Loading...
HomeMy WebLinkAbout20200349 Ver 3_8b_BlueRidge_Permit Drawings_Buffers_(2020-04-20)_20220823 PROJECT REFERENCE NO. SHEET NO. ES-2018-04 THE CITY OF LEl H UDOCUMENT NOT NLESS ALL SIGNACNSIDERED FINAL TURES COMPLETED INC®MPLETE PLANS DO NOT USE FOR RW ACQUISITION GRAPHIC SCALE ENGINEERING SERVICES DEPARTMENT 20 0 40 THE DESIGN AND CONSTRUCTION DIVISION 20 PLANS 40 BLUE RIDGE ROAD (SR 16 70) ��F 5 OK RD o o WIDENING PROJECT PROFILE (HORIZONTAL) DESIGN DATA a 70 W U � v 2 0 ADT 2020 = 7,500 VPD CITY PROJECT N O: E S-2 018-04 PROFILE (VERTICAL) ADT 2040 = 12,000 VPD FROM DURALEIGH ROAD (SR 1664) TO CRABTREE VALLEY AVENUE s �g�� 44 BUFFER IMPACTS e�° R 70 50 cue PERMIT DRAWING SHEET 1 OF 4 1 ' o WAD E m O r 70 o I! p 4 1 hats 54 440 sDhD��hsr 0 f 0 m TYPE OF WORK:WIDENING,GRADING, DRAINAGE, PAVING, o CULVERT,SIGNALS,SIDEWALK,AND SIGNING 0 �ry0 Iy, Y Posted 0 0 O Speed — 35 mph SITE 3 2 O CRABTREE w BEGIN PROJECT m m VALLEY MALL BEGIN CONSTRUCTION } } oo� F�O� -L- STA 10+41.08 ,,, J J O r ~ SUMMIT 0 � BEGIN CONSTRUCTION Q 2 2 0 m CHURCH 6 �00 -L- STA 62+06.00 �O �� Z C L� o `1 5 74 END CONSTRUCTION 9 �� O� ��-L- STA 61+45.00 Z v > CRABTREE i BLUE RIDGE RD 8(SR 1670) /Q C, LAKESIDE ���y H USE C REED C EK w o R` B�UF REX O o u 0 Lu ��2�F O (SRRj6�E Rp - END PROJECT HOSPITAL 9° Q N 0) END CONSTRUCTION m O Any -L- STA 114+18.00 o Z 9���y91 MAPA TMENTS RSHALL K 4 0 l o � O PAROK C� � OJ���� 3 @ 8'X 11'RCBC SITE 1 14'X 10'RCBC Y SITE 2 PLANS PREPARED FOR THE CITY OF RALEIGH BY. o N RU F F I N HALL NAN CY Mc FARLAN E Kim ey >>Horn©=o,9 CITY MANAGER MAYOR „�, PERMIT DRAWING SHEET 2 OF 4 DETAIL 1 DETAIL 2 DETAIL 3 EI XA DETAIL 4 DETAIL 5 SPECIAL BACK OF CURB CUT DITCH SPECIAL LATERAL 'V'DITCH FALSE SUMP , SPECIAL LATERAL 'V'DITCH (NOT TO SCALE) (Not to Scale) (Not to Scale) SPECIAL BACK OF CURB CUT DITCH (Not to Scale) NATURAL Outside Ditch (NOT TO SCALE) GROUND Traffic Flow 10 NATURAL o� '1 -►I 2'� GROUND- - o� Natural 1 Fill - - Natural 1 Fill a�•� ,� — — — _ _ _ Ground .>..� ��p'L\e Slope ? — — — — — — — _ Ground ?�D �\o Slope GI 3 f S— etc. I - S=Ditch Slope rk Proposed Ditch Min.D= Ft. Min.D= Ft. FROM STA.28+65 TO STA.29+90 -L- LT FROM STA.51+97 TO STA.52+12 -L-LT FROM STA.38+00 TO STA.39+50 -L- LT FROM STA.30+35 TO STA.30+85 -L- LT FROM STA.43+00 TO STA.46+30 -L- LT FROM STA.94+77 TO STA.94+92 -L-LT FROM STA.79+30 TO STA.80+95 -L- LT FROM STA.39+50 TO STA.43+00 -L- LT FROM STA.51+00 TO STA.51+95 -L- LT FROM STA.10+00 TO STA.11+70 -Y14- RT FROM STA.49+25 TO STA.51+00 -L- LT FROM STA.84+25 TO STA.85+80 -L- RT FROM STA.90+15 TO STA.95+20 -L- LT FROM STA.74+60 TO STA.76+00 -L- RT O DETAIL 6 DETAIL 9 SPECIAL LATERAL BASE DITCH DETAIL 8 RIP RAP AT EMBANKMENT DETAIL 10 DETAIL 11 (Not to Scale) TOE PROTECTION I Not to Scale) Ordina Hi h STANDARD BASE DITCH BERM BASE DITCH (Not to Scale) Ordinary 9 oc 10'min. Water Mark INot to Scale) (Not to Scale) Natural \of \o'� Natural Natural Ground �') 3' \\et Slope Natural °K�\°Q® Pipe outlet7��4 n. 2.0 Ground 3� 3.� Ground Natural -N ? GENWT D F\oGround6 1 F�\S d D Ground D ti iOGeotextile B �dGeotextIle B Min.D=1.5 Ff.Min.D=1.5 Ft. d=1.5 Ft. TILE Stop Rip Rap Max.d=2.0 Ft. Min.D=1.0 Ft. Max.d=1.5 Ft. b=3.0 Ft. Geotextile and Geotextile "When B is< 6.0' B=3.0 Ft. B=1.0 Ft. Fp B=5.0 Ff. Type of Liner= CL-B Rip-Rap at Ordinary High b=1.0 Ff. Type of Liner- CL-I Rip-Rap Type of Liner= Class II Rip Rap Water Mark Type of Liner= CL-I Rip-Rap FROM STA.112+65 TO STA.113+50 -L-RT FROM -L-STA.75+35 TO STA.76+50 LT. AT STA.111+50 LT. FROM -G2-STA.15+00 TO STA.15+50 LT. FROM -L-STA.84+50 TO STA.86+00 LT. STA.111+50 -L- (LT) tn a W N DETAIL 12 DETAIL 7 CONCRETE DITCH DETAIL 13 SPECIAL 6% BACK CURB BEHIND RETAINING WALL SPECIAL LATERAL BASE DITCH (NOT To SCALE) (Not to Scale) �'i (Not to Scale) RETAINING B WALL REAKER Natural o< Fill Ground ?� D 3`ogeT slope c a e ti, F\ 6" / cos 0.00 6„ / 006 0.04 GROUND � Min.D=1.5 Ft. B=5.0 Ft. 7" coos° 7 0.06a° a Min. D= 1.0' FROM STA.113+50 TO STA.113+95 -L- RT FROM STA.13+55 TO STA.15+00 -G2- (LT) 0 6" L W 7"7" LZDT�_ y _U J O FROM STA.13+50 TO STA.17+25 -L-LT $ FROM STA.50+00 TO STA.52+00 -L-LT FROM STA.56+50 TO STA.57+50 -L-RT a> a FROM STA.65+70 TO STA.68+00 -L-LT a� ro I 0 o 0 0 0 3 0 g 6c DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OF: PPCIJEI INC LICE NSEIF-1112 DRAINAGE DETAILS BLUE RIDGE ROAD WIDENING REV.No.: REVISION: DATE: DRAWN BY: wecKED Br: Kimley )) Horn PRELIMINARY PLANB RA FAYETT RTH STREET,SMITE 800 PHONE::(NORTH 2000 NA 2]601 This document, together with the concepts and designs presented herein, d an Instrument of se rvice,ce, IS PHONE:(919)8]]-2000 4'1 Intended only for the Specific purpose and client for which It was prepared. Reuse of and Improper ZZ� reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2019 Shall be without liability to Kimley-Horn and Associates.Inc. JOB NUMBER: IS, NuMBER: Copyright Kimley-Horn and Associates,Inc.,2019 011063094 PERMIT DRAWING ' I SHEET 3 OF 4 -c2- Pc sto.20+osAo Div /� UND -G2- PC Sto.19+38A __�I-G2- PT Sto.18+96 -G2- PC Sto.18+48.65 'c �(�P \ \ \ 5301US WOOD BANKS R 111 ( I MARO CRABTREE c to.16+19J6 //5 y \ \ \ \ °-� / � + \\ \ -Y20- PT Sta.10+43.61 Q DBE / SsIt - _ ASEY2/- PCI t l5 35A9 \N \ \\\ � �• -G2- PT Sfo.17+45J4 \\ coNc sw = VILE -Y20- PC Sk l +OOAO 2�SS -L- POT Sfo.l04+58.60 2'CONC e K -Y20- PO fa.l1+00.00 RLTAwIN ALL 90° PRIVET MRNMAGE a € -L- POT S o.106+60.69 = c� // -G2- T fo.l3+1L97 //////// ,' I �i 0 F � � - 4P� �// . TB 10"CONC BLOCK _. sr --T_ �F /I S RETAINING WALL' '� $I - $ ` may/ - _ - - EiJE B —LJ------TEE E-'... 'a F PSE PSE— FP`�E �! \ / I�E�F11F•-'�- T � TB F To �PSi '� r T� ••�•� i __ _ E° iw _- c R -F - - - - / -sl ae Fey/-PSE Psi PSE - O RCP FA RCP s^ -- ETIF r OP -X - - y> 20+0 nxoox�z'urlk"]Sv° aenxoox�z r� Ea .� ,pS }z•Hueowaoo - E�-�t�i�-Ro-_._. :B •--- ~_ ___ B• — - - - - - - - —T --- p e"ss OPT 04 n '[11 exist Riw � — •. OF f' xisR' _ __- H•RCP �- - Elw- z R is I SE F - Hdd - - WE E eti q , �£U P E F'�PDE _PDE Die SEE T E -L- P StO.//4�36 -G2 PT Sta.12+5 77 -/, ..-..-• - - I6nARDwaao ��//�/ ,6��•Mc uM// / -Y2/- P�OC BZ ISBKBIS 9P ll✓ -L- PT Sto.104+5526 RIC St 449 15+8 / -L- POT Sta.108+35.66 = 1 END BRIDGE - y` -Gl- POT Sfa.14+35A0 9 -G2- PC Sto.11+92.09 � 115 -) / / / \ _ y 3 sumly wo LUNG CANCER SITE 1 �y'� ' r .� 6 �� .' INITIATIVE OF �• � `�. NORTH CAROLINA -L- PC Sto.110+0429 _ � � I � ^ �••� `U'o I ® a. +6/•60 BLUE R-LID-G E RDLEGEND sz c -G/ � SUMMIT PARK O PERPENDICULAR ROADWAY ZONE 1 l I I <" F -Y21- POT Sto.17+75.00 1 PERPENDICULAR ROADWAY ZONE 2 ,y/ / F ii'•'•�F�pS�ME� NQQ EEN PY SITE 2 ES I P TEMPORARY ROADWAY ZONE 1 I�1ti I ! /�••�• KZ pPS Ew / QfF C� -GI- PC Sta.12+62.45 Pd�ss / -Y21- PT Sto.17+,8J RK ARSHAL L °N,SPN -Gl- PT Sto 11+48.76 2 / -Y2/- PCC Std.16+42.02 TEMPORARY ROADWAY ZONE 2 MO L P� ' RK F/ °F BEGIN BRIDGE 4000 BLUE RIDGE m PARALLEL ROADWAY ZONE 1 Aa -G2- POT Sta.11+12A9 I I PARALLEL ROADWAY ZONE 2 -G1- PC Sfo.10+48.34 O UTILITY ZONE 2 BLUE RIDGE RD / -G2- PT Sfa.10+4525 g /REENWAY ZONE 1 BEGIN CONSTRUCTION G / / 2'_Q0 SUMMIT " N -Gl- POT Sta.10+I0.34 = 8 -G2- PC Sta.10+I034 / GREENWAY ZONE 2 / �1 N 19'18' E STREAMBANK STABILIZATION ZONE 1 � -Gl- POT Sta.lO+OOAO = Y STREAMBANK STABILIZATION ZONE 2 -G2- POT Sta.I0+00.00 / DENOTES LIMITS OF DOCUMENT NOT CONSIDERED FINAL -••-••- DISTURBED AREA UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OF: PRi!JE N INC LICE 20 BLUE RIDGE ROAD WIDENING O This No.: REVISION:ent on s onTE:in DRAWN BY service, is Br: Kimley-)) Horn RA EAYETTERTH STREET,SMITE 800 PERMIT DRAWINGS I��M1 LET6 PLANB r This document, together with the c cepts and designs presented herein, a instrument of PHONE::(NORTH CAROLINA 2]601 BUFFER IMPACTS Intended only for the specific purpose and Client for whloh It was prepered. Reuse of and Improper PHONE:919 e]]-2aa0 N reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2020 Shall be without liability to Klmley-Horn and Associates.Inc. JOB NUMBER: SREET nuNBER: Copyright Kimley-Horn and Associates,Inc.,2020 011063094 PERMIT DRAWING - - - - _ 0 m \ SHEET 3 OF 4 /// //I �30 / / i ��////i//�/i///v///' FI /-G2- P Sta. V0�1�1/O.1/(Yj' -G2- _ _ / ice / - - /' ///�/ i/ / i/ii i /i // /i �.��- V A //i /i/ i�� �/ / d• _ I / / .r' ' - /� /. / / i I � vr• / i-- �- Z - � V 0 Jim _ / I / / A� V A \\\ HO W00 BA S R MARL AT � / \�,/ CRABTREE >� v / s� ys. z +1916 __ �,., ss. / �I /' / / vII / •v v /� . 82; v I +35.09�\ X -Y20- PT Sto.10+43.6/ - - -� �� z Sto.l��45J4 W V v J i����/i/i/� �i/ / j/��I e �F�c •' - // '_- ���/ I/rl I //I I '1 A a -Y�O-�PCA St .� +60.00 i/i j� ��qo �tl, �i� �, -220/.,ti BZ Z VALLE�p4VE L- POT Sto.�104+58.60 = - g T v . e z'co StO. +28.90 a - - 20 , J- to.1I+00.00 RE ALL �/ / J y5 _� s s F?• r 300 AINACD E _NT , / I /� t POT Sto.106 f60.69 P07 Sta.13+11.97 7 F I A -v45 S f I\ \ � _ - - � Ra _ - _� TB. JE �L2+ - / IS"RC I _ _ _ /{. rW 5 - re 6ETs C P _ Sf 1 � / - % — - - -�' FSE F PSE— RCa ��� f EUE \ C - - - --- rF Nil 20+ waoo _ _ _- - - - - - - -RR�-•-•- _ --_ ..-. =-- �� `"1 - e"s 1e'PI E `~ -44PSE a B_ j j 2 F�_ / c — F ,. ET / WE F - _ PDE TCE r� �I _, :. .. _ E - -L-.POT Sta.114+36.56 S 12+5 77 "� - _ o F $i � y,� PDE r _ _ _ / ' ��M Y�11�POC Sta.15+82.33 r / o -L- PT Sao:1d4+5526 AG2- f'RC t .�+ 949 �F // =Is�KD s _ _ zz y \ APO 1 --� -- -L- POT 'Std.108+35b5 �� END BRIDGE ��` �� /�/. - POT Sta.14+35A0 -G2- PC Sta.11+92.09 - - - ///llir�- / UM - � �. �� a� / � � \°, I/ LU �CA�jCfR- _% � / -/' ' -� �f// ��� �/��i;� ���K� l i �W i " ,.� i o��p '����5 ,/ � wad//1/ l/l'I SIT !i; NORTH ,CAR NA N -L_ P Sto.llOt \ / _ - + RlD R �� /,� / f SUMMIT BLUE GE/ D /s o���� z LEGEND P� Sol 6/.60 I� � _ - rl � ,_a5 O PERPENDICULAR ROADWAY ZONE 1 y�/ /F zze�. G G I �/ -Y2I- POT So.77�75.00 ` \ cl / I �l .. ����T C �/ / \ �5p / / �R}�Y / F 111 PERPENDICULAR ROADWAY ZONE 2 ��l %/ r/ �' t �� y �.•� _�W /f-MQGR f_1�' _ SITE ��/ � � �� 0�Y2--PT Sta.17+48.13' -�� j, SpN P� - •\ / -, �S - i + / //\ \i Sys /\ a, TEMPORARY ROADWAY ZONE 1 �/J I/ P 2� `� / \� G/- PG.`Sta.l2 6245�c / C _ _ ' TEMPORARY ROADWAY ZONE PT Sto.i! '�6\Jr r \I / / J/ / / £�� 'i /// \\\\�\ l✓v0� �Ly/ 'Y2- PCC Std.16+42A2 a SHAL � m PARALLEL ROADWAY ZONE GZ POT Sta.t+12A9Ir a •✓ / - - -G/-PARALLEL ROADWAY ZONE PC Sto.10+4834 2 j c7S / _ / 1 \ l I� / �/ / $\p i ii / yc � _ .�I�'•�' I /` I �I - I / `GD FT$a:10+4525 / � �✓ �r / 3 ��� �A o � UTILITY ZONE 2 BLU£521DGE RD � � l BEGIN CONSTRUCTION / _� ��'/ /_ /i A I l �2 / �l�i I U / l_ s / pgz) p GREENWAY ZONE 1 - I- .StQ.10 4 / ✓ J2�\ // /� U' l_ 11 - 2200 SUMMIT PARK---Pl G � �' / g � GREENWAY ZONE 2 /r� �- /5h].Id 10.34i /� p \ /i/8'3.8E ( / o STREAMBANK STABILIZATION ZONE 1 f / `J3' P ;�,� �'-Gl- POT Sta.10+00.00 /l Y STREAMBANK STABILIZATION ZONE 2 < \ -G2- POT .Sta.1D+00401 (- ( / / / / / DENOTES LIMITS OF / c'S- IT`S 25 / / �L l l )/ / 1 /1(r I I/r/// /l / �� _/�� 1 1�\ / - w -••-••- DNSIDERED FINAL ISTURBED AREA \ �ZdJ ) 1y / \ L n\J-1 / /�" ' / /ti/) // / /j / 'erg-211-SUMK1YT PARK.1,N j �f � � UNLESS ALL SIGNATDOCUMENT NOT OURES COMPLETED PREPARED IN THE OFFICE OF: PPCIJE;: N NOLICEEEVILLE2 201 Q 4a BLUE RIDGE ROAD WIDENING O This No.: REVISION:ent on s on in DRAWN BYservice,CHE is BY: KimlerMorn RA FAYETT NORTH STREET,SMITE 800 PERMIT DRAWINGS IN�M LET6 PLANS r This document, together with the c cepts and designs presented herein, a instrument of PHONE::(NORTH CAROLINA 2]601 BUFFER IMPACTS Intended only for the Specific purpose and Client for whloh It was prepered. Reuse of and Improper PHONE:919 e]]-2aa0 N reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2020 Shall be without liability to Klmley-Horn and ASsoclates,Inc. Jo0 rvuHBER: $REST nuMBER: Copyright Kimley-Horn and Associates,Inc.,20% 011063094 SUMMARY TABLE PERMANENT BUFFER ZONE 1 IMPACTS GREENWAY UTILITY STREAMBANK PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER STABILIZATION 1 725.22 0 7029.18 0 0 2 500.96 0 0 3416.68 0 3 2967.01 0 0 4356.55 1298.93 4 0 0 0 0 5168.84 TOTAL (SF) 4193.19 0.00 7029.18 7773.23 6467.77 TEMPORARY BUFFER ZONE 1 IMPACTS STREAMBANK GREENWAY UTILITY PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER STABILIZATION 2 0 0 0 2994.35 0 3 0 0 0 525.90 0 PERMANENT BUFFER ZONE 2 IMPACTS GREENWAY UTILITY STREAMBANK PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER STABILIZATION 1 2365.86 0 162.56 0 0 2 1999.34 0.00 0 68.01 0 3 4309.46 143.32 0 1060.33 0 4 0 0 0 0 3471.6 TOTAL (SF) 8674.66 143.32 163 1128.34 3471.60 TEMPORARY BUFFER ZONE 2 IMPACTS STREAMBANK SITE NUMBER GREENWAY UTILITY STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY 2 0 0 0 2650.11 0