Loading...
HomeMy WebLinkAboutNCC216205_NOT Closeout Documents_20220824North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Rowan Project: Line 217 Low Water Crossing River basin: Yadkin-PeeDee Person financially responsible: Public Service Co of NC, Inc - Andrew Moore Project #: ROWAN-2022-004 Address: 800 Gaston Rd, Building A, Gastonia, NC 28053 1. Project Location: 6255 Wright Road, Atwell Pictures: No 2. Weather and soil conditions: Sunny, workable soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one on site Title: Inspection report: Sent Report Date given/sent: June 03, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All project that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Jesse McDonnell Others present: Date of inspection: June 01, 2022 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: