HomeMy WebLinkAboutNCC203493_NOT Closeout Documents_20220822North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Iredell Project: Duke Energy Stamey Tie to Staesville- to Marshall # 80 River basin: Yadkin-PeeDee
Person financially responsible: Duke Energy Carolinas, LLC - Randy Veltri Project #: IREDE-2021-001
Address: 526 South Church Street, Charlotte, NC 28201
1. Project Location: Various Streets, Statesville
Pictures: No
2. Weather and soil conditions: Sunny, workable soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Rob Wade (Phone) Title: Duke Energy
Inspection report: Sent Report Date given/sent: May 10, 2021
9. Corrective action needed:
10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are
some bare areas and rills that need to be repaired and stabilized. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
All project that have been approved prior to April 01, 2019, under the old permit system, are
not required to take any additional actions. The stormwater permit is terminated at the same
time as the termination of this erosion control permit.
Reported by: Jesse McDonnell Others present:
Date of inspection: May 04, 2021 Time arriving on site: 10:45 AM Time leaving site: 12:00 PM
cc: