HomeMy WebLinkAboutNCC215727_NOT Closeout Documents_20220826North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Johnston Project: Amazon Main River basin: Neuse
Person financially responsible: Piedmont Natural Gas -Jason Bingham, Project #: JOHNS-2022-024
Distribution Project Specialist
Address: 250 Five Points Rd, Dudley, NC 28333
1. Project Location: SR 1501, US 70 Bus., SR 1918, Smithfield
Pictures: No
2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): N/A
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: August 15, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Lauren Garcia
Date of inspection: August 11, 2022
cc:
Others present: Ivana Barham
Time arriving on site: 12:00 PM Time leaving site: 12:30 PM