Loading...
HomeMy WebLinkAbout20221007 Ver 1_More Info Received_20220825Strickland, Bev From: Yvette Huffman <yvette@lakepermitservices.com> Sent: Thursday, August 25, 2022 3:21 PM To: Perez, Douglas J Subject: [External] ID 20221007 - Hausman - Iredell Attachments: Dorothy Hausman - Revised NC Water.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hello Doug. Good speaking with you today. After speaking with the contractor and receiving confirmation, I am submitting the required adjustment to the application. See attached. Thank you, Yvette Huffman Lake Permit Services, LLC (828) 600-LAKE i 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Iredell Nearest Town: Stony Point Lake/ river/ ocean adjacent to property: Lake Lookout Shoals Property size (acres): .88 acres Subdivision name or site address (include phase/lot number): 318 Rivercliff Drive, Stony Point NC 28678 — Riverwalk Subd, Lot 34 Directions to site - please include road names and numbers, landmarks, etc.: Included in this packet Latitude (in decimal degrees) 35.771296 Longitude (decimal degrees)-81.102432 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential/ Developed/ With a dock 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Homeowner requests to have riprap placed alone the shoreline to prevent further erosion. 7. Will work be conducted from land? XX From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: y 0 sgft Temporary impacts in square feet: 0 .-_, 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: ! (o O sq-F-l- Temporary impacts (temporary clearing, construction corridor) in square feet: + (construction corridor) 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 11. Signa ure Owner/Agent's Signature` (15A NCA.0 02 0502(f)l, r�son`s ctraw i -c2/-zZ Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) Full Pond/ Normal Water Level, Shoreline &Trice _ 1 W Plan View RIpPap Cas 5 8 sfz Y)ie,) I �Ig,R,v�,r�l►��r Full Pond/ Normal Water L Slioreline 2 ft. x 150 ft. addlti—.! clearing If necessary Plan View Lake (At Fill Pond/ Normal Water Lc I) Riprap Existing Dock 3 ftz 150k "fal l all pond/ NWL ft x lin ft.A� fin pond/ NWL B-d J �� ='4 Ab.;le, FORM: SSGP 02-2017 Page 3 of 4