Loading...
HomeMy WebLinkAbout20200349 Ver 3_8a_BlueRidge_Permit Drawings_Streams_(2020-04-27)_20220823 PROJECT REFERENCE NO. SHEET NO. ES-2018-04 THE CITY OF LEl H UDOCUMENT NOT NLESS ALL SIGNACNSIDERED FINAL TURES COMPLETED INC®MPLETE PLANS DO NOT USE FOR RW ACQUISITION GRAPHIC SCALE ENGINEERING SERVICES DEPARTMENT 20 0 40 THE DESIGN AND CONSTRUCTION DIVISION 20 PLANS 40 BLUE RIDGE ROAD (S R 16 70) ��F , 5 OK RD o o WIDENING PROJECT� � � � / PROFILE (HORIZONTAL) DESIGN DATA 70 U � v 2 0 ADT 2020 = 7,500 VPD CITY PROJECT N O: E S-2 018-04 PROFILE (VERTICAL) ADT 2040 = 12,000 VPD FROM DURALEIGH ROAD (SR 1664) TO CRABTREE VALLEY AVENUE s �g�� 44 STREAM IMPACTS 70 ' 0�J I 50 c�a PERMIT DRAWING of Rq`z SHEET 1 OF 4 1 a \ H B WAD E m O r 40 O iii �Ih I I! /p 0 54 1 4400�Nsr p c o _ h m TYPE OF WORK:WIDENING,GRADING, DRAINAGE, PAVING, o CULVERT,SIGNALS,SIDEWALK,AND SIGNING o SITE 3 ^airy ,,, Posted = 35 mph 2Po� 0 00 Speed p CRABTREE w BEGIN PROJECT m m VALLEY MALL BEGIN CONSTRUCTION } } oo� -L- STA 10+41.08 ,,, J J O r AT ~ SUMMIT �� BEGIN CONSTRUCTION Q 2 2 Z O'o� -L- STA 62+06.00 O JIn CRABTREE Ln m m CHURCH 6 �O O\ Z 0 4 5 J END CONSTRUCTION 9 O� �� O� i� -L- STA 61+45.00 Z v > CRABTREE BLUE RIDGE RD �O (SR 1670) 8 IA �Q C, O LAKESIDE 0'6p m 13 o, H USE CR EK_ 21 y O W Q B�U� l REX O o V 0 Lu 2�F a (SRR76jE Rp END PROJECT HOSPITAL 9° Q N o A OI END CONSTRUCTION 0 �' �P m O -L- STA 114+18.00 Z 0 0 9���y91 MAPARTMENTS K �GF1 3 O cePILOT C . 5 o O PARK F OJ 0� 3 @ 8'X 11'RCBC C5 � �� 14'X 10'RCBC SITE 1 Y SITE 2 PLANS PREPARED FOR THE CITY OF RALEIGH BY. O RU F F I N HALL NAN CY Mc FARLAN E Kim ey >>Horn N CITY MANAGER MAYOR „�, PERMIT DRAWING SHEET 2 OF 4 DETAIL 1 DETAIL 2 DETAIL 3 EI XA DETAIL 4 DETAIL 5 SPECIAL BACK OF CURB CUT DITCH SPECIAL LATERAL 'V'DITCH FALSE SUMP , SPECIAL LATERAL 'V'DITCH (NOT TO SCALE) (Not to Scale) (Not to Scale) SPECIAL BACK OF CURB CUT DITCH (Not to Scale) NATURAL Outside Ditch (NOT TO SCALE) GROUND Traffic Flow 10 NATURAL o� '1 -►I 2'� GROUND- - o� Natural 1 Fill - - Natural 1 Fill a�•� ,� — — — _ _ _ Ground .>..� ��p'L\e Slope ? — — — — — — — _ Ground ?�D �\o Slope GI 3 f S— etc. I - S=Ditch Slope rk Proposed Ditch Min.D= Ft. Min.D= Ft. FROM STA.28+65 TO STA.29+90 -L- LT FROM STA.51+97 TO STA.52+12 -L-LT FROM STA.38+00 TO STA.39+50 -L- LT FROM STA.30+35 TO STA.30+85 -L- LT FROM STA.43+00 TO STA.46+30 -L- LT FROM STA.94+77 TO STA.94+92 -L-LT FROM STA.79+30 TO STA.80+95 -L- LT FROM STA.39+50 TO STA.43+00 -L- LT FROM STA.51+00 TO STA.51+95 -L- LT FROM STA.10+00 TO STA.11+70 -Y14- RT FROM STA.49+25 TO STA.51+00 -L- LT FROM STA.84+25 TO STA.85+80 -L- RT FROM STA.90+15 TO STA.95+20 -L- LT FROM STA.74+60 TO STA.76+00 -L- RT O DETAIL 6 DETAIL 9 SPECIAL LATERAL BASE DITCH DETAIL 8 RIP RAP AT EMBANKMENT DETAIL 10 DETAIL 11 (Not to Scale) TOE PROTECTION I Not to Scale) Ordina Hi h STANDARD BASE DITCH BERM BASE DITCH (Not to Scale) Ordinary 9 oc 10'min. Water Mark INot to Scale) (Not to Scale) Natural \of \o'� Natural Natural Ground �') 3' \\et Slope Natural °K�\°Q® Pipe outlet7��4 n. 2.0 Ground 3� 3.� Ground Natural -N ? GENWT D F\oGround6 1 F�\S d D Ground D ti iOGeotextile B �dGeotextIle B Min.D=1.5 Ff.Min.D=1.5 Ft. d=1.5 Ft. TILE Stop Rip Rap Max.d=2.0 Ft. Min.D=1.0 Ft. Max.d=1.5 Ft. b=3.0 Ft. Geotextile and Geotextile "When B is< 6.0' B=3.0 Ft. B=1.0 Ft. Fp B=5.0 Ff. Type of Liner= CL-B Rip-Rap at Ordinary High b=1.0 Ff. Type of Liner- CL-I Rip-Rap Type of Liner= Class II Rip Rap Water Mark Type of Liner= CL-I Rip-Rap FROM STA.112+65 TO STA.113+50 -L-RT FROM -L-STA.75+35 TO STA.76+50 LT. AT STA.111+50 LT. FROM -G2-STA.15+00 TO STA.15+50 LT. FROM -L-STA.84+50 TO STA.86+00 LT. STA.111+50 -L- (LT) tn a W N DETAIL 12 DETAIL 7 CONCRETE DITCH DETAIL 13 SPECIAL 6% BACK CURB BEHIND RETAINING WALL SPECIAL LATERAL BASE DITCH (NOT To SCALE) (Not to Scale) �'i (Not to Scale) RETAINING B WALL REAKER Natural o< Fill Ground ?� D 3`ogeT slope c a e ti, F\ 6" / cos 0.00 6„ / 006 0.04 GROUND � Min.D=1.5 Ft. B=5.0 Ft. 7" coos° 7 0.06a° a Min. D= 1.0' FROM STA.113+50 TO STA.113+95 -L- RT FROM STA.13+55 TO STA.15+00 -G2- (LT) 0 6" L W 7"7" LZDT�_ y _U J O FROM STA.13+50 TO STA.17+25 -L-LT $ FROM STA.50+00 TO STA.52+00 -L-LT FROM STA.56+50 TO STA.57+50 -L-RT a> a FROM STA.65+70 TO STA.68+00 -L-LT a� ro I 0 o 0 0 0 3 0 g 6c DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OF: PPCIJEI INC LICE NSEIF-1112 DRAINAGE DETAILS BLUE RIDGE ROAD WIDENING REV.No.: REVISION: DATE: DRAWN BY: wecKED Br: Kimley )) Horn PRELIMINARY PLANB RA FAYETT RTH STREET,SMITE 800 PHONE::(NORTH 2000 NA 2]601 This document, together with the concepts and designs presented herein, d an Instrument of se rvice,ce, IS PHONE:(919)8]]-2000 4'1 Intended only for the Specific purpose and client for which It was prepared. Reuse of and Improper ZZ� reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2019 Shall be without liability to Kimley-Horn and Associates.Inc. JOB NUMBER: IS, NuMBER: Copyright Kimley-Horn and Associates,Inc.,2019 011063094 PERMITSHEET ETDR OF 4G SITE 5 -G2- PCC Sto.20+06.00 }�\1j \V` \ UND -G2- PC Sto.19+380 / -. -G2- PT Sto.18+96 -G2- PC Sto.18+48.65 /c ( IMARO AT 92Rc� 1 sE/ CRABTto.16+19J6 REE / RCP � �p �--_ ��• \ Sto.14 f 3 / ``''-sse o�/'F ��,� /F, %• SITE 4 -Y20- PT Sta.10+43.6/ F 0-DBE / - - - SS - YZl_ PC St 15+35A9 \N \ \\\ CONC SW '�P RI �,-/ �s�.•�' -G2- PT Sto.17+45J4 �/] \r \ \\\\\ _ ILA -Y20- PC Sto.1 +00A0 // �o�� ASS f / \ \ -L- POT Sto.104+58.60 2'CONc B K '�� —�`� y/ -L- PTr'Sto. +28.90 O \\ -Y20- PO to.11+00.00 ETANIN ALL \ \\ 9 PRIVET MRNMAGE -1� � 18 -L- POT Sta./06+60.69 I V -GZ- POT to.l3+1L97 rs' = 4 I Ta .,vf - . SiEEF lo coNc eLocK Ta st Ta .. -S�s �F \ L GR L3 rr::'�22 r� /'�✓ \- RETAINING WALL' '� $( SI S El `u' 4�' rW .. - to 15 i - Ie^Rc Ij .�, `f' +ec E `-s s�� Tff TEE -E F FC -T --F TCf 7EE"'�• i� 1 11 ' _I cH "yam' liE--RE-�--�E - a -A F — — ��S@ �t"`= PSE r E W f a R F - PSE PSF s ' "RC F _— CIS"RCPE- Q E- IIA _ _ _ --- — _x -- - - — 2 0-10 f nxoox 1z-ur{IZR] v xoox Iz r zr �= r� I2-HARDWOOD N. c1 e„ss ._.._.. ._..._.._ _. -_ p __ e" 18.PIE I p « y RCP 2 - -- e,P EXIST R/w PSE P XIS - - ' « « RAP 6"RCP \ 'EIP'ip I � _._ RIP dl _ � RiP� E T E Ri :1,- SW / PD PDE +EGUM -/ --LY Sto. G2- PT Sto.12+52.77 PYf � 2/_ POC ./5+ BKBIS b'nAR000 -L- PT Sto.104+5526 -G2- PRCSta C /F 8 / •- F �' -L- POT Sta./08+35.66 END BRIDGE ` ` � i - , �.• -Gl- POT Sta.14+35A0 115* SUM w a wo -G2- PC Sto.11+92.09 ! � �i' ILUG CACER NITIATIVE OF W4Q '� \ ` L F NORTH CAROINA -L- PC Sto.110+0429 _ SITE I — 1 a. +6L60 BLUE RIDGE RD SUMMIT ' c y � , PARK- l� I If BEGIN BRIDGE y FII /lF GI REEK / / Y2/- POT Sto.17+75. -G2- POT Sto.11+12.09 00 $ i ,y I FR�PS Noo EEN SITE 2 SE P GR -Gl- PC Sta.12+62.45 �� -Y21- PT Sta.17+48J3 J . . �° - -MARSHALL / / / MEMORIAL I � / FP` Y2/ PCC Sta.16+42.02 -Gl- PT Sta.//+48.76 -G PC Sto.10+48.34 o LEGEND � -G2- PT Sta.10+4525 O DENOTES PERMANENT IMPACTS / � ® IN SURFACE WATER - BEGIN CONSTRUCTION (BANK STABILIZATION( o / /z/ 7 -Gl- POT Sto.10+I0.34 = g DENOTES PERMANENT IMPACTS -G2- PC Sta.10+10.34 / IN SURFACE WATER(CULVERT) / / / N 19'l8'3,?E ® DENOTES TEMPORARY - - - IMPACTS IN SURFACE WATER -G1- POT Sta.IO OODO DENOTES LIMITS OF +00.0 = / -GZ- POT Sta.10+00.00 DISTURBED AREA DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OF: PPi!IE;: 20 0 40 BLUE RIDGE ROAD WIDENING N INC LICE NSEVILLE2 PERMIT DRAWINGS INCOMPLOTE PLANS 0 RThis: REVent on sonAinTE: DRAWN BYservice, is: CHECKED Br: KI� �� „�� orn RA EIGH,FAYE NORTH CAROLIN SUITE 800 This document, together with the c cepts and designs presented herein, a instrument of PHONE:H,NORTHCAROLINA2]601 STREAM IMPACTS Intended only for the Specific Du..... and allent for which It was prepered. Reu56 of and Improper PHONE:919 e]]-2aa0 VN reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2020 shall be without Ilablllty to Klmley-Horn and Assoclates.Inc. Jo0 rvuHBER: $REST nuMBER: Copyright Kimley-Horn and Associates,Inc.,2020 0063094 PERMIT DRAWING - - - _ 3Oo/ ^ % / //// // /i///vi//� I \\SHEET 3 OF 4 SITES - l�` -G2- PCC Sto.20+06.00 F - - - - - - - - - - - - - - - - - - />�� -� 1 / /// ti / /// �. - - / // l////l/ A// /ii/ f A /� �iii: 1=G2- PC Sto.,l�+ A ��/ q �. / � � /:/i /////i////i/�/ j iiii// i Sto. ; - - - - - - - - - ' �` I //o /// // // / /// ///iir / i /� / /C ' - - - - - - - - _ - - - - - ti / / i i rr� // / G2 PC o � �� //2ii//ii'i//rr/���� I I •��� O �G�/Q,�� ri// /i /� I V �� / 1 / J 1 1 Il I I I 1/ A V\� MARO AT f j//c CRABTREE t0/ +t916 - ,3� SSi�/ S�E.! ,�.f,i 1 JI VAIIII. / •V A /�� d 4 .14 /59/ �.. .. a _ - sue% �� z � �r� ` - „ - _ , F 4 S PC<S�t l +35A9 I 1 1 _ SITE -Y20- PT Sta.10+43.6/ G, -G2- y2 G v�J /� //� Sto.l445J4 E s 1 eonlesw� Ftl� / / // / // ram' __ -Y2O-�GA /� \ i -L- POT Sto.104+58.60 = �,cN - //, / / h / o a - ;�1 /� ti / h�� ,'LLi T Sta. +28 90 20 PO- to.11+00.00 RE ALL /- / / J N !�/ ` r/ I/ L t POT Sto.106 f60.69 5 -Oe- POT Sta.13+1/.97Sir -26 _a5 _ TnOrJ BwALL-_ /fie Sf `ejT i ��st n �-°�—T _.�-� .x _ -v- of �iEE M1 _{�� J�C R BE `—fI _ EHE F s��/ e - C6P F TPSf—PF- ' ''P5i" -Z /S -/ - - R BCP _ i - O RE_E� _ - - ,. _ �f zOfn F Ar Dora iz ur zTuL I:E FT w y -- w� :z � I XIS—RE / - - .. . .r .r _ _ _ R RCP W� P PIDE F PE _ De �p StO.15+82.33 /G2- PT Sta.12+52Z -Y21 POCPDE / i -G2- PRC Sta./ + 449 /F �/_ !� /'/ =IS�KBUs _ - • / -Ie-�iARDwaac- � -L- PT Sto.104+5526 - �' // lz / - - 5aa _ _ � i , l / _ - R F i -L- POT Sf6.t08+35bfi= ��I- - E D BRIDGE / / v / Gl- POT Sta.14+35.00 - - {� v -G2- PC Sta.11+92.09 , �/ \\ /.1 \ _ //5* CANCER _ �� /1 _ _ ' UM /Y , W r LN C�CANCER- /I // i '/ K> os - / , �``7'Ta AR +y- YVC Wq /1)MIDI/�//i �i%�' /' S / /.• ���.•� /�o// / { / /,.-S,`- A / / IITIATIVE" �F - / c /i /NOOTH CAR_OLINA - /- / PC, - e - _ t/� - - // .. / / /// - L� Sto.//O'F / / / A /(j0� 1 .1 0� _ - / 9 / �.F �I - / i / 11 / �. C/ •- / _ , / / / 'l: / / / - o / -s, U� R/DOE/RD - l/ / BB� / T I z �/ \ �.1 '��i/�! ^`�_s J - `�o BEGIN BRIDGE / F ' / / 1' EK / - // 3 s /� / v / = - ss POT ta./\t+009. / �i`\ moo` -Y2/- PO / ��/ % / V / � I GGSEE SITE / 562 c�3s as 0 S / w�R / H RE , / / / / / a / , /,. 2 z G // /\ _ \ _ 1 -Y2- PT:Sto.I7+48J3 M SHALL, ..• L 2 ��s1 -Gl- PC Sta.i2+62 �i' Z �y / �1 I - ti a All i126o Iy�EMORIAL J� / ii F r // / /\ �/ l � ' \/ G^=Y2-\PCC St /6+42.02 PARK \l�0'\ O LEGEND `GZL PT 5 o $oOIO 5 4 ^ /ll�i i///// I% b i// _ I O DENOTES PERMANENT IMPACTS Jy 9 I + / / / ^✓i / III\ / 'j/ ' oi ® (N SURFACE WATER / BEGIN CONSTRUCTION ti aBANK STABILIZATION) 0� Stu./01, J/ /i/ 3 DENOTES PER IMPACTS ,1,F ' IN SURFACE WATER CULVER / / /5 - /5ta./d 10.34i i / i i / •//� i�= //�/��/ 1 ' , �. J Z - / / ( ! `�' ® v DENOTES TEMPORARY IMPACTS IN SURFACE WATER f / � � -Gl- POT Sta.10+00.00 �f \I -G2- POT Sto./0+00 _I `; / I ;i/,l r/ / '` , = L\// I I ti -„-„_ DENOTES LIMITS OF - DISTURBED AREA � 1��S z2S� / � � -- \�` l lJI I / Io'�/ /\ DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PREPARED IN THE OFFICE OF: PPi!IE;: 20 0 40 BLUE RIDGE ROAD WIDENING N NO LICENSEVILLE2 PERMIT DRAWINGS INCOMPLOTE PLANS O REV.No.: REvent on s on inTE: DRAWN BY:service, is BY: Kimley „�) Horn RA FAYETTRTH STREET,SMITE 800 This document, together with the c cepts and designs presented herein, a instrument I PHONE:H,NORTHCAROLINA2]601 STREAM IMPACTS Intended only for the SDealflc purpose and Client for whlah It was prepared. Reu58 of and In PHONE:919 e]]-2Da0 N reliance on this document without written authorization and adoption by Kimley-Horn and Associates,Inc. ©2020 5holl be without liability to Klmley-Horn and A55oalote5.Inc. Jo0 NUMBER: SREET nuMBER: Copyright Kimley-Horn and Associates,Inc.,2020 011063094 SUMMARY TABLE (STREAM IMPACTS) SITE NUMBER BANK STABILIZATION (P) CULVERT EXTENSION (P) TEMPORARY (T) ACRES LINEAR FT. ACRES LINEAR FT. ACRES LINEAR FT. 1 0.0266 149 0.0000 0 0.0000 0 2 0.0245 61 0.0140 57 0.0104 37 3 0.0161 41 0.0052 15 0.0124 69 TOTAL 0.0672 251 0.0192 72 0.0228 106