Loading...
HomeMy WebLinkAbout20140902 Ver 1_401 Application_20140814�t WAT( O`er q G. 9 1 1 2 0 1 4 0 9 02 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ED Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 401r 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ® No 1 f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. Eg Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2. Project Information 2a. Name of project: Perform Maintenance Dredgin of Long Point Boat Basin 2b. County: Carteret 2c. Nearest municipality / town: n/a 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: n/a 3. Owner Information 3a. Name(s) on Recorded Deed: National Park Service, Cape Lookout Na 3b. Deed Book and Page No. n/a 14 2014 3c. Responsible Party (for LLC if applicable): &116 pat Kenney, Superintendent 3d. Street address: 131 Charles Street PERMITTING 3e. City, state, zip: Harkers Island, NC 28531 3f. Telephone no.: 252 - 728 -2250 3g. Fax no.: 252 - 728 -2160 3h. Email address: CALO — Superintendent @nps.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other „specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 6 ,4h Email address 5. Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City, state; zip 5e Telephone no 5f Faxsno 5g Email address L Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax;PIN`or parcel ID) (Long Point Cabin Area - North Core Banks 1b Site coordinates (in decimal degrees) Latitude 34 8995 Longitude - 76'257761 1c Property size 7,033 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Core Sound 2b Water Quality Classification of nearest receiving water SA 2c River basin White Oak 3. Project Description 3a Describe the existing conditions on °the site and the general land use in the vicinity of the project at the time.of this application The boat basin has been dredged twice since hurricane Isabel im2011 Hurricane,Arthur (2104) has washed more sand' into the boat basin The boat basin is accessed from Core,Sound via a channel 3b List the total estimated acreage of all existing wetlands on the property 1,500 3c List the total estimated linear feet of,all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project To dredge the sand from-the boat basin 3e ,Describe the overall project in detail, including the type of equipment to be used The dredging. consists of,pumping or dredgmg�and,hauling sand and other,organic matter form the Long Point boat basin Less than 1000 cubic yards of sand will'be removed,and,the basin restored to alusabie depth of,5,feet The�sand'wili be, disposed of within the interior of the island 4. Jurisdictional Determinations 4a Have junsdictlonal wetland or strearn determinations ;by the Corps or State been requested,or obtained for this property/ project (including all prior hases In the; ast? El Yes Q No I❑ Unknown Comments - 4b If the Corps made the jurisdictional, determination, what,type of determination was made? ❑ Preliminary, ❑ Final 4c If yes, who delineated the juirisdictibnaf areas? Name (If known) Agency /Consultant Company 1,0ther 4d If yes, list the dates of'the Corps jutisdictional determinations or State determinations and attach documentation S. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑X Yes ❑ No ❑Unknown 5b If yes, explain in detail according to "help file" instructions A,permit for this same proiect,was issued,on August 8, 2012 r 6. Future Project Plans 6a Is this a phased project? ❑ Yes Q No 6b If yes, explain Page 3 of 10 PCN Form — Version 1.4 January 2009, C. Proposed'Impacts Inventory 1. Impacts Summary `1a Which sections were completed below for your profect,(check all that apply) ❑ Wetlands ❑ Streams— tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site,'then complete this question foreach wetland area impacted 2a A Wetland impact number Permanent (P) or Temporary T 2b Type of,impact 2c Type of wetland - - 2d - Forested 2e Type of jurisdiction Corps (404;10) or DWQ' (401, other) 2f Area of impact (acres) W1 Choose,one Choose one Yes %No W2 Choose one Choose,one Yes /No W3 Choose one Choose one Yes /No - W4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose,one Yes /No 20 Total Wetland Impacts: 2h Comments 3. Stream Impacts - If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then completelthis question for all stream sites impacted 9 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact : 3c Stream name 3d Perennial (PER) or intermittent (INT)? �3e f *Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one - S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and,tributary°impacts 31 Comments 'Page 4 of 10 PCN Form — Version 1 4,January 2009 4. Open Water Impacts If there are proposed impacts to' lakes „ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then,indiv ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary T 4b Name�of waterbody (if,applicable) 4c Type of impact 4d Waterbody type '4e Area of impact (acres) 01 T Cope Sound Dredging Sound 05 02, Choose,one Choose 03 Choose one Choose 04 Choose,one Choose 4f Total open water impacts 05 4g Comments 5. Pond or Lake Construction If pond or,lake construction proposed, the complete the chart,below 5a Pond ID number 5b Proposed use or purpose'ofpond ` 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Fifled Excavated P1 Choose one P2 Choose one 5f Total. 5g Comments 5h Is a dam high hazard permit required? ; ❑ Yes ' ❑,No Ifyes, permit ID no ,51 Expected pond surface area (aces) 5j Size of pond - watershed (acres) 15k Method of construction 6. Buffer-Impacts (for DWQ) If project will impact a protected npanan. buffer; then complete the chart below If yes, then individually list all buffer impacts below _If an "im acts,require mitigation, then ou MUST fill out Section D-of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba, ❑ Randleman ,❑ Other 6b Buffer Impact number - Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet 6g Zone 2 impact (square feet 61' Yes /No B2 Yes /No B3 Yes /No 84 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts- 61' Comments Page,5,of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts, in designing protect Dredging will be limited to a small area within a currently used boat basin The dredged material will be disposed of'nearby within the'inienor of North Core Banks 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of'the U S or Waters -of the State?' ❑ Yes ❑X - No 2b If yes, mitigation is required by (check all that apply) ❑ bWQ ❑ Corps 2c - If yes,, which mitigation option will be used for this project? ❑ Mitigation bank El Payment,to in-lieu fee program ❑ Permittee, Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and,letter) l Type Choose one Type Choose one Type �Choose.one Quantity Quantity Quantity 3c Comments 4. Complete if Makin ,a Payment to,ln -lieu Fee.PrO ram 4a Approval,letter4rom in -'lieu feeMprdgram is attached ❑ Yes 4b Stream,mitigatioa requested linear feet 4c If using,stream mitigation, stream temperature Choose one ` ,4d Buffer mitigation requested'(DWQ'only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested `acres 4g Coastal (tidal)'wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) --required by DWQ 6a Will the protect result in an impact within a protected riparian buffer that requires buffer mitigation? Yes X No 6b _ If yes, then identify the square feet,of impact to each zone of 4he riparian buffer that requires mitigation Calculate the amount;of mitigatiowregwred Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation, required: 6g If buffer mitigation is required, discuss what,type ofImitigation ^is proposed (e g ,,payment, to private` mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee,fund) 6h, Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include.or is it adjacent to protected riparian buffers identified ❑ Yes © No within one of the NC Riparian Buffer Protection Rules? 1b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No '2. Stormwater Management Plan 2a What is the overall percent imperviousness of this,project? 0% 2b Does,this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c If'this project DOES NOT require a.Stormwater Management Plan,, explain why 2d If this, project DOES require a Stormwater Management, Plan, then provide a brief, narrative descnp ion of the plan 2e Who wilkbe responsible fof the review-of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review '3a In which local government's I urisdiction is this project? ❑ Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW apply (check all that apply) ❑ USMP ❑ Water Supply,Watershed ❑ Other ;3c Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ORW (check all that apply) HSession Law 2006 -246 _T [-]Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes [] No attached? 5. DWQ 401 Unit, Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑,Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental "Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the , 0 Yes ❑ No use of public (federal /state) land 1b If you answered "yes" to the above, does the project require preparation,of an environmental document,,pursuant to the requirements of the National or State = ❑X Yes ❑'No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to,the above, has the document review been finalized by,the State Clearing House? (If so, attach a copy of -the NEPA or SEPA final approval letter ❑ Yes ©No ) Comments 2. Violations (DWQ Requirement) 2a_ Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules ( -15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparnan'Buffer Rule s,(15A NCAC 2B 0200)? 2b Is'this an after - the -fact permit application? El Yes © No 2c If you answered ",yes" to one orlboth of the above questions, provide an explanatiowof the violation(s)_ 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past,and reasonably anticipated future impacts) result in QYes ©'Nv additional development, which could impact nearby downstream water quality ?' 3b, If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact�analysis,in accordance with the most recent DWQ,policy If you answered '•no, "provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail,the,ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility n/a P6ge\9,of 10 'PCN Form — Version,1.4 January 2009 S. Endangered Species.and Designated Critical Habitat (Corps Requirement). 5a Will this project occur in orneair an area,with federally protected spec_les or habitat? Yes ' No ® ❑ 5b Have you checked with the USI V WS concerning Endangered Species Act impacts? ® Yes ❑ No 5c If yes, indicate the,USFWS Field`Office you have contacted Raleigh 5d What data sources did you use to determine whether yoursite ,' would impact Endangered Species or Designated 'Critical Habitat? 6. Essential Fish Habitat (Corps - Requirement) , ' 6a Will this project occur in or near an area designated as essential fish habitats ®Yes ❑ No 6b What data'sources did you use to determine whether your site Would impact Essential Fish Habitat? The -area has been dredged in the past and has been used for ferry operations on a routine basis } 7. Historic or Prehistoric Cultural Resources (CorpsAtiquirement), 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e g , National Historic Trust designation or properties,significant in North Carolina, history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources'? 8. Flood Zone Designation (Corps Requirement) 8a WIII this project occur in a FEMA- designated 100 -year floodplain? ❑X Yes ❑ No 8b If yes, explain how project meets FEMA requirements 8c WhaLsource(s) did you use to make the'floodplain determin on,) FEMA FIRM 3720842200) Patrick M Kenney �� �p • ®Y , Applicant/Agent's Printed Name Date App*fcandAlfenrs Sig ature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 J Cape Lookout National Seashore National Park Service North Carolina U.S. Department of the Interior