HomeMy WebLinkAbout20161268 Ver 6_R-3300B_Modification Request_20220818_20220824 S TATE OF N ORTH C AROLINA D EPARTMENTOF T RANSPORTATION R OY C OOPER J.E RIC B OYETTE G OVERNOR S ECRETARY August 18, 2022 Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 ATTN: Mr. Brad Shaver NCDOT Coordinator Dear Sir: Subject: Request for Modification to Individual Section 404 and Section 401 Water Quality Certification for the proposed Hampstead Bypass in Pender County. State Project No. 40237.1.2, TIP No. R-3300B. Debit $570.00 from WBS 40237.1.1. References: Section 404 Individual Permit signed August 10, 2017 (SAW-2007-1386) for U- 4751 & R-3300 Section 401 Water Quality Certification issued June 5, 2017 (20161268) for U- 4751 & R-3300 DCM Federal Consistency CD17-018 The purpose of this letter is to request modification of the Clean Water Act (CWA) Section 404 Individual Permit (IP) and Section 401 Water Quality Certification for R-3300B to authorize impacts to facilitate construction of temporary diversion channels at three permit site locations shown in the project Erosion Control Culvert Construction Phasing plans. The temporary diversion channels are required to build proposed culverts. The additional impacts summarized below were inadvertently excluded in the impact summary tables provided in the permit drawings during the 2020 permit modification request for R-3300B. Alternatives to avoid and minimize these additional impacts associated with the culvert phasing plans have been considered and are outlined below. Impacts to Jurisdictional Resources Impacts to jurisdictional wetlands and surface waters for R-3300B are summarized below in Tables 1 - 3. Additional impacts compared to the 2020 permit modification request are shown in red. No additional permanent impacts are proposed and there are no changes in utility impacts. Mailing Address: Telephone: (910 341-2000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (910) 675-0143 5501 BARBADOS BOULEVARD DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 CASTLE HAYNE, NC 28429-5647 5501 BARBADOS BOULEVARD CASTLE HAYNE, NC 28429-5647 Website: www.ncdot.gov Table 1. R-3300B Wetland Impacts c Permit Map Label in Permanent Temporary Mitigation HUC a Drawing Site FEIS (2014) Type Impacts Impacts Required Number (2012) (ac.) (ac.) Non-Riparian 8.568 0 Yes CPF-07 1 IWD Riparian 0.007 0 Yes CPF-07 2 IWE Non-Riparian 0.163 0 Yes CPF-07 3 LWB Riparian 4.707 0.410 Yes CPF-07 d 3 LWB Riparian 0 0.045 CPF-07 Non-Riparian 1.839 0 Yes CPF-07 4 MWM(2) Riparian 0.109 0 Yes CPF-07 5 LWD1 Riparian 0.065 0 Yes CPF-07 7 LWD Riparian 5.756 0.130 Yes CPF-07 d 7 LWD Riparian 0 0.016 CPF-07 8 LWF Non-Riparian 0.083 0 Yes CPF-07 9 LWE Non-Riparian 0.128 0 Yes CPF-07 11 LWG Non-Riparian 0.001 0 Yes CPF-07 13 LWI Riparian 2.344 0 Yes CPF-07 d 13 LWI Riparian 0 0.025 CPF-07 15 LWJ Non-Riparian 6.464 0 Yes CPF-07 16 LWL Riparian 0.075 0.106 Yes CPF-07 17 LWK Riparian 0.251 0 Yes CPF-07 18 NWO Non-Riparian 0.849 0 Yes CPF-07 d 19 NWP, PD-29, Non-Riparian 26.965 0 Yes CPF-07 -15, -16, -31, -WOK-02 Non-Riparian 8.078 0 Yes 11, -32, -33, WOK-02 Riparian 2.756 0 Yes -35 21 NWQ Riparian 0.448 0 Yes WOK-02 22 IWC Riparian 0.220 0 Yes WOK-02 24 IWA Riparian 0 0.025 Yes WOK-02 25 LWI Riparian 0 0.001 Yes WOK-02 26 NWL Riparian 0.005 0 Yes WOK-02 28 NWM Non-Riparian 0.392 0 Yes WOK-02 29 NWE Non-Riparian 0.019 0 Yes WOK-02 31 NWB Non-Riparian 0.006 0 Yes WOK-02 32 NWN Non-Riparian 0.014 0 Yes WOK-02 bb 2021 Total: 70.312 0.672 New Total:70.312 0.758 a For permanent impacts b Rounded totals are sum of actual impacts. c CPF-07 = Cape Fear 8-digit HUB 03030007; WOK-02 = White Oak 8-digit HUC 03020302 d 2022 additional impacts; 0.015 acres of hand clearing converted to temporary excavation; additional 0.037 acres of hand clearing Permanent Impacts: No changes to permanent impacts are proposed with this modification. Proposed permanent impacts for R-3300B include fill, excavation, and mechanized clearing in wetlands. This includes impacts to 16.743 acres of riparian wetlands and 53.569 acres of non- riparian wetlands. Proposed permanent impacts to streams are 6,170 linear feet. Temporary Impacts: There is 0.758 acre of temporary impacts to riparian wetlands for R-3300B. Proposed temporary impacts to surface waters are 503 linear feet. Hand Clearing: The hand clearing totals due to the project construction are 0.318 acres. Table 2. R-3300B Surface Water Impacts b Permit Permanent Temporary Permanent Temporary Mitigation HUC a Drawing Waterbody (ft) (ft) (ac.) (ac.) Required Site Number 3 stream 1,411 302 0.718 0.046 Yes CPF-07 c 3 stream 0 14 0 0.004 No CPF-07 5 stream 364 0 0.085 0 Yes CPF-07 6 stream 355 31 0.121 0.01 Yes CPF-07 7 stream 2,060 62 0.731 0.015 Yes CPF-07 10 pond 0 0 0.633 0 No CPF-07 12 pond 0 0 0.416 0 No CPF-07 13 stream 348 26 0.085 0.007 Yes CPF-07 14 tributary 0 0 0.150 0.013 No CPF-07 f 19 stream 1257 0 0.398 0 Yes WOK-02 21 stream/pond 97 33 0.014 0.009 Yes WOK-02 22 stream 163 0 0.007 0 Yes WOK-02 23 pond 0 0 0.279 0 No WOK-02 26 stream 0 0 0.028 0 Yes WOK-02 27 pond 0 0 0.117 0.046 No WOK-02 31 stream 115 62 0.032 0.015 Yes WOK-02 b 2021 Total: 6,170 516 3.814 0.161 New Total: 6,170 530 3.814 0.165 a For permanent impacts b CPF-07 = Cape Fear 8-digit HUB 03030007; WOK-02 = White Oak 8-digit HUC 03020302 c 2022 additional impacts Table 3. Summary of Wetland and Stream Impacts for R-3300B Permanent Wetland Temporary Wetland (ac.) (ac.) Permanent Stream Temporary Stream Section (lf.) (lf.) Riparian Non- Riparian Non- riparian riparian B 16.743 53.743 0.758 0 6,170 530 Avoidance and Minimization Final designs were adjusted to avoid and/or minimize impacts to jurisdictional areas. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all its designs. Many of these strategies have been incorporated into BMP documents that have been reviewed and approved by the resource agencies and which will be followed throughout construction. All wetland areas not affected by the project will be protected from unnecessary encroachment. Individual avoidance and minimization items are as follows: Permit Site 3 Culvert C08 Î Sta. 19+49 -Y30RPD- Upstream end of temporary diversion channel was moved approximately 10Ó closer to Culvert C08 to minimize additional impacts. Approximately 260Ó of downstream diversion channel was relocated outside of wetlands to avoid additional impacts. Additional Impacts: Temp. Excavation 0.005 acres (currently permitted as HC) Culvert C09 Î Sta. 612+13 -L1- Downstream diversion channel was relocated to minimize additional impacts. Additional Impacts: Temp. Excavation 0.009 acres (currently permitted as HC) Culvert C10 Î Sta. 16+22 -Y30RPA- In an effort to minimize impacts, relocating the diversion channel to the opposite side of the culvert was considered. However, this change would limit contractor access to the site and require excessive temporary channel excavation due to topographic constraints. Due to these factors, it was determined to retain the diversion channel in its original proposed location. Additional Impacts: Temp. Excavation 0.025 acres Hand Clearing 0.020 acres Temp. SW 0.004 acres (14 linear feet) Permit Site 7 Culvert C11 Î Sta. 660+85 -L1- Upstream end of temporary diversion channel was moved approximately 32Ó closer to Culvert C11 to avoid additional impacts. No modifications to downstream end of temporary diversion channel were possible due to proximity of proposed culvert wingwall. Additional Impacts: Temp. Excavation 0.011 acres (0.001 acres in currently permitted HC) Hand Clearing 0.006 acres Permit Site 13 Culvert C13 Î Sta. 712+62 -L1- Upstream end of temporary diversion channel was moved approximately 72Ó closer to Culvert C13, and downstream end of temporary diversion channel was moved approximately 28Ó closer to Culvert C13 to minimize additional impacts. Additional Impacts: Temp. Excavation 0.014 acres Hand Clearing 0.011 acres Total Additional Impacts Temp. Excavation 0.064 acres Hand Clearing 0.037 acres Temp. SW 0.004 acres (14 linear feet) Regulatory Approvals Section 404: We are, therefore, requesting the modification of the USACE Individual 404 Permit signed August 10, 2017 (SAW-2007-1386), for the above-described activities. Section 401: We are hereby requesting a modification to the 401 Water Quality Certification from the NCDWQ issued June 5, 2017 (20161268). In compliance with Section 143-215.3D(e) of the NCAC, we will provide $570.00 to act as payment for processing the Section 401 permit modification. CAMA: A copy of this application is being provided to the NC Division of Coastal Management for review in accordance with their Federal Consistency determination Thank you for your assistance with this project. If you have any questions or need additional information, please contact Mason Herndon at 910-341-2036 or tmherndon@ncdot.gov. Sincerely, Ejhjubmmz!tjhofe!cz!Nbtpo! Ifsoepo! Ebuf;!3133/19/29!19;59;25! .15(11( For Chad Kimes, PE, Division 3 Engineer North Carolina Department of Transportation ec: Hannah Sprinkle, NC Division of Water Resources Kristi Lynn Carpenter, NC Division of Water Resources Cathy Brittingham, NC Division of Coastal Management Stephen Lane, NC Division of Coastal Management Chris Rivenbark, NC Department of Transportation, ECAP Enclosures WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1584+18 to 601+51-L1-ROADWAY FILL 5.4360.0050.699 5+13 to 5+71-Y30RPB-LT 0.0150.016 13+27 to 18+16-Y30RPB- 0.8830.118 19+30 to 26+02-Y30RPC- 1.1900.0250.080 27+65-SR4- 0.004 20+90 to 21+60-SR5- 0.0080.0280.027 43+83 to 44+59-Y30DET-LT 0.0380.003 241+43 to 43+15-Y30-RTROADWAY FILL 0.1410.022 43+21 to 44+49-Y30DET-LT * 3609+50 to 618+70-L1-ROADWAY FILL 1.7540.0020.0890.2010.5260.01041936 611+72 to 611+91-L1-RT1 at 12'x7' RCBC INLET CHANNEL 0.004 INLET BANK STABILIZATION 33 611+98 to 612+68-L1-LTOUTLET CHANNEL 0.0050.0150.01456 OUTLET BANK STABILIZATION 38 TEMP. DIVERSION CHANNEL** 613+78 to 613+91 -L1- LT 0.009 45+87 to 47+20-Y30-LTROADWAY FILL 0.1800.0350.024 53+88 to 54+12-Y30-LT30" RCP OUTLET DITCH 0.0130.0090.00525 54+51 to 56+42-Y30-LT2 at 66" RCP OUTLET DITCH 0.0820.0190.0029110 56+99 to 57+43-Y30-RTROADWAY FILL 0.008 57+15 to 58+74-Y30DET- 0.1490.0100.006125 13+40 to 19+59-Y30RPA- 1.6940.0450.1880.0940.01144155 TOTALS:11.3320.1490.2851.2620.2260.6530.03410782510 NOTES: * Site 2 detour impacts included in roadway fill impacts (Total Take). NC DEPARTMENT OF TRANSPORTATION ** Temporary Excavation Impact for the Diversion Channel DIVISION OF HIGHWAYS 08-27-2021 REV. 08-08-2022 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 157OF162 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 at 12'x7' RCBC INLET CHANNEL 315+01 to 15+77-Y30RPA-LT 0.0200.0050.0032912 TEMP. DIVERSION CHANNEL* 0.0200.017 OUTLET CHANNEL 25+97 to 26+49-SR6-LT0.0050.00414 OUTLET BANK STABILIZATION 14 TEMP. DIVERSION CHANNEL* 0.0050.0030.00414 18+22 to 20+14-Y30RPD-ROADWAY FILL 0.4700.0640.0210.060243 19+69 to 20+05-Y30RPD-LT1 at 12'x7' RCBC INLET CHANNEL 0.0040.00525 INLET BANK STABILIZATION 25 TEMP. DIVERSION CHANNEL* 0.005 18+99 to 19+24-Y30RPD-RTOUTLET CHANNEL 0.012 OUTLET BANK STABILIZATION 22 4623+04 to 632+02-L1-ROADWAY FILL 1.8120.131 633+70 to 634+01-L1-LT30" RCP PIPE OUTLET 0.005 5638+99 to 642+01-L1-ROADWAY FILL 0.0650.085364 6641+99 to 643+06-L1-ROADWAY FILL 0.1210.01035531 7645+01 to 666+60-L1-ROADWAY FILL 4.8050.2490.3800.6060.012176852 OUTLET CHANNEL 0.062 OUTLET BANK STABILIZATION 34 660+08 to 660+66 -L1- LTTEMP. DIVERSION CHANNEL* 0.0110.006 18+94 to 20+52-Y38-ROADWAY FILL 0.0720.0330.0180.112226 19+83-Y38-RT3 AT 12'x8' RCBC 0.009 19+38 to 20+09-Y38-LTINLET CHANNEL 0.007 19+57 to 20+40Y38-RTOUTLET CHANNEL 0.0620.0080.0130.0033210 TOTALS:7.2240.0000.4970.6130.0471.0020.04131121580 NOTES: * Temporary Excavation Impact for the Diversion Channel NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 08-27-2021 REV. 08-08-2022 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 158OF162 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 718+94 to 19+38-Y38-ROADWAY FILL 0.0330.018 11+08 to 12+48-Y38DET- 0.1100.019 8673+01 to 673+68-L1-RTROADWAY FILL 0.0710.012 9673+18 to 689+67-L1-LTROADWAY FILL 0.0870.041 10676+64 to 679+37-L1-DRAIN POND 0.633 11695+36 to 695+47-L1-LTROADWAY FILL 0.001 12700+69 to 702+88-L1-DRAIN POND 0.416 13709+67 to 715+63-L1-ROADWAY FILL 2.1600.1140.063228 2 at 12'x7' RCBC INLET CHANNEL 712+74 to 713+95-L1-RT 0.0240.0150.0220.0047814 TEMP. DIVERSION CHANNEL* 0.0080.007 711+57 to 712+35-L1-LTOUTLET CHANNEL 0.0210.0100.00312 OUTLET STABILIZATION 42 TEMP. DIVERSION CHANNEL* 0.0060.004 14724+44 to 725+96-L1-ROADWAY FILL 0.1000.007 48" RCP OUTLET STABILIZATION 724+48 to 724+73-L1-RT 0.007 17+51 to 18+26-Y31RPC-ROADWAY FILL 0.0350.006 54" RCP OUTLET STABILIZATION 17+57 to 17+87-Y31RPC- 0.008 TOTALS:2.3180.1100.0920.2110.0301.2840.020348260 NOTES: Site 14: JS Non-Mitigable NC DEPARTMENT OF TRANSPORTATION * Temporary Excavation Impact for the Diversion Channel DIVISION OF HIGHWAYS 08-27-2021 REV. 08-08-2022 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 159OF162 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 15730+72 to 743+68-L1-ROADWAY FILL 4.8980.0600.228 15+72 to 22+37-SR7- 1.0590.0140.193 15+91 to 16+09-SR7-RT24" RCP OUTLET CHANNEL 0.012 1618+25 to 21+01 -Y31-RTROADWAY FILL 0.0660.009 18+74 to 21+34-Y31DET- 0.0820.024 1718+38 to 19+05-Y31-LTROADWAY FILL 0.0020.007 26+86 to 28+87-SR7- 0.1900.0300.022 1845+47 to 47+66-SR7-ROADWAY FILL 0.2520.043 766+70 to 769+26-L1- 0.5340.020 19769+74 to 854+07-L1-ROADWAY FILL 25.2190.0733.0360.254773 48+38 to 56+57-SR7- 1.0020.188 7+45 to 16+31-Y32RPB1- 2.0750.156 18+01 to 22+37-Y32- 1.0940.0540.0020.144484 29+50 to 39+40-Y32- 4.4550.1100.335 TOTALS:40.8460.0820.3534.2390.0240.3980.000125700 NOTES: Site 20 Combined with Site 19. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 08-27-2021 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 160OF162 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 2123+66 to 25+54-Y19-ROADWAY FILL 0.3720.0200.01497 25+09-Y19-1 AT 8'x6' RCBC 0.013 24+82 to 25+32-Y19-OUTLET CHANNEL 0.0330.0100.00933 2210+17 to 12+28-SR5-ROADWAY FILL 0.2090.0020.0090.007163 23603+49 to 604+94-L1-RTPOND 0.279 2416+83 to 18+03-Y30DET-RTROADWAY FILL 0.0130.012 2546+69 to 46+76-Y31DET-RTROADWAY FILL 0.001 26Y19 50+00 RTChannel Realignment 0.0050.028 27Y19 51+27 to 53+44Roadway Fill 0.1170.046 28L 279+29 to 286+38 RTRoadway Fill 0.3070.085 29L 293+08 to 293+80 RTRoadway Fill 0.0160.003 30L 301+00 RTRoadway Fill 0.0050.001 TOTALS:0.9090.0130.0480.1330.0130.4450.055260330 NOTES: Site 26: JS Non-Mitigable NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 08-27-2021 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 161OF162 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTSSURFACE WATER IMPACTS HandExisting Existing PermanentTemp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural SiteStationStructureFill InFill Inin Clearingin SW SWImpactsImpactsStream No.(From/To)Size / TypeWetlandsWetlands Wetlandsin Wetlands WetlandsimpactsimpactsPermanentTemp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 31LLT 320+33 LTChannel Realignment (LT) 0.01547 LLT 320+33 RTCL. B Rip Rap Pad 0.0040.0042020 LLT 320+33 RTChannel Realignment (RT) 0.0130.0114842 3213+45 to 14+89-Y43-LTDITCH 0.014 TOTALS THIS SHEET 0.0000.0000.0000.0140.0000.0320.015115620 TOTAL SHEET 157 11.3320.1490.2851.2620.2260.6530.03410782510 TOTAL SHEET 158 7.2240.0000.4970.6130.0471.0020.04131121580 TOTAL SHEET 159 2.3180.1100.0920.2110.0301.2840.020348260 TOTAL SHEET 160 40.8460.0820.3534.2390.0240.3980.000125700 TOTAL SHEET 1610.9090.0130.0480.1330.0130.4450.055260330 TOTALS:62.6290.3541.2756.4720.3403.8140.16561705300 NOTES: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 08-27-2021 REV. 08-08-2022 PENDER COUNTY R-3300B 40237.2.1 Revised 2018 Feb SHEET 162OF162