HomeMy WebLinkAboutNCG030095_Supplemental Info Review_20220805Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 8/5/2022 3:19:43 PM (Supplemental Submittal)
Submit by Georgoulias, Bethany A 8/24/2022 1:27:51 PM (Supplemental Info Submittal)
* Reassigned from Christine Hall at WiRO. Should have been NPDES permit upload for Central Office.
• Georgoulias, Bethany A reassigned the task to Georgoulias, Bethany A 8/24/2022 11:23 AM
• The task was assigned to Hall, Christine 8/5/2022 3:19 PM
Submittal from 8/5/2022
Permit Information:
Please provide specific hermit details below.
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater (Post -Construction) Permit
• Other
Permit Number*
NCG030000
Begins with "SW", "NCG", or "NCS"
What DEQ Office is
Reviewer: Please correct if misidentified, close this review form, and reassign task to the appropriate contact.
the Primary Contact?
e Central Office
*
Washington Regional Office (Attn: Carl Dunn)
Wilmington Regional Office (Attn: Christine Hall)
Project Name*
Brian Lambe paperwork for tier change of Stanadyne LLC
Owner/Operator*
Stanadyne LLC
County:
Onslow
Submitter Name: *
Jacob Davis
Who is submitting this information?
E-mail Address:*
Jdavis@stanadyne.com
Phone Number*
(910) 391-6378
Additional E-mail for (Optional)
Submittal
Confirmation:
Other Information Uploads
Describe file and upload attachment (Reviewer may remove unnecessary submittals)
File Description* Map of Stanadyne
File name will incorporate this description.
File Upload Click the upload button, or drag and drop files to attach
Map of plant with SDO's.pdf 153.19KB
Only PDF files are accepted.
File Description* Application
File name will incorporate this description.
File Upload Click the upload button, or drag and drop files to attach
Application finished for NPDES-ROS Request
165.36KB
DEMLR-SW Tier change.pdf
Only PDF files are accepted.
Uploads contain • NO
Confidential YES
Information* NOTE: The following information cannot be claimed as confidential: the name and address of any permit applicant
or permittee, permit applications, permits, effluent data, information required by NPDES application forms provided
by the Director inclusive of all forms and attachments [Ref. 40 CFR 122.7(b) and (c)].
Notes about the attachments:
The application's question 4 has the information needed for the second checklist requirement. I attached the site map
with the SDO's labeled and a description. I have a Excel file of the last 5 years of samples summarized that is in the
mail as summary of results and/or supporting documents.
* By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
o I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the
NC General Statutes (the "Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Jacob Davis
Signature:
Date Submitted: 08/05/2022
Initial Review
Verify Permit No.* IMPORTANT. REVIEWER SHOULD VERIFY and revise here if necessary.
NCG030095
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Brittany Carson
Identify Regional Office:*
Wilmington Regional Office — 910-796-7215
Any Comments or This looks like an ROS Request.
Added Info for CO
Staff Reviewer?
Select RO Stormwater Contact(s): *
brian.lambe@ncdenr.gov
Kicks off e-mail notification
Review Date* 08/24/2022