 6.38 0.00 25.16 12.21 0.33 --- -- --- --- -- - 0.33 6.40 0.00 25.15 12.21 0.33 - - --- - --- - 0.33 6.42 0.00 25.15 12.20 0.33 - -- -- -- -- -- 0.33 6.43 0.00 25.15 12.20 0.33 -- -- -- - - - 0.33 6.45 0.00 25.15 12.20 0.33 - - - - - - 0.33 6.47 0.00 25.15 12.19 0.33 - - - - - - 0.33 6.48 0.00 25.15 12.19 0.33 - - - - - - 0.33 6.50 0.00 25.15 12.19 0.33 -- - -- - - - 0.33 6.52 0.00 25.15 12.19 0.33 - - - - - - 0.33 6.53 0.00 25.15 12.18 0.33 - - -- - - - 0.33 Continues on next page... Post through Pond Hydrograph Discharge Table Page 9 Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cis cis 6.55 0.00 25.15 12.18 0.33 -- - -- - --- - 0.33 6.57 0.00 25.15 12.18 0.33 - - - - - - 0.33 6.58 0.00 25.15 12.17 0.33 -- - - --- -- - 0.33 6.60 0.00 25.15 12.17 0.33 - -- - - -- - 0.33 6.62 0.00 25.15 12.17 0.33 - - - - - - 0.33 6.63 0.00 25.15 12.17 0.33 - - - - - - 0.33 6.65 0.00 25.15 12.16 0.33 - - - - - - 0.33 6.67 0.00 25.15 12.16 0.33 - - - - - - 0.33 6.68 0.00 25.15 12.16 0.33 - - - - - - 0.33 6.70 0.00 25.15 12.16 0.33 - - - - - - 0.33 6.72 0.00 25.15 12.15 0.33 - - - - - - 0.33 6.73 0.00 25.15 12.15 0.33 - -- - - -- - 0.33 6.75 0.00 25.15 12.15 0.33 - - -- - --- - 0.33 6.77 0.00 25.15 12.14 0.33 - -- - - -- - 0.33 6.78 0.00 25.15 12.14 0.33 - -- -- - - - 0.33 6.80 0.00 25.14 12.14 0.33 - - - - - - 0.33 6.82 0.00 25.14 12.14 0.33 - - - - - - 0.33 6.83 0.00 25.14 12.13 0.33 -- - -- - - - 0.33 6.85 0.00 25.14 12.13 0.33 - - - - - - 0.33 6.87 0.00 25.14 12.13 0.33 - - - - - - 0.33 6.88 0.00 25.14 12.12 0.33 - - - - - - 0.33 6.90 0.00 25.14 12.12 0.33 - - - - - - 0.33 6.92 0.00 25.14 12.12 0.33 - - - - - - 0.33 6.93 0.00 25.14 12.12 0.33 - - - - - - 0.33 6.95 0.00 25.14 12.11 0.33 - - - - - - 0.33 6.97 0.00 25.14 12.11 0.33 - - - - - - 0.33 6.98 0.00 25.14 12.11 0.33 - - - - -- - 0.33 7.00 0.00 25.14 12.10 0.33 - - --- - - - 0.33 7.02 0.00 25.14 12.10 0.33 - - -- -- -- - 0.33 7.03 0.00 25.14 12.10 0.33 - - - -- - - 0.33 7.05 0.00 25.14 12.10 0.33 - -- -- - -- - 0.33 7.07 0.00 25.14 12.09 0.33 - - - - - - 0.33 7.08 0.00 25.14 12.09 0.33 - - - - - - 0.33 7.10 0.00 25.14 12.09 0.33 - - - - - - 0.33 7.12 0.00 25.14 12.09 0.33 - - - - -- - 0.33 7.13 0.00 25.14 12.08 0.33 - - - - - - 0.33 7.15 0.00 25.14 12.08 0.33 - - - - - - 0.33 7.17 0.00 25.14 12.08 0.33 - - - - - - 0.33 7.18 0.00 25.13 12.07 0.33 - - - - - -- 0.33 7.20 0.00 25.13 12.07 0.33 - - - - -- - 0.33 7.22 0.00 25.13 12.07 0.33 -- -- -- - - - 0.33 7.23 0.00 25.13 12.07 0.33 --- - --- - --- --- 0.33 7.25 0.00 25.13 12.06 0.33 ---- --- - - - - 0.33 7.27 0.00 25.13 12.06 0.33 ---- -- - -- -- - 0.33 7.28 0.00 25.13 12.06 0.33 -- --- -- -- -- -- 0.33 7.30 0.00 25.13 12.05 0.33 --- - - -- -- - 0.33 7.32 0.00 25.13 12.05 0.33 --- -- - - -- - 0.33 7.33 0.00 25.13 12.05 0.33 -- -- - -- --- - 0.33 7.35 0.00 25.13 12.05 0.33 --- - - - - -- 0.33 Continues on next page... Post through Pond Page 10 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 7.37 0.00 25.13 12.04 0.33 - - - - - - 0.33 7.38 0.00 25.13 12.04 0.33 - - - - - - 0.33 7.40 0.00 25.13 12.04 0.32 - - - - - -- 0.32 7.42 0.00 25.13 12.03 0.32 - - - - - - 0.32 7.43 0.00 25.13 12.03 0.32 - -- - - - - 0.32 7.45 0.00 25.13 12.03 0.32 -- - - - -- - 0.32 7.47 0.00 25.13 12.03 0.32 - - - - -- - 0.32 7.48 0.00 25.13 12.02 0.32 - -- - - - - 0.32 7.50 0.00 25.13 12.02 0.32 - - - - - - 0.32 7.52 0.00 25.13 12.02 0.32 - - - - - - 0.32 7.53 0.00 25.13 12.02 0.32 - - - - - - 0.32 7.55 0.00 25.13 12.01 0.32 - - - - - - 0.32 7.57 0.00 25.13 12.01 0.32 - - - - - - 0.32 7.58 0.00 25.12 12.01 0.32 - - - - - - 0.32 7.60 0.00 25.12 12.00 0.32 - - - - - - 0.32 7.62 0.00 25.12 12.00 0.32 -- - - - - - 0.32 7.63 0.00 25.12 12.00 0.32 - - -- - - - 0.32 7.65 0.00 25.12 12.00 0.32 - - - - - - 0.32 7.67 0.00 25.12 11.99 0.32 - - - - - - 0.32 7.68 0.00 25.12 11.99 0.32 - - - - - - 0.32 7.70 0.00 25.12 11.99 0.32 - - - - - - 0.32 7.72 0.00 25.12 11.98 0.32 - - - - - - 0.32 7.73 0.00 25.12 11.98 0.32 - - - - - - 0.32 7.75 0.00 25.12 11.98 0.32 - - - - - - 0.32 7.77 0.00 25.12 11.98 0.32 - - - - - - 0.32 7.78 0.00 25.12 11.97 0.32 - - - - - - 0.32 7.80 0.00 25.12 11.97 0.32 - - - - - - 0.32 7.82 0.00 25.12 11.97 0.32 - - - - - - 0.32 7.83 0.00 25.12 11.97 0.32 - - - - - - 0.32 7.85 0.00 25.12 11.96 0.32 - - - - - - 0.32 7.87 0.00 25.12 11.96 0.32 - - - - - - 0.32 7.88 0.00 25.12 11.96 0.32 - - - - - - 0.32 7.90 0.00 25.12 11.95 0.32 - - - - - - 0.32 7.92 0.00 25.12 11.95 0.32 - - - - - - 0.32 7.93 0.00 25.12 11.95 0.32 - - - - - - 0.32 7.95 0.00 25.12 11.95 0.32 - - - - - - 0.32 7.97 0.00 25.12 11.94 0.32 - - - - - - 0.32 7.98 0.00 25.11 11.94 0.32 - - - - - - 0.32 8.00 0.00 25.11 11.94 0.32 - - - - - - 0.32 8.02 0.00 25.11 11.93 0.32 - - - - - - 0.32 8.03 0.00 25.11 11.93 0.32 - - - - - - 0.32 8.05 0.00 25.11 11.93 0.32 - - - - - - 0.32 8.07 0.00 25.11 11.93 0.32 - - -- - - - 0.32 8.08 0.00 25.11 11.92 0.32 - - - - - - 0.32 8.10 0.00 25.11 11.92 0.32 - - - - - - 0.32 8.12 0.00 25.11 11.92 0.32 - -- - - - - 0.32 8.13 0.00 25.11 11.91 0.32 - - - - - - 0.32 8.15 0.00 25.11 11.91 0.32 - -- -- - - - 0.32 8.17 0.00 25.11 11.91 0.32 - - - - - - 0.32 Continues on next page... Post through Pond Page 11 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 8.18 0.00 25.11 11.91 0.32 - - -- - - - 0.32 8.20 0.00 25.11 11.90 0.32 - -- -- -- - - 0.32 8.22 0.00 25.11 11.90 0.32 - -- - -- - -- 0.32 8.23 0.00 25.11 11.90 0.32 - - - - - - 0.32 8.25 0.00 25.11 11.90 0.32 - - -- - - - 0.32 8.27 0.00 25.11 11.89 0.32 - - - - - - 0.32 8.28 0.00 25.11 11.89 0.32 - - - -- - - 0.32 8.30 0.00 25.11 11.89 0.32 -- - - - - - 0.32 8.32 0.00 25.11 11.88 0.32 - -- - --- - - 0.32 8.33 0.00 25.11 11.88 0.32 - - -- - - - 0.32 8.35 0.00 25.11 11.88 0.32 - - - - - - 0.32 8.37 0.00 25.11 11.88 0.32 - - -- - - - 0.32 8.38 0.00 25.10 11.87 0.32 - - - - - - 0.32 8.40 0.00 25.10 11.87 0.32 - -- - - - -- 0.32 8.42 0.00 25.10 11.87 0.32 - - --- -- - -- 0.32 8.43 0.00 25.10 11.86 0.32 - - - - - -- 0.32 8.45 0.00 25.10 11.86 0.32 - - - - - - 0.32 8.47 0.00 25.10 11.86 0.32 - - - - - - 0.32 8.48 0.00 25.10 11.86 0.32 - - - - - - 0.32 8.50 0.00 25.10 11.85 0.32 - - - - - -- 0.32 8.52 0.00 25.10 11.85 0.32 - -- -- - - - 0.32 8.53 0.00 25.10 11.85 0.32 - - - - - - 0.32 8.55 0.00 25.10 11.85 0.32 - - - - - - 0.32 8.57 0.00 25.10 11.84 0.32 - - - - - - 0.32 8.58 0.00 25.10 11.84 0.32 - - - - - - 0.32 8.60 0.00 25.10 11.84 0.32 - -- - - - - 0.32 8.62 0.00 25.10 11.83 0.32 - -- - - - - 0.32 8.63 0.00 25.10 11.83 0.32 - -- -- - - -- 0.32 8.65 0.00 25.10 11.83 0.32 - - - - - - 0.32 8.67 0.00 25.10 11.82 0.32 - - - - - - 0.32 8.68 0.00 25.10 11.82 0.32 - - - - - - 0.32 8.70 0.00 25.10 11.82 0.32 - -- - - - - 0.32 8.72 0.00 25.10 11.82 0.32 - -- - -- - -- 0.32 8.73 0.00 25.10 11.81 0.32 - -- - - - - 0.32 8.75 0.00 25.10 11.81 0.32 - -- - - - - 0.32 8.77 0.00 25.10 11.81 0.32 - - - - - - 0.32 8.78 0.00 25.09 11.80 0.32 - - - - - - 0.32 8.80 0.00 25.09 11.80 0.32 - - - - - - 0.32 8.82 0.00 25.09 11.80 0.32 -- --- -- - - -- 0.32 8.83 0.00 25.09 11.79 0.32 -- ----- -- - -- -- 0.32 8.85 0.00 25.09 11.79 0.32 - -- - -- -- - 0.32 8.87 0.00 25.09 11.79 0.32 -- - - - - - 0.32 8.88 0.00 25.09 11.79 0.32 - - - - - - 0.32 8.90 0.00 25.09 11.78 0.32 - - - - -- - 0.32 8.92 0.00 25.09 11.78 0.32 - -- - ---- -- - 0.32 8.93 0.00 25.09 11.78 0.32 --- ----- -- --- - - 0.32 8.95 0.00 25.09 11.77 0.32 -- --- - --- - - 0.32 8.97 0.00 25.09 11.77 0.32 -- -- - - - - 0.32 8.98 0.00 25.09 11.77 0.32 - - - - - - 0.32 Continues on next page... Post through Pond Hydrograph Discharge Table Page 12 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 9.00 0.00 25.09 11.76 0.32 - - - - - - 0.32 9.02 0.00 25.09 11.76 0.32 - - - - - - 0.32 9.03 0.00 25.09 11.76 0.32 - - - - - - 0.32 9.05 0.00 25.09 11.76 0.32 - - - - - - 0.32 9.07 0.00 25.09 11.75 0.32 - - - - - -- 0.32 9.08 0.00 25.09 11.75 0.32 - - - - -- - 0.32 9.10 0.00 25.09 11.75 0.32 - -- -- - - -- 0.32 9.12 0.00 25.09 11.74 0.32 - -- - -- - --- 0.32 9.13 0.00 25.09 11.74 0.32 - - - - - - -- 0.32 9.15 0.00 25.09 11.74 0.32 -- - -- - - -- 0.32 9.17 0.00 25.09 11.73 0.32 - -- - - -- -- 0.32 9.18 0.00 25.08 11.73 0.32 - - - - - - 0.32 9.20 0.00 25.08 11.73 0.32 -- -- - - -- -- 0.32 9.22 0.00 25.08 11.73 0.32 - - - - - - 0.32 9.23 0.00 25.08 11.72 0.32 - - - - - -- 0.32 9.25 0.00 25.08 11.72 0.32 - - - - - -- 0.32 9.27 0.00 25.08 11.72 0.32 - - - - - - 0.32 9.28 0.00 25.08 11.71 0.32 - - - - - - 0.32 9.30 0.00 25.08 11.71 0.32 - - - - - - 0.32 9.32 0.00 25.08 11.71 0.32 - - - - - - 0.32 9.33 0.00 25.08 11.70 0.32 - - - - - - 0.32 9.35 0.00 25.08 11.70 0.32 - -- - - - - 0.32 9.37 0.00 25.08 11.70 0.32 -- - - - - -- 0.32 9.38 0.00 25.08 11.69 0.32 - -- --- - - - 0.32 9.40 0.00 25.08 11.69 0.32 -- --- -- - -- -- 0.32 9.42 0.00 25.08 11.69 0.32 - -- ---- - - - 0.32 9.43 0.00 25.08 11.69 0.32 - - -- - - - 0.32 9.45 0.00 25.08 11.68 0.32 -- -- - - - - 0.32 9.47 0.00 25.08 11.68 0.32 - - - - - - 0.32 9.48 0.00 25.08 11.68 0.32 - - - - - - 0.32 9.50 0.00 25.08 11.67 0.32 -- - - - - - 0.32 9.52 0.00 25.08 11.67 0.32 - - - - - - 0.32 9.53 0.00 25.08 11.67 0.32 - - - - - - 0.32 9.55 0.00 25.08 11.66 0.32 - - - - - - 0.32 9.57 0.00 25.08 11.66 0.32 -- - - - - - 0.32 9.58 0.00 25.07 11.66 0.32 - - - - - - 0.32 9.60 0.00 25.07 11.66 0.32 - - - - - - 0.32 9.62 0.00 25.07 11.65 0.32 - - - - - -- 0.32 9.63 0.00 25.07 11.65 0.32 -- - -- - - - 0.32 9.65 0.00 25.07 11.65 0.32 -- -- - -- - -- 0.32 9.67 0.00 25.07 11.64 0.32 -- - --- -- -- -- 0.32 9.68 0.00 25.07 11.64 0.32 --- - -- --- -- -- 0.32 9.70 0.00 25.07 11.64 0.32 --- -- - -- - -- 0.32 9.72 0.00 25.07 11.63 0.32 -- - - - -- -- 0.32 9.73 0.00 25.07 11.63 0.32 -- - - -- - -- 0.32 9.75 0.00 25.07 11.63 0.32 - - - - - - 0.32 9.77 0.00 25.07 11.63 0.32 --- - - - - - 0.32 9.78 0.00 25.07 11.62 0.32 - - - -- - - 0.32 9.80 0.00 25.07 11.62 0.32 - - - - - - 0.32 Continues on next page... Post through Pond Hydrograph Discharge Table Page 13 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cis cis cis cfs cfs cfs cfs cis cis 9.82 0.00 25.07 11.62 0.32 - -- -- -- - - 0.32 9.83 0.00 25.07 11.61 0.32 - - - - - - 0.32 9.85 0.00 25.07 11.61 0.32 - - - - - - 0.32 9.87 0.00 25.07 11.61 0.32 - - - - - - 0.32 9.88 0.00 25.07 11.60 0.32 -- -- - - --- - 0.32 9.90 0.00 25.07 11.60 0.32 - - -- - - - 0.32 9.92 0.00 25.07 11.60 0.32 - - - - - - 0.32 9.93 0.00 25.07 11.60 0.32 - - - - - - 0.32 9.95 0.00 25.07 11.59 0.32 - - - - - - 0.32 9.97 0.00 25.07 11.59 0.32 - -- - -- - - 0.32 9.98 0.00 25.06 11.59 0.32 - - - - - - 0.32 10.00 0.00 25.06 11.58 0.32 - - - - - - 0.32 10.02 0.00 25.06 11.58 0.32 - - - - - - 0.32 10.03 0.00 25.06 11.58 0.32 -- - - - -- - 0.32 10.05 0.00 25.06 11.57 0.32 -- - -- -- - - 0.32 10.07 0.00 25.06 11.57 0.32 - - - - - - 0.32 10.08 0.00 25.06 11.57 0.32 - - - - - - 0.32 10.10 0.00 25.06 11.57 0.32 - - - - - - 0.32 10.12 0.00 25.06 11.56 0.32 --- - -- - - - 0.32 10.13 0.00 25.06 11.56 0.32 -- -- - - - - 0.32 10.15 0.00 25.06 11.56 0.32 - - - - - - 0.32 10.17 0.00 25.06 11.55 0.32 - - - - - - 0.32 10.18 0.00 25.06 11.55 0.32 - - - - - - 0.32 10.20 0.00 25.06 11.55 0.32 - --- - - - - 0.32 10.22 0.00 25.06 11.55 0.32 - - - - - - 0.32 10.23 0.00 25.06 11.54 0.32 - - - - - - 0.32 10.25 0.00 25.06 11.54 0.32 - - - - - - 0.32 10.27 0.00 25.06 11.54 0.32 - - - - - -- 0.32 10.28 0.00 25.06 11.53 0.32 - - - - - - 0.32 10.30 0.00 25.06 11.53 0.32 - - -- - - -- 0.32 10.32 0.00 25.06 11.53 0.32 - - - - - - 0.32 10.33 0.00 25.06 11.52 0.32 - - - - - - 0.32 10.35 0.00 25.06 11.52 0.32 -- -- --- - - --- 0.32 10.37 0.00 25.06 11.52 0.32 -- - -- - -- --- 0.32 10.38 0.00 25.05 11.52 0.32 - - - - --- - 0.32 10.40 0.00 25.05 11.51 0.32 - - - - - - 0.32 10.42 0.00 25.05 11.51 0.32 - - - - - - 0.32 10.43 0.00 25.05 11.51 0.32 - - --- - - - 0.32 10.45 0.00 25.05 11.50 0.32 --- -- - --- -- 0.32 10.47 0.00 25.05 11.50 0.32 ---- - - - - - 0.32 10.48 0.00 25.05 11.50 0.32 - - -- - - - 0.32 10.50 0.00 25.05 11.49 0.32 - - - - - - 0.32 10.52 0.00 25.05 11.49 0.32 -- - -- - -- - 0.32 10.53 0.00 25.05 11.49 0.32 --- -- -- -- - - 0.32 10.55 0.00 25.05 11.49 0.32 --- - -- - - - 0.32 10.57 0.00 25.05 11.48 0.32 - - - - - - 0.32 10.58 0.00 25.05 11.48 0.32 -- -- --- - - - 0.32 10.60 0.00 25.05 11.48 0.32 --- -- --- - --- - 0.32 10.62 0.00 25.05 11.47 0.32 --- -- - - - - 0.32 Continues on next page... Post through Pond Hydrograph Discharge Table Page 14 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 10.63 0.00 25.05 11.47 0.32 - - - - -- - 0.32 10.65 0.00 25.05 11.47 0.32 - - - - - - 0.32 10.67 0.00 25.05 11.46 0.32 - - - - - - 0.32 10.68 0.00 25.05 11.46 0.32 - - - - - - 0.32 10.70 0.00 25.05 11.46 0.32 - - - -- --- - 0.32 10.72 0.00 25.05 11.46 0.32 -- - -- ___ - 0.32 10.73 0.00 25.05 11.45 0.32 - - - --- -- - 0.32 10.75 0.00 25.05 11.45 0.32 - - - -- -_ - 0.32 10.77 0.00 25.05 11.45 0.32 - - -- - - - 0.32 10.78 0.00 25.04 11.44 0.32 - - - - - - 0.32 10.80 0.00 25.04 11.44 0.32 - - -- - -- - 0.32 10.82 0.00 25.04 11.44 0.32 - --- -- - - - 0.32 10.83 0.00 25.04 11.43 0.32 -- - - - -_ - 0.32 10.85 0.00 25.04 11.43 0.32 - - - - - - 0.32 10.87 0.00 25.04 11.43 0.32 - - - - - - 0.32 10.88 0.00 25.04 11.43 0.32 - - - - - - 0.32 10.90 0.00 25.04 11.42 0.32 - - - - - - 0.32 10.92 0.00 25.04 11.42 0.32 - - - - - - 0.32 10.93 0.00 25.04 11.42 0.32 - - - - - -- 0.32 10.95 0.00 25.04 11.41 0.32 -- - - - - -- 0.32 10.97 0.00 25.04 11.41 0.32 - - - - - - 0.32 10.98 0.00 25.04 11.41 0.32 - - - - - - 0.32 11.00 0.00 25.04 11.40 0.32 - - - - - - 0.32 11.02 0.00 25.04 11.40 0.32 - - - - - - 0.32 11.03 0.00 25.04 11.40 0.32 - -- - - - - 0.32 11.05 0.00 25.04 11.40 0.32 - - - - - - 0.32 11.07 0.00 25.04 11.39 0.32 - - - - -- - 0.32 11.08 0.00 25.04 11.39 0.32 - - - - -- - 0.32 11.10 0.00 25.04 11.39 0.32 - - - - - - 0.32 11.12 0.00 25.04 11.38 0.32 - - - - - - 0.32 11.13 0.00 25.04 11.38 0.32 - - - -- -- - 0.32 11.15 0.00 25.04 11.38 0.32 - - -- - -- -- 0.32 11.17 0.00 25.04 11.38 0.32 - -- - - -_ - 0.32 11.18 0.00 25.04 11.37 0.32 - - - - - - 0.32 11.20 0.00 25.03 11.37 0.32 - - - - - - 0.32 11.22 0.00 25.03 11.37 0.32 - -- - - - - 0.32 11.23 0.00 25.03 11.36 0.32 - - - - -- -- 0.32 11.25 0.00 25.03 11.36 0.32 - -- - - - - 0.32 11.27 0.00 25.03 11.36 0.32 ----- -- - - - 0.32 11.28 0.00 25.03 11.35 0.32 - ---- -- - -- - 0.32 11.30 0.00 25.03 11.35 0.32 - - - - -- - 0.32 11.32 0.00 25.03 11.35 0.32 - - - - - - 0.32 11.33 0.00 25.03 11.35 0.32 - -- - - - - 0.32 11.35 0.00 25.03 11.34 0.32 -- -- -- - -__ -- 0.32 11.37 0.00 25.03 11.34 0.32 ---- ----- --- - ----- ---- 0.32 11.38 0.00 25.03 11.34 0.32 - -- --- --- --- - 0.32 11.40 0.00 25.03 11.33 0.32 - - - -- --- - 0.32 11.42 0.00 25.03 11.33 0.32 - - - --- -- -- 0.32 11.43 0.00 25.03 11.33 0.32 - - - - - - 0.32 Continues on next page... Post through Pond Hydrograph Discharge Table Page 15 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cis cfs cis cis cfs cis cfs 11.45 0.00 25.03 11.32 0.32 - - - -- - - 0.32 11.47 0.00 25.03 11.32 0.32 - - - - - - 0.32 11.48 0.00 25.03 11.32 0.32 - - - -- - --- 0.32 11.50 0.00 25.03 11.32 0.32 - - - -- - -- 0.32 11.52 0.00 25.03 11.31 0.32 - - - - - - 0.32 11.53 0.00 25.03 11.31 0.32 - - - - - - 0.32 11.55 0.00 25.03 11.31 0.32 - - - - - - 0.32 11.57 0.00 25.03 11.30 0.32 -- - - -- - -- 0.32 11.58 0.00 25.03 11.30 0.32 - - - - - - 0.32 11.60 0.00 25.02 11.30 0.32 - - - - - - 0.32 11.62 0.00 25.02 11.29 0.32 - - - - - - 0.32 11.63 0.00 25.02 11.29 0.32 - ----- - -- - -- 0.32 11.65 0.00 25.02 11.29 0.32 - - -- -- - - 0.32 11.67 0.00 25.02 11.29 0.32 - - - - - - 0.32 11.68 0.00 25.02 11.28 0.32 - -- -- -- - - 0.32 11.70 0.00 25.02 11.28 0.32 - -- -- --- - - 0.32 11.72 0.00 25.02 11.28 0.32 - -- - --- - - 0.32 11.73 0.00 25.02 11.27 0.32 - - - - - - 0.32 11.75 0.00 25.02 11.27 0.32 - -- - - - - 0.32 11.77 0.00 25.02 11.27 0.32 - -- - -- - - 0.32 11.78 0.00 25.02 11.27 0.32 - - -- - - - 0.32 11.80 0.00 25.02 11.26 0.32 - - - - - - 0.32 11.82 0.00 25.02 11.26 0.32 - - - - - - 0.32 11.83 0.00 25.02 11.26 0.32 - - -- - - - 0.32 11.85 0.00 25.02 11.25 0.32 - - -- - - - 0.32 11.87 0.00 25.02 11.25 0.32 - - - - - - 0.32 11.88 0.00 25.02 11.25 0.32 - - - - - - 0.32 11.90 0.00 25.02 11.24 0.32 - - -- - - - 0.32 11.92 0.00 25.02 11.24 0.32 - - -- - - - 0.32 11.93 0.00 25.02 11.24 0.32 - - - - - - 0.32 11.95 0.00 25.02 11.24 0.32 - - - - - - 0.32 11.97 0.00 25.02 11.23 0.32 - - - - - - 0.32 11.98 0.00 25.02 11.23 0.32 - -- -- - - -- 0.32 12.00 0.00 25.02 11.23 0.32 - - - - - -- 0.32 12.02 0.00 25.01 11.22 0.32 - - - - - - 0.32 12.03 0.00 25.01 11.22 0.32 - - - - - - 0.32 12.05 0.00 25.01 11.22 0.32 ---- -- --- - - - 0.32 12.07 0.00 25.01 11.22 0.32 --- -- -- -- - --- 0.32 12.08 0.00 25.01 11.21 0.32 - - - - - - 0.32 12.10 0.00 25.01 11.21 0.32 - - - - - --- 0.32 12.12 0.00 25.01 11.21 0.32 -- -- -- - ----- 0.32 12.13 0.00 25.01 11.20 0.32 -- - -- -- - ----- 0.32 12.15 0.00 25.01 11.20 0.32 -- - - - - -- 0.32 12.17 0.00 25.01 11.20 0.31 - - - -- - - 0.31 12.18 0.00 25.01 11.19 0.31 - - --- -- - -- 0.31 12.20 0.00 25.01 11.19 0.31 --- -- --- - -- -- 0.31 12.22 0.00 25.01 11.19 0.31 -- - - -- - - 0.31 12.23 0.00 25.01 11.19 0.31 - - - - - - 0.31 12.25 0.00 25.01 11.18 0.31 - - -- --- - -- 0.31 Continues on next page... Post through Pond Hydrograph Discharge Table Page 16 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cis cfs cfs cfs cfs cfs 12.27 0.00 25.01 11.18 0.31 - -- -- -- - --- 0.31 12.28 0.00 25.01 11.18 0.31 --- -- - -- -- --- 0.31 12.30 0.00 25.01 11.17 0.31 - - - - - -- 0.31 12.32 0.00 25.01 11.17 0.31 -- -- -- - - - 0.31 12.33 0.00 25.01 11.17 0.31 - - - - - -- 0.31 12.35 0.00 25.01 11.16 0.31 -- - - -- - -- 0.31 12.37 0.00 25.01 11.16 0.31 - - - -- -- -- 0.31 12.38 0.00 25.01 11.16 0.31 - - - - - -- 0.31 12.40 0.00 25.01 11.16 0.31 - - - - - -- 0.31 12.42 0.00 25.00 11.15 0.31 - - - -- - - 0.31 12.43 0.00 25.00 11.15 0.31 - - - - - - 0.31 12.45 0.00 25.00 11.15 0.31 - - - - -- - 0.31 12.47 0.00 25.00 11.14 0.31 - - - - - - 0.31 12.48 0.00 25.00 11.14 0.31 - - - - - - 0.31 12.50 0.00 25.00 11.14 0.31 - - - - - - 0.31 12.52 0.00 25.00 11.14 0.31 - - - -- - -- 0.31 12.53 0.00 25.00 11.13 0.31 - - - - -- - 0.31 12.55 0.00 25.00 11.13 0.31 - - - - -- - 0.31 12.57 0.00 25.00 11.13 0.31 - - -- - - - 0.31 12.58 0.00 25.00 11.12 0.31 - - - - - - 0.31 12.60 0.00 25.00 11.12 0.31 - -- - - -- - 0.31 12.62 0.00 25.00 11.12 0.31 - - -- - -- - 0.31 12.63 0.00 25.00 11.11 0.31 - - -- - - - 0.31 12.65 0.00 25.00 11.11 0.31 - -- - - - - 0.31 12.67 0.00 25.00 11.11 0.31 - - - - - - 0.31 12.68 0.00 25.00 11.10 0.31 - - -- - - - 0.31 12.70 0.00 25.00 11.10 0.31 - - - - - - 0.31 12.72 0.00 25.00 11.10 0.31 - - - - - - 0.31 12.73 0.00 25.00 11.09 0.31 - - - - - - 0.31 12.75 0.00 25.00 11.09 0.31 - - - - - - 0.31 12.77 0.00 25.00 11.09 0.31 - - - - - - 0.31 12.78 0.00 25.00 11.08 0.31 - - - - - - 0.31 12.80 0.00 25.00 11.08 0.31 - - - - - - 0.31 12.82 0.00 24.99 11.08 0.31 - - - - - - 0.31 12.83 0.00 24.99 11.07 0.31 - -- - - - - 0.31 12.85 0.00 24.99 11.07 0.31 - - - - - - 0.31 12.87 0.00 24.99 11.07 0.31 - -- -- - - - 0.31 12.88 0.00 24.99 11.06 0.31 -- -- -- - - - 0.31 12.90 0.00 24.99 11.06 0.31 --- - --- -- - - 0.31 12.92 0.00 24.99 11.06 0.31 - --- - - - --- 0.31 12.93 0.00 24.99 11.05 0.31 ----- - -- -- - - 0.31 12.95 0.00 24.99 11.05 0.31 --- --- --- -- - -- 0.31 12.97 0.00 24.99 11.05 0.31 ----- -- -- - - -- 0.31 12.98 0.00 24.99 11.04 0.31 -- - --- - - --- 0.31 13.00 0.00 24.99 11.04 0.31 ---- - - - - -- 0.31 13.02 0.00 24.99 11.04 0.31 -- -- - - - -- 0.31 13.03 0.00 24.99 11.03 0.31 -- - - -- - - 0.31 13.05 0.00 24.99 11.03 0.31 --- - - - - -- 0.31 13.07 0.00 24.99 11.03 0.31 -- - - - -- - 0.31 Continues on next page... Post through Pond Hydrograph Discharge Table Page 17 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.08 0.00 24.99 11.02 0.31 -- - -- -- -- - 0.31 13.10 0.00 24.99 11.02 0.31 -- -- --- - - - 0.31 13.12 0.00 24.99 11.02 0.31 - - --- - - -- 0.31 13.13 0.00 24.99 11.01 0.31 - -- --- - - - 0.31 13.15 0.00 24.99 11.01 0.31 - - -- -- - - 0.31 13.17 0.00 24.99 11.01 0.31 - - - -- - - 0.31 13.18 0.00 24.99 11.00 0.31 - - -- - - - 0.31 13.20 0.00 24.98 11.00 0.31 - - - - - - 0.31 13.22 0.00 24.98 11.00 0.31 - - - - - - 0.31 13.23 0.00 24.98 11.00 0.31 - - - - - - 0.31 13.25 0.00 24.98 10.99 0.31 - - - - - - 0.31 13.27 0.00 24.98 10.99 0.31 - - - - - - 0.31 13.28 0.00 24.98 10.99 0.31 - - - - - - 0.31 13.30 0.00 24.98 10.98 0.31 - - - - - - 0.31 13.32 0.00 24.98 10.98 0.31 - - - - - - 0.31 13.33 0.00 24.98 10.98 0.31 - - - -- - - 0.31 13.35 0.00 24.98 10.97 0.31 - - -- - -- - 0.31 13.37 0.00 24.98 10.97 0.31 - - - - - - 0.31 13.38 0.00 24.98 10.97 0.31 - - - - - - 0.31 13.40 0.00 24.98 10.96 0.31 -- - - - - - 0.31 13.42 0.00 24.98 10.96 0.31 - --- - - - - 0.31 13.43 0.00 24.98 10.96 0.31 - - - - - - 0.31 13.45 0.00 24.98 10.95 0.31 - - - - - - 0.31 13.47 0.00 24.98 10.95 0.31 - - - - - - 0.31 13.48 0.00 24.98 10.95 0.31 - - - - - - 0.31 13.50 0.00 24.98 10.94 0.31 - - - - - - 0.31 13.52 0.00 24.98 10.94 0.31 - - - - - - 0.31 13.53 0.00 24.98 10.94 0.31 - - - - - - 0.31 13.55 0.00 24.98 10.93 0.31 - - - - - - 0.31 13.57 0.00 24.98 10.93 0.31 - - - - - - 0.31 13.58 0.00 24.98 10.93 0.31 - - - - - - 0.31 13.60 0.00 24.97 10.92 0.31 - - - - - - 0.31 13.62 0.00 24.97 10.92 0.31 - - - - - - 0.31 13.63 0.00 24.97 10.92 0.31 - - - - - - 0.31 13.65 0.00 24.97 10.91 0.31 - - - - - -- 0.31 13.67 0.00 24.97 10.91 0.31 - - - - - - 0.31 13.68 0.00 24.97 10.91 0.31 -- - --- - - - 0.31 13.70 0.00 24.97 10.90 0.31 -- - -- -- - - 0.31 13.72 0.00 24.97 10.90 0.31 - -- --- -- -- -- 0.31 13.73 0.00 24.97 10.90 0.31 ----- --- --- -- -- - 0.31 13.75 0.00 24.97 10.89 0.31 --- --- --- -- - - 0.31 13.77 0.00 24.97 10.89 0.31 -- - -- - - -- 0.31 13.78 0.00 24.97 10.89 0.31 - - -- - - - 0.31 13.80 0.00 24.97 10.88 0.31 - - --- - - - 0.31 13.82 0.00 24.97 10.88 0.31 --- - -- - - - 0.31 13.83 0.00 24.97 10.88 0.31 -- - - - - - 0.31 13.85 0.00 24.97 10.87 0.31 - - -- - - - 0.31 13.87 0.00 24.97 10.87 0.31 - - - - - - 0.31 13.88 0.00 24.97 10.87 0.31 - - - - - - 0.31 Continues on next page... Post through Pond Hydrograph Discharge Table Page 18 Time Inflow Elevation Clv A Civ B Clv C MID Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.90 0.00 24.97 10.86 0.31 - - - - - -- 0.31 13.92 0.00 24.97 10.86 0.31 - - - - - - 0.31 13.93 0.00 24.97 10.86 0.31 - - - - - - 0.31 13.95 0.00 24.97 10.85 0.31 - - - - - - 0.31 13.97 0.00 24.97 10.85 0.31 - - - - -- - 0.31 13.98 0.00 24.96 10.85 0.31 - - - - - -- 0.31 14.00 0.00 24.96 10.84 0.31 - - -- - -- - 0.31 14.02 0.00 24.96 10.84 0.31 - -- -- - -- - 0.31 14.03 0.00 24.96 10.84 0.31 - - --- --- -- - 0.31 14.05 0.00 24.96 10.83 0.31 - - -- -- -- - 0.31 14.07 0.00 24.96 10.83 0.31 - - -- - - -- 0.31 14.08 0.00 24.96 10.83 0.31 - - -- - - - 0.31 14.10 0.00 24.96 10.82 0.31 - - - - - - 0.31 14.12 0.00 24.96 10.82 0.31 - -- - - - - 0.31 14.13 0.00 24.96 10.82 0.31 - - - - - - 0.31 14.15 0.00 24.96 10.81 0.31 - - - - - - 0.31 14.17 0.00 24.96 10.81 0.31 - -- - - - - 0.31 14.18 0.00 24.96 10.81 0.31 - - - - - - 0.31 14.20 0.00 24.96 10.80 0.31 - - - - - - 0.31 14.22 0.00 24.96 10.80 0.31 - - - - - - 0.31 14.23 0.00 24.96 10.80 0.31 - - - - - - 0.31 14.25 0.00 24.96 10.79 0.31 - - - - - - 0.31 14.27 0.00 24.96 10.79 0.31 - -- - - - - 0.31 14.28 0.00 24.96 10.79 0.31 - -- - - - - 0.31 14.30 0.00 24.96 10.78 0.31 - -- - - - - 0.31 14.32 0.00 24.96 10.78 0.31 -- -- - - - - 0.31 14.33 0.00 24.96 10.78 0.31 - - - - - - 0.31 14.35 0.00 24.96 10.77 0.31 - - - - - - 0.31 14.37 0.00 24.96 10.77 0.31 - - - - - - 0.31 14.38 0.00 24.95 10.77 0.31 - - - - - - 0.31 14.40 0.00 24.95 10.76 0.31 -- - - - - -- 0.31 14.42 0.00 24.95 10.76 0.31 - - - - - - 0.31 14.43 0.00 24.95 10.76 0.31 - - - - - - 0.31 14.45 0.00 24.95 10.75 0.31 - - - - - - 0.31 14.47 0.00 24.95 10.75 0.31 - - - - - - 0.31 14.48 0.00 24.95 10.75 0.31 -- - - - - - 0.31 14.50 0.00 24.95 10.74 0.31 - - - - - - 0.31 14.52 0.00 24.95 10.74 0.31 - - - - - - 0.31 14.53 0.00 24.95 10.74 0.31 -- -- - - - - 0.31 14.55 0.00 24.95 10.73 0.31 - -- -- - -- --- 0.31 14.57 0.00 24.95 10.73 0.31 ---- -- -- - -- -- 0.31 14.58 0.00 24.95 10.73 0.31 --- -- -- - ---- - 0.31 14.60 0.00 24.95 10.73 0.31 -- - -- -- --- -- 0.31 14.62 0.00 24.95 10.72 0.31 - - - -- - --- 0.31 14.63 0.00 24.95 10.72 0.31 --- - -- -- - - 0.31 14.65 0.00 24.95 10.72 0.31 - -- - - -- -- 0.31 14.67 0.00 24.95 10.71 0.31 - - - -- --- -- 0.31 14.68 0.00 24.95 10.71 0.31 - - - - - - 0.31 14.70 0.00 24.95 10.71 0.31 -- - - -- - - 0.31 Continues on next page... Post through Pond Hydrograph Discharge Table Page 19 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cis cfs cis cfs cfs cfs 14.72 0.00 24.95 10.70 0.31 -- -- -- - - - 0.31 14.73 0.00 24.95 10.70 0.31 - - - - - - 0.31 14.75 0.00 24.95 10.70 0.31 - - - - - - 0.31 14.77 0.00 24.94 10.69 0.31 - - - - - - 0.31 14.78 0.00 24.94 10.69 0.31 - - - - - - 0.31 14.80 0.00 24.94 10.69 0.31 - - - - - - 0.31 14.82 0.00 24.94 10.68 0.31 - - - - - - 0.31 14.83 0.00 24.94 10.68 0.31 - - -- - - - 0.31 14.85 0.00 24.94 10.68 0.31 -- --- -- - - - 0.31 14.87 0.00 24.94 10.67 0.31 -- ---- -- - - - 0.31 14.88 0.00 24.94 10.67 0.31 -- ---- - - - - 0.31 14.90 0.00 24.94 10.67 0.31 - --- -- -- - - 0.31 14.92 0.00 24.94 10.66 0.31 --- -- -- - - - 0.31 14.93 0.00 24.94 10.66 0.31 - - - - - - 0.31 14.95 0.00 24.94 10.66 0.31 - - - - - - 0.31 14.97 0.00 24.94 10.65 0.31 - - - - - - 0.31 14.98 0.00 24.94 10.65 0.31 - - - - - - 0.31 15.00 0.00 24.94 10.65 0.31 - - - - - - 0.31 15.02 0.00 24.94 10.64 0.31 - - - - - - 0.31 15.03 0.00 24.94 10.64 0.31 - - - - - - 0.31 15.05 0.00 24.94 10.64 0.31 - - -- - - - 0.31 15.07 0.00 24.94 10.63 0.31 - - - - - - 0.31 15.08 0.00 24.94 10.63 0.31 -- --- - - - --- 0.31 15.10 0.00 24.94 10.63 0.31 - -- - - - -- 0.31 15.12 0.00 24.94 10.62 0.31 - - - - - - 0.31 15.13 0.00 24.94 10.62 0.31 - - - - - - 0.31 15.15 0.00 24.94 10.62 0.31 - - - - - - 0.31 15.17 0.00 24.93 10.61 0.31 - - - - - - 0.31 15.18 0.00 24.93 10.61 0.31 - - - - - - 0.31 15.20 0.00 24.93 10.61 0.31 - - - - - - 0.31 15.22 0.00 24.93 10.60 0.31 - - - - - -- 0.31 15.23 0.00 24.93 10.60 0.31 - - - - - - 0.31 15.25 0.00 24.93 10.60 0.31 - --- - -- - - 0.31 15.27 0.00 24.93 10.59 0.31 - -- -- - - -- 0.31 15.28 0.00 24.93 10.59 0.31 - - - - - -- 0.31 15.30 0.00 24.93 10.59 0.31 - - - - - - 0.31 15.32 0.00 24.93 10.58 0.31 - -- - - - -- 0.31 15.33 0.00 24.93 10.58 0.31 - - - - -- -- 0.31 15.35 0.00 24.93 10.58 0.31 - - - - - - 0.31 15.37 0.00 24.93 10.57 0.31 - - - - - - 0.31 15.38 0.00 24.93 10.57 0.31 - - - - - - 0.31 15.40 0.00 24.93 10.57 0.31 - - - - - - 0.31 15.42 0.00 24.93 10.57 0.31 -- - - - - - 0.31 15.43 0.00 24.93 10.56 0.31 - - - -- -- -- 0.31 15.45 0.00 24.93 10.56 0.31 - --- -- -- -- -- 0.31 15.47 0.00 24.93 10.56 0.31 -- -- ---- - - - 0.31 15.48 0.00 24.93 10.55 0.31 -- - --- - -- - - 0.31 15.50 0.00 24.93 10.55 0.31 --- - - - - -- 0.31 15.52 0.00 24.93 10.55 0.31 - - - - -- 0.31 Continues on next page... Post through Pond Hydrograph Discharge Table Page 20 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C MID Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cis cis cfs 15.53 0.00 24.93 10.54 0.31 - - - - - - 0.31 15.55 0.00 24.93 10.54 0.31 - - - - - - 0.31 15.57 0.00 24.92 10.54 0.31 - - - -- - - 0.31 15.58 0.00 24.92 10.53 0.31 - - - - - - 0.31 15.60 0.00 24.92 10.53 0.31 - - - - - - 0.31 15.62 0.00 24.92 10.53 0.31 -- -- - - - - 0.31 15.63 0.00 24.92 10.52 0.31 - - - - - - 0.31 15.65 0.00 24.92 10.52 0.31 - - - -- - - 0.31 15.67 0.00 24.92 10.52 0.31 - - - - - - 0.31 15.68 0.00 24.92 10.51 0.31 -- ---- - - - - 0.31 15.70 0.00 24.92 10.51 0.31 - -- --- - - - 0.31 15.72 0.00 24.92 10.51 0.31 -- - --- - - - 0.31 15.73 0.00 24.92 10.50 0.31 -- -- --- - - - 0.31 15.75 0.00 24.92 10.50 0.31 ---- ---- - - - -- 0.31 15.77 0.00 24.92 10.50 0.31 -- --- -- -- - - 0.31 15.78 0.00 24.92 10.49 0.31 --- - --- - - - 0.31 15.80 0.00 24.92 10.49 0.31 ----- - --- - --- - 0.31 15.82 0.00 24.92 10.49 0.31 ----- - -- - - - 0.31 15.83 0.00 24.92 10.48 0.31 - - - - - - 0.31 15.85 0.00 24.92 10.48 0.31 -- - - - -- - 0.31 15.87 0.00 24.92 10.48 0.31 --- - - - - - 0.31 15.88 0.00 24.92 10.47 0.31 - -- - - - - 0.31 15.90 0.00 24.92 10.47 0.31 - - - - - - 0.31 15.92 0.00 24.92 10.47 0.31 - - - - - - 0.31 15.93 0.00 24.92 10.46 0.31 - - - - - - 0.31 15.95 0.00 24.92 10.46 0.31 - -- - - - - 0.31 15.97 0.00 24.91 10.46 0.31 - - - - - - 0.31 15.98 0.00 24.91 10.45 0.31 -- - - - - - 0.31 16.00 0.00 24.91 10.45 0.31 - - - - - - 0.31 16.02 0.00 24.91 10.45 0.31 - - - - - - 0.31 16.03 0.00 24.91 10.44 0.31 - - - - - - 0.31 16.05 0.00 24.91 10.44 0.31 - - - - - - 0.31 16.07 0.00 24.91 10.44 0.31 - - - - - - 0.31 16.08 0.00 24.91 10.44 0.31 - - - - - - 0.31 16.10 0.00 24.91 10.43 0.31 - - - - - - 0.31 16.12 0.00 24.91 10.43 0.31 - - - - - - 0.31 16.13 0.00 24.91 10.43 0.31 - - - - - - 0.31 16.15 0.00 24.91 10.42 0.31 - - - - - - 0.31 16.17 0.00 24.91 10.42 0.31 - - - - - - 0.31 16.18 0.00 24.91 10.42 0.31 -- - - - - - 0.31 16.20 0.00 24.91 10.41 0.31 - - - - - - 0.31 16.22 0.00 24.91 10.41 0.31 - - - - - - 0.31 16.23 0.00 24.91 10.41 0.31 - - -- - -- - 0.31 16.25 0.00 24.91 10.40 0.31 - - - - - -- 0.31 16.27 0.00 24.91 10.40 0.31 - - - - - - 0.31 16.28 0.00 24.91 10.40 0.31 - - -- - - - 0.31 16.30 0.00 24.91 10.39 0.31 - - --- --- - - 0.31 16.32 0.00 24.91 10.39 0.31 - - -- - - - 0.31 16.33 0.00 24.91 10.39 0.31 -- - -- - - - 0.31 Continues on next page... Hydrograph Report Page 1 English Hyd. No. 4 Reality check post pnd Hydrograph type = Reservoir Peak discharge = 0.34 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = Reality Check f Max. Elevation = 25.31 ft Max. Storage = 99,858 cuft S"e Indicafion whoa used Total Volume = 26,825 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.23 100.09 24.92 5.82 0.30 --- - - -- - - 0.30 0.25 83.41 25.04 6.22 0.31 - ---- ---- --- - -- 0.31 0.27 66.73 25.14 7.37 0.32 -- - - -- - - 0.32 0.28 50.05 25.22 8.16 0.33 - - - -- - - 0.33 0.30 33.36 25.27 8.67 0.33 - - - -- - - 0.33 0.32 16.68 25.30 8.97 0.34 - - 0.00 - - - 0.34 0.33 0.00 25.31 << 9.06 0.34 - - 0.00 - - - 0.34 << 0.35 0.00 25.31 9.05 0.34 - - 0.00 - - - 0.34 0.37 0.00 25.31 9.05 0.34 - - 0.00 - - - 0.34 0.38 0.00 25.31 9.05 0.34 - - 0.00 - - - 0.34 0.40 0.00 25.31 9.04 0.34 - - 0.00 - - - 0.34 0.42 0.00 25.31 9.04 0.34 - - 0.00 - - - 0.34 0.43 0.00 25.31 9.03 0.34 - - 0.00 - - - 0.34 0.45 0.00 25.31 9.03 0.34 -- - 0.00 - - - 0.34 0.47 0.00 25.31 9.03 0.34 - - 0.00 - - - 0.34 0.48 0.00 25.31 9.02 0.34 - - 0.00 - - - 0.34 0.50 0.00 25.31 9.02 0.34 - - 0.00 - - - 0.34 0.52 0.00 25.31 9.02 0.34 - - 0.00 - - - 0.34 0.53 0.00 25.31 9.01 0.34 - - 0.00 - - - 0.34 0.55 0.00 25.31 9.01 0.34 - - 0.00 - - -- 0.34 0.57 0.00 25.31 9.00 0.34 - - 0.00 - - - 0.34 0.58 0.00 25.31 9.00 0.34 - - 0.00 - - - 0.34 0.60 0.00 25.31 9.00 0.34 - - 0.00 - - - 0.34 0.62 0.00 25.30 8.99 0.34 - - 0.00 - - - 0.34 0.63 0.00 25.30 8.99 0.34 - - 0.00 - -- - 0.34 0.65 0.00 25.30 8.99 0.34 - - 0.00 - - - 0.34 0.67 0.00 25.30 8.98 0.34 -- -- 0.00 --- --- - 0.34 0.68 0.00 25.30 8.98 0.34 --- -- 0.00 ----- -- - 0.34 0.70 0.00 25.30 8.98 0.34 --- -- 0.00 - --- -- 0.34 0.72 0.00 25.30 8.97 0.34 -- -- 0.00 ---- ---- -- 0.34 0.73 0.00 25.30 8.97 0.34 ----- -- 0.00 ----- --- --- 0.34 0.75 0.00 25.30 8.96 0.34 --- -- 0.00 -- -- - 0.34 0.77 0.00 25.30 8.96 0.34 -- - 0.00 ----- -- - 0.34 0.78 0.00 25.30 8.96 0.34 -- - 0.00 - -- - 0.34 0.80 0.00 25.30 8.95 0.34 -- - ---- -- - -- 0.34 0.82 0.00 25.30 8.95 0.34 -- - - - - - 0.34 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 2 Time Inflow Elevation CIv A Clv B Clv C MID Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cis cfs cfs 0.83 0.00 25.30 8.94 0.34 - - - - - - 0.34 0.85 0.00 25.30 8.94 0.34 -- -- - - - - 0.34 0.87 0.00 25.30 8.94 0.34 -- -- --- -- - - 0.34 0.88 0.00 25.30 8.93 0.34 -- -- - - - - 0.34 0.90 0.00 25.30 8.93 0.34 - -- -- - - - 0.34 0.92 0.00 25.30 8.92 0.34 - - - - - - 0.34 0.93 0.00 25.30 8.92 0.34 - - - - - - 0.34 0.95 0.00 25.30 8.92 0.34 - -- - - - - 0.34 0.97 0.00 25.30 8.91 0.34 -- - -- - - - 0.34 0.98 0.00 25.30 8.91 0.34 - -- -- -- -- - 0.34 1.00 0.00 25.29 8.90 0.34 -- - - - - - 0.34 1.02 0.00 25.29 8.90 0.34 - - - - - - 0.34 1.03 0.00 25.29 8.90 0.34 - - - - - - 0.34 1.05 0.00 25.29 8.89 0.34 - - - - - - 0.34 1.07 0.00 25.29 8.89 0.34 - - - - - - 0.34 1.08 0.00 25.29 8.88 0.34 - --- - - - - 0.34 1.10 0.00 25.29 8.88 0.34 - - -- - -- - 0.34 1.12 0.00 25.29 8.87 0.34 - - -- - -- - 0.34 1.13 0.00 25.29 8.87 0.34 - - - - - - 0.34 1.15 0.00 25.29 8.87 0.34 - - - - - - 0.34 1.17 0.00 25.29 8.86 0.34 - - - - - - 0.34 1.18 0.00 25.29 8.86 0.34 - - - - - - 0.34 1.20 0.00 25.29 8.85 0.34 - - - -- - -- 0.34 1.22 0.00 25.29 8.85 0.34 - - -- - - - 0.34 1.23 0.00 25.29 8.85 0.34 - - - - - - 0.34 1.25 0.00 25.29 8.84 0.34 - - - - - - 0.34 1.27 0.00 25.29 8.84 0.33 - - - - - - 0.33 1.28 0.00 25.29 8.83 0.33 - - - - - - 0.33 1.30 0.00 25.29 8.83 0.33 - - - - - - 0.33 1.32 0.00 25.29 8.83 0.33 - - - - - - 0.33 1.33 0.00 25.29 8.82 0.33 - - - - - - 0.33 1.35 0.00 25.29 8.82 0.33 -- - - - - - 0.33 1.37 0.00 25.29 8.81 0.33 - - - - - - 0.33 1.38 0.00 25.28 8.81 0.33 - - - - - - 0.33 1.40 0.00 25.28 8.80 0.33 - - - - - - 0.33 1.42 0.00 25.28 8.80 0.33 --- - - - - - 0.33 1.43 0.00 25.28 8.80 0.33 --- -- -- -- -- - 0.33 1.45 0.00 25.28 8.79 0.33 - -- -- --- -- - 0.33 1.47 0.00 25.28 8.79 0.33 -- -- - - - - 0.33 1.48 0.00 25.28 8.78 0.33 - - - - - - 0.33 1.50 0.00 25.28 8.78 0.33 - - - - - - 0.33 1.52 0.00 25.28 8.78 0.33 - -- - - - - 0.33 1.53 0.00 25.28 8.77 0.33 - -- -- - -- - 0.33 1.55 0.00 25.28 8.77 0.33 -- --- -- - --- --- 0.33 1.57 0.00 25.28 8.76 0.33 - -- --- --- --- --- 0.33 1.58 0.00 25.28 8.76 0.33 - - - - -- - 0.33 1.60 0.00 25.28 8.76 0.33 - - - - -- - 0.33 1.62 0.00 25.28 8.75 0.33 - - - - - - 0.33 1.63 0.00 25.28 8.75 0.33 -- - - -- -- - 0.33 Continues on next page... Reality check post pnd Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Civ D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.65 0.00 25.28 8.74 0.33 - - --- - - - 0.33 1.67 0.00 25.28 8.74 0.33 -- --- --- --- -- -- 0.33 1.68 0.00 25.28 8.74 0.33 - - -- - - -- 0.33 1.70 0.00 25.28 8.73 0.33 - -- -- - -- -- 0.33 1.72 0.00 25.28 8.73 0.33 -- -- -- -- - - 0.33 1.73 0.00 25.28 8.72 0.33 - -- - - -- -- 0.33 1.75 0.00 25.28 8.72 0.33 - - - - - - 0.33 1.77 0.00 25.27 8.71 0.33 - - -- -- --- - 0.33 1.78 0.00 25.27 8.71 0.33 - - - -- - -- 0.33 1.80 0.00 25.27 8.71 0.33 - - - -- - - 0.33 1.82 0.00 25.27 8.70 0.33 -- - - -- - - 0.33 1.83 0.00 25.27 8.70 0.33 - -- -- -- - --- 0.33 1.85 0.00 25.27 8.69 0.33 - -- - -- -- - 0.33 1.87 0.00 25.27 8.69 0.33 - - - --- -- - 0.33 1.88 0.00 25.27 8.69 0.33 - - -- - -- - 0.33 1.90 0.00 25.27 8.68 0.33 - - -- -- - -- 0.33 1.92 0.00 25.27 8.68 0.33 - - - - -- -- 0.33 1.93 0.00 25.27 8.67 0.33 - - - - - - 0.33 1.95 0.00 25.27 8.67 0.33 - - - -- - - 0.33 1.97 0.00 25.27 8.67 0.33 - - - -- - - 0.33 1.98 0.00 25.27 8.66 0.33 - - - - - - 0.33 2.00 0.00 25.27 8.66 0.33 - - - - - - 0.33 2.02 0.00 25.27 8.65 0.33 - - - -- - - 0.33 2.03 0.00 25.27 8.65 0.33 - - - - - - 0.33 2.05 0.00 25.27 8.65 0.33 - - - - - - 0.33 2.07 0.00 25.27 8.64 0.33 - - - - - - 0.33 2.08 0.00 25.27 8.64 0.33 - - - -- - - 0.33 2.10 0.00 25.27 8.63 0.33 - --- - - - - 0.33 2.12 0.00 25.27 8.63 0.33 - - -- - - - 0.33 2.13 0.00 25.27 8.63 0.33 - - - - - - 0.33 2.15 0.00 25.26 8.62 0.33 - -- - - - - 0.33 2.17 0.00 25.26 8.62 0.33 - -- - - - - 0.33 2.18 0.00 25.26 8.61 0.33 - - - -- - - 0.33 2.20 0.00 25.26 8.61 0.33 - -- -- - - -- 0.33 2.22 0.00 25.26 8.60 0.33 --- -- -- - - - 0.33 2.23 0.00 25.26 8.60 0.33 - -- -- - -- -- 0.33 2.25 0.00 25.26 8.60 0.33 --- --- -- -- - -- 0.33 2.27 0.00 25.26 8.59 0.33 - ---- - -- - -- 0.33 2.28 0.00 25.26 8.59 0.33 - -- - -- --- -- 0.33 2.30 0.00 25.26 8.58 0.33 ----- --- ---- -- - --- 0.33 2.32 0.00 25.26 8.58 0.33 --- --- -- - -- --- 0.33 2.33 0.00 25.26 8.58 0.33 -- --- -- - -- -- 0.33 2.35 0.00 25.26 8.57 0.33 ---- -- - -- -- - 0.33 2.37 0.00 25.26 8.57 0.33 --- - - - --- --- 0.33 2.38 0.00 25.26 8.56 0.33 - --- -- -- --- -- 0.33 2.40 0.00 25.26 8.56 0.33 -- --- --- -- - -- 0.33 2.42 0.00 25.26 8.56 0.33 - - -- - -- --- 0.33 2.43 0.00 25.26 8.55 0.33 -- --- - -- --- -- 0.33 2.45 0.00 25.26 8.55 0.33 -- -- -- -- -- -- 0.33 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 4 Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cis cfs cfs cfs 2.47 0.00 25.26 8.54 0.33 -- -- -- - -- - 0.33 2.48 0.00 25.26 8.54 0.33 - - -- - - - 0.33 2.50 0.00 25.26 8.54 0.33 - - - - - - 0.33 2.52 0.00 25.26 8.53 0.33 - - - - - - 0.33 2.53 0.00 25.25 8.53 0.33 - - - - - - 0.33 2.55 0.00 25.25 8.52 0.33 - - - - - - 0.33 2.57 0.00 25.25 8.52 0.33 - -- - - - - 0.33 2.58 0.00 25.25 8.52 0.33 - -- - - - - 0.33 2.60 0.00 25.25 8.51 0.33 - - -- - - -- 0.33 2.62 0.00 25.25 8.51 0.33 -- --- --- - - - 0.33 2.63 0.00 25.25 8.50 0.33 -- -- - - - --- 0.33 2.65 0.00 25.25 8.50 0.33 -- - - - - - 0.33 2.67 0.00 25.25 8.49 0.33 -- - -- - - - 0.33 2.68 0.00 25.25 8.49 0.33 - -- - - - -- 0.33 2.70 0.00 25.25 8.49 0.33 - - - - - - 0.33 2.72 0.00 25.25 8.48 0.33 - - - - - - 0.33 2.73 0.00 25.25 8.48 0.33 - - - - - - 0.33 2.75 0.00 25.25 8.47 0.33 - - - - - - 0.33 2.77 0.00 25.25 8.47 0.33 - - - - - - 0.33 2.78 0.00 25.25 8.47 0.33 - - - - - -- 0.33 2.80 0.00 25.25 8.46 0.33 - - - - - - 0.33 2.82 0.00 25.25 8.46 0.33 - -- - - - - 0.33 2.83 0.00 25.25 8.45 0.33 --- -- - - - - 0.33 2.85 0.00 25.25 8.45 0.33 - -- - - - - 0.33 2.87 0.00 25.25 8.45 0.33 - - - - - - 0.33 2.88 0.00 25.25 8.44 0.33 - - - - - - 0.33 .2.90 0.00 25.25 8.44 0.33 - - - - - - 0.33 2.92 0.00 25.24 8.43 0.33 - - - - - - 0.33 2.93 0.00 25.24 8.43 0.33 - - - - - - 0.33 2.95 0.00 25.24 8.43 0.33 - - - - - - 0.33 2.97 0.00 25.24 8.42 0.33 - - - - - - 0.33 2.98 0.00 25.24 8.42 0.33 - - - -- - - 0.33 3.00 0.00 25.24 8.41 0.33 - -- -- - - - 0.33 3.02 0.00 25.24 8.41 0.33 - - -- -- -- - 0.33 3.03 0.00 25.24 8.41 0.33 - - -- - -- - 0.33 3.05 0.00 25.24 8.40 0.33 - - - - - - 0.33 3.07 0.00 25.24 8.40 0.33 - - - - - - 0.33 3.08 0.00 25.24 8.39 0.33 - - - - - - 0.33 3.10 0.00 25.24 8.39 0.33 - - - - - - 0.33 3.12 0.00 25.24 8.39 0.33 - - - - - - 0.33 3.13 0.00 25.24 8.38 0.33 - - -- - -- - 0.33 3.15 0.00 25.24 8.38 0.33 - - - - - - 0.33 3.17 0.00 25.24 8.37 0.33 - - -- - - - 0.33 3.18 0.00 25.24 8.37 0.33 - -- -- - -- - 0.33 3.20 0.00 25.24 8.36 0.33 -- - -- - -- -- 0.33 3.22 0.00 25.24 8.36 0.33 -- - -- -- -- - 0.33 3.23 0.00 25.24 8.36 0.33 -- --- -- - --- - 0.33 3.25 0.00 25.24 8.35 0.33 -- -- ---- - - - 0.33 3.27 0.00 25.24 8.35 0.33 - - --- - - - 0.33 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 5 Time Inflow Elevation Clv A Clv B Clv C MID Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cis cis cfs cis cfs cis cis cis 3.28 0.00 25.24 8.34 0.33 - - - - - - 0.33 3.30 0.00 25.24 8.34 0.33 - - - - - - 0.33 3.32 0.00 25.23 8.34 0.33 - - - - - - 0.33 3.33 0.00 25.23 8.33 0.33 - - - - - - 0.33 3.35 0.00 25.23 8.33 0.33 -- - - - - - 0.33 3.37 0.00 25.23 8.32 0.33 - - - - - - 0.33 3.38 0.00 25.23 8.32 0.33 -- - -- - - - 0.33 3.40 0.00 25.23 8.32 0.33 -- - --- - - - 0.33 3.42 0.00 25.23 8.31 0.33 --- --- --- - - - 0.33 3.43 0.00 25.23 8.31 0.33 - - -- -- - - 0.33 3.45 0.00 25.23 8.30 0.33 -- - - - - - 0.33 3.47 0.00 25.23 8.30 0.33 -- --- - - - - 0.33 3.48 0.00 25.23 8.30 0.33 - - - - - - 0.33 3.50 0.00 25.23 8.29 0.33 - - -- - - - 0.33 3.52 0.00 25.23 8.29 0.33 - - - - - - 0.33 3.53 0.00 25.23 8.28 0.33 - - - - - - 0.33 3.55 0.00 25.23 8.28 0.33 - - - - - - 0.33 3.57 0.00 25.23 8.28 0.33 - - - - - - 0.33 3.58 0.00 25.23 8.27 0.33 - - - - - - 0.33 3.60 0.00 25.23 8.27 0.33 - - - - - - 0.33 3.62 0.00 25.23 8.26 0.33 - - - - - - 0.33 3.63 0.00 25.23 8.26 0.33 - - - - - - 0.33 3.65 0.00 25.23 8.26 0.33 - - - - - - 0.33 3.67 0.00 25.23 8.25 0.33 - - - - - - 0.33 3.68 0.00 25.23 8.25 0.33 -- --- -- - - - 0.33 3.70 0.00 25.22 8.24 0.33 -- -- - - - -- 0.33 3.72 0.00 25.22 8.24 0.33 - -- --- -- - - 0.33 3.73 0.00 25.22 8.24 0.33 - - - - - - 0.33 3.75 0.00 25.22 8.23 0.33 - - - - -- - 0.33 3.77 0.00 25.22 8.23 0.33 - - - - - - 0.33 3.78 0.00 25.22 8.22 0.33 - - - - - - 0.33 3.80 0.00 25.22 8.22 0.33 - - - - - - 0.33 3.82 0.00 25.22 8.22 0.33 - - - - - - 0.33 3.83 0.00 25.22 8.21 0.33 - - - - - - 0.33 3.85 0.00 25.22 8.21 0.33 - - - - - - 0.33 3.87 0.00 25.22 8.20 0.33 - - - - - - 0.33 3.88 0.00 25.22 8.20 0.33 - - - - - - 0.33 3.90 0.00 25.22 8.20 0.33 - - - - - - 0.33 3.92 0.00 25.22 8.19 0.33 - - - - - - 0.33 3.93 0.00 25.22 8.19 0.33 -- -- - - -- - 0.33 3.95 0.00 25.22 8.18 0.33 - -- - - --- -- 0.33 3.97 0.00 25.22 8.18 0.33 -- - --- --- - -- 0.33 3.98 0.00 25.22 8.17 0.33 -- -- -- - -- -- 0.33 4.00 0.00 25.22 8.17 0.33 - - - -- - - 0.33 4.02 0.00 25.22 8.17 0.33 -- - --- - - -- 0.33 4.03 0.00 25.22 8.16 0.33 - - - - - -- 0.33 4.05 0.00 25.22 8.16 0.33 - - - - - -- 0.33 4.07 0.00 25.22 8.15 0.33 - - - - - -- 0.33 4.08 0.00 25.22 8.15 0.33 - - - - - - 0.33 Continues on next page... Reality check post pnd Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs Cfs c% cfs Cfs C% Cfs cfs cis 4.10 0.00 25.21 8.15 0.33 - - - - - - 0.33 4.12 0.00 25.21 8.14 0.33 - -- - - - - 0.33 4.13 0.00 25.21 8.14 0.33 - - - - - - 0.33 4.15 0.00 25.21 8.13 0.33 - - -- - - - 0.33 4.17 0.00 25.21 8.13 0.33 - - -- - - - 0.33 4.18 0.00 25.21 8.13 0.33 - - -- - - - 0.33 4.20 0.00 25.21 8.12 0.33 - - - - - - 0.33 4.22 0.00 25.21 8.12 0.33 - - --- -- - - 0.33 4.23 0.00 25.21 8.11 0.33 - - -- -- - -- 0.33 4.25 0.00 25.21 8.11 0.33 - -- - - - -- 0.33 4.27 0.00 25.21 8.11 0.33 - -- --- - - - 0.33 4.28 0.00 25.21 8.10 0.33 - - --- --- -- - 0.33 4.30 0.00 25.21 8.10 0.33 --- -- -- -- - --- 0.33 4.32 0.00 25.21 8.09 0.33 - -- -- - -- -- 0.33 4.33 0.00 25.21 8.09 0.33 - --- --- -- - - 0.33 4.35 0.00 25.21 8.09 0.33 -- - --- -- - - 0.33 4.37 0.00 25.21 8.08 0.33 - -- - - - --- 0.33 4.38 0.00 25.21 8.08 0.33 -- - - - - - 0.33 4.40 0.00 25.21 8.07 0.33 - - - - - - 0.33 4.42 0.00 25.21 8.07 0.33 - - - - - - 0.33 4.43 0.00 25.21 8.07 0.33 - - - - - - 0.33 4.45 0.00 25.21 8.06 0.33 - - - - - - 0.33 4.47 0.00 25.21 8.06 0.33 - - - - - - 0.33 4.48 0.00 25.20 8.05 0.33 - - - - - - 0.33 4.50 0.00 25.20 8.05 0.33 - - - - - - 0.33 4.52 0.00 25.20 8.05 0.33 - - - - - - 0.33 4.53 0.00 25.20 8.04 0.33 - - - - - - 0.33 4.55 0.00 25.20 8.04 0.33 - - - - - - 0.33 4.57 0.00 25.20 8.03 0.33 - - - - - - 0.33 4.58 0.00 25.20 8.03 0.33 - - - - - - 0.33 4.60 0.00 25.20 8.03 0.33 - - - - - - 0.33 4.62 0.00 25.20 8.02 0.33 - - - - - - 0.33 4.63 0.00 25.20 8.02 0.33 - - - - - - 0.33 4.65 0.00 25.20 8.01 0.33 - - - - - - 0.33 4.67 0.00 25.20 8.01 0.33 - - -- - - - 0.33 4.68 0.00 25.20 8.01 0.33 - - - - - - 0.33 4.70 0.00 25.20 8.00 0.33 - - -- - - - 0.33 4.72 0.00 25.20 8.00 0.33 - - - - - - 0.33 4.73 0.00 25.20 7.99 0.33 - - - - - - 0.33 4.75 0.00 25.20 7.99 0.33 - - - -- - - 0.33 4.77 0.00 25.20 7.98 0.33 - -- - - - - 0.33 4.78 0.00 25.20 7.98 0.33 - - - - - - 0.33 4.80 0.00 25.20 7.97 0.33 -- - -- - - - 0.33 4.82 0.00 25.20 7.97 0.33 - - - - - -- 0.33 4.83 0.00 25.20 7.96 0.33 - --- - - - - 0.33 4.85 0.00 25.20 7.96 0.33 - --- -- -- -- - 0.33 4.87 0.00 25.20 7.96 0.33 -- - ---- - - --- 0.33 4.88 0.00 25.19 7.95 0.33 - -- -- -- - -- 0.33 4.90 0.00 25.19 7.95 0.33 - -- --- - - -- 0.33 Continues on next page... Reality check post pnd Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 4.92 0.00 25.19 7.94 0.33 -- --- -- - - - 0.33 4.93 0.00 25.19 7.94 0.33 - --- - - -- - 0.33 4.95 0.00 25.19 7.93 0.33 - - - - - - 0.33 4.97 0.00 25.19 7.93 0.33 - - - - - - 0.33 4.98 0.00 25.19 7.92 0.33 - - - - - - 0.33 5.00 0.00 25.19 7.92 0.33 - - - - - -- 0.33 5.02 0.00 25.19 7.91 0.33 - - - - - - 0.33 5.03 0.00 25.19 7.91 0.33 - - -- - - - 0.33 5.05 0.00 25.19 7.91 0.33 - - -- -- - - 0.33 5.07 0.00 25.19 7.90 0.33 - -- -- - - -- 0.33 5.08 0.00 25.19 7.90 0.33 - - -- - - --- 0.33 5.10 0.00 25.19 7.89 0.33 - - --- - - 0.33 5.12 0.00 25.19 7.89 0.33 - - -- - - - 0.33 5.13 0.00 25.19 7.88 0.33 - - - - - - 0.33 5.15 0.00 25.19 7.88 0.33 - - - - - - 0.33 5.17 0.00 25.19 7.87 0.33 - - - - - - 0.33 5.18 0.00 25.19 7.87 0.33 - - - - - - 0.33 5.20 0.00 25.19 7.86 0.33 - - - - - - 0.33 5.22 0.00 25.19 7.86 0.33 - - - - - - 0.33 5.23 0.00 25.19 7.86 0.33 - - - - - - 0.33 5.25 0.00 25.19 7.85 0.33 - - - - - - 0.33 5.27 0.00 25.18 7.85 0.33 - - - - - - 0.33 5.28 0.00 25.18 7.84 0.33 - - -- - - - 0.33 5.30 0.00 25.18 7.84 0.33 - - - - - - 0.33 5.32 0.00 25.18 7.83 0.33 - - - - - -- 0.33 5.33 0.00 25.18 7.83 0.33 - - - - - - 0.33 5.35 0.00 25.18 7.82 0.33 - - - - - - 0.33 5.37 0.00 25.18 7.82 0.33 - - - - - - 0.33 5.38 0.00 25.18 7.81 0.33 - - - - - - 0.33 5.40 0.00 25.18 7.81 0.33 - - - - - - 0.33 5.42 0.00 25.18 7.81 0.33 - - - - - - 0.33 5.43 0.00 25.18 7.80 0.33 - - - - - - 0.33 5.45 0.00 25.18 7.80 0.33 -- -- - - - - 0.33 5.47 0.00 25.18 7.79 0.33 - - -- -- - - 0.33 5.48 0.00 25.18 7.79 0.33 - - - - - - 0.33 5.50 0.00 25.18 7.78 0.33 - - - - - -- 0.33 5.52 0.00 25.18 7.78 0.33 - - - -- - - 0.33 5.53 0.00 25.18 7.77 0.33 - -- - - - - 0.33 5.55 0.00 25.18 7.77 0.33 - - - - - - 0.33 5.57 0.00 25.18 7.76 0.33 - -- -- - - - 0.33 5.58 0.00 25.18 7.76 0.33 - - - - - - 0.33 5.60 0.00 25.18 7.76 0.33 - - - - - - 0.33 5.62 0.00 25.18 7.75 0.33 - ----- --- - - - 0.33 5.63 0.00 25.18 7.75 0.33 - --- -- --- - -- 0.33 5.65 0.00 25.18 7.74 0.33 - ----- - -- -- 0.33 5.67 0.00 25.17 7.74 0.33 -- ----- ----- --- - ---- 0.33 5.68 0.00 25.17 7.73 0.33 -- ----- -- --- - - 0.33 5.70 0.00 25.17 7.73 0.33 --- - -- -- -- ---- 0.33 5.72 0.00 25.17 7.72 0.33 - - -- --- -- -- 0.33 Continues on next page... Reality check post pnd Page 8 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs 5.73 0.00 25.17 7.72 0.33 -- -- -- -- --- --- 0.33 5.75 0.00 25.17 7.71 0.33 - - -- -- --- -- 0.33 5.77 0.00 25.17 7.71 0.33 -- - - - -- - 0.33 5.78 0.00 25.17 7.71 0.33 - -- -- - -- - 0.33 5.80 0.00 25.17 7.70 0.33 -- -- -- - -- - 0.33 5.82 0.00 25.17 7.70 0.33 - - -- -- - - 0.33 5.83 0.00 25.17 7.69 0.33 - - -- - - - 0.33 5.85 0.00 25.17 7.69 0.33 - - -- - - - 0.33 5.87 0.00 25.17 7.68 0.33 - - --- - - - 0.33 5.88 0.00 25.17 7.68 0.33 -- - - - - -- 0.33 5.90 0.00 25.17 7.67 0.33 - - -- - - - 0.33 5.92 0.00 25.17 7.67 0.33 -- - - - - - 0.33 5.93 0.00 25.17 7.67 0.33 - - -- - - -- 0.33 5.95 0.00 25.17 7.66 0.33 - - - - - - 0.33 5.97 0.00 25.17 7.66 0.33 - - - - - - 0.33 5.98 0.00 25.17 7.65 0.33 - - - - - - 0.33 6.00 0.00 25.17 7.65 0.33 -- - - - - - 0.33 6.02 0.00 25.17 7.64 0.33 - - - - - - 0.33 6.03 0.00 25.17 7.64 0.33 - - - - - - 0.33 6.05 0.00 25.17 7.63 0.32 - - - - - - 0.32 6.07 0.00 25.16 7.63 0.32 - - - - - - 0.32 6.08 0.00 25.16 7.62 0.32 - - - - - - 0.32 6.10 0.00 25.16 7.62 0.32 - - - - - - 0.32 6.12 0.00 25.16 7.62 0.32 - - - - - - 0.32 6.13 0.00 25.16 7.61 0.32 - - - - - - 0.32 6.15 0.00 25.16 7.61 0.32 - - - - - - 0.32 6.17 0.00 25.16 7.60 0.32 - - - - - - 0.32 6.18 0.00 25.16 7.60 0.32 - - - - - - 0.32 6.20 0.00 25.16 7.59 0.32 - - - - - - 0.32 6.22 0.00 25.16 7.59 0.32 - - - - - - 0.32 6.23 0.00 25.16 7.58 0.32 - - - - - - 0.32 6.25 0.00 25.16 7.58 0.32 - - - - - - 0.32 6.27 0.00 25.16 7.57 0.32 - - - - - - 0.32 6.28 0.00 25.16 7.57 0.32 -- - - - - - 0.32 6.30 0.00 25.16 7.57 0.32 -- - - - - - 0.32 6.32 0.00 25.16 7.56 0.32 -- -- - - - - 0.32 6.33 0.00 25.16 7.56 0.32 -- - - - - - 0.32 6.35 0.00 25.16 7.55 0.32 - -- - - - - 0.32 6.37 0.00 25.16 7.55 0.32 - - - - -- - 0.32 6.38 0.00 25.16 7.54 0.32 -- -- - - -- - 0.32 6.40 0.00 25.16 7.54 0.32 - - - -- - - 0.32 6.42 0.00 25.16 7.53 0.32 -- - - - --- - 0.32 6.43 0.00 25.16 7.53 0.32 - --- -- --- - -- 0.32 6.45 0.00 25.15 7.53 0.32 -- --- -- --- --- -- 0.32 6.47 0.00 25.15 7.52 0.32 - -- - - --- --- 0.32 6.48 0.00 25.15 7.52 0.32 -- - -- -- --- -- 0.32 6.50 0.00 25.15 7.51 0.32 -- - -- --- -- -- 0.32 6.52 0.00 25.15 7.51 0.32 --- ---- -- -- -- --- 0.32 6.53 0.00 25.15 7.50 0.32 - -- -- - --- -- 0.32 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 9 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cis cfs 6.55 0.00 25.15 7.50 0.32 - - - - - - 0.32 6.57 0.00 25.15 7.49 0.32 - - - - - - 0.32 6.58 0.00 25.15 7.49 0.32 - - - - -- -- 0.32 6.60 0.00 25.15 7.48 0.32 - - - - - -- 0.32 6.62 0.00 25.15 7.48 0.32 - - - - - -- 0.32 6.63 0.00 25.15 7.48 0.32 --- -- -- -- --- - 0.32 6.65 0.00 25.15 7.47 0.32 - - - - -- -- 0.32 6.67 0.00 25.15 7.47 0.32 - - - - -- - 0.32 6.68 0.00 25.15 7.46 0.32 - - - - - - 0.32 6.70 0.00 25.15 7.46 0.32 - - - - -- - 0.32 6.72 0.00 25.15 7.45 0.32 - - - - - - 0.32 6.73 0.00 25.15 7.45 0.32 - - - - - - 0.32 6.75 0.00 25.15 7.44 0.32 - -- - - -- - 0.32 6.77 0.00 25.15 7.44 0.32 - - - - -- -- 0.32 6.78 0.00 25.15 7.44 0.32 - - --- - - -- 0.32 6.80 0.00 25.15 7.43 0.32 -- - -- - -- - 0.32 6.82 0.00 25.15 7.43 0.32 - - - - - - 0.32 6.83 0.00 25.15 7.42 0.32 - - - - - - 0.32 6.85 0.00 25.14 7.42 0.32 - - - - - - 0.32 6.87 0.00 25.14 7.41 0.32 - - - - - - 0.32 6.88 0.00 25.14 7.41 0.32 - - - - - - 0.32 6.90 0.00 25.14 7.40 0.32 - - -- - - - 0.32 6.92 0.00 25.14 7.40 0.32 - - -- - - - 0.32 6.93 0.00 25.14 7.39 0.32 - - - - - - 0.32 6.95 0.00 25.14 7.39 0.32 - - - - - - 0.32 6.97 0.00 25.14 7.39 0.32 - - - - - - 0.32 6.98 0.00 25.14 7.38 0.32 - - - - - - 0.32 7.00 0.00 25.14 7.38 0.32 - - - - - - 0.32 7.02 0.00 25.14 7.37 0.32 - - - - - - 0.32 7.03 0.00 25.14 7.37 0.32 - - - - - - 0.32 7.05 0.00 25.14 7.36 0.32 - - - - - - 0.32 7.07 0.00 25.14 7.36 0.32 - - -- - - - 0.32 7.08 0.00 25.14 7.35 0.32 - -- - - - -- 0.32 7.10 0.00 25.14 7.35 0.32 - - - - - -- 0.32 7.12 0.00 25.14 7.35 0.32 - - - - - - 0.32 7.13 0.00 25.14 7.34 0.32 - - - - - - 0.32 7.15 0.00 25.14 7.34 0.32 - - - - - - 0.32 7.17 0.00 25.14 7.33 0.32 - - - - - - 0.32 7.18 0.00 25.14 7.33 0.32 - - --- - --- -- 0.32 7.20 0.00 25.14 7.32 0.32 -- - - - - 0.32 7.22 0.00 25.14 7.32 0.32 - -- --- --- -- 0.32 7.23 0.00 25.14 7.31 0.32 - - -- - -- -- 0.32 7.25 0.00 25.13 7.31 0.32 - - -- - - -- 0.32 7.27 0.00 25.13 7.31 0.32 - - - - -- - 0.32 7.28 0.00 25.13 7.30 0.32 - - - - - - 0.32 7.30 0.00 25.13 7.30 0.32 - - - - - - 0.32 7.32 0.00 25.13 7.29 0.32 - - - - - - 0.32 7.33 0.00 25.13 7.29 0.32 - - --- - - - 0.32 7.35 0.00 25.13 7.28 0.32 -- - -- -- -- 0.32 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 10 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 7.37 0.00 25.13 7.28 0.32 - - - - - - 0.32 7.38 0.00 25.13 7.27 0.32 - - - - - - 0.32 7.40 0.00 25.13 7.27 0.32 - - - - - - 0.32 7.42 0.00 25.13 7.26 0.32 - - - - - - 0.32 7.43 0.00 25.13 7.26 0.32 -- - - - - - 0.32 7.45 0.00 25.13 7.26 0.32 - -- -- - -- - 0.32 7.47 0.00 25.13 7.25 0.32 -- - -- - - - 0.32 7.48 0.00 25.13 7.25 0.32 - - - -- -- - 0.32 7.50 0.00 25.13 7.24 0.32 --- --- --- ---- - 0.32 7.52 0.00 25.13 7.24 0.32 -- -- -- - --- - 0.32 7.53 0.00 25.13 7.23 0.32 - - - - - - 0.32 7.55 0.00 25.13 7.23 0.32 -- - - -- - - 0.32 7.57 0.00 25.13 7.22 0.32 - - - - -- - 0.32 7.58 0.00 25.13 7.22 0.32 - - - - - - 0.32 7.60 0.00 25.13 7.22 0.32 - - - - - - 0.32 7.62 0.00 25.13 7.21 0.32 - - - - - - 0.32 7.63 0.00 25.13 7.21 0.32 - - - - - - 0.32 7.65 0.00 25.12 7.20 0.32 - - - - - - 0.32 7.67 0.00 25.12 7.20 0.32 - - - - - - 0.32 7.68 0.00 25.12 7.19 0.32 - - - - - - 0.32 7.70 0.00 25.12 7.19 0.32 - - - - - - 0.32 7.72 0.00 25.12 7.18 0.32 - - - - - - 0.32 7.73 0.00 25.12 7.18 0.32 - -- - - - - 0.32 7.75 0.00 25.12 7.18 0.32 - - - - - - 0.32 7.77 0.00 25.12 7.17 0.32 -- -- - - - -- 0.32 7.78 0.00 25.12 7.17 0.32 ----- - - -- - - 0.32 7.80 0.00 25.12 7.16 0.32 - - - - - - 0.32 7.82 0.00 25.12 7.16 0.32 - - - - - - 0.32 7.83 0.00 25.12 7.15 0.32 - - - - - - 0.32 7.85 0.00 25.12 7.15 0.32 -- - - - - - 0.32 7.87 0.00 25.12 7.14 0.32 - - - - - - 0.32 7.88 0.00 25.12 7.14 0.32 - - - - - - 0.32 7.90 0.00 25.12 7.14 0.32 - - - - - - 0.32 7.92 0.00 25.12 7.13 0.32 - - - - - - 0.32 7.93 0.00 25.12 7.13 0.32 - - - - - - 0.32 7.95 0.00 25.12 7.12 0.32 - - - - - - 0.32 7.97 0.00 25.12 7.12 0.32 - - - - - - 0.32 7.98 0.00 25.12 7.11 0.32 - - - - - - 0.32 8.00 0.00 25.12 7.11 0.32 --- -- - - - - 0.32 8.02 0.00 25.12 7.10 0.32 - -- - - - - 0.32 8.03 0.00 25.12 7.10 0.32 - -- - -- - --- 0.32 8.05 0.00 25.11 7.10 0.32 --- --- - - --- - 0.32 8.07 0.00 25.11 7.09 0.32 - -- - - --- -- 0.32 8.08 0.00 25.11 7.09 0.32 - - -- -- -- - 0.32 8.10 0.00 25.11 7.08 0.32 -- - - - - - 0.32 8.12 0.00 25.11 7.08 0.32 -- -- - - - -- 0.32 8.13 0.00 25.11 7.01 -0.32 - - - - - - 0.32 8.15 0.00 25.11 7.07 0.32 - - - - - - 0.32 8.17 0.00 25.11 7.06 0.32 - - - -- - - 0.32 Continues on next page... Reality check post pad Hydrograph Discharge Table Page 11 Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cis cis cfs cfs 8.18 0.00 25.11 7.06 0.32 - - - - - - 0.32 8.20 0.00 25.11 7.05 0.32 -- - - - - - 0.32 8.22 0.00 25.11 7.05 0.32 - - - -- - --- 0.32 8.23 0.00 25.11 7.05 0.32 - - - - - - 0.32 8.25 0.00 25.11 7.04 0.32 - - - - - - 0.32 8.27 0.00 25.11 7.04 0.32 - - - - - - 0.32 8.28 0.00 25.11 7.03 0.32 -- - - -- - - 0.32 8.30 0.00 25.11 7.03 0.32 -- - - - - - 0.32 8.32 0.00 25.11 7.02 0.32 - - - - - - 0.32 8.33 0.00 25.11 7.02 0.32 - - - - - - 0.32 8.35 0.00 25.11 7.01 0.32 -- - - - - - 0.32 8.37 0.00 25.11 7.01 0.32 - - - - - - 0.32 8.38 0.00 25.11 7.01 0.32 - - - - - - 0.32 8.40 0.00 25.11 7.00 0.32 - - - - - - 0.32 8.42 0.00 25.11 7.00 0.32 -- - -- -- - - 0.32 8.43 0.00 25.11 6.99 0.32 - - - - - - 0.32 8.45 0.00 25.10 6.99 0.32 - - - - - - 0.32 8.47 0.00 25.10 6.98 0.32 -- - -- - - - 0.32 8.48 0.00 25.10 6.98 0.32 - -- -- - - -- 0.32 8.50 0.00 25.10 6.97 0.32 - - - - - - 0.32 8.52 0.00 25.10 6.97 0.32 - - - - - - 0.32 8.53 0.00 25.10 6.97 0.32 - - - - - - 0.32 8.55 0.00 25.10 6.96 0.32 -- - - - - - 0.32 8.57 0.00 25.10 6.96 0.32 - - - - - - 0.32 8.58 0.00 25.10 6.95 0.32 - - - - - - 0.32 8.60 0.00 25.10 6.95 0.32 - - - - - - 0.32 8.62 0.00 25.10 6.94 0.32 - - - - -- -- 0.32 8.63 0.00 25.10 6.94 0.32 - - - - - - 0.32 8.65 0.00 25.10 6.93 0.32 - - - - - - 0.32 8.67 0.00 25.10 6.93 0.32 - - - - - -- 0.32 8.68 0.00 25.10 6.92 0.32 - - - - - - 0.32 8.70 0.00 25.10 6.92 0.32 - - - - - - 0.32 8.72 0.00 25.10 6.91 0.32 - - - - - - 0.32 8.73 0.00 25.10 6.91 0.32 - - - - - - 0.32 8.75 0.00 25.10 6.90 0.32 - -- - -- -- --- 0.32 8.77 0.00 25.10 6.90 0.32 - - - - - - 0.32 8.78 0.00 25.10 6.89 0.32 - - - - -- - 0.32 8.80 0.00 25.10 6.89 0.32 - - - -- -- - 0.32 8.82 0.00 25.10 6.88 0.32 --- - -- --- - ---- 0.32 8.83 0.00 25.10 6.88 0.32 - - - - - -- 0.32 8.85 0.00 25.09 6.87 0.32 - - -- -- - - 0.32 8.87 0.00 25.09 6.87 0.32 --- - - --- - --- 0.32 8.88 0.00 25.09 6.86 0.32 --- - - --- -- --- 0.32 8.90 0.00 25.09 6.86 0.32 - - - - - - 0.32 8.92 0.00 25.09 6.85 0.32 -- - - -- - - 0.32 8.93 0.00 25.09 6.85 0.32 ---- - -- -- - - 0.32 8.95 0.00 25.09 6.84 0.32 --- --- - -- - - 0.32 8.97 0.00 25.09 6.83 0.32 -- -- - -- - - 0.32 8.98 0.00 25.09 6.83 0.32 -- - - --- - - 0.32 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 12 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 9.00 0.00 25.09 6.82 0.32 - - - - - - 0.32 9.02 0.00 25.09 6.82 0.32 - - - - - - 0.32 9.03 0.00 25.09 6.81 0.32 - - - - - - 0.32 9.05 0.00 25.09 6.81 0.32 - - - - - -- 0.32 9.07 0.00 25.09 6.80 0.32 -- - -- - -- -- 0.32 9.08 0.00 25.09 6.80 0.32 -- - --- --- - --- 0.32 9.10 0.00 25.09 6.79 0.32 - - - --- - -- 0.32 9.12 0.00 25.09 6.79 0.32 - -- - - -- -- 0.32 9.13 0.00 25.09 6.78 0.32 - - - - - - 0.32 9.15 0.00 25.09 6.78 0.32 - - - -- - - 0.32 9.17 0.00 25.09 6.77 0.32 - - - - - - 0.32 9.18 0.00 25.09 6.77 0.32 - - - - - - 0.32 9.20 0.00 25.09 6.76 0.32 - - - - - - 0.32 9.22 0.00 25.09 6.76 0.32 - - - -- - - 0.32 9.23 0.00 25.09 6.75 0.32 - - - - - - 0.32 9.25 0.00 25.09 6.75 0.32 - - - - - - 0.32 9.27 0.00 25.08 6.74 0.32 - - - --- - - 0.32 9.28 0.00 25.08 6.73 0.32 -- -- - -- - - 0.32 9.30 0.00 25.08 6.73 0.32 -- -- - -- - - 0.32 9.32 0.00 25.08 6.72 0.32 - -- -- -- - - 0.32 9.33 0.00 25.08 6.72 0.32 - - -- - - - 0.32 9.35 0.00 25.08 6.71 0.32 - - - - - - 0.32 9.37 0.00 25.08 6.71 0.32 - - - - - - 0.32 9.38 0.00 25.08 6.70 0.32 - - - - - - 0.32 9.40 0.00 25.08 6.70 0.32 - - - - - - 0.32 9.42 0.00 25.08 6.69 0.32 - - - - - - 0.32 9.43 0.00 25.08 6.69 0.32 - - - - - - 0.32 9.45 0.00 25.08 6.68 0.32 - - - - - - 0.32 9.47 0.00 25.08 6.68 0.32 - - - - - - 0.32 9.48 0.00 25.08 6.67 0.32 - - -- - - - 0.32 9.50 0.00 25.08 6.67 0.32 - - - - - - 0.32 9.52 0.00 25.08 6.66 0.32 -- - -- - - - 0.32 9.53 0.00 25.08 6.66 0.32 - - -- - - -- 0.32 9.55 0.00 25.08 6.65 0.32 - -- - - - - 0.32 9.57 0.00 25.08 6.65 0.32 - -- - - - - 0.32 9.58 0.00 25.08 6.64 0.32 - - -- - - - 0.32 9.60 0.00 25.08 6.64 0.32 - - - - - - 0.32 9.62 0.00 25.08 6.63 0.32 - - - - - -- 0.32 9.63 0.00 25.08 6.62 0.32 - - - - - - 0.32 9.65 0.00 25.08 6.62 0.32 - - - - - - 0.32 9.67 0.00 25.07 6.61 0.32 - - - - -- - 0.32 9.68 0.00 25.07 6.61 0.32 -- - - -- --- --- 0.32 9.70 0.00 25.07 6.60 0.32 - - --- --- - -- 0.32 9.72 0.00 25.07 6.60 0.32 ---- - -- ---- --- -- 0.32 9.73 0.00 25.07 6.59 0.32 -- - - -- --- -- 0.32 9.75 0.00 25.07 6.59 0.32 -- -- -- ---- -- -- 0.32 9.77 0.00 25.07 6.58 0.32 -- - -- ---- -- - 0.32 9.78 0.00 25.07 6.58 0.32 - -- - -- --- - 0.32 9.80 0.00 25.07 6.57 0.32 - - - ---- - - 0.32 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 13 Time Inflow Elevation Civ A Civ B Clv C Civ D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cis cis cfs cfs cfs cfs cfs cfs 9.82 0.00 25.07 6.57 0.32 - - - - - - 0.32 9.83 0.00 25.07 6.56 0.32 - - - - - -- 0.32 9.85 0.00 25.07 6.56 0.32 - - - - - - 0.32 9.87 0.00 25.07 6.55 0.32 - - - - - - 0.32 9.88 0.00 25.07 6.55 0.32 - - - - - --- 0.32 9.90 0.00 25.07 6.54 0.32 - - - - - -- 0.32 9.92 0.00 25.07 6.54 0.32 - -- - - - -- 0.32 9.93 0.00 25.07 6.53 0.32 -- --- - -- - - 0.32 9.95 0.00 25.07 6.53 0.32 - --- - - --- --- 0.32 9.97 0.00 25.07 6.52 0.32 --- -- --- -- --- -- 0.32 9.98 0.00 25.07 6.52 0.32 -- - - - - - 0.32 10.00 0.00 25.07 6.51 0.32 -- -- -- - - - 0.32 10.02 0.00 25.07 6.50 0.32 -- - - - - - 0.32 10.03 0.00 25.07 6.50 0.32 - - - - - - 0.32 10.05 0.00 25.07 6.49 0.32 - - - - - - 0.32 10.07 0.00 25.06 6.49 0.32 - - - - - - 0.32 10.08 0.00 25.06 6.48 0.32 - - - - - - 0.32 10.10 0.00 25.06 6.48 0.32 - - - - - - 0.32 10.12 0.00 25.06 6.47 0.32 - - - - - - 0.32 10.13 0.00 25.06 6.47 0.32 - - - - - - 0.32 10.15 0.00 25.06 6.46 0.32 - - - - - - 0.32 10.17 0.00 25.06 6.46 0.32 - - - - - - 0.32 10.18 0.00 25.06 6.45 0.32 - - -- - - - 0.32 10.20 0.00 25.06 6.45 0.32 - - - - - - 0.32 10.22 0.00 25.06 6.44 0.32 - - - - - - 0.32 10.23 0.00 25.06 6.44 0.32 -- -- - - - - 0.32 10.25 0.00 25.06 6.43 0.32 - -- - - - - 0.32 10.27 0.00 25.06 6.43 0.32 - - - - - -- 0.32 10.28 0.00 25.06 6.42 0.32 - - - - - - 0.32 10.30 0.00 25.06 6.42 0.32 - - - - - - 0.32 10.32 0.00 25.06 6.41 0.32 - - - - - - 0.32 10.33 0.00 25.06 6.41 0.32 - - - - - - 0.32 10.35 0.00 25.06 6.40 0.32 - - - - - - 0.32 10.37 0.00 25.06 6.40 0.32 - - - - - - 0.32 10.38 0.00 25.06 6.39 0.32 - - - - - - 0.32 10.40 0.00 25.06 6.38 0.32 - - - - - - 0.32 10.42 0.00 25.06 6.38 0.32 - - - - - - 0.32 10.43 0.00 25.06 6.37 0.32 - - -- - - - 0.32 10.45 0.00 25.06 6.37 0.32 - -- - - - - 0.32 10.47 0.00 25.06 6.36 0.32 -- -- - - -- -- 0.32 10.48 0.00 25.05 6.36 0.32 -- -- - - ----- ---- 0.32 10.50 0.00 25.05 6.35 0.32 - --- -- -- -- 0.32 10.52 0.00 25.05 6.35 0.32 -- ---- --- --- --- -- 0.32 10.53 0.00 25.05 6.34 0.32 - -- - - -- --- 0.32 10.55 0.00 25.05 6.34 0.32 - --- - -- - -- 0.32 10.57 0.00 25.05 6.33 0.32 - --- -- - -- - 0.32 10.58 0.00 25.05 6.33 0.32 - --- -- - - - 0.32 10.60 0.00 25.05 6.32 0.32 - - - - - - 0.32 10.62 0.00 25.05 6.32 0.32 - --- - - -- - 0.32 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 14 Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 10.63 0.00 25.05 6.31 0.32 -- ----- - -- - -- 0.32 10.65 0.00 25.05 6.31 0.32 - - -- - -- - 0.32 10.67 0.00 25.05 6.30 0.32 - -- - - - - 0.32 10.68 0.00 25.05 6.30 0.32 - - - - - - 0.32 10.70 0.00 25.05 6.29 0.32 - - - - - - 0.32 10.72 0.00 25.05 6.29 0.32 - - - - - - 0.32 10.73 0.00 25.05 6.28 0.32 - - - - - - 0.32 10.75 0.00 25.05 6.28 0.32 -- --- - -- - - 0.32 10.77 0.00 25.05 6.27 0.32 - --- -- --- - -- 0.32 10.78 0.00 25.05 6.26 0.32 -- --- -- -- - - 0.32 10.80 0.00 25.05 6.26 0.32 - -- - - - - 0.32 10.82 0.00 25.05 6.25 0.32 - - - - - - 0.32 10.83 0.00 25.05 6.25 0.32 - - - - - - 0.32 10.85 0.00 25.05 6.24 0.32 - - - - - - 0.32 10.87 0.00 25.05 6.24 0.31 - - - - - - 0.31 10.88 0.00 25.04 6.23 0.31 -- - - - - - 0.31 10.90 0.00 25.04 6.23 0.31 ----- - --- --- - -- 0.31 10.92 0.00 25.04 6.22 0.31 ----- -- - -- - --- 0.31 10.93 0.00 25.04 6.22 0.31 - - - - - - 0.31 10.95 0.00 25.04 6.21 0.31 -- - - - - - 0.31 10.97 0.00 25.04 6.21 0.31 - - - - - - 0.31 10.98 0.00 25.04 6.20 0.31 - - - - - - 0.31 11.00 0.00 25.04 6.20 0.31 -- - - - - - 0.31 11.02 0.00 25.04 6.19 0.31 -- - - - - - 0.31 11.03 0.00 25.04 6.19 0.31 - - - - - - 0.31 11.05 0.00 25.04 6.18 0.31 - - - - - - 0.31 11.07 0.00 25.04 6.18 0.31 - - - - - - 0.31 11.08 0.00 25.04 6.17 0.31 - - - - - - 0.31 11.10 0.00 25.04 6.17 0.31 - - - - - - 0.31 11.12 0.00 25.04 6.16 0.31 - - - - - - 0.31 11.13 0.00 25.04 6.16 0.31 - - - - - - 0.31 11.15 0.00 25.04 6.15 0.31 - - - - - - 0.31 11.17 0.00 25.04 6.15 0.31 - - - - - - 0.31 11.18 0.00 25.04 6.14 0.31 - -- - - - - 0.31 11.20 0.00 25.04 6.14 0.31 - --- - - - - 0.31 11.22 0.00 25.04 6.13 0.31 - - - - - - 0.31 11.23 0.00 25.04 6.12 0.31 - - - - - - 0.31 11.25 0.00 25.04 6.12 0.31 - - - - - - 0.31 11.27 0.00 25.04 6.11 0.31 - -- -- - - - 0.31 11.28 0.00 25.04 6.11 0.31 - -- - - - - 0.31 11.30 0.00 25.03 6.10 0.31 -- ----- -- - - - 0.31 11.32 0.00 25.03 6.10 0.31 -- --- -- - - - 0.31 11.33 0.00 25.03 6.09 0.31 - ----- -- - - - 0.31 11.35 0.00 25.03 6.09 0.31 - ----- --- -- -- - 0.31 11.37 0.00 25.03 6.08 0.31 - -- -- - - - 0.31 11.38 0.00 25.03 6.08 0.31 - - - - - - 0.31 11.40 0.00 25.03 6.07 0.31 - - -- - - - 0.31 11.42 0.00 25.03 6.07 0.31 - --- -- -- -- - 0.31 11.43 0.00 25.03 6.06 0.31 - --- - -- -- -- 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 15 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs Cfs cfs cfs cfs cfs cfs cfs 11.45 0.00 25.03 6.06 0.31 -- - - - -- --- 0.31 11.47 0.00 25.03 6.05 0.31 - - - - - - 0.31 11.48 0.00 25.03 6.05 0.31 - - - - - - 0.31 11.50 0.00 25.03 6.04 0.31 - - - - - - 0.31 11.52 0.00 25.03 6.04 0.31 - - -- - - - 0.31 11.53 0.00 25.03 6.03 0.31 - - - - - - 0.31 11.55 0.00 25.03 6.03 0.31 - - - - - - 0.31 11.57 0.00 25.03 6.02 0.31 -- -- - - -- - 0.31 11.58 0.00 25.03 6.02 0.31 - - - - - - 0.31 11.60 0.00 25.03 6.01 0.31 - -- --- - - - 0.31 11.62 0.00 25.03 6.01 0.31 - - - - - - 0.31 11.63 0.00 25.03 6.00 0.31 - - - - - - 0.31 11.65 0.00 25.03 6.00 0.31 -- - -- - - - 0.31 11.67 0.00 25.03 5.99 0.31 - - -- - - - 0.31 11.68 0.00 25.03 5.99 0.31 - -- ---- - -- - 0.31 11.70 0.00 25.02 5.98 0.31 - - - - - - 0.31 11.72 0.00 25.02 5.97 0.31 - - -- - -- - 0.31 11.73 0.00 25.02 5.97 0.31 -- - - - - - 0.31 11.75 0.00 25.02 5.96 0.31 - - -- - - - 0.31 11.77 0.00 25.02 5.96 0.31 - - -- - - - 0.31 11.78 0.00 25.02 5.95 0.31 - - - - - - 0.31 11.80 0.00 25.02 5.95 0.31 - -- -- - - - 0.31 11.82 0.00 25.02 5.94 0.31 - - - - - - 0.31 11.83 0.00 25.02 5.94 0.31 - -- - - - - 0.31 11.85 0.00 25.02 5.93 0.31 - - -- - - - 0.31 11.87 0.00 25.02 5.93 0.31 - - - - - - 0.31 11.88 0.00 25.02 5.92 0.31 - - - - - -- 0.31 11.90 0.00 25.02 5.92 0.31 - - - - - - 0.31 11.92 0.00 25.02 5.91 0.31 - -- -- - - - 0.31 11.93 0.00 25.02 5.91 0.31 - - - - - - 0.31 11.95 0.00 25.02 5.90 0.31 - - - - - -- 0.31 11.97 0.00 25.02 6.90 0.31 - -- - - - - 0.31 11.98 0.00 25.02 5.89 0.31 - -- - - - - 0.31 12.00 0.00 25.02 5.89 0.31 - -- - - - - 0.31 12.02 0.00 25.02 5.88 0.31 - - - - - -- 0.31 12.03 0.00 25.02 5.88 0.31 -- -- - - -- -- 0.31 12.05 0.00 25.02 5.87 0.31 - - - - - - 0.31 12.07 0.00 25.02 5.87 0.31 - - - - - -- 0.31 12.08 0.00 25.02 5.86 0.31 - -- - -- - -- 0.31 12.10 0.00 25.02 5.86 0.31 - - - - - - 0.31 12.12 0.00 25.01 5.85 0.31 -- -- -- --- --- --- 0.31 12.13 0.00 25.01 5.85 0.31 - - - - - - 0.31 12.15 0.00 25.01 5.84 0.31 --- - -- -- -- -- 0.31 12.17 0.00 25.01 5.84 0.31 - -- - - - - 0.31 12.18 0.00 25.01 5.83 0.31 - - -- -- - - 0.31 12.20 0.00 25.01 5.83 0.31 - - - - - - 0.31 12.22 0.00 25.01 5.82 0.31 - - -- - -- - 0.31 12.23 0.00 25.01 5.82 0.31 - --- -- ---- --- - 0.31 12.25 0.00 25.01 5.81 0.31 - - - -- - - 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 16 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs It cfs cfs cis cfs cfs cfs cfs cfs cfs 12.27 0.00 25.01 5.80 0.31 - - - - - - 0.31 12.28 0.00 25.01 5.80 0.31 -- -- -- - - -- 0.31 12.30 0.00 25.01 5.79 0.31 - - - - - - 0.31 12.32 0.00 25.01 5.79 0.31 - -- --- - - -- 0.31 12.33 0.00 25.01 5.78 0.31 - -- - - - - 0.31 12.35 0.00 25.01 5.78 0.31 - - - - - -- 0.31 12.37 0.00 25.01 5.77 0.31 - - - - - -- 0.31 12.38 0.00 25.01 5.77 0.31 - - - - - - 0.31 12.40 0.00 25.01 5.76 0.31 - - - - - - 0.31 12.42 0.00 25.01 5.76 0.31 - - - -- - - 0.31 12.43 0.00 25.01 5.75 0.31 - -- --- -- - -- 0.31 12.45 0.00 25.01 5.75 0.31 - - - - - - 0.31 12.47 0.00 25.01 5.74 0.31 - -- - - - -- 0.31 12.48 0.00 25.01 5.74 0.31 - - - - - - 0.31 12.50 0.00 25.01 5.73 0.31 - -- -- - - --- 0.31 12.52 0.00 25.01 5.73 0.31 - - - - - - 0.31 12.53 0.00 25.00 5.72 0.31 - - -- - - -- 0.31 12.55 0.00 25.00 5.72 0.31 - - - - - - 0.31 12.57 0.00 25.00 5.71 0.31 - -- - - - - 0.31 12.58 0.00 25.00 5.71 0.31 - -- -- -- - - 0.31 12.60 0.00 25.00 5.70 0.31 - - - - - - 0.31 12.62 0.00 25.00 5.70 0.31 - - - - - - 0.31 12.63 0.00 25.00 5.69 0.31 - - - - - - 0.31 12.65 0.00 25.00 5.69 0.31 - - - - - - 0.31 12.67 0.00 25.00 5.68 0.31 - - - - - - 0.31 12.68 0.00 25.00 5.68 0.31 - -- -- -- - - 0.31 12.70 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.72 0.00 25.00 5.67 0.31 -- - - - - - 0.31 12.73 0.00 25.00 5.66 0.31 - - - - - - 0.31 12.75 0.00 25.00 5.66 0.31 -- - - - - - 0.31 12.77 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.78 0.00 25.00 5.67 0.31 - - - -- - - 0.31 12.80 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.82 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.83 0.00 25.00 5.67 0.31 - - - - - -- 0.31 12.85 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.87 0.00 25.00 5.67 0.31 - - - - - -- 0.31 12.88 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.90 0.00 25.00 5.67 0.31 -- - -- - - 0.31 12.92 0.00 25.00 5.67 0.31 - - - - - - 0.31 12.93 0.00 24.99 5.67 0.31 -- --- - - --- 0.31 12.95 0.00 24.99 5.67 0.31 - - - -- - - 0.31 12.97 0.00 24.99 5.68 0.31 -- -- -- - - ---- 0.31 12.98 0.00 24.99 5.68 0.31 -- - -- - - ----- 0.31 13.00 0.00 24.99 5.68 0.31 -- - -- -- - -- 0.31 13.02 0.00 24.99 5.68 0.31 - - -- - - --- 0.31 13.03 0.00 24.99 5.68 0.31 - - -- -- - -- 0.31 13.05 0.00 24.99 5.68 0.31 -- -- -- -- - --- 0.31 13.07 0.00 24.99 5.68 0.31 - - -- - - - 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 17 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cis cfs cfs cfs 13.08 0.00 24.99 5.68 0.31 - - - - - - 0.31 13.10 0.00 24.99 5.68 0.31 - - - - - - 0.31 13.12 0.00 24.99 5.68 0.31 - -- - - - - 0.31 13.13 0.00 24.99 5.68 0.31 - - - - - - 0.31 13.15 0.00 24.99 5.69 0.31 - - - - - - 0.31 13.17 0.00 24.99 5.69 0.31 --- --- - -- - --- 0.31 13.18 0.00 24.99 5.69 0.31 - --- - - - - 0.31 13.20 0.00 24.99 5.69 0.31 -- --- - - - - 0.31 13.22 0.00 24.99 5.69 0.31 -- --- -- -- - - 0.31 13.23 0.00 24.99 5.69 0.31 ---- ----- - -- - - 0.31 13.25 0.00 24.99 5.69 0.31 - - - -- - - 0.31 13.27 0.00 24.99 5.69 0.31 -- -- - - -- - 0.31 13.28 0.00 24.99 5.69 0.31 -- - - - - - 0.31 13.30 0.00 24.99 5.69 0.31 - - - - - - 0.31 13.32 0.00 24.98 5.69 0.31 - - - - - - 0.31 13.33 0.00 24.98 5.69 0.31 - - - - - - 0.31 13.35 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.37 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.38 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.40 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.42 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.43 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.45 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.47 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.48 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.50 0.00 24.98 5.70 0.31 -- - - - - - 0.31 13.52 0.00 24.98 5.70 0.31 - - - - - - 0.31 13.53 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.55 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.57 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.58 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.60 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.62 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.63 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.65 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.67 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.68 0.00 24.98 5.71 0.31 - - - - -- - 0.31 13.70 0.00 24.98 5.71 0.31 - - - - - - 0.31 13.72 0.00 24.97 5.71 0.31 - ---- --- - - -- 0.31 13.73 0.00 24.97 5.72 0.31 ---- --- - --- -- -- 0.31 13.75 0.00 24.97 5.72 0.31 -- --- ---- --- -- - 0.31 13.77 0.00 24.97 5.72 0.31 -- -- -- --- -- 0.31 13.78 0.00 24.97 5.72 0.31 ---- ----- -- ---- --- - 0.31 13.80 0.00 24.97 5.72 0.31 ---- -- --- --- - -- 0.31 13.82 0.00 24.97 5.72 0.31 - --- -- --- -- - 0.31 13.83 0.00 24.97 5.72 0.31 - -- - - -- - 0.31 13.85 0.00 24.97 5.72 0.31 --- - -- - - - 0.31 13.87 0.00 24.97 5.72 0.31 - - - - - - 0.31 13.88 0.00 24.97 5.72 0.31 -- - - - - - 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 18 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 13.90 0.00 24.97 5.72 0.31 - - - - - - 0.31 13.92 0.00 24.97 5.73 0.31 --- - - - - -- 0.31 13.93 0.00 24.97 5.73 0.31 - - - - - - 0.31 13.95 0.00 24.97 5.73 0.31 - - - - - - 0.31 13.97 0.00 24.97 5.73 0.31 - - - - - - 0.31 13.98 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.00 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.02 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.03 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.05.0.00 24.97 5.73 0.31 - - - - - - 0.31 14.07 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.08 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.10 0.00 24.97 5.73 0.31 - - - - - - 0.31 14.12 0.00 24.96 5.74 0.31 - - - - - - 0.31 14.13 0.00 24.96 5.74 0.31 -- - ---- - - -- 0.31 14.15 0.00 24.96 5.74 0.31 - - - - - - 0.31 14.17 0.00 24.96 5.74 0.31 -- -- -- - - ---- 0.31 14.18 0.00 24.96 5.74 0.31 - - -- - - - 0.31 14.20 0.00 24.96 5.74 0.31 - - -- - - - 0.31 14.22 0.00 24.96 5.74 0.31 - -- - -- - -- 0.31 14.23 0.00 24.96 5.74 0.31 - - - - - - 0.31 14.25 0.00 24.96 5.74 0.31 -- - - - - - 0.31 14.27 0.00 24.96 5.74 0.31 - - - - - - 0.31 14.28 0.00 24.96 5.74 0.31 -- - -- - - -- 0.31 14.30 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.32 0.00 24.96 5.75 0.31 -- - -- - - -- 0.31 14.33 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.35 0.00 24.96 5.75 0.31 -- - -- - - --- 0.31 14.37 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.38 0.00 24.96 5.75 0.31 -- - - - - - 0.31 14.40 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.42 0.00 24.96 5.75 0.31 - - -- - - - 0.31 14.43 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.45 0.00 24.96 5.75 0.31 - - - - - - 0.31 14.47 0.00 24.96 5.75 0.31 - -- -- - - -- 0.31 14.48 0.00 24.96 5.75 0.31 -- - - - - - 0.31 14.50 0.00 24.96 5.76 0.31 -- - -- -- - - 0.31 14.52 0.00 24.95 5.76 0.31 - - - - - - 0.31 14.53 0.00 24.95 5.76 0.31 -- -- - -- - -- 0.31 14.55 0.00 24.95 5.76 0.31 - - - - - - 0.31 14.57 0.00 24.95 5.76 0.31 -- - -- -- --- - 0.31 14.58 0.00 24.95 5.76 0.31 - - - - - - 0.31 14.60 0.00 24.95 5.76 0.31 - - - - - - 0.31 14.62 0.00 24.95 5.76 0.31 - - - - - - 0.31 14.63 0.00 24.95 5.76 0.31 - - - --- - - 0.31 14.65 0.00 24.95 5.76 0.31 - -- - --- - --- 0.31 14.67 0.00 24.95 5.76 0.31 -- - - -- - -- 0.31 14.68 0.00 24.95 5.77 0.31 -- --- ----- - - 0.31 14.70 0.00 24.95 5.77 0.31 - - - - - -- 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 19 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.72 0.00 24.95 5.77 0.31 - -- - - - - 0.31 14.73 0.00 24.95 5.77 0.31 - - -- - - - 0.31 14.75 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.77 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.78 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.80 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.82 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.83 0.00 24.95 5.77 0.31 - - - - - - 0.31 14.85 0.00 24.95 5.77 0.31 - - -- -- - - 0.31 14.87 0.00 24.95 5.77 0.31 -- - -- - - -- 0.31 14.88 0.00 24.95 5.78 0.31 - -- - - - - 0.31 14.90 0.00 24.94 5.78 0.31 - - - - - - 0.31 14.92 0.00 24.94 5.78 0.31 - - - - - - 0.31 14.93 0.00 24.94 5.78 0.31 - - - - - - 0.31 14.95 0.00 24.94 5.78 0.31 - - - - - - 0.31 14.97 0.00 24.94 5.78 0.31 - -- - - - - 0.31 14.98 0.00 24.94 5.78 0.31 - -- - -- - - 0.31 15.00 0.00 24.94 5.78 0.31 -- --- - -- -- - 0.31 15.02 0.00 24.94 5.78 0.31 - -- - - - - 0.31 15.03 0.00 24.94 5.78 0.31 - - - - - - 0.31 15.05 0.00 24.94 5.78 0.31 - - - - - - 0.31 15.07 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.08 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.10 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.12 0.00 24.94 5.79 0.31 - -- - - - - 0.31 15.13 0.00 24.94 5.79 0.31 - -- - -- - - 0.31 15.15 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.17 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.18 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.20 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.22 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.23 0.00 24.94 5.79 0.31 - - - -- - - 0.31 15.25 0.00 24.94 5.79 0.31 - - - - - - 0.31 15.27 0.00 24.94 5.80 0.31 - - - -- - - 0.31 15.28 0.00 24.94 5.80 0.31 - - - - - - 0.31 15.30 0.00 24.93 5.80 0.31 - - - - - - 0.31 15.32 0.00 24.93 5.80 0.31 - - - - - - 0.31 15.33 0.00 24.93 5.80 0.31 - - - - - - 0.31 15.35 0.00 24.93 5.80 0.31 - - - - - - 0.31 15.37 0.00 24.93 5.80 0.31 -- - - -- - -- 0.31 15.38 0.00 24.93 5.80 0.31 - -- -- - - -- 0.31 15.40 0.00 24.93 5.80 0.31 --- - --- - -- -- 0.31 15.42 0.00 24.93 5.80 0.31 --- --- -- - - - 0.31 15.43 0.00 24.93 5.80 0.31 - -- -- - - - 0.31 15.45 0.00 24.93 5.81 0.31 - -- - - - - 0.31 15.47 0.00 24.93 5.81 0.31 - - - - - - 0.31 15.48 0.00 24.93 5.81 0.31 - - - - - - 0.31 15.50 0.00 24.93 5.81 0.31 - - - - - - 0.31 15.52 0.00 24.93 5.81 0.31 - --- - - - - 0.31 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 20 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.53 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.55 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.57 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.58 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.60 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.62 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.63 0.00 24.93 5.81 0.30 - - - - - - 0.30 15.65 0.00 24.93 5.82 0.30 - - - - - - 0.30 15.67 0.00 24.93 5.82 0.30 - - - - - - 0.30 15.68 0.00 24.93 5.82 0.30 - - - - - - 0.30 15.70 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.72 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.73 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.75 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.77 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.78 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.80 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.82 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.83 0.00 24.92 5.82 0.30 - - - - - - 0.30 15.85 0.00 24.92 5.83 0.30 - - - - - - 0.30 15.87 0.00 24.92 5.83 0.30 - - - - - - 0.30 15.88 0.00 24.92 5.83 0.30 - - - -- - -- 0.30 15.90 0.00 24.92 5.83 0.30 - - - - - - 0.30 15.92 0.00 24.92 5.83 0.30 -- - - - - - 0.30 15.93 0.00 24.92 5.83 0.30 - - - -- - - 0.30 15.95 0.00 24.92 5.83 0.30 - - - - - - 0.30 15.97 0.00 24.92 5.83 0.30 - -- -- - - - 0.30 15.98 0.00 24.92 5.83 0.30 --- - - - - - 0.30 16.00 0.00 24.92 5.83 0.30 - -- - - - - 0.30 16.02 0.00 24.92 5.83 0.30 - -- - - - - 0.30 16.03 0.00 24.92 5.84 0.30 -- - - - - - 0.30 16.05 0.00 24.92 5.84 0.30 - - - - - - 0.30 16.07 0.00 24.92 5.84 0.30 - - - - - - 0.30 16.08 0.00 24.92 5.84 0.30 - - - - - - 0.30 16.10 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.12 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.13 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.15 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.17 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.18 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.20 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.22 0.00 24.91 5.84 0.30 - - - - - - 0.30 16.23 0.00 24.91 5.85 0.30 - - - - - - 0.30 16.25 0.00 24.91 5.85 0.30 - - - - - - 0.30 16.27 0.00 24.91 5.85 0.30 - - - - - - 0.30 16.28 0.00 24.91 5.85 0.30 - - - - - - 0.30 16.30 0.00 24.91 5.85 0.30 - -- - - - - 0.30 . 16.32 0.00 24.91 5.85 0.30 - - - - - -- 0.30 16.33 0.00 24.91 5.85 0.30 - - - - - - 0.30 Continues on next page... Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume (tuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (crdt) Hydrograph description 1 Rational 48.91 1 20 58,691 100 — — Existing Condition 2 Rational 166.82 1 10 100,093 100 — Post Development 3 Reservoir 0.34 1 20 27,057 100 2 25.31 99,855 Post through Pond 4 Reservoir 0.34 1 20 26,825 100 2 25.31 99.858 Reality check post Proj. file: pre_post_8-9-05.GPW OF file: BrunCo_hydrograph vef ddilf3ate: 09-01-2005 Hydrograph Report Page 7 English Hyd. No. 1 Existing Conditions Hydrograph type = Rational Peak discharge = 48.91 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.3 Intensity = 7.00 in Time of conc. (Tc) = 20 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 58,691 cult Hydrograph Discharge Table Time — Outflow (hrs cfs) 0.32 46.46 0.33 48.91 << 0.35 46.46 0.37 44.02 ...End Hydrograph Report Hyd. No. 2 Post Development Page 1 English Hydrograph type = Rational Peak discharge = 166.82 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.84 Intensity = 8.52 in Time of conc. (Tc) = 10 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 100,093 cult Hydrograph Discharge Table Time — Outflow (hrs cfs) 0.15 150.14 0.17 166.82 << 0.18 150.14 ... End Hydrograph Report Page English Hyd. No. 1 Existing Conditions Hydrograph type = Rational Peak discharge = 48.91 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.3 Intensity = 7.00 in Time of conc. (Tc) = 20 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 58,691 cult Hydrograph Discharge Table Time -- Outflow (min cfs) 20 48.91 << ...End Hydrograph Report Hyd. No. 2 Post Development Page 1 English Hydrograph type = Rational Peak discharge = 166.82 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 23.3 ac Runoff coeff. = 0.84 Intensity = 8.52 in Time of conc. (Tc) = 10 min I-D-F Curve = BrunCo_hydrograph_ver6.IDF Reced. limb factor = 1 Total Volume = 100,093 cuft Hydrograph Discharge Table Time -- Outflow (min cfs) 10 166.82 << End Hydrograph Report Hyd. No. 3 Post through Pond Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 2 Max. Elevation = 25.31 ft SWage Indr lion medwd used Hydrograph Discharge Table Time Inflow (min) cfs 18 33.36 19 16.68 20 0.00 21 0.00 22 0.00 23 0.00 24 0.00 25 0.00 26 0.00 27 0.00 28 0.00 29 0.00 30 0.00 31 0.00 32 0.00 33 0.00 34 0.00 35 0.00 36 0.00 37 0.00 38 0.00 39 0.00 40 0.00 41 0.00 42 0.00 43 0.00 44 0.00 45 0.00 46 0.00 47 0.00 48 0.00 49 0.00 50 0.00 51 0.00 52 0.00 53 0.00 Peak discharge Time interval Reservoir name Max. Storage Page 1 English = 0.34 cfs = 1 min = Existing Pond = 99,855 cuft Total Volume = 27,057 cult Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.27 12.92 0.34 - - - - - - 0.34 25.30 13.11 0.34 - - 0.00 - - - 0.34 25.31 13.17 0.34 - - 0.00 - - -- 0.34 << 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.16 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - -- 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.15 0.34 - - 0.00 - - - 0.34 25.31 13.14 0.34 - - 0.00 - - - 0.34 25.31 13.14 0.34 - - 0.00 - -- - 0.34 25.31 13.14 0.34 - - 0.00 - - - 0.34 25.31 13.14 0.34 - - 0.00 - - - 0.34 25.31 13.13 0.34 -- -- 0.00 - - - 0.34 25.31 13.13 0.34 - - 0.00 - - - 0.34 25.30 13.13 0.34 - - 0.00 - - - 0.34 25.30 13.13 0.34 - - 0.00 - -- -- 0.34 25.30 13.12 0.34 - - 0.00 - - - 0.34 25.30 13.12 0.34 - - 0.00 - -- -- 0.34 25.30 13.12 0.34 --- - 0.00 - -- -- 0.34 25.30 13.12 0.34 --- --- 0.00 -- -- - 0.34 25.30 13.12 0.34 - -- 0.00 - - -- 0.34 25.30 13.11 0.34 --- -- 0.00 -- -- - 0.34 25.30 13.11 0.34 --- -- 0.00 --- -- -- 0.34 25.30 13.11 0.34 - -- 0.00 ---- -- -- 0.34 25.30 13.11 0.34 --- -- 0.00 ----- --- --- 0.34 25.30 13.10 0.34 --- - 0.00 -- - -- 0.34 25.30 13.10 0.34 -- - ---- --- --- -- 0.34 25.30 13.10 0.34 -- --- --- - -- 0.34 25.30 13.10 0.34 - -- --- - -- 0.34 25.30 13.09 0.34 --- -- --- ---- --- -- 0.34 25.30 13.09 0.34 ----- --- -- -- - 0.34 25.30 13.09 0.34 ---- -- --- --- - - 0.34 Continues on next page... Post through Pond Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 54 0.00 25.30 13.09 0.34 --- --- --- -- - --- 0.34 55 0.00 25.30 13.08 0.34 -- -- -- - - - 0.34 56 0.00 25.30 13.08 0.34 -- -- - - - - 0.34 57 0.00 25.30 13.08 0.34 - - - - - -- 0.34 58 0.00 25.30 13.08 0.34 - --- - - - - 0.34 59 0.00 25.29 13.07 0.34 -- -- -- - - - 0.34 60 0.00 25.29 13.07 0.34 - --- -- - - - 0.34 61 0.00 25.29 13.07 0.34 --- -- -- - - - 0.34 62 0.00 25.29 13.06 0.34 - -- - - - - 0.34 63 0.00 25.29 13.06 0.34 - -- - - - - 0.34 64 0.00 25.29 13.06 0.34 - --- - - - - 0.34 65 0.00 25.29 13.06 0.34 -- -- - - - - 0.34 66 0.00 25.29 13.05 0.34 - -- - - - - 0.34 67 0.00 25.29 13.05 0.34 - -- -- - - - 0.34 68 0.00 25.29 13.05 0.34 - -- - - -- - 0.34 69 0.00 25.29 13.05 0.34 - - - - - - 0.34 70 0.00 25.29 13.04 0.34 - - - - - - 0.34 71 0.00 25.29 13.04 0.34 - - -- - - - 0.34 72 0.00 25.29 13.04 0.34 - - - - - - 0.34 73 0.00 25.29 13.04 0.34 - - - - - - 0.34 74 0.00 25.29 13.03 0.34 - - - - - - 0.34 75 0.00 25.29 13.03 0.34 - - - - - - 0.34 76 0.00 25.29 13.03 0.34 - - - - - - 0.34 77 0.00 25.29 13.03 0.34 - - - - - - 0.34 78 0.00 25.29 13.02 0.34 - - - - - - 0.34 79 0.00 25.29 13.02 0.34 - - - - - - 0.34 80 0.00 25.29 13.02 0.34 - - - - - - 0.34 81 0.00 25.29 13.02 0.34 - - - - - - 0.34 82 0.00 25.28 13.01 0.34 - - - - - - 0.34 83 0.00 25.28 13.01 0.34 - - - - - - 0.34 84 0.00 25.28 13.01 0.34 - - - - - - 0.34 85 0.00 25.28 13.00 0.34 - - - - - - 0.34 86 0.00 25.28 13.00 0.34 - - - - - - 0.34 87 0.00 25.28 13.00 0.34 - - - - - - 0.34 88 0.00 25.28 13.00 0.34 -- - - - - - 0.34 89 0.00 25.28 12.99 0.34 - - - - - - 0.34 90 0.00 25.28 12.99 0.34 - - -- - - - 0.34 91 0.00 25.28 12.99 0.34 - - - -- - - 0.34 92 0.00 25.28 12.99 0.34 -- - - - - - 0.34 93 0.00 25.28 12.98 0.34 -- - - - - - 0.34 94 0.00 25.28 12.98 0.34 -- - - - - - 0.34 95 0.00 25.28 12.98 0.34 -- - - -- - - 0.34 96 0.00 25.28 12.98 0.34 -- - - --- - -- 0.34 97 0.00 25.28 12.97 0.34 - - -- - - -- 0.34 98 0.00 25.28 12.97 0.34 - - - - - - 0.34 99 0.00 25.28 12.97 0.34 - - - - - -- 0.34 100 0.00 25.28 12.97 0.34 -- - -- - - - 0.34 101 0.00 25.28 12.96 0.34 - - -- - -- - 0.34 102 0.00 25.28 12.96 0.34 -- - -- - - -- 0.34 Continues on next page... Post through Pond Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cis ft cis cfs cfs cfs cis cfs cfs cfs cfs 103 0.00 25.28 12.96 0.34 - - - - - - 0.34 104 0.00 25.28 12.96 0.34 - -- - --- - - 0.34 105 0.00 25.27 12.95 0.34 --- - -- -- -- - 0.34 106 0.00 25.27 12.95 0.34 - -- -- -- - -- 0.34 107 0.00 25.27 12.95 0.34 - -- -- -- -- - 0.34 108 0.00 25.27 12.94 0.34 - - - -- - - 0.34 109 0.00 25.27 12.94 0.34 - -- - - -- - 0.34 110 0.00 25.27 12.94 0.34 --- -- -- - - - 0.34 111 0.00 25.27 12.94 0.34 - -- -- - -- - 0.34 112 0.00 25.27 12.93 0.34 - -- --- - -- - 0.34 113 0.00 25.27 12.93 0.34 - -- --- -- -- -- 0.34 114 0.00 25.27 12.93 0.34 - -- - - - - 0.34 115 0.00 25.27 12.93 0.34 - -- -- - - - 0.34 116 0.00 25.27 12.92 0.34 -- --- --- -- -- - 0.34 ..End Reservoir Report Reservoir No. 1 - Existing Pond Pond Data Pond storage is based on known contour areas Stage / Storage Table Page 1 English Stage ft 0.00 1.00 2.00 3.00 Elevation ft 23.00 24.00 25.00 26.00 Contour area sqft 40,336 42,687 45,093 47,553 Incr. Storage Total storage cuft cuft 0 0 41,512 41,512 43,890 85,402 46,323 131,725 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 36.0 3.0 0.0 0.0 Crest Len ft = 16.00 0.00 0.00 0.00 Span in = 36.0 3.0 0.0 0.0 Crest El. ft = 25.40 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 23.00 23.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 200.0 6.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.10 0.10 0.00 0.00 N-Value = .013 .010 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 0.00 ft Nob. All amwws have bean enab«d udw inW a,d outlet m 1 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 23.00 0.00 0.00 - - 0.00 - - - 0.00 1.00 41,512 24.00 4.13 0.21 -- - 0.00 -- - - 0.21 2.00 85,402 25.00 11.12 0.31 - - 0.00 - -- - 0.31 3.00 131,725 26.00 14.80 0.00 - - 22.31 - - 14.80 Hydrograph Report Hyd. No. 4 Reality check post pnd Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time interval Inflow hyd. No. = 2 Reservoir name Max. Elevation = 25.31 ft Max. Storage Storage IWirauon m gmd used Hydrograph Discharge Table Time Inflow (min) cfs 19 16.68 20 0.00 21 0.00 22 0.00 23 0.00 24 0.00 25 0.00 26 0.00 27 0.00 28 0.00 29 0.00 30 0.00 31 0.00 32 0.00 33 0.00 34 0.00 35 0.00 36 0.00 37 0.00 38 0.00 39 0.00 40 0.00 41 0.00 42 0.00 43 0.00 44 0.00 45 0.00 46 0.00 47 0.00 48 0.00 49 0.00 50 0.00 51 0.00 52 0.00 53 0.00 54 0.00 Page 1 English = 0.34 cfs = 1 min = Reality Check f = 99,858 cuft Total Volume = 26,825 cult Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.30 8.97 0.34 - - 0.00 - - - 0.34 25.31 << 9.06 0.34 - - 0.00 - - - 0.34 << 25.31 9.05 0.34 - -- 0.00 - - - 0.34 25.31 9.05 0.34 - - 0.00 - - - 0.34 25.31 9.05 0.34 - - 0.00 - - - 0.34 25.31 9.04 0.34 - - 0.00 - - - 0.34 25.31 9.04 0.34 - - 0.00 - - - 0.34 25.31 9.03 0.34 - - 0.00 - - - 0.34 25.31 9.03 0.34 - - 0.00 - - - 0.34 25.31 9.03 0.34 - - 0.00 - - - 0.34 25.31 9.02 0.34 - - 0.00 - - - 0.34 25.31 9.02 0.34 - - 0.00 - - - 0.34 25.31 9.02 0.34 - - 0.00 - - - 0.34 25.31 9.01 0.34 - - 0.00 - - - 0.34 25.31 9.01 0.34 - - 0.00 - - - 0.34 25.31 9.00 0.34 - - 0.00 - - - 0.34 25.31 9.00 0.34 - - 0.00 - - - 0.34 25.31 9.00 0.34 - - 0.00 - - - 0.34 25.30 8.99 0.34 - - 0.00 - - - 0.34 25.30 8.99 0.34 - - 0.00 - - - 0.34 25.30 8.99 0.34 - - 0.00 - - - 0.34 25.30 8.98 0.34 - - 0.00 - - - 0.34 25.30 8.98 0.34 - - 0.00 - - - 0.34 25.30 8.98 0.34 - - 0.00 - - -- 0.34 25.30 8.97 0.34 -- - 0.00 - - -- 0.34 25.30 8.97 0.34 - -- 0.00 - -- - 0.34 25.30 8.96 0.34 -- --- 0.00 -- - - 0.34 25.30 8.96 0.34 -- - 0.00 -- -- - 0.34 25.30 8.96 0.34 -- -- 0.00 - - - 0.34 25.30 8.95 0.34 -- -- -- -- -- - 0.34 25.30 8.95 0.34 - --- -- --- - - 0.34 25.30 8.94 0.34 -- -- -- --- -- - - 0.34 25.30 8.94 0.34 -- -- - ---- -- --- 0.34 25.30 8.94 0.34 -- -- -- -- -- 0.34 25.30 8.93 0.34 -- - --- --- --- --- 0.34 25.30 8.93 0.34 --- ---- -- -- --- - 0.34 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 2 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs 55 0.00 25.30 8.92 0.34 -- -- - - - - 0.34 56 0.00 25.30 8.92 0.34 --- -- -- - - - 0.34 57 0.00 25.30 8.92 0.34 - -- - - - - 0.34 58 0.00 25.30 8.91 0.34 -- - -- - - -- 0.34 59 0.00 25.30 8.91 0.34 -- - ---- - - - 0.34 60 0.00 25.29 8.90 0.34 - -- --- - - - 0.34 61 0.00 25.29 8.90 0.34 -- - --- - - - 0.34 62 0.00 25.29 8.90 0.34 - -- - - - - 0.34 63 0.00 25.29 8.89 0.34 - -- -- - - - 0.34 64 0.00 25.29 8.89 0.34 -- -- - - - --- 0.34 65 0.00 25.29 8.88 0.34 - - -- - - - 0.34 66 0.00 25.29 8.88 0.34 - - --- -- - -- 0.34 67 0.00 25.29 8.87 0.34 -- -- - - - - - 0.34 68 0.00 25.29 8.87 0.34 - - - - -- -- 0.34 69 0.00 25.29 8.87 0.34 - -- -- - - - 0.34 70 0.00 25.29 8.86 0.34 - - -- - - -- 0.34 71 0.00 25.29 8.86 0.34 - -- -- - - -- 0.34 72 0.00 25.29 8.85 0.34 -- - - - - -- 0.34 73 0.00 25.29 8.85 0.34 - - - - - - 0.34 74 0.00 25.29 8.85 0.34 - - - - - - 0.34 75 0.00 25.29 8.84 0.34 - -- - - - -- 0.34 76 0.00 25.29 8.84 0.33 - - - - - - 0.33 77 0.00 25.29 8.83 0.33 - -- - - - - 0.33 78 0.00 25.29 8.83 0.33 - - - - - - 0.33 79 0.00 25.29 8.83 0.33 - - - - - -- 0.33 80 0.00 25.29 8.82 0.33 - - - - - - 0.33 81 0.00 25.29 8.82 0.33 - - -- - - - 0.33 82 0.00 25.29 8.81 0.33 - - - - - - 0.33 83 0.00 25.28 8.81 0.33 - - - - - - 0.33 84 0.00 25.28 8.80 0.33 - - - - - - 0.33 85 0.00 25.28 8.80 0.33 -- - - - - - 0.33 86 0.00 25.28 8.80 0.33 - - - - - - 0.33 87 0.00 25.28 8.79 0.33 - - - - - - 0.33 88 0.00 25.28 8.79 0.33 - - - - - - 0.33 89 0.00 25.28 8.78 0.33 -- - - -- - - 0.33 90 0.00 25.28 8.78 0.33 - - - - -- - 0.33 91 0.00 25.28 8.78 0.33 -- - - - - - 0.33 92 0.00 25.28 8.77 0.33 - - - - - - 0.33 93 0.00 25.28 8.77 0.33 -- - -- -- - - 0.33 94 0.00 25.28 8.76 0.33 - -- -- -- - - 0.33 95 0.00 25.28 8.76 0.33 --- - - - -- - 0.33 96 0.00 25.28 8.76 0.33 -- - - - - - 0.33 97 0.00 25.28 8.75 0.33 - - - -- - - 0.33 98 0.00 25.28 8.75 0.33 - - - -- - - 0.33 99 0.00 25.28 8.74 0.33 -- -- -- - --- -- 0.33 100 0.00 25.28 8.74 0.33 -- -- -- - - - 0.33 101 0.00 25.28 8.74 0.33 -- - -- -- - - 0.33 102 0.00 25.28 8.73 0.33 - - - - - - 0.33 103 0.00 25.28 8.73 0.33 - - - -- - -- 0.33 Continues on next page... Reality check post pnd Hydrograph Discharge Table Page 3 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (min) cis ft cis cfs cis cis cfs cis cis cis cis 104 0.00 25.28 8.72 0.33 -- - - - -- - 0.33 105 0.00 25.28 8.72 0.33 - - - - - - 0.33 106 0.00 25.27 8.71 0.33 - - - - - -- 0.33 107 0.00 25.27 8.71 0.33 - - - - - -- 0.33 108 0.00 25.27 8.71 0.33 - - - - - - 0.33 109 0.00 25.27 8.70 0.33 - - - - - - 0.33 110 0.00 25.27 8.70 0.33 -- - - - - - 0.33 111 0.00 25.27 8.69 0.33 - - - - - - 0.33 112 0.00 25.27 8.69 0.33 - - - - - - 0.33 113 0.00 25.27 8.69 0.33 - - -- - -- - 0.33 114 0.00 25.27 8.68 0.33 - - - - - - 0.33 115 0.00 25.27 8.68 0.33 - -- - -- - - 0.33 116 0.00 25.27 8.67 0.33 - - - - - - 0.33 End Reservoir Report Reservoir No. 2 - Reality Check for Ex. Pnd Pond Data Pond storage is based on known contour areas Stage / Storage Table Page 1 English Stage Elevation ft ft 0.00 23.00 1.00 24.00 2.00 TP, 25.00.15 3.00 26.00 Contour area sqft 40,336 42,687 45,093gbo77 47,553 Incr. Storage Total storage cuft cult 0 0 41,512 41,512 43,890 85,402_/03 93, 46,323 131,725 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 24.0 3.0 0.0 0.0 Crest Len ft = 16.00 0.00 0.00 0.00 Span in = 24.0 3.0 0.0 0.0 Crest El. ft = 25.40 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 23.00 23.00 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 200.0 6.0 0.0 0.0 Multi -Stage = Yes No No No Slope % = 0.10 0.10 0.00 0.00 N-Value = .013 .010 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = - Yes No No Tailwater Elevation = 0.00 ft Nob All outlbxs haw been anayc unJer inlet antl outlet mnhal Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 23.00 0.00 0.00 - - 0.00 - - - 0.00 1.00 41,512 24.00 3.00 0.21 - - 0.00 - - - 0.21 2.00 85,402 25.002S,y. 5.66 0.31 - - 0.00 - -- - 0.31 3.00 131.725 26A0 13.87 0.00 -- - 22.31 -- - 13.87 rfi^u g>9l�5�0 Q3��f�,VE^ FEAR North Carolina 12inol Drive. Wil 0� r� NGINEERING !nt of Environment NC 28405 (910) 9 Express 9 03831045 n mot , FAX Review Sw $ 0 FILL-IN all information below and CHECK required Permit(s). FAX or email to Cameron. Weaveri8ncmail.net along with a narrative and vicinity map of the project Joe, Projects must be submitted by 9:00 A.M. of the review date, unless prior arran em�(nts are mad v ( 070 6 : 1 d) -L. r2 4 ��Ef �/�mkwa✓r APPLICANT NameD-�-04A0 _ Company_ l O/,taw) ,'DWJGt S+ ANh ¢EAR ;EtrATC__ Address (0 �4o t � E l�raN_ 5 ecity State W tt.tn , rl G- Zio 7-84�untvO PROJECT Name A6H0L tN"Dv> 10ESS 8 Z PROJECT SYSTEM(S)-TRIBUTARY TG--—� (STREAM NAME) Cam% RIVER BASIN ENGINEFR/CONSULTANT QA1t5Fe,NwE�� Company e, o r t16 Address_l51 Toov6?-o 15ottE \03 City/State Wil\c. C. Zip_Z84SI Cou BPo,y��' Phone_3e3-1044 Fax 393-104,�" EmailA:�aQ%<-- nar'l CyftW ------------- ------- ---------------- ------ ------ --------------- ----- ------- ------------------------- --------------- -- - --------------------------Cc State or National Environmental Policy Act ($EPA, NEPA) - EA or EIS Required ❑ Yes ❑ No ❑ STREAM ORIGIN Determination; ____# of stream calls; Stream N STORMWATER ❑ Low Density ❑ High Density -Detention Pond ❑ High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ['MOff Site ❑ COASTAL MANAGEMENT ❑ LAND QUALITY ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Upland Development ❑ Marina Development ❑ Erosion and Sedimentation Control Plan with ❑ Structures Information ❑ Urban Waterfront acres to be disturbed. WETLANDS (401) Wetlands on Property ❑ Yes ❑ No Isolated Wetlands on Property ❑ yes ❑ No Check all that apply Wetlands Will Be Impacted ❑ Yes ❑ No Wetland Impacts: Acre(s) Wetlands Delineation has been completed ❑ Yes ❑ No ❑ Buffers Impacted: Acre(s) USA COE Approval of Delineation completed ❑ Yes ❑ No 404 Application in process w/USACOE ❑Yes ❑No / Permit received from USACE ❑Ycs ❑No 401 Application required ❑Yes ❑ No If Yes, ❑ Regular ❑ Express -------- ----------------------------------------------------------------------------------------- Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: SW $ CAMA $ LQS $ 401 $ Total Fee Amount $ Aug 13 05 12:56y�p-- CAPE FEAR ENGINEERING Im DESIGN NARRATIVE 1. GENERAL: 1!t - lot-7( /-'-7�Z The project site is located oll' of Hwy 17 at project lies entirely within the city limt_t of project boundary of Magnolia Busing -_. — area to the approved stormwatcr ma aeemt 2. EXISTINC SITE: 3103831045 �7 Ad.�n�e Leland industrial Park. The 010706). Ldl #2 was Site topography in the area is relatively flat with slopes typically less than one (1) percent. The vegetation consists primarily of grasses and minor ground cover within the area of the improvements. Subsurface soils are typically a mixture of sands, silty sands and organics. 3. PROPOSED IMPROVF,MENTS: The proposed development of Lot 42 includes the installation of sub -surface drainage, parking lots and landscaping, and a business office for a residential and commercial construction company. a. DRAINAGE CONSIDERATIONS: All drainage from the project site will drain to a piped system that will convey the collected stormwatcr to the approved wet detention basin. We are working under the assumption that the pond has been previously certified because other offsite permits have been issued recently for other Projects in the Magnolia Business Park. 5. EROSION CONTROL CONSIDERATIONS: Silt fence shall be employed to retain all sediment on -site both at the project boundary and as protection around proposed stormwatcr inlets. We do not attticipate the nccd for any other erosion control measures. 6. MAINTENANCE CONSIDERATIONS: During construction, the Contractor shall be required to inspcet and repair as needed all erosion control devices after any significant rain event. Any measure lbund not perfunming its intended I unction, shall be repaired immediately. Upon completion of construction the establishment of permanent ground cover will be a priority. p.3F . T,. Y =-•fiJ� 19 05 12:5GF CAPE FEAR ENGINEERING 9103831045 p.2 .l Express Storm Water Narrative Subject: Lot 2 at Magnolia Business Park Brunswick County, North Carolina Prepared for i_ogan Construction, Developers, and Real Estate Group L.L.0 6740 Netherlands Drive Suite h Wilmington, North Carolina 28405 (910)443-2869 SEAL 024" Date: August 2005 Prepared by Cape Fear Yngineering, Inc. IS Poole Road, Suite 100 Belville, [North Carolina 29451 (910)383-1044 M AQAV5S Aug 19 05 03:03p- CAPE FEAR -ENGINEERING 9103831-045 P'2h' . L"OCATION MAP NOT TO SCALE