Loading...
HomeMy WebLinkAbout20220962 Ver 1_More Info Received_20220825Strickland, Bev From: Yvette Huffman <yvette@lakepermitservices.com> Sent: Thursday, August 25, 2022 3:26 PM To: Perez, Douglas J Subject: [External] 20220962 - Thompson - Catawba Attachments: Nancy Thompson - Revised NC Water.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hello Doug. Again, good speaking with you today. After speaking with the contractor and receiving confirmation, I am submitting the required adjustment to the application (adjusting the corridor from 15 ft wide to 10). See attached. Thank you, Yvette Huffman Lake Permit Services, LLC (828) 600-LAKE 1 d0la 01(a2- 4. Location of the property (where work is to be conducted) County Catawba Nearest Town: Hickory Lake/ river/ ocean adjacent to property: Lake Hickory Property size (acres): 1.78 acres Subdivision name or site address (include phase/lot number): 4155 54th Ave NE, Hickory NC 28601 Directions to site - please include road names and numbers, landmarks, etc.: Included in this packet Latitude (in decimal degrees) 35.810034 Longitude (decimal degrees)-81.235971 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential/Undeveloped 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Homeowner requests to have riprap placed along the full shoreline (127 ft) to prevent further erosion 7. Will work be conducted from land? XX From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 127 salt Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: 254 sgft Temporary impacts (temporary clearing, construction corridor) in square feet: 5S OQ (construction corridor) 10! wide by 580 ft long 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 87 ft of sandy beach. 40 ft of shoreline is a slight bank with height of 1-2 ft. Scrappy vines with one snag. Grassy yard. Couple of trees Trees will NOT be impacted. Minimal disturbance to buffer. 11. Signatur Owner/Ag is Signature` (15A NCAC 02H .0502(f) Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 i nornpso n 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) I�U.,� �p - Uass Full Pond/ Normal water Level R.;, t x ► z-► bclflw Shoreline ' �, 2.XM-7 AlooVe, 6A k n i ► yoA cl ► 5�-ttirbar�c e- 12'� ar-e,-irye-, I l7 h 2. s n o--tn remavQ • �T _. '(,o rr i d or l l 101 yv i d-e. 4159 S4-t—b five, N F, X Plan View Full Pond/ Normal Water eft-15oft. addiHonalclearir ' fi necessary Plan View Lake ,At RAI Pond/ Noma! water Levey Existing Dock 3ftxmft Wort fut pond/ NWL 4ftx 150ft Ab— U4 pond/ NLVL FORM: SSGP 02-2017 Page 3 of 4