Loading...
HomeMy WebLinkAboutNC0063096_Authorization to Construct_20000114NPDES DOCUMENT ! CANNINO COVER SHEET NC0063096 Holly Springs WWTP NPDES Permit: Document Type: Permit Issuance Wasteload Allocation `Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Meeting Notes Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: January 14, 2000 Thin document is printed on reuse paper - igriore any content on the reYerse wide 1 1 CompanyW on Engineering Planning Architecture 120 N. Boylan Avenue Raleigh, NC 27603 919-828-0531 Fax:919.834-3589 ENGINEER'S CERTIFICATION TO: NC Department of Environment and Natural Resources Division of Water Quality Permits & Engineering Unit P.O. Box 29535 Raleigh, North Carolina 27626-0535 FROM: Charles W. Davis, P.E. The Wooten Company 120 N. Boylan Avenue Raleigh, North Carolina 27603 DATE: January 14, 2000 RE: Wastewater Treatment Facilities Town of Holly Springs Wake County TWC 2657-Y Division of Water Quality Permit No. NC0063096 Dated: July 30, 1997 R -cwiLF wc/ G,,qte era DENR - WATER DUALITY 3OURCE BRANCH I, Charles W. Davis, as a duly registered Professional Engineer in the State of North Carolina, do hereby certify to the best of my knowledge and belief that construction of these permitted facilities have been completed in substantial compliance and intent of the approved plansdspecificati Signature: AzX Gt. Registratio''CNo.: 22531 Date: /�ffre2 inc`e 15:6 c: Stephanie Sudano, Town of Holly Springs TWC File The Division of Water QualitY berebY of Enemasp ,wiect receipt � his BConti 10 (0 JAN f 4 2000 DIV. OF WATER QUALITY DIRECTOR'S OFFICE Wooten Company Engineering Planning Architecture 120 N. Boylan Avenue Raleigh, NC 27603 919-828-0531 Since 1936 September 22. 1997 David Goodrich NPDES Unit Supervisor NC Division of Water Quality P.O. Box 29535 Raleigh, North Carolina 27626-0535 Re: Wastewater Treatment Improvements Holly Springs, North Carolina TWC No. 2657-I RITO d• SEP ? 199/ POINT SOURCE BRANCH Dear David: Charles Davis of our office has been speaking with Steve Pellei of your office about our plans for bidding the Holly Springs Wastewater Treatment Improvements project. The purpose of this letter is to confirm how we plan to bid the project. In your "Authorization To Construct" letter, all of the various unit processes were outlined and approval was granted to construct the cited facilities. As we approach the time for bidding, we are concerned there may be insufficient funds to construct all of the facilities as designed. Rather than having to risk negotiating a change order after a lump sum bid is received for the entire project, we plan to designate two distinctive elements of the plant as "add alternates" in order to obtain the best pricing for the project. The two "add alternates" involve the headworks units Wow measurement, screening, and grit removal) and improvements to the administration/laboratory building. Although we are planning for the worst case scenario of not being able to fund these two particular elements of the project, the Town is already working hard to secure additional funds for the current project to insure that all elements can be constructed. In the event we have to postpone construction of either of these elements, we propose to first postpone the admin/lab building but construct the headworks, if funds are available. In the event both elements have to he postponed, we envision the headworks and lab will he constructed within the next two to three years. As Steve related to Charles, the Engineer's Certification will reference the "Authorization To Construct" letter and will note the items deleted and to be constructed later. The primary concern of course would be system integrity and we believe the plant will be able to meet effluent limits even if the lab and headworks are not provided at this time. You can rest assured the Town will make every effort to include both elements during the current construction project and, if not possible, will make every effort to insure both elements are constructed in the very near future. If you have any questions regarding this matter, please contact our office. Sincerely, THE WOOTEN COMPANY Arthur L. Kennedy, P.E. President ALK:hmm Attachment c: Stephanie Sudano, P.E. ACTIVATED SLUDGE PROCESS Oxidation Ditch ( CASE 1 I CASE 2 I TYPICAL RANGE I Page I INPUTS Given 0 (gpd) • 1,000,000 1,500,000 var. Intl. BOD5 [So] (mg/l) - 300 300 110 -400 p109 EHI. BOD5 [S] (mg/l) - 5 5 0- 30 Intl. TKN (NH3-N If TKN not avail) (No] • 2 5 3 5 20 - 85 p109 Effl. NH3-N (N) • 1 1 0-10 EO Volume (gal) • 250.000 250,000 var. Reactor Volume (gal) • 1.150,000 1,150,000 var. Clarifier Volume (gal) • 195,600 195,600 var. Clarifier Surface Area (sf) • 4,418 4,418 var. Clarifier Weir Length (I1) • 235 235 var. Digestor Volume (gal) • 300.000 300,000 Operating Elevation (ft) • 370 370 Worsed Case Air Temp. (F) • 3 2 3 2 Assumptions (Complete Mix) MCRT (day) • 22.0 22.0 20-30 p550 MLSS (mg/I) • 4.000 4,000 1,500-5,000 p550 RAS, WAS (mg/l) • 10.000 10.000 8,000-25,000 p774 Y (mass cells/mass BO05) • 0.65 0.65 0.4-0.8 p394 kd • 0.05 0.05 0.025-0.075 p394 f (BOD5/BODI) . 0.68 0.68 0.45-0.68 p535 EQUALIZATION TANK EO tank Vol/Ow • 25% 1 7% > 25% Air Req'mts (CFM) - 31 3 31 3 p470 REACTOR VESSEL J Y # BOD5 / 1000 CF • 16.0 24.0 10-25 p550 MLVSS (mg/l) • 3,200 3.200 80% MLSS p550 HRT (hours) • 27.6 18.4 18-36 p550 F/M • 0.08 0.12 0.05.0.15 p550 U • 0.08 0.12 E (%) • 98.33 98.33 85-95% p548 Y (obs) • 0.31 0.31 0.23 - 0.63 Owaste ave. (gpd) - 9,131 21.818 Or/0 ave. • 0.46 0.45 0.25-1.0 p550 Px calc (#/d) - 761.5 1,142.3 by kinetics 02 (CBOD removal, #/d) - 2,537 3,805 02 (NH3 removal, #Id) - 913 1,940 02 Credit for Dertttri (#/d) - -572 -1,216 Total 02 (Biological removal,#/d) - 5.787 9.106 includes resid of 2 p536 Air Requirements - Diffused Air Transfer Eff. (%) - Air (w/Nitrificatlon, CFM) - Alr (w/out Nitrification, CFM) - Air (mixing requirement, CFM) - Actual Air Required, w/nit. CFM - Actual Air Required, w/o nit. CFM • Standard Air. w/nit. CFM • Standard Air. w/o nit. CFM • 10 2.171 952 3,075 2,171 952 2.268 994 10 3.416 1.428 3,075 3,416 1,428 3.569 1.491 5.10 Calc. based on Act Calc. based on Act p595 p536 p536 p573 Air Requirements - Surface Aerator Standard 02 Saturation, mg/L • 02 Solubility Correction Factor, F • Standard 02 Transfer (Ib 02/hp-hr) - Field 02 Transfer (Ib 02/hp-hr) - Horsepower for 02 transfer, hp - Mixing hp/1000 ft"3 • Horsepower for mixing. hp - 14.57 1.0 3.5 3.24 55 1.00 154 14.57 1.0 3.5 3.24 55 1.00 154 M&E, Table E-2 2-5 0.75-1.5 p1259 p572 p572 p572 p573 D(GE.SSTEB ,AEROBIC % solids In • 1.00 1.00 < 2.5 p774 % solids out - 2.00 2.00 < 2.5 p774 Vol Req'd (gal) - 182.619 490.909 for 30 days 02 req'd (1b) biol. - 1 75 1 2627 2.3/0 sol p837 Transfer Eff. % • 5.0 5.0 5.0 - 10.0 02 req'd (CFM) biol.- 1398 2097 02 regd (CFM) mixing . 488 802 p837 TOTAL AIR RFOUIRFMFNTS EO+Rctor+Digest. w/nit. (CFM) - 3.979 5,979 EO+Rctor+Digest, w/o nit. (CFM) • 2.705 3.901 Act Air Provided (CFM) • All Blowers Act Air Provided (CFM) • Irgst blower out Project: Holly Springs Utley Creek WWTP Date: 1-May-97 ver. 5/1/97 SDP ref: Metcalf & Eddy. 3rd Ed. Ludes SF=2.0 Standard Actual Elevation (ft) • 0 370 Temperature (F) - 68 32 Temperature (C) • 2 0 0 Suction Pressure (PSIA) • 14.7 14.2 Barometric Press. (PSIA) - 14.5372 Relative Humidity (%) • 36 10 Sat. VP of water (PSI) . 0.3391 0.08859 Air Density (Ib/11^2) - 0.075 0.080 CASE 1 1 CASE 2 L RANGE CLARIFIER Hydraulic detention time (hr) - 4.7 3.1 >3 Overflow Rate (gpd/sf) . 226 340 400-800 Weir Loading Rate (gpd/II) - 4255 6383 <10.000 Solids Flux (#/hr-sf) - 0.31 0.47 0.2-1 Prepared by: SDP and MDM t'Z I ;TC, RAT 2 Your f\opnr N, • /. oxit cit NEE, J /9 +st -r 1 New 18" Parshall Flume tArTb '6e.1s St „L t:5it- S AIL Sludge Digestio (old % Package WWTP) i �" ••Persl WA. New 1.5 MGD Mechanical Screen uSc? 24 9o' Ir,7u,,� lk: . 111111 2_ 11111111111111111 [44 New 1.5 MGD Aerated Grit Chamber bh6Z.. EQute t 4 1 s`k llllll IIIIIIIIIIIIIIII T - Flow Equalization (old package WWTP) o.ZSw 0 S+rES New Flow cL1'f v do M4L(1 Splitter Box I GLOsI o I Existing 0.5 MGD Package Plant use EQu;f n New Flow Splitter Box New 1.15 MG Oxidation Ditch w/ Denitrification Zone W. ,off Vol!, Iz 1 I4 tC' 1 Existing 0.5 MGD Tertiary Filter (OU-tpt- ear gFeA tLSS. vOL.vz-t New 1.0 MGD Tertiary Filter New 75' 0, 15' SWD Final Clarifier - 44tf? SF LF RAS/WAS SCHEMATIC FLOW DIAGRAM 13 GQ: HOLLY SPRINGS WASTEWATER TREATMENT PLANT 1C'1,0,;7 CA, le -gr. Hum vko New Intermediate Lift/RAS Station (3 @ 1825 gpm ea) 74-70 ryx CLR)Fi�OTto� �.� 64 Gs- 4 'R ?s ,� IF 1 c SGOD4gxj 4 New 1.5 MGD UV Disinfection 2 3 S C; CANNA '1 A� OuJ ia� C: P ttlyvitvot1, New 1.5 MGD Cascade Aerator C--c. State of North Carolina Department of Environment, Health and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director July 30, 1997 Ms. Stephanie Sudano, P.E., Town Engineer Town of Holly Springs P.O. Box 8 Holly Springs, North Carolina 27540 Av477VA EDIEI-1 NJ I Subject: Authorization to Construct Permit No. NC0063096 Utley Creek WWTP Wake County Dear Ms. Sudano: A letter of request for an Authorization to Construct (ATC) was received February 20,1997 by the Division and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction and installation of the proposed components to upgrade the existing 0.5 MGD WWTP to 1.5 MGD with discharge of treated wastewater from outfall 001 to Utley Creek in the Cape Fear River Basin. Specifically, this ATC allows: • the installation of a mechanical bar screen and aerated grit chamber, • the installation of a parshall flume with influent monitoring, • the conversion of an existing equalization basin to an aerobic sludge digester, • the installation of an intermediate lift station with three 1825 gpm centrifugal pumps, • the installation of splitter boxes, • the installation of a 1.15 MG oxidation ditch with denitrification zone, • the installation of a 70 foot dia. clarifier (15 foot side water depth), • the installation of a,1.0 MGD tertiary filter, • the installation of a dual bank 1.5 MGD UV disinfection unit, • the installation of post aeration via cascade aeration, • the installation of an effluent sampler and flow monitoring, • the abandonment of the existing 0.5 MGD UV system, • the abandonment of the existing post aeration chamber, • the installation of additional piping, valves, and control equipment. Holly Springs has corrected past problems with the filter and UV disinfection systems. Should problems reoccur the Town should consider a backup disinfection system. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES No. NC0063096 issued January 22, 1997 and shall be subject to revocation unless the water treatment facilities are constructed in accordance with the conditions and limitations specified above, and in Permit No. NC0063096. Any sludge generated from this treatment facility must be disposed of in accordance with G.S. 143- 215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facility fails to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement water treatment or disposal facilities. The Raleigh Regional Office, telephone number (919) 571-4700, shall be notified at least forty- eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer So% recycled/ 10% post -consumer paper Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to the Permits and Engineering Unit, P.O. Box 29535, Raleigh, NC 27626-0535. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Steven D. Pellei, telephone number (919) 733- 5083 extension 516. Sincerely cc: Central Files Raleigh Regional Office, Water Quality Section Permits and Engineering Unit/NPDES Files Facility Assessment Unit Technical Assistance & Certification Group er_,Gt1 . Preston Howard, Jr., P.E. • TEST Permit No. Project Name Type of Project Title First Name Last Name Applicant Address City State Zip Consulting Date Received Acknowledgement Payor Fee Received Check No. Reg. / C.O. Dep. County Region Reviewer Comments 479 ACC063096 WWTP/Ut1ey Creek Exp. Authorization To Construct MS. STEPHANIE SUDANO TOWN OF HOLLY SPRINGS PO BOX 8 HOLLY SPRINGS NORTH CAROLINA 27540 The Wooten Company February 20, 1997 February 24, 1997 T.ofHollySprings 200 24917 C.O. Wake Raleigh Steve Pellei [(kb la-rtiES7 71Z-0 g off "f 9"-cl CWooten Engineering Planning Architecture 120 N. Boylan Avenue Raleigh, NC 27603 919-828-0531 Since 1936 Z n ..ir ti� /i f.f1.7. 1r February 19, 1997 Mr. David Goodrich, NPDES Supervisor State Engineering Review Group NCDEHNR-DWQ P.O. Box 29535 Raleigh, North Carolina 27626-0535 Re: Request for Authorization to Construct Town of Holly Springs, Wake County NPDES No. NC0063096 Dear Mr. Goodrich: The Town of Holly Springs has requested that an Authorization To Construct be issued for a new 1.0 MGD wastewater treatment facility expansion to be built on the grounds of the existing 0.5 MGD Utley Creek Wastewater Treatment Plant. A new NPDES permit establishing a flow rate of 1.5 MGD has been issued. The application fee in the amount of $200, made payable to NCDEHNR, was sent by the Town of Holly Springs under separate cover on February 18, 1997. Enclosed please find the following items: 1) Three sets of Detailed Plans and Specifications 2) Design Calculations 3) Hydraulic Profile (Included in plans) 4) 8 1/2 X 11" Flow Schematic If you should have any questions please contact me at (919)828-0531. Sincerely, TH WOOTEN COMPANY / L,Charles Davis Enclosures c: Stephanie Sudano, Town of Holly Springs NPDES FACILITY AND PERMIT DATA 01/23/96 12:55:27 UPDATE OPTION TRXID 5NU KEY NC0063096 PERSONAL DATA FACILITY APPLYING FOR PERMIT REGION FACILITY NAME> HOLLY SPRINGS, TOWN OF/WWTP COUNTY> WAKE 05 ADDRESS: MAILING (REQUIRED) LOCATION (REQUIRED) STREET: P.O. BOX 8 STREET: NCSR 1115 S/W OF CITY: HOLLY SPRINGS ST NC ZIP 27540 CITY: HOLLY SPRINGS ST NC ZIP 27540 TELEPHONE 919 557 3921 DATE FEE PAID: 01/23/96 AMOUNT: 400.00 STATE CONTACT> POWELL PERSON IN CHARGE THOMAS TILLAGE 1=PROPOSED,2=EXIST,3=CLOSED 2 1=MAJOR,2=MINOR 2 1=MUN,2=NON-MUM 1 LAT: 3538420 LONG: 07851010 N=NEW,M=MODIFICATION,IR=REISSUE> R DATE APP RCVD 01/23/96 WASTELOAD REQS 0\/4 f1(12 DATE STAFF REP REQS v t /Z4/1(.0 WASTELOAD RCVD / / DATE STAFF REP RCVD / / SCH TO ISSUE / / DATE TO P NOTICE / / DATE DRAFT PREPARED / / DATE OT AG COM REQS / / DATE DENIED / / DATE OT AG COM RCVD / / DATE RETURNED / / DATE TO EPA / / DATE ISSUED / / ASSIGN/CHANGE PERMIT DATE FROM EPA / / EXPIRATION DATE 03/31/96 FEE CODE C 3) 1=(>10MGD),2=01MGD),3=00.1MGD),4=(<0.1MGD),5=SF,6=(GP25,64,79), 7=(GP49,73)8=(GP76)9=(GP13,34,30,52)0=(NOFEE) DIS/C 01 02 CONBILL ( ) COMMENTS: EFFECTIVE 12.01.93 MESSAGE: *** DATA MODIFIED SUCCESSFULLY *** n4(12l°l (P , rctA-4-ocirre d-60 z-lci c a (Zo c -z(.(-Q-4 , 1145 -� 5 ( e ,. ,re"