Loading...
HomeMy WebLinkAboutSW4220801_Design Calculations_2022082521-026 EROSION AND SEDIMENTATION CONTROL NEWLIN MEADOW SUB. PH II Mineral Spring Road Graham, NC 27253 Engineer of Record: Chad E. Abbott, PE chad@c3designeng.com / 919-230-0996 Ext. 101 April 25, 2022 CaIOEESIGN & ENGINEERING, PLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE NARRATIVE 2537E. LYON STATION RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919 230-0996 r3DESIGN & ENGINEERING, RLLC CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE Narrative Project Data: • C3 Project#: 21-026 • Name: Newlin Meadow Sub. PH II • PIN:161952 • Address: Mineral Spring Road, Graham, NC 27253 • River Basin: Cape Fear • Property Total Area: 1,413,050 sf (32.44 ac) • Existing BUA: 0 sf (0.00 ad • Removed BUA: 0 sf (0.00 ad • Proposed BUA: 160,000 sf (3.67 ac) • Total BUA: 160,000 sf (3.67 ad —11% • Disturbed Area: 269,272 sf (6.18 ad • Water Protection Overlay: Motes Creek (WS-V: NSW) 2537E. LYON STATION RD, STE 102 PO BOX 361 CREEDMOOR, NC 27522 919 230-0996 Site Description and Existing Conditions: The subject property is located approximately 4,300 ft. south of the intersection between NC54 and Mineral Spring Road. The property predominantly consists of existing managed pervious areas used for agriculture/farming. The drainage area (DA) for the property drains to the west where the existing creek borders the property. The soils in the project site are mapped as Chewacla loam (ChA), Cullen clay loam (CnB2), Cullen clay load (CnC2), and Cullen clay loam (CnD2). Those soils area classified as B and B/D is hydrologic soil group (HSG). Project Description: The proposed project is for a single-family subdivision development with 27 lots, consisting of 2 phases. This submittal is for the development of lots 14-27 (phase 2) with a new cul-de-sac street. Phase I has been previously permitted as project ID ALAMA-2022-029. One skimmer basin is proposed for the erosion control treatment and will be located on lot 21. This skimmer basin will be treating the runoff for lots 14-18 and 22-27, while the rest will be treated by silt fence and silt fence outlets. Temporary Gravel Construction Entrance/Exit: A temporary gravel construction entrance/exit will be installed at the beginning of the proposed road. During wet weather, it may be necessary to wash vehicle tires at this location. Temporary and Permanent Diversion: A temporary ditch/diversion will be constructed above the existing 3:1 fill slope start from construction entrance/exit. This temporary diversion will outlet to the proposed sediment basin in lot 21. The ditch/diversions will be matted with NAG product DS75 with straw wattle spacing according to the plan details. Sediment Fence and Sediment Fence Outlet: A sediment fence will be constructed as perimeter control along the limited of disturbance line where a temporary or permanent diversion is not proposed. The sediment fence outlet will be placed at the lowest elevation where the runoff can possibly pond. Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2022-2009 Certificate of Coverage No. NCC222009 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Cimland, LLC is hereby authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Newlin Meadows Sub Phase II Mineral Spring Road Graham Alamance County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No. ALAMA-2022-049 This Certificate of Coverage shall become effective 5/31/2022. This Certificate of Coverage shall remain in effect until rescinded or expired. This Certificate of Coverage will expire on the anniversary of its effective date unless it is renewed by payment of the annual administration and compliance fee. for Brian Wrenn Director, Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission