Loading...
HomeMy WebLinkAbout20200349 Ver 3_8b_BlueRidge_Permit Drawings_Buffers_(2020-04-20)_20220823O O rii rn 0 0 0 a a cr- Q fA N N GRAPHIC SCALE 20 0 40 PLANS 20 0 40 PROFILE (HORIZONTAL) 2 0 4 PROFILE (VERTICAL) THE DESIGN DATA ADT 2020 ADT 2040 PERMIT DRAWING SHEET 1 OF 4 BEGIN PROJECT BEGIN CONSTRUCTION -L- STA 10 + 41.08 CITY OF RALEIGH ENGINEERING THE DESIGN AND 7,500 VPD 12,000 VPD RUFFIN SERVICES DEPARTMENT CONSTRUCTION DIVISION BLUE RIDGE ROAD (SR 1670) WIDENING PROJECT CITY PROJECT NO: ES-2018-04 FROM DURALEIGH ROAD (SR 1664) TO CRABTREE VALLEY AVENUE BUFFER IMPACTS HALL CITY MANAGER TYPE OF WORK: WIDENING, GRADING, DRAINAGE, PAVING, CULVERT, SIGNALS, SIDEWALK, AND SIGNING F 35 mph NANCY McFARLANE MAYOR SITE G �A PROJECT REFERENCE NO. SHEET NO. ES -2018 -04 / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED INCOMIPLETE PLANS DO NOT USE FOR RW ACQUISITION G ttl- END PROJECT -L- STA 114 + 18.00 vl1 3 @ 8' X ll' RCBC 14' X 10' RCBC I'd' 2 PLANS PREPARED FOR THE CITY OF RALEIGH BY: Kim ley ))Horn '2019 NC LICENSE #F-0102 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 PERMIT DRAWING SHEET 2 OF 4 O O N Ln D ETAI L 1 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL GROUND_ FROM STA. 28 + 65 TO STA. 29 + 90 -L- LT FROM STA. 30 + 35 TO STA. 30 + 85 -L- LT FROM STA. 39 + 50 TO STA. 43 + 00 -L- LT FROM STA. 49 + 25 TO STA. 51 + 00 -L- LT FROM STA. 90 + 15 TO STA. 95 + 20 -L- LT D ETAI L 6 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural 1 0( Fill Ground ? J 3' ��el Slope d D F\a Geotextile B Min. D =1.5 Ft. Max. d =1.5 Ft. B = 5.0 Ft. Type of Liner= CL-1 Rip -Rap FROM STA. 112 + 65 TO STA. 113 + 50 -L- RT 6„ ° ° / 0.06 0.00 T' 0.06 0.02 6„ 7" ° D ETAI L 2 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural IYN °el Fill Ground 3•� D \0 Slope Min. D = Ft. FROM STA. 43 + 00 TO STA. 46 + 30 -L- LT FROM STA. 51 + 00 TO STA. 51 + 95 -L- LT FROM STA. 84 + 25 TO STA. 85 + 80 -L- RT FROM STA. 74 + 60 TO STA. 76 + 00 -L- RT D ETAI L 8 TOE PROTECTION ( Not to Scale) Natui Grou d=1.F b = 3 . U rr. Type of Liner= CL-B Rip -Rap VCU1V1X111C FROM -L- STA. 75 + 35 TO STA. 76 + 50 LT. FROM -L- STA. 84 + 50 TO STA. 86 + 00 LT. DETAIL 7 SPECIAL 6% BACK CURB (NOT TO SCALE) 0.06 0.04 6„ 7" FROM STA. 13 + 50 TO STA. 17 + 25 -L- LT FROM STA. 50 + 00 TO STA. 52 + 00 -L- LT FROM STA. 56 + 50 TO STA. 57 + 50 -L- RT FROM STA. 65 + 70 TO STA. 68 + 00 -L- LT REV. No.e REVISION: DATE° DRAWN BYe CHECKED BY: This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. Copyright Kimley-Horn and Associates, Inc., 2019 PREPARED IN THE OFFICE OFo D ETAI L 3 a FALSE SUMP ono ( Not to Scale) Outside Ditch Traffic Flow �0 �S— S = Ditch Slope � Proposed Ditch FROM STA. 51 + 97 TO STA. 52 + 12 -L- LT FROM STA. 94 + 77 TO STA. 94 + 92 -L- LT DETAIL 9 RIP RAP AT EMBANKMENT ( Not to Scale) Ordinary High 101min. Water Mark Pipe outlet 1.0'2.0' min. , GEOTEXTILE —j 'Stop Rip Rap and Geotextile at Ordinary High Type of Liner= Class II Rip Rap Water Mark STA. 111 + 50 -L- (LT) D ETAI L 4 SPECIAL BACK OF CURB CUT DITCH (NOT TO SCALE) NATURAL _ GROUND FROM STA. 38 + 00 TO STA. 39 + 50 -L- LT DETAIL 10 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground Ground d D Geotextile B Min. D =1.5 Ft. Max. d = 2.0 Ft. *When B is < 6.0' B = 3.0 Ft. Type of Liner= CL-1 Rip -Rap D ETAI L 12 CONCRETE DITCH BEHIND RETAINING WALL ( Not to BONDaIe) RETAINING WALL BREAKER � NATURAL GROUND Min. D = 1.0' B = (1.0') AT STA. 111 + 50 LT. FROM STA. 13 + 55 TO STA. 15 + 00 —G2— (LT) ■ INC LICENSE #F-0102 Kimley))Horn 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 ©2019 D ETAI L 5 SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural ,L.N oe� Fill Ground 2.�\d'�'� Slope D Min. D = Ft. FROM STA. 79 + 30 TO STA. 80 + 95 -L- LT FROM STA. 10 + 00 TO STA. 11 + 70 -Y14- RT DETAIL 11 BERM BASE DITCH ( Not to Scale)• b I I Natural N GRNWY Ground D "B Min. D=1.0 Ft. B =1.0 Ft. b =1.0 Ft. FROM -G2- STA. 15 + 00 TO STA. 15 + 50 LT. DETAIL 13 SPECIAL LATERAL BASE DITCH ( Not to Scale) Natural ��\ Fill Ground ?.� D e< Slope Ft BJ Min. D=1.5 Ft. B = 5.0 Ft. FROM STA. 113 + 50 TO STA. 113 + 95 -L- RT DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DRAINAGE DETAILS I PRELIMINARY PLANS ®O NOT USE FOR CONSTRUCTION PROJECT-. JOB NUMBER° BLUE RIDGE ROAD WIDENING 0 1 1063094 SHEET NUMBER° PERMIT DRAWING SHEET 3 OF 4 O O N N N OMNgECC RO FI41 -G2 - PC Sta. 20 +06.00 `� ��.• \ \ \ O _ — �• UND -G2- t + G2 C Sta. l9 38.0 -G2- PT Sto.18+96 c '-G2- PC Sta 18 +48.65 ' , ; ��,�, � m A \ \ 5301 TO WOOD BANKS R \� QC co\\ \ \ \\ -G2-P Sto +3 _ RAP — ? 5 5 \ \\ • •5�� _ ; �G R to.16+19J6 5 �' s �' \ \ \ \ \ \ O / %- \ \\ • — _ _ _ _ _ ss — I TE m 4 H -Y2/- PC t l5 +J U. ;f A _ � ,�, _ _ s — _ _ NSF — ��- ,2 �� s� _ � � \�, \ \ \ O -Y20 PT Sto. l0 +43.6/ - SE �— - - + \\ 2 p \ ss F , • G2 PT Sta. l7 45.14 \� \ \ \ _ _ _ -Y20- PC Sta l0 .00 ,�c`� S �� - BZ 2-� 7 - V A L L POT to. 104+58.60 - 12'' CDZNcK O E E i� �� - - + \\ � L PT Sta. 28.90 -Y20- PO to. 11+00.00 RETAINAGE 5 5 ' • 90 PRIDAT ze \\ \ \\ -L - POT S o. /06 +60.69 -G2 - POT to. 13 +1/.97 45 \ \ — TTB �.. S� � \\ � O � ` L�♦ Io° coNc BLOCK �� B � � �o ` Sr F OR \ / � RETAINING WALyV �� Sf S B�TB (4 \ \ \\ \ E v v T Te�— B TB ,S —TB TB— ] T " n — C—E To S 88 RCP _ O W �S� �j5� — F eE B - PH E s iW R F F J RCP 5" RCP — Ex -77 r ----' I\ Rio 1-- — - - y ANDON •12" UTj2�T�LPI r ♦ABANDON 12 UTIL;T P r 1 �2- HARDWOOD- - G T l _ _ y. _ _ -l-%� 106E -R��' 12" WL V cv 12° 2 B, SS - — 8" SS ♦ r 1 OP T 18'PINE ---- �� --. _--- WL — RA 8 RCP " — ♦ ♦ a a ♦ EXIST R/W EXIST R ElP EXIST ♦ r ♦ ♦ EIP � e I ,T R,WRO'f`DC r ♦ r , a , a �U\ — y6RCP �— PDEEip _ s-HARR4WE ti DE ETC 6.E p 8,MAPLE -LPOT Sta. 11 3 F-- � G2-PT Sta. l2 +5 77 4'GUM 4' GUM — 2/— � POCPD15•HARDwooD 9/-0 q. l5 +8 1.2 L PT Sta 104+55.26 G2 RC Sta. 12 34.49 �, - - + - O N �� L POT Sta. l08 35.66 O /\� N END BRIDGE Gl -POT Sto. 14+35.Q0 -G2- PC Sto. 11 +92.09 , 0 e � \\ _ //5 SUMV wR / . LUNG CANCER RE� N� SITE 1 PARK _ N�N� ��. r , i' INITIATIVE OF wp<4 O LEGEND PERPENDICULAR ROADWAY ZONE 1 PERPENDICULAR ROADWAY ZONE 2 TEMPORARY ROADWAY ZONE 1 TEMPORARY ROADWAY ZONE 2 PARALLEL ROADWAY ZONE 1 PARALLEL ROADWAY ZONE 2 UTILITY ZONE 2 GREENWAY ZONE 1 GREENWAY ZONE 2 STREAMBANK STABILIZATION ZONE 1 STREAMBANK STABILIZATION ZONE 2 DENOTES LIMITS OF DISTURBED AREA 0 0 MARO AT CRABTREE •� NORTH CAR0LINA -L- PC Sta. 110+04.29 l000 -Gl - o. l +61.60 BLUE RIDGE RD SUMMIT I \\ PARK F' I / F i � �� -Y2/- POT Sto.17+75.00 FO/ SSE N� P SITE 2 o E / . N GRE cc�s� �P -Y2/- PT Sta. l7+ RA EN ti �� �� �' P� -GI- PC Sta. 12+62.45 P 2� A R S H A L L - % �� y -Gl - PT Sto. 11 +48.76 O -Y2/ - PCC S 16 +42.02 MORIAL �of '-PBEG/N BRIDGERK 4000 BLUE RIDGE RD -G2- POT Sta. 11 +12.09 + Gl PC Sta l0 48.34 BLUE RIDGE RD —G2— PT Sta 10+45.25 BEGIN CONSTRUCTION 2200 SUMMIT PARK EN / / / -GI _ POT Sta, 10 +10,34 = / / / -G2 PC Sto.10+10.34 N 19018" 3.F E -Gl - POT Sto.10+00.00 = -G2- POT Sto.10+00.00 X DOCUMENT NOT CONSIDERED FINAL \ 2211 SUMMIT PARK EN UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OFo PROJECT-. 20 0 40 BLUE RIDGE ROAD WIDENING INC LICENSE VILLE 2 PERMIT DRAWINGS INCOMPLETE PLANS REV. No .e REVISION: BATE° DRAWN BYe CHECKED BY: 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NORTH CAROLINA 27601 DO NOT USE FOR xW ACQUISVTION This document, together with the concepts and designs presented herein, as an instrument of service, is PHONE: (919)677-2000 BUFFER IMPACTS intended only for the specific purpose and client for which it was prepared. Reuse of and improper Im >)) Horn reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. ©2020 shall be without liability to Kimley-Horn and Associates, Inca JOB NUMBER° SHEET NUMBER° Copyright Kimley-Horn and Associates, Inc., 2020 0 1 1063094 O O o, 0 U 1 Z3 -O I Ez- I _, I M 0 Q O i C CL Lo N 4- m , c .Q 16- c 0 c LLJ `) E Cl- 0 i 113 O cc _Z) m I C) O C) �a, a I Q CC N N N- PERMIT DRAWING -----___ -3 0/ \ ,-,- - \ - / - � // � ,,� //" - SHEET 3 OF 4 - _ =�5� /,�"', '� ; ,,,, �,� - ,�23 ���� ��� ', , ��- �,, ' '/J/� I -' ' _ r V �y / IIJ I I 1 / _///%i ' - - , ,ice„, _ , /i i i �, � ,i'� " / '�/ , i i �, a A'��� / // / //!l l/ l _ l - -' ��i/ / i\ � " , � ,/i - �-�/, � /i '///,'� ', ' , / , r , r Ai__ c' '/ //// /// ' ��� , �1 _ \� O ' '/' _ / A I / /, �' / / , i ' , , / i , �- , '/ /// A 7 / fjl� ' , ,,' �, ,, �� �� ,/ // / - -- A� / ro \ lei �G V / / / J V I i �i�- i/ / / '/ �'�� i ' ' l �' -G2 �C Sto 2V-+VV ''/ / '�i / ���• - - - _' '/�j , / // ) IAV IV , ,/ ,i, , i," i - A • • ,, I ////i \\V %'(i� i , / �/ / l V _ '/ ' , 5,/ , , / I � /, l 1 � �3 -___-_ , /ice - _ I // l /' //�/ / ii�vv i � 1, " , � ,%� � ' [ � N/ / // / - ------ 7'� ,'-- F. / //// or NCO 1 /, -/ ',,� /.'I , N - � / / / / / / /// „ O�� - v �\ , � / -,�� /, /7� ---- /m/� ,/i , / /,/// // t/ )//�'/'/////,_'�, I �'' j y �yj� /� i ------------ _ /� �Ji/ -� �/ ' �'// /// / /v ////////'// i / �" -- '/ v /V,', ,�%�, -, `r- / , -_� / w�� / a , / / / / // , , 1 / , / V', ,, , / I , - - ----- - ;,/6 ) I //'/ '/' // 1,/////// // i/- i - 'Et4jI I� -�' \Z \\ / /, o - r // . / - / ��/- / ' - /, / , /, / / // / / r/ , -G2- PT Sto. l � 6 , � -- '� " / _ //',' �,o '� v - -L 1­1 ---------------------� \ \ / I --------------- _, � _� v, �C,/ / ,/ /,/,�. ;///' // /� -G2 PC Sto 18+48.65 / / /',�� I/' �, ; ' � ��, , ,� -1 ) _ _ / / / / , / / / v / 1� / / / / / // / /" / / J , / / r"-/ �i v V � / /i / / _ v / // / / // v v / � \ \ _ _ _ _ 3d5'_ _ _ _ _ _ _ _ _ _ _ _ _-_-_-_-_-_-_-_-_-_-_-_-_-_-_- - - - - - - - -_- -_ -__ y/ , s i �; / / --------------__�_ _7---_--_------------------- -------_--- / / „ �� / s i �o( / ��� - - -- - - - - - - - - - — —_ JIJ �- -- — — — ,J�l�-- _-_- - - - �� � - �/ / // / / // / /, // / / '�� „ I /i / , , , i , �i , A _ � - / � � I �I � I �V 1 A N / �' / , / / / / / / / , / , , , �CC� 1 / �g�U - - ���- — — — � I /i i'0 / �// // , /� �/ / I / / I / l� N �r �� \ q ' / ' , , / / /' /'// / , / / , v / v / / / " / A 22 � O N _ z��/ / / / �/ / i i /, i / I / / i / , i I V l \ V /� , V A - , , Cp /,O - / , Cl �/ / , / / , , / / / / l '1 / I V l I I j I / \ \ �� "I //1,'---//�/ '' v_ ,�/ y ', /,�//,, /,/i/// //i/ ' C) V/ ///, /, � / j �11V A 11l l I _ - ,i �/ / / // , // �,// / / A /, / / �� / '� / _ l / /O l / '� ' - ) /I 1 �/ - ,i, 0 —� / // , / "/ / , / / , , / / / / / / A �jA A '�, _/ - / ��/ / - ,/--//, �i //i // / / / /// / // �� ,���- - /," �� , 1 /% /LNv /�- / '/,�'/i ,/// ,�/- / / \ / /� /, `' ��, '\ / / 1 / ICI I _ � � � _ � �� ' �[ ,\ \ l '/ '' '/,,, ,, Vj /,/ / / / l ' \ A - ,/ CI ,J /' , 11 A /' / A / l�l // I � � I ' /�;% ;- _R_IH01� 0� Q PA S R / ,, ,, / '''O Imov -/ �/ v � / /// // / ��11 f - - / " , / / , / , / / , / / / A / _ /// / , ,r , �� 1 / v '/ / /tom ''� , % `� v / �I ,)` / �� //I / v r ,// \ \ / // / / O- \ / r MARQAT /� - _ - - , / 2�v„ /� /% 'lv ,-/ 1 �'� 'i �/ /, /�, „ - �I - I - I 1 I /I I Il 1l r 1 I "' 1' I /� ��A'// , / / / -r�- , 6 < , � / 1, // I A �A / / I 1-1 CRH�TR�� _� �� /i, / �/ // i i A �� A _ '/ V/,/ �, / f 11 Il ��� i I ' V ' 'V W / /i J ,' , /� �.' ' V - ' , // V / 1�4 I- / / /' i _ i� _ /� / , / L �[/ / f / I , A �. A��s1�'��; __-�i�� Amay V 1/'//'�''I/�/l//I 11//lI�///,//'�/yO'°/�-���';�_-- --���/ '�/" '�� /�v�� ! I_� / I! '�//'I/'/ / A �'�/ ���� i���, - _ - v-� - / O // r/ - - - - -�; Oar -I ) �` / / / / // / / / ,,,,� O'er _ �< '� v I / N f � �� - j ��y � V ' \ `V / ', i ;' O ///' ' ' /� l' l / 11 ��/�/�7�',' ''ll�/'',' ''°/� �s - — ��.- - _ _ - 6'/ � '` •��� cA • / TttTT co ' ' N ,'� ' ,� �' ' /� /-` l,'S to. 15 +35.09 \\1 v / / / _ _- — -_ " - ./ A / ,/ / / // / / / / ' / %� / / A _ � ` V / / / / / // /-f / �- (gyp - ---- �'`� G) /I � - v- / / \' \'_ ��'\ \ -Y20 - PT Sto. l0 43.6/ �� -, ; , 75,, , ' , , , / i, E - �_ ,2 W _ _ , v �`o , , _- , -- , , // _ �� �, V(� q� , , /, , / �=° , �, / , ' / / �/, ' , / / G2 �`Sto. T+45.14 0 _, _ /% �O/ , 1 , �� - / !1'/�J' �i�--� 15 I /i�i, 'i��/', / /,/ / / / / / // //l // / -, se�- �/� �i� , / /� / �/ /',/ / / � v �� -C_ ee._'--,,v __ v /,// /'i/I// ', // / /,'///i /, //// / �/l /1111 �11 , I / (�� / /�. // v �\ l I �i.� /'G/�/ f / I . ; o ,� , ' , - , /, , /, % / , / /, 'li U �� v \� ° // / ,220/ B 2 - VAEEE AVE O Z / ° v "fit = ; y -Y20- PC Sto �0 ',, ,� " y ti v / -L - POT tt�y/ 4+58.60 = , , �- - ' �= O �/ ' / � l 1 s �. / �i - o ' ,� / / // ,l / A E - / I /' ' /r / ' Q� ,�I / / -/ // / , / �" / /� s ✓ / / J / / / ' , , , _ / - - �� �� ',' L �- �t Sto. +28.90 -Y20- PO=- tb�. 11+00.00 - '5-,' ' �- RE ��� ) / - / ,2 ;;;i,, - , , //'/� _pe ,,.% ,> - Z __ — 7n i ///' - / `� - �� —�J-7- _ '/ i, 3 ,1T [6RAINAGE / / // / I r / " /// , / /`/ �/I / v / / m L FLB� / - �/ - / r'/r ' ' /r/ / / Q� / , / / , / /, / / \ \ \ - _ = R - ,, ' -L �f' 7` v6 60.69 ��, , , /' i / /� _ ' �� O ` - c - -` _ O " O _ , , - �� - --O i /�'�A 1 _ O O ,, '- o- -O 1 - - , i ' \ V / -, / ��' - - - O� - /�_';E�__' I /' / /i -� / A v . / �:. I — �-, -�- / / ' ,ram _�� � _A I I f ( / \ ;0�� - - - _ - /- , / , ' , , ,/, �S V�y - ' , - �' O -\ - �'�'J %`��J"��B _ 'T$ � S�v / �S � V / / - t,� / 1 v V v v\V �- �_b�2-� ,-// �� / / _ .-� 0"CRN�BROCK /; - T�-- —Y— _ ,- _ ��Z=_T v -j '''/ '/ / /- ' _ G� - �� �� - - - /', ' - _ ' ���'�WT-AININ, WALL �' �S ( �� - -!'_ _ TB _� - / �/ - - - / /'/ / / _�' ° '/i'O� / ` 1 ' Et`-- _-260'-- -_- _=- - '� Te 'Z`\\�/ �-`--' - _ - ° TI / �---//' / j-O' '/ �.��� -\ _- _ f O ' / O / III�_ R c P = Off' _ _ - _ - _ _ - - = O -°�_ - / \ \.� s \ - _ __ v v - � - _ - s ---__-_� - - F u - _ - _ ��� — RCP ��/ / 2 v — _ - - - 11111111111 -/ / , /��- ��- - - - - - , T— . I / \ / will _ 5' R/P , / / / �- / v v - EX � � . � ) � r � v p �1 / / T � � � .a _ ' - - - _ - � �- , A i I � A \ /' I I 1 .�-�--- - —-. I \- � — .� — � -0"117— -_- -- - — I- /�� [_ G \ �� / _ --L— t I �O1 I \ \ ta.A OU� UTJ _�; Ni IIBANDON� 12 UTIL,�T P ' - 1 \ �2'_HARDWOOD - - _ _ - - - - - - -��i� - - _ __—__F_ _ -'--�7 ` / — V A ` I T �i — . — / - Gv / / f� �� J / I _ - - - - — — / / ' �- —�- / iqt, —i- - l G -�� 1 12" WL — ' _ _ / / / / -t— / / � - - _ �'� / _ _ �� / , 8 'SS — — $„ 5S / I I ' ' 1 �P �p 3T G 18' PINE _ — . . — . . — Pv — — — 12 WL 12" wL - - 2 ' v 8�_CP V� ' - - i _ -,or a-' -------------- __ _- _ -- - ----_- - IS R/W / ELIST R /°� O '� / �A s I � - -''lF° ,EXSN R - ---s ' - / --� _r i /_ _ ------ — _ — — _ ---------- - ---- _ _ ��- - y�"/ P / ' �� 'i' 4Pt-SE ' ��' _ _ - - - - _- _ RP - --- _ — ' /, y� %� v ten/ / / - / /- / / v , - - %/ �/i - - / ' - — RCP I / // / / ' �/• / /�i / Z-) r �/ /C / / / �I - - � i_ - ' � / 3' flARDW ` I / _' ' _ / �U A-� v — — � v I , _ _ _ F . v. - - - PD T - _ - - " _ ; _ � _ _ ; - - / - R ODE P E - s• MAPLE -5 - O O O �O - - OQ � / _ / / E ry _- - - z - _F P I `Q E_ ° 4• GUM `' 11 -L % Sta. ll/ 3 T - - - -- / / / I ' /' //%'/ I �� _4'-'z'-_ v - - - .. — — - - _ - - - _ _v/, / _ - �O 4' GUMO ' l -Y l / 0 �1/ / �� �� �- � -- _ - � C�' 8 �� / �°° S O, /'� '/ / // / / / / j _ i_ v , / 15'FIARDW00� z ' -v ' - 'O - ' v _ , O �/ / / , /I / / / ' 1 // �'I - ; , _ I /�� > SBKBUS — / - - - - c - �I , /7 i z _ �� ' I z� -t ' T ,— _ + 4 4 _♦ -�__ O - -� — O_--- r ,P,S �,43 9 ' /. _ _ _--_- ' ," _ ' 00 - ' --- '/%' _ o- ';v'r,;;/ ////'v/'41- ' �, �y'v '20_ -L POT Sta. 108+35.66 - - "- -_ ,--- /00 -'' . v '- - -, O/ -- O � I % ,/X // ;/� '/ ' - - - - - - - , ;; /% ' - „ /''' / ; ���� - _ , ' y . -Gl - POT Sto. 14 +35.00 - - _ _ , �� ��; , % ,, ; ; � �� O ;� _ , / � / / / ////// ; _ _ ; - / � `�� - - ? z , , , - -off _ - I = _ � - GMM / -, _ O� - s - ��_� _,,,, /ry _ LUNG CANCEF�-- O- ° - /2 0 v ti /,I F/ / -, _ �f i .� �v , - PgRKv _'_ �,�. ETq v v i i %�III _ fi i f / / G ///i/- - l/� l�- 'O �, 0 INITIATIVE 0- ; .� / , - \ o- - °� �' ',' /' ' _- = �,'' v / - - O �' O NORTH CAROLINA -L/ PC Sta. 110+04.29 - �,�%/-- , _ v� ��, , - / ' _ / - - / '�� - :_ ) 4 -_ _'/ 7 ...- - LEGEND l / ' / / j - - - � - � = Gl'- a,l +6/ 60 _ �:; -" '; _ '- SUMMIT -, ' �,_ -�_ �� _ - s /: ' - - BLUE RIDGE /RD L _ , - ' % '� O - _ -- „� ✓l/ > \ -' , A - - G_ i i i - ' z3— - - ' / �� , � A �� -�', - � i, PARK �'), -- ' ' _� -i ce/ ," -''� _-' ---- / l / C' '� O� �/ / ,� 'L I �Z'��,/ ,_�, �'y /I/ v PERPENDICULAR ROADWAY ZONE 1 „/��N � /y ! �/ ///F / F r ' ��O/ �- f i � �� - '' y _- ' / ' / _`�,- '� YS / ,---- rl\- i i� - `I - o � - OSO ,/ � Oho —�," ' 1-1 �� G CREW - - l' _ - - ' �. / ; - � ' ' _ I Y21 POT S �17 475.00- - - ' ' PERPENDICULAR ROADWAY ZONE 2 ''I '�' �/ C / r - OR� SE P ' - - -' / Z `-S�� i ; _ - - - _ _ _ - ; - ; `- `�� - - '�' %_ -Z ' °I _'//' / ' '� l ' '� %� O OW I O� �� . ���iJ , ' / / / / / , A \ I �°��`° �� ,� _ _ - - _ 0°` V '� I CL� -'ol° / 11 I '�� l - / �F` N RE / / 1 , '� / i/iii �9 I /, Ir , y,��,�� z ��z �' �� / G s� O 1 , , , ' _ __ � /- o� -Y2/- PT Sta. l7+ -�N TEMPORARY ROADWAY ZONE 1 � , I '� i iri �N�°°� - - I '� �il -`,PC Sto. 12+62.4� //' / / - r - i ��S - ,'icy -i,%i, _ , - _ - P / , �_ _ v / �o' A S H A L - ' �� Gl PT Ito. l 48:�6 ' �_ - - - / , , - ; ; / - - - - ' ' / vv , / - / _ —Y2 — ACC l +42.02 �z� TEMPORARY ROADWAY ZONE 1 �MORIAL /�%--/ " �'°O ���� , / - -' � - ` -° � �� _ /��v v I / / f °F BEGIN BRIDGE ,� - �i ,-' ,' / -,r / _ I r _ � /� 400O� i�5E- " ' � :0= -- \\ ' . �/ '1// / v " v , PARALLEL ROADWAY ZONE 1 " _ RK F ���' -G2- POT Sta. 11+12.09 ,' _" �� ,//'� //9O'- A/`'v -' ;/� „� /_ '' � v / -- � - ,may / y � .I � _/ /� / // //, y ' �,' , ' Vv � � / , ,'/_-;j, i� V 11 �- 1 � / ' ' �� _ / '' I ' / / / /' - � - - + -� / - / / / - \VA/ - '/"i % i�� I , , ^ A / VA -_ ' V 1 / y F7 7 O Gl PC Sto. l0 48.34 , — ' ' , ' 5� v , , -, - _ _ _ y PARALLEL ROADWAY ZONE 2 /' / v F v / O - / - / , / / / ( / _ZI =�,,,/ 1 , I00 - - / v v / -G2 PT Sto. l0 +45.25 _ o , ► /�� ; UTILITY ZONE 2 BEUE-_�LDGE RD P 1� , ��o/ _ yr ; j �,' ' / '`I ; / - - � --v � ��O ,. O ' /� _ - ,�-_� � � !- / / / , / I / - _/ -1 / _ /1 '/ / /, - -�� , ' I ' ��� 1NCONSTRUCTION - �v l � - -I � -'�v �0 i ----_ -%yam_ , BEG - _ _ / o, �_ -2200 SUMMIT PLO GREENWAY ZONE 1 ���� / /'/ -G1- Pl_ Sto. 10+10.3-4 ' r� l-I _� -- 0 //Cy' --- / - / ,- //� ',' ," //_ _ v _ _ /'//' /, ,� �,' ' = �-- GREENWAY ZONE 2 5 - /'''_ �,- ;/' _ / '/i v ' - N l9"18�3.8"E �� 1v �'/ / �, / _'/' 1 't - '- '- - '/ - � I - STREAMBANK STABILIZATION ZONE 1 �`_ -G O S O O+OOOO = �' � / � v �' r - ,/� -' / _7_ lr/ �% - ' '/ � 1 1 , �°> � -� _ � -1 - - - / - y_ - - / ( ' STREAMBANK STABILIZATION ZONE 2 f I It I �° -C72 PDT StO. IO+OO.00 1 / -/ r ', ` �'-) r i k-- /' /l / w ��5�'/ I - , — _—_�_ _1-1 _-_----___-_�___ v - _ _' !�O�Cn ✓i�'S2__( _�� )/' / 1 ,-/ /,'/ ', ;--'° / -- �„ // �' ----- v� ;- / ----=--------=_v'_- - v - .. - .. - DENOTES LIMITS OF ZZ, _� N1 ° ' -, / �v / /r _ / // DISTURBED AREA ) - _ - - / - - - / / - ,2, , ; - QOCUIdIEWT NO 6�NS1DE#�6 FINAL - ., / O ---' �o ,�/ ' r� _i ; /' ,'4ti ,� ,/ /' !'' ;- ,�;�__ _VJT PARK v�N -- tiNLESS ALL SIG �S COMPLETED PREPARED IN THE OFFICE OFo PROJECT-. INC0 0 40 BLUE RIDGE ROAD WIDENING C LICENSE 2 PERMIT DRAWINGS INCOMPLETE PLANS REV. No.e REVISION: BATE° DRAWN BYe CHECKED BY: 421 FAYETTEVILLE VILLE STREET, SUITE 600 Im >)) Horn RALEIGH, NORTH CAROLINA 27601 DO NOT USE FOR RW ACQUISVTION This document, together with the concepts and designs presented herein, as an instrument of service, is PHONE: (919)677-2000 B� E R IMPACTS intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc. ©2020 shall be without liability to Kimley-Horn and Associates, Inca BER° SHEET NUMBER° Copyright Kimley-Horn and Associates,�oB NUM Inc., 2020 0 I IO63094 SUMMARY TABLE PERMANENT BUFFER ZONE 1 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 1 725.22 0 7029.18 0 0 2 500.96 0 0 3416.68 0 3 2967.01 0 0 4356.55 1298.93 4 0 0 0 0 5168.84 TOTAL (SF) 4193.19 0.00 7029.18 7773.23 6467.77 TEMPORARY BUFFER ZONE 1 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 2 0 0 0 2994.35 0 3 0 0 0 525.90 0 PERMANENT BUFFER ZONE 2 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 1 2365.86 0 162.56 0 0 2 1999.34 0.00 0 68.01 0 3 4309.46 143.32 0 1060.33 0 4 0 0 0 0 3471.6 TOTAL (SF) 8674.66 143.32 163 1128.34 3471.60 TEMPORARY BUFFER ZONE 2 IMPACTS GREENWAY UTILITY STREAMBANK STABILIZATION PERPENDICULAR ROADWAY PARALLEL ROADWAY SITE NUMBER 2 0 0 0 2650.11 0