Loading...
HomeMy WebLinkAboutNCC215727_NOT Closeout Documents_20220826North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Johnston Project: Amazon Main River basin: Neuse Person financially responsible: Piedmont Natural Gas -Jason Bingham, Project #: JOHNS-2022-024 Distribution Project Specialist Address: 250 Five Points Rd, Dudley, NC 28333 1. Project Location: SR 1501, US 70 Bus., SR 1918, Smithfield Pictures: No 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): N/A Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: August 15, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Date of inspection: August 11, 2022 cc: Others present: Ivana Barham Time arriving on site: 12:00 PM Time leaving site: 12:30 PM