Loading...
HomeMy WebLinkAboutNCC202100_NOT Closeout Documents_20220824North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Halifax Project: Dawson's Crossroads Substation River basin: Tar -Pamlico Person financially responsible: Halifax Electric Membership Corporation - Charles Project #: HALIF-2020-012 H Guery Address: PO Box 667, Enfield, NC 27823-0667 1. Project Location: 13 Bridges Road, Scotland Neck Pictures: No 2. Weather and soil conditions: hot dryworkable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Brianna Eddy Inspection report: Sent Report 9. Corrective action needed: Title: General Manager Date given/sent: June 10, 2022 10. Comments: This site is stable and can be closed in our office Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Thaddeus Valentine Others present: no one Date of inspection: June 08, 2022 Time arriving on site: 1:20 PM Time leaving site: 2:00 PM cc: