HomeMy WebLinkAbout20140873 Ver 1_401 Application_20140814�pFWATEgO 2 0 1 4 0 8 700$e use Only:
ps action ID no
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form - Version 1.4 January 2009
C' F-�
.A*
n
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing i 17 $00 f, 130
1 a.
Type(s) of approval sought from the Corps:
[Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) numbe :I Q 8'. oO RO (,",j
1c.
Has the NWP or GP number been verified by the Corps?
02'Yes ❑ No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
[2'401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification - Express [Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
El Yes �o
For the record only for Corps Permit:
, -,/
El Yes l-7 No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
^�
L] Yes EKO
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes E/No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes Blko
2.
Project Information
2a.
Name of project:
C S_ Norr % 5 Pro &,-+v
2b.
County:
2c.
Nearest municipality / town:
W
f1i
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no: N
3.
Owner Information
3a.
Name(s) on Recorded Deed:
T Chr', 5 �o �c.- Norr -% S
3b.
Deed Book and Page No.
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
toy L C q�ks NccL, (Z l
3e.
City, state, zip:
WQ In -Iro- NC- 2.7) 17,E
3f.
Telephone no.:
l pZ
3g.
Fax no.:
3h. Email address:
'} ono rn S o n V J Cou-1 c.p ri
Page 1 of 10
PCN Form - Version 1.4 January 2009
C' F-�
.A*
n
r�
4. Applicant Information (If different.frohi owner) ,A
4a Applicant is
❑ Agent ❑ Other, specify
4b Name
4c Business name
(if applicable)
4d Street address
4e City, state, zip
4f Telephone no
4g Fax no
4h Email address
5. Agent/Consultant Information (if applicable) 1.J A
5a Name- -
5b Business name
(if applicable)
5c Street,address
5d City, state, zip
5e Telephone no-
5f Fax no
59 Email address
Page 2 of,1'0
B
Project Information and Prior Project History
1
Property Identification
1a
Property identification no (tax PIN or parcel ID)
to (u b A_l O 105
lb
Site coordinates_ (in decimal degrees)
I Latitude Longitude
1c
Property size
J acres
2
Surface Waters
2a
Name of nearest body of water to proposed project
TrA ems C r e- t k
2b
Water Quality Classi ication of nearest receiving water
C _S kt�f �.IS W
2c
River basin
3.
Project Description
3a Describe the existing conditions on the site and the generai'land use in the vicinity of the project,at the time of this
application L o �- �114 �, r 2.c A/\Vk y �ce.� Cle/are � ;.� PrcPr -��: a � fog^ Co '\ s- Vruc�: o..
p� Si:.j(t - �"�•\�� {c�,• 3.cncc �%P�Frc� .� o�'c, }� S !� ..tkhe.9� S�o-�I ��� w N�q
L R' ( H l t i -ii \�Q F�t1�i•
3b
List1he total estimatedvacreage,of,all existing wetlands on the property
3c
List the total,estimated linear feet of,all existing streams (intermittent and perennial) on the property
3d Explain the purpose,ofthe , proposedproject o 6,,\kheA�i-
r7-F 5�1i+� r� Zi.�� S� me 1: n� (A -0w:1117) Al co s Er ut q boa'c I t + P
3e
Describe the overall project imdetail, including, the °type of equipment to,be used r J jk k�ab dJ
TJ US._ QXegv +n Q. *r i.,Ikh eaa p. \; 3� �'(T✓n �
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland,or stream determinations by the
Corps or State been requested or obtained for this property /
project includin all prior phases) in the past?
/
'El Yes [j , Rio ❑ Unknown
Comments
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
53"P reliminary M' Final,
46
If yes, who delineated the jurisdictional areas?
Name (if known)
Agency /Consultant Company
Other
4d
If yes, list the dates of the Corps, junsdictional, determinations or State determinations and.attach documentation
5:
Project History
5a
Have permits' or certifications been requested or obtained for
this project (including all prior phases) in the past
❑ Yes No ❑ Unknown
5b
If yes, explain in detail according to "help file" instructions
6
Future Project Plans _
6a
Is this a phased project?
El Yes YNo
6b
If yes, explain
Page 3 of 10
PCN Form — Version 1 4 Jarivary 2009
C. Proposed Impacts Inventory
1. Impacts Summary
la Which sections Were completed below for your project (check all that,apply)
❑ Wetlands ❑ Streams — tributaries RJ Buffers 5 Open Waters ❑ Pond Construction
2 Wetland Impacts 0 1A
If there are wetland "impact's proposed on the site, then complete this question for each Wetland area impacted
2a
Wetland impact
number
Permanent (P) or
Temporary T
2b
Type of impact
2c
Type of wetland
2d
Forested
2e
Type.of- jurisdiction
Corps (404,10),oir
,DWO (401, other)
2f
Area of
impact
(acres)
W1
Choose one
Ctioose'one
Yes /No
W2
Choose one
Choose one
Yes /No
W3
Choose one
Choose one
Yes /No
W4
Choose one
Choose one
Yes /No
W5
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
YeS /No
2g Total Wetland Impacts
2h Comments
3 Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for,all_ stream sites impacted
3a
Stream impact
number
Permanent (P) or
- Temporary (T)
3b
Type of impact
3c
Stream name
30
Perennial (PER) or
intermittent (INT)?
3e
Type of
jurisdiction
3f•
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one
S2
Choose one
S3
Choose one
S4
Choose one
S5
S6
Choose one
Choose one
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 1 4 January 2009
z
yyi �.;,,
s: , .
4., Open Waterlmpacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then individua�fly list all open water impacts !below
4a
4b
4c
4d
4e
Open water
Name of waterbody
impact number
(iflapplicable)
Type of impact
Waterbody
Area of impact (acres)
Permanent (P) or
�kH
type
Temporary T
01 Q
},- ��� -zr5 Gf�ek
t hooseone
Choose
0 (o
02
�A� er S C ^e < V
;�aose one
Choose
p 00 S
03
Choose=e
Choose
04
Choose one
Choose
4f Total open water impacts
4g Comments
5 Pond or Lake Construction N„
ki;
If and or lake construction proposed,
complete the,chart below _
5a
5b
15c
5d
5e.
Pond ID, number
Proposed use or
Wetland.lmpacts (acres)
Stream Impacts (feet)
Upland
purpose of pond
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f Total.
•5g Comments
5h Is a dam high hazard permit - required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method,of construction
6. Bufferlmpacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D ofthis form _
6a Protect is in which protected basin?
E] Neuse E] Tar-Pamlico ❑ Catawba E] Randleman ❑Other"
6b
6c
6d
6e
6f
6g
Buffer Impact
Reason for impact
Stream name
Buffer,
Zone 1
Zone 2
number —
mitigation
impact
impact
Permanent (P) or'
required?
(square
(square
Temporary T
_
feet )
feet
Yes /No
Z$JJ
B2
Yes /No
B3
Yes /No
B4
Yes/No
--
B5
Yes/No
B6
Yes/No
6h Total Buffer Impacts:
ZS�tJ
61 Comments
Page,6 of 10
D Impact Justification and Mitigation
1 Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing protect
5A-A6 Zt S�.ort� nom.
1 b Specifically describe measures taken to,avoid or minimize,the, proposed impacts through construction techniques`
S \A- -T2rt e- 6 t J��2 �'u �''c- ✓x-. �- S�-3.. ��c -i�1, -'�/'o.... to }cam �n �,
- �rAn�Ftrs Cr�el� y %„\k�• -OZ �v,t'1 Est ns+•rlle �l,o� io ba�'Lc�, 11 +o
,2 Compensatory Mitigation for Impacts to Waters.of the U.S or Waters of the State .
2a Does the protect require Compensatory ,Mitigabon for
impacts to Waters of the U.S or Waters of the State?
❑ Yes LErNo
2b If yes, mitigation,is required by (check all,that- apply)
❑ DWQ O'Corps
2c If °yes; which mitigation option will be used for this
protect?
❑ Mitigation bank
❑ Payment'to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a 'Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type Choose one
Type• Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4 Complete if Making a Pa ment,to In -lieu Fee Program
4a Approval, ettenfrom in -lieu fee program is attached
'❑ Yes
4b Stream -,mitigation requested
linear feet
4c If using stream mitigation, stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non- ripanawwetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN'Form — Version 1 4 January 2009
-e
6 Buffer Mitigation (State Regulated Riparian Buffer Rules) - -required by DWQ
6a Will the, project result in an impact within a protected `riparian buffer that requires
E] Yes EO/No
buffer mitigation?
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c
6d
6e
Zone
Reason for impact
Total "impact
'Multiplier
Required mitigation
(square feet)
(square feet)
Zone 1
3 (2 for,Catawba)
Zone 2
1 5
6f- Total buffer'mitigation required:
6g If buffer mitigation is required, discuss what<type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
la
Does the project include or is,it adjacent to protected,ripanan, buffers identified
j(Yes, ❑ No
within one of the NCI Riparian Buffer Protection Rules?
lb
If,yes, then is a diffuse flow plan included If, no, explain why
u. 5b�rc1 ,nc .6q �'?tT ;o� e� cc
❑ Yes No
'2.
Stormwater Management Plan
2a
What is the overall percent Imperviousness °of this project?
0
2b
Does this project require a Stormwater Management Plan?
❑ Yes ❑ No
2c
if this project DOES NOT require a Stormwater Management Plan, explain,why
2d
If this project DOES require a Stormwater Management 'Plan, then provide•a brief, narrative
description of the plan
2e
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government,Stormwater Review
3a
In which local overnment!s jurisdiction is this project?
❑ Phase 11,
❑ NSW
3b
Which of the following locally - Implemented stormwater management programs
❑ USMP
apply (check all that,apply)
❑ Water Supply Watershed
❑ Other
°3c
Has,the approved Stormwater Management Plan with•,proofof approval been
❑ Yes ❑ No
attached?
4
DWQ Stormwater Program Review
❑Coastal,counties
❑HQW
4a
Which of the following state - implemented stormwater management ,'programs apply
❑ORW
(check all that apply)
❑Session Law 2006 -246
❑Other
4b
Has the approved Stormwater Management,Plan with proof of approval been
❑ Yes ❑ No
attached?
5
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b
Have all�of the 401 Unit submittal`,requirements been met?
❑ Yes ❑ No
Page,8 °of 10
PCN Form —Version 1 4 January 2009
F
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
El Yes
use of public (federal /state) land
No
1 b
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes
❑ No
(North Carolina) Environmental Policy Act (NEPA /SEPA)?
1c
If you answered "yes" to4he`above; has the document review been finalized by the
State Clearing House? (If so, attadh a +copy of,the NEPA or SEPA,fnal approval
letter )
❑ Yes
❑ No
Comments
2
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
f
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
F] Yes
[ (No
or,Riparian,Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after - the -fact permit application?
❑Yes
No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of °the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project,(based on past and reasonably anticipated future impacts) result an
❑ Yes
No
additional development,, which ,could impact nearby downstream water quality
3b
If you answered "yes" to the• above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," prcMe a,short narrative description
4
Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or,available capacity of`the subject facility
Page 9 of 10
PCN Form — Version 14 January 2009
5. Endangered Species and Designated Cribcal Habitat,(Corps Requirement)
5a WiiIl,this• protect occur in or near an area with federally,protected,species'or
,habitat?
O'Yes �o
'5b 'Have you checked with the USFWS concerning Endangered,Species Act
impacts?
❑ Yes No
5c If yes, Indicate the USFWS Field Office you have contacted
5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical
Habitat'>
6 Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
-❑ Yes No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
7. Histoncior Prehistoric Cultural, Resources (Corps Requirement)
7a WIII this protect occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeol'ogy)?
[]'Yes MIN o
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
Eeyes Q No
8b If yes, explain how protect meets FEMA requirements
8c What source(s) did you use to make the floodplain determmation7
Arc>
Applicant /Agent's Printed Name
Date
Appticant/Agent's Signature
(Agent's signature is valid only if an,authonzation
letter from the applicant is provided
Page 10 of 10
�� 4N
y�
6
ti
t
c
op, r
k
0
V
� 0
'f
x
�
�
� .
'/'''`` i
-�
�
' ^
�
i
\ |
�
'~ !
!
i
.-- |
` .
`
. �
` � |
`.
' ~