Loading...
HomeMy WebLinkAboutNCC213534_NOT Closeout Documents_20220824North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Enloe Magnet High School Tennis Court River basin: Neuse Person financially responsible: Wake County Board of Education -David Neter, Project #: WAKE-2021-084 Chief Operating Officer Address: 5625 Dillard Drive, Crossroads Building 1, Cary, NC 1. Project Location: Clarendon Crescent, Raleigh Pictures: No 2. Weather and soil conditions: overcast, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one Inspection report: Gave Report 9. Corrective action needed: Title: Date given/sent: August 18, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: August 11, 2022 Time arriving on site: 11:35 AM Time leaving site: 11:45 AM cc: