Loading...
HomeMy WebLinkAboutNC0021253_Authorization to Construct_20150507NPDES DOCUMENT SCANNIN. COVER SHEET NPDES Permit: NC0021253 Havelock WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: May 7, 2015 This document is printed on reuse paper - ignore any content on the rezrerse side City of Havelock Havelock Wastewater Treatment Plant Expansion and Neuse River Outfall A To C No. 021253A01 Issued May 7, 2011 Ncoo Engineer's Certification REC E VED MAY 0 7 2015 Division of Water Infrastructure I, 7a11 Gt/ . avi.T , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Havelock WWTP, located on North Jackson Drive in Craven County for the City of Havelock, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: A new replacement 8.4 MGD mechanical bar screen, a new replacement manual bar screen basket, replacement of one 1,300 gpm pump in Influent Pump Station No. 2, an UV disinfection system rated at 8.4 MGD peak flow consisting of three banks in one channel (2 duty banks and one standby bank), a new effluent pump station consisting of three (3) 2,344 gpm vertical turbine pumps, an effluent flow meter, approximately 24,970 linear feet of 24-inch force main, approximately 4,730 linear feet of 30-inch HPDE force main, 17 air -release valves, an effluent cascade aerator, a submerged diffuser in the Ncuse River, and associated yard piping, electrical work and control systems, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. We understand that the new limits associated with the modifications to expand to 2.25 MGD now apply. Signature �� - Date Y/2 8//5' Mail this Certification to: Registration No. 3 8 5(( Attn: Ken Pohlig, P.E. Infrastructure Finance Section DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 ,Lc( ,,,_cN c 4:x( /zq//( cat y I ,m i1051 12. i 7 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary May 7, 2012 Mr. Dan Harbaugh, Public Services Director City of Havelock One Governmental Avenue Havelock, North Carolina 28532 SUBJECT: Authorization to Construct A to C No. 021253A01 City of Havelock Havelock Wastewater Treatment Plant Expansion and Neuse River Outfall Craven County Dear Mr. Harbaugh: A letter of request for an Authorization to Construct was received January 19, 2012, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 1.9 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the East Prong Slocum Creek in the Neuse River Basin. This authorization results in an increase in design and permitted capacity to 2.25 MGD, and is awarded for the construction of the following specific modifications: A new replacement 8.4 MGD mechanical bar screen, a new replacement manual bar screen basket, replacement of one 1,300 gpm pump in Influent Pump Station No. 2, an UV disinfection system rated at 8.4 MGD peak flow consisting of three banks in one channel (2 duty banks and one standby bank), a new effluent pump station consisting of three (3) 2,344 gpm vertical turbine pumps, an effluent flow meter, approximately 24,970 linear feet of 24-inch force main, approximately 4,730 linear feet of 30-inch HPDE force main, 17 air -release valves, an effluent cascade aerator, a submerged diffuser in the Neuse River, and associated yard piping, electrical work and control systems, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 l FAX: 919-807-6492 Nose Carolina Internet: www.ncwaterquality.orq An Equal Opportunity 1 Atfirrnative Action Employer Mr. Dan Harbaugh, Public Services Director May 7, 2012 Page 2 This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0021253 issued March 12, 2012, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0021253. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Washington Regional Office, telephone number (252) 946-6481, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Infrastructure Finance Section, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. Mr. Dan Harbaugh, Public Services Director May 7, 2012 Page 3 During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 707-9175. Sincerely, Charles Wakild, P.E. kp:sr cc: H. Thomas Tant, P.E. - Hazen and Sawyer, P.C., 4011 WestChase Blvd, Raleigh, NC 27606 Craven County Health Department DWQ Washington Regional Office, Surface Water Protection DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Ken Pohlig, P.E. ATC File