Loading...
HomeMy WebLinkAboutNCC213648_NOT Signed Certification_20220822NCG01 Notice of Termination (NOT) Certification Form Directions,0 Print this form, compete, scan and «I)Io��cf to the electronic NET (Rescission) Form. Then' mail the original signed form to the NC DEMLR Stormwater ProFr.�t: Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 61" Floor 1612 Mai! Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.. SHE FORM YOU MAIL MUST BE COMPLETED W111-1 AN ORIGINAL SIGNATURE (NOT DIGITAL) [40 CFR 122.,22] General Permit Certificate of Coverage (COC) No.: NCC213648 Name of Project: STR 295 Peach Valley,Cliffside STR 79 Per NC General Statute 143.215.68 (i), any person who knowingly makes any false sratemenrl representation, or certification in any application, record, report, plan, or other documentfiled or required to be maintained under this Article or ❑ rule implementing this Article. , , shall be gudty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($1 OF 000)4 Under penalty of law., I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request, and to the best of my knowledge and belief, such information is true, compete, and accurate. Legally Responsible Organizational Entity: Duke Ener *Legally Responsible Person: Randy Veltri Title of Legally *Signature: spansible Person: Carolinas, LLC Di -rector Transmission Permiff-in Date: 8/11 L L Senior Transm'i'ssion Permitting Manager Print Name and Title af Signed (only if authorized in dividual sign in g differs fro m Legally Responsible Perso n): IMPO R TA N T NO TE.- Th is fo rm must be signed by cr responsibly corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, ar a manager that is Authorized in accordance with Part IV, Section B, Item (6) of the NCGO1 0000 permit. For more information on signatory requirements, see Park IV ,, Section B., Item (6) of the NCGO1 0000 permit.