Loading...
HomeMy WebLinkAbout20140774 Ver 1_Approval Letter_20140826A AJA NC®ER V/ North Carolina Department of Environment and Natural Resources Pat McCrory Governor August 26, 2014 Colleen Peek 1209 Jenkins Valley Road Alexander, NC 28701 Resource Institute, LLC Attn: Charles Anderson 2714 Henning Dr. Winston - Salem, NC 27106 Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION Peek Site Stream Enhancement Dear Ms. Peek and Mr. Anderson: John E. Skvarla, III Secretary DWR # 14 -0774 Buncombe County In accordance with your application dated July 11, 2014 received on July 29, 2014, approval has been granted for the impacts listed in the table below. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and any additional conditions listed below. Project impacts are covered by the attached Water Quality General Certification Number 3885 and the conditions listed below. This certification is associated with the use.of Nationwide Permit Number 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations. IMPACTS APPROVED The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and /or Buffer Rules are met. No other impacts are approved, including incidental impacts. Type of Impact Amount Approved Amount Approved Temporary Permanent Stream 900 (linear feet) (linear feet) Water Quality Regional Operations — Asheville Regional Office 2090 US Hwy 70, Swannanoa, NC 28778 Phone: 828 - 296 -45001 FAX: 828 - 299 -7043 Internet, hftp: / /portal.ncdenr.org /web /wgtws An Equal Opportunity 1 Affirmative Action Employer Resource Institute, LLC August 26, 2014 Page 2 of 3 ADDITIONAL CONDITIONS This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification (s) /Permit/Authorization and is responsible for complying with all conditions. 2. The designer or his designee shall supervise the installation of in- stream structures. 3.. The permittee will provide on -site supervision of stability work including, but not limited to bank re- sloping, culvert installation, in- stream structure placement, and riparian zone re- establishment, by an appropriately trained individual. 4. Natural fiber matting is recommended for streambank stabilization over plastic matting that can entrap small animals. 5. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, stream banks, or vegetation may require future repairs or replacement, which requires coordination with the Asheville Regional Office. 6. This authorization exempts the Permittee from meeting Condition #7 (Work in the Dry) in the attached general certification for the placement of in- stream structure material into Newfound Creek. The Permittee shall take all reasonable measures to construct in- stream structures while keeping heavy equipment out of the stream channel. Stream flow will be diverted around work areas as much as practicable. All reasonable steps must be taken to limit the amount of disturbance in the channel and to therefore reduce downstream turbidity during construction. This exemption does not relieve the Permittee of meeting stream standards as indicated in 15A NCAC 02B. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at hqp: / /www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431 -3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Resource Institute, LLC _August 2k 2014 Page 3 of 3 Mailing address for the OAH: If sending via US Postal Service Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A NCAC .0500. Please contact Tim Fox at 828 - 296 -4664 or tim.fox@ncd6nr.gov if you have any questions or concerns. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3885 Certificate of Completion cc: Aaron Earley — Wildlands Engineering (via email) Tasha Alexander - Asheville Regulatory Field Office (via email) DWR ARO 401 files DWR 401 and Buffer Permitting Unit DocumeG:\ WR \WQ\Buncombe \401s\Non- DOT\Peek Site - Stream Enhancement\APRVL.40IPeekSite 8 -20 -14 docntl