HomeMy WebLinkAbout2019-00578 RGP 50 TearsheetU.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-00578 County: Rockingham U.S.G.S. Quad: NC-Mavodan GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: NCDOT Attn: Jerry Parker Address: 1584 Yancevville Street Greensboro, NC 27415-4996 Size (acres) —6.9 Nearest Town Mavodan Nearest Waterway UT to Dan River River Basin Roanoke USGS HUC 03010103 Coordinates 36.416657,-79.938151 Location description: The proiect area is located at the existing US Highway 220 interchange with US Highway 311/NC Highway 135, near Mavodan, Rockingham County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 234 linear feet (0.02 acre) of stream channel (227 linear feet [0.02 acre] of which is considered a permanent loss of waters) and 0.02 acre of wetlands, and the temporary discharge of fill material into 101 linear feet (0.01 acre) of stream channel. These activities, including culvert extensions, fill, bank stabilization, and associated activities, are necessary to construct NCDOT TIP I-5898. improvements to US Highwav 220 at the US Highwav 311/NC Highwav 135 interchange. Applicable Law(s): © Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit 50 - NCDOT - Bridges, Road Widenings, and Interchanges SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 1/11/2022, additional information submitted via email on 6/29 and 8/7/2022, and the enclosed plans Permit Drawing Sheets 1 through 10. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 817-2436 or David.E.Bailey2*usace.army.mil. Date: 2022.08.23 16:09:15 Corps Regulatory Official:-04'00' Date: 08/23/2022 Expiration Date of Verification: 5/25/2025 SAW-2019-00578 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. 2. The U.S. Fish and Wildlife Service's (USFWS's) Programmatic Biological Opinion (PBO) titled, "NCDOT Program Effects on the Northern Long-eared Bat in Divisions 1-8", dated November 6, 2020, contains agreed upon conservation measures for the NLEB. As noted in the PBO, applicability of these conservation measures varies depending on the location of the project. Your authorization under this Department of the Army permit is conditional upon your compliance with all applicable agreed upon conservation measures in the PBO, which are incorporated by reference in this permit. Failure to comply with the applicable these conservation measures would constitute non-compliance with your Department of the Army permit. The USFWS is the appropriate authority to determine compliance with the terms and conditions of its PBO, and with the ESA. Corps Regulatory Official: .,, - 6/,-4' Date: 2022.08.23 16:08:55-04'00' Expiration Date of Verification: 5/25/2025 Date: 08/23/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at https://re ug latory.ops.usace.g.M.mil/customer-service-survey. Copy furnished: Ryan Conchilla, NCDEQ-DWR, 1617 Mail Service Center, Raleigh, NC 27699-1617 Ray Bode, JMT, 1130 Situs Court, Suite 200, Raleigh, NC 27606 U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: NCDOT, Attn: Jerry Parker Action ID: SAW-2019-00578 Project Name: NCDOT / 1-5898 / improve US 220 at NC 135 Interchange / Bridge 74 County: Rockingham Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03010103, Roanoke River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 227 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03010103, Roanoke River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 227 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsorfails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Version 10 June 2020 updated CESAW-RG (File Number, SAW-2019-00578) Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios may be applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 12/30/2021 was included with the preconstruction notification. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4 the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Date: 2022.08.23 16:08:30-04'00' 08/23/2022 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. [I�;fl�1'i1y' �turl A�lp'Ir North Carolina Department of Transportation Highway Stormwater Program ytM, STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 46860.1.1 TIP/Prof No: 1-5898 Count ies : Rockingham Page 1 of 1 General Project Information WBS Element: 46860.1.1 ITIP Number: 1-5898 Project Type: Roadway Widening Date: 11/19/2021 NCDOT Contact: Galen Call, PE Contractor/ Desi ner: MI Engineering Address: 1590 Mail Service Center Address: 1011 Schaub Dr Raleigh, NC 27699-1590 Suite 100 Raleigh, INC 27606 Phone: 919-707-6711 Phone: 919-851-6606 Email: gcail@ncdot.com Email: khefner mi-en ineers.com City/Town: Ma odan Count ies : Rockin ham River Basins : Roanoke I CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 0.51 Surrounding Land Use: Commercial/Business along alignment, Woods North/South of project Mli Proposed Project Existing Site Project Built -Upon Area ac. 6.9 lac. 5.4 lac. Typical Cross Section Description: Y Line - 2 to 3 12'-14' lanes w/ curb and gutter & Concrete Median Y Line - 2 to 3 10'-12' lanes w/ curb and gutter & Concrete Median Ramps A, B, C, D - 12'-14' lanes w/ open shoulder Ramps A, B, C, D - 10'-12' lanes w/ open shoulder Annual Avg Daily Traffic (veh/hr/day): Design/Future: 20,600 1 Year: 2045 I Existing: 16,000 Year: 2017 General Project Narrative: The project consists of the widening of NC-135 from West of the US-220/311 interchange to East of US-220/311 interchange from 2 lanes in each direction to 2-3 lanes in each (Description of Minimization of Water direction with independent turn lanes into commercial business and highway. Bridge 780074 will be replaced along the project corridor and 4 access ramps will be upgraded on/from Quality Impacts) US-220/311. The proposed stormwater runoff from the roadway widening has been conveyed to roadside ditches and storm drainage systems via curb and gutter that drain to existing ouffalls. Minimization efforts were made to reduce potential impacts to Wetlands and Surface Waters. Pipe Networks were utilized to preserve stream flow in areas where existing Jurisdictional Streams are impacted by proposed roadway design and fill. 2:1 roadway slopes are used to reduce permanent fill encroaching into existing Jursidictional Streams. c' CP O O O O �I 00 U-' 0 L� oS E O L ey w w A 1z UD o� L O O T E C7 O U) F Z U 00 CXD �O-�4 CD -be- LL o� N LQ O a� N� Qz CD f O ti h See Sheet I A For Index of Sheets See Sheet 9 B For Conventional Plan Sheet Symbols See Sheet I C- I For Survey Control Sheets STATE OF NORTH CAROLINA DIVISION OF H11"'HWAYS OCI<INGHAM COUNTY LOCATION: US 135 FROM WEST OF SR 2177 (DAN VALLEY RD.) TO EAST OF SR 2271 (SHADE RD.) AND SR 2283 (COMMERCE TYPE OF WORD: GRADING, PA VIND INA GE, STRUCTURE AND UL VERTS A U 220 3 11 11 BEGIN CONSTRUCTION —RAMP D— STA. 10 + 00.00 A,� 1 END TIP PROJECT 1-5898 MAYODAN MUNICIPAL BOUNDARIES ;,;%' -Y- POT STA. 133 + 10.00 BEGIN CONSTRUCTION —RAMP A— STA. 10 + 00.00 BEGIN TIP PROJECT 1-5898 -Y- POT STA. 106 + 00.00 O LO N S1/S2 YODAN BEGIN BRIDGE —Y— STA. 118 + 8 7 Ma C4 BEGIN CONSTRUCTION `4 —RAMP B— STA. 10 + 00.00 BYP `" zzo � 220 — THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF MAYODAN. J — CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD 11. — THIS IS A FULL & PARTIAL CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS AS SHOWN GRAPHIC SCALES 50 25 0 50 700 i I i I I� I, � PLANS 50 25 0 50 700 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2017 = 16,000 ADT 2045 = 201600 K = 11 % D = 55 % T = 3 % V = 40 MPH * TTST =1 % DUAL 2 % FUNC CLASS = RURAL MINOR ARTERIAL STATEWIDE TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT 1-5898 LENGTH BRIDGE TIP PROJECT 1-5898 TOTAL LENGTH OF TIP PROJECT 1-5898 NCDOT POINT OF CONTACT: BRIAN KETNER, PE PROJECT ENGINEER WVWII S3 6 Cie P 13 0 co tn Z LU W 0 I- 1�_ r iN THE PLANS. = 0.482 MILES = 0.031 MILES = 0.513 MILES STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. 1-5898 1 STATE PROJ. NO. F. A. PROD. NO. DESCRIPTION 46860.1.1 PE DR.) PERMIT SHEET DRAWING 1 OF 10 CM 00;0 Q CV ZZ WETLAND AND SURFACE WATER IMPACTS PERMIT TO EDEN END BRIDGE —Y— STA. 120 + 52 BEGIN CONSTRUCTION —RAMP C— STA. 10 + 00.0 Prepored in the Office of: /FYIV'� JOHNSON, MIRMIRAN, & THOMPSON, INC. /�� 1130 Situs Court, Suite 200, Raleigh NC, 27606 2018 STANDARD SPECIFICATIONS PRODUCTION RIGHT OF WAY DATE: ENRICO A. ROQUE, PE F E B RUARY 17, 2 02 0 PROJECT ENGINEER PRODUCTION LETTING DATE: CHARLES R. BARBOUR, PE S E PT E M B E R 15, 2020 PROJECT DESIGN ENGINEER HYDRA ULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER SIGNATURE: P.E. INCOMPLETE PLANS DO NOT USE FOR R % W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED o� Hoa�� 0 \� o 0 tN 0 _N W w 0- CT_ PER A A Prepared in the Office of. Y \ I T DRAWING �FYI ,�T OHNSON MIRMIRAN & THOMPSON INC. 1� � a SHEET 2 OF 10 1130 Situs Court, Suite 200, Raleigh NC, 27606 L z Q ar 3 E L Q z zl co 7, co z i L 3 0 L z ro 0 F L 0 L w CIS rr w CL i L 0 or C�) (TI, C01 Ln c Ln�" oar No �L CD-0 CD Qz- oz_ Si/S2 O INSET BEGIN PROTECT TIP I-5898 50' 0' 50' 100, 150' TO MAYODAN (m ss TOP=693,08' EXISTING R/W 135 STA. 106 + 00.00 O I � BRUSH I T �G 01,61 30, BST C '35 BST VARIES _ D 30" C&G 30" C&G EXISTING R/W ROBESON ASSISTED LIVING WATER VAULT OF ROCKINGHAM, INC DB 1314 PG 2390 PB 18 PG 48 CONC BM6 GW1�6/1/SGIiiI VCHAEL HIGH SCHOOL & SR 2177 (DAN VALLEY RD) A/DTEWb*WfE*,+FdRAgH SCHOOL IMPACe/URFACE WATER 2,386 DENOTES IMPACTS IN SURF WAT R /,375 _Y_ 797� 1,589 NC l35 9150 �- 13,750 -Y - 10,72/ 6257_'�,575 15,893 US 3/1 r 697 5,075 2024 ADT 2044 ADT 5,200 5,771 SR 2177 (DAN VALLEY RD) IV Uv "- ,- EIP 71 70.' EIP � I � 00 kn LLEWELLYN 21 0 o CEMETERY o PB 18 PG 48 0 z m S 77°I3'04" W 88, 5 7' -Y- PI Sto 112 +91.11 p = /7° 42' 02.1" (LT) D = 4° 05' 33.2" L = 432.51" T = 217.99" R = 1,400.00' e = 0.040 RO = 168' DS = 40mph PI Sto 116 +23.66 = 9° 38' 17.5" (RT ) D = 4° 05' 33.2" L = 235.51' T = 118.03" R = 1,400.00" e = 0.040 RO = 132' DS = 40mph C* 7 9 \A S2 14' CkNV HW PROJECT REFERENCE NO. SHEET NO. 1-5898 1 04 R/W SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMP L,IE D® NOT USE FOR NS lE PLANS W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED /si 12" RCP & HW - REMOVE CB COLLAR/EXTEND W/54" RCP -IV O W W PDE NCDOT H4�I " BCCS �PROJ.° 6.t 18 — — _F F �J 5" P-IV R B USH W W U> 'RCP CB 15" RCP E C B/S 0 END C) UNK -I- 15" R - —� 3 I`Ti 15" RCP -IV Q 1w U> w _ _ A�6�Fgs EE P IA ETAII GR - / j c H Y cF� OR IfFSE BT �- I IQ 65.00 RT I P J. 11018 I P I 6" STONE GR EIP / GQ �tt IG 99tip m I I 48"CONC I o I WALL / ExP { I ] 8 LT RjOS IBL JB �P 43.5 BST o I I BST o �i ( �= ATIONIzw cn WOODS �./--__\_L0 \\ CB Q F F Z JOSE G. DIAZ CC)RAKESTRAW Z / �ri D o N II IN Lo o DB 746 PG 70 N INVESTMENT CO INC ��° � 0 / / �C o II w PB 18 PG 48 DB 1358 PG 1356 00� w CONC �� 2� z COREY M. CAPLE coNc / \�-' - � II = / C m m PB 18 PG 48 ;z - KAREN A. CAPLE I 84"CONC �� z I N� III U O 'm NICHO AS D. CPLE \ \ II z 1- 4 m DART M.-CA LE II- Q O m DB 1529 PG 579 II - - U 3/l POT STA ll0 +42. 5 z P �PG 48 9 BaT l II Y2 SR 2177 DAN VALLEY ROAD) PO STA. 10 +29.02 c A N o P // cU / - II - w N 70°53'39" E E E GRI 5 �O / \\\72.66 R I�+85-00 -; \\ Lo 86.54 RT II E E 8.67' I- m N 70'4919" E N 70°48'49" E N 70'50'26" E 0°48'59" E / �Q ISBLKBUS EIP 119.76' EIP 101.76' EIP EIP 109.86' EIP WOODS. 88.28' EIP n\\� E E E 20' UTILITY & DRAINAGE CANOPY E EASEMENT PB 18 PG 48 w II n Ln oCo / 0O \ Noll � RUTH ANN MARTIN I / // m \ N II (NO CURRENT DEED REFERENCE / FOUND) DB 733 PG 903 \`9 GR��- EN CONSTRUCTION DB 78PB 81 PPG G 791 l I / -Y2L POT STA. 11 +25.00 P \ / QO RETAIN 2G1 & DO NOT DISTURB \ —E— N 8S° o AUTOZONE DEVELOPMENTCD \\\ 20000 8 , F o DB 1430 PG 2094 PB 63 PG 44 \ OREO LLC +3027 N 52g°S85 g, w ° �3 \�\ DB 1513 PG 968 g4, S 31'g0-- w PB 77 PG 55 PB 63 PG 44 q,Oq, \\ s SEE SHEET 09 FOR —Y— PROFILE SEE SHEET 13 FOR —Y2— PROFILE APPROX. VISUAL LOCATION OF JUNCTION BOXES 54" RCP BENDS O DI \\ -Y NC /35/ US 311 POT STA 110 +50.33 \ -Y2- SR 2177 (DAN VALLEY ROAD) POT STA. 10+00.00 \\\ B \\9� \ �\ \\\➢ \ ST T �n 48" RCP — — _ \SDI 15" RCP -I CP ROCKINGHAM COUNTY SCHOOLS REMOVE 12" COLLAR AND XTEND,\' RCP & DI S DB 764 PG 591 18" RCP -IVY I} \ O REMOVE 15" RCP -IV \\ 36. 'e T I L \ 12" RCP O�? LO Ln r- ELECTRONIC & I� 1�ON REMOVE CB BRICK SIGN C — & 15 RCPJrV7 I I Imo► 00 I� I 0- m I I C I w //40.pORT E ,10 0 36"CONC I It 65.00 RT o SAMUEL RICHARDS OD � DB 1481 PG 2995 PB18PG48 m O 2 -Y- NC /35/ 54" RCP 30" C&G CB CB 30" C&GREMOVE 15" RCP (BY PLANS) T _ = 15" RCP -IV CB NC CB _ GRAV CB CB &EMOV CPB— — W/LT - O CONC ISL to Z 0 1 w 0 i E ro or 11— I 0 ,c I `F O0-F CV 0 CV L CD-C CV --n �U Qz- oz- \ l\ / // // // // / ! `\ 1 '.Prepared In the Office of: PROJECT REFERENCE NO. SHEET NO. \ ^ bqh , /- i 690• \ \ J PERMIT DkAWlNq-ll �rF-- ��-5898 04 ` \ / / \% !,\\�®�JOHNSON, MIRMIRAl ,--& THOMPSON,INC.---—SHEET OF 12- // /\ / bq \ � / RAW SHEET NO. / // —, \ I b / 113�(0 Situs -Court, -S-u to 200,Raleigh NC, 27606 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE'rE PLANS o' DO NOT USE FOR % W ACQUIISITIION 01 _J Cl Cb 685— — \\\\600v/j � I rZ685 /—�� 5•�_ y ----/ �- — \ \ \ I \ \ \ _ P/ Sto 116 t 3.6,6 _ \ 2 \ \\�\ \ \ �, \ I \1 _ �l7 42 02.1 (LT) v \ \\ �DOCUMENT NOT CONSIDERED FINAL ✓., \ . � /UNLESS ALL SIGNATURES COMPLETED T- BEGI L\'\ kRO ECT TIP I-5898 _\ L 432.5/33.2 _ � _ -23:2� / r _ /_ / z 6�° \ _ _ \ \ T = 217.99" i/18.03' \ \ \ \ 690 Y NCPS S\TA. 1 Q6 + 00. 00 _�� \\ \ \ _ 1,400.00 R J 1,400.00 / _ - — �L\�' e = 0.040\/ �/ e = 0.040 I /�\\/� \ RO - 168' RO✓ - 132' / \ o \ _ (� \ \\ \\ �� / — \ DS = 40mph / p•S - 40mpp�i \\ \ °� ��% �O�\\ \\\ \ 1 \\ \ \\ \� Q ' �\ \ O \ 414 ` \ \ \ \I \ \ \ \ \ ° \ _Y -NC 11,35/7 US 3// POT STA ll0 +50.33 \\ \ \ ll I \ \\ oo f \ \ \ \ \ 1 69\ \ \ Y� � SR 217��DAN V ALLEY ROAD) POT STA. /0 +00.00 \\ BST \``'\ \ I I _ � /moo \ \� � � S 2— \ \ l /\�\\O 9��\� ��C\\ ^ bSp� �\680-� � I \ \\ � ` \ _• \ �\ \ \\ \ \ I \ SAD _. ` ' � b�°,\� D \ \� RE 012' RCP & W — 15� RCP -I \ c \ / — kuAR/EXTF�iC \ \ / �MOa/E/12„ L�ARIXTEND' / 675- / — / _ ROCKINGHA,M COUNSY SCHO6L� — —�RG�&1DI'S I ) � -� / 68b I, i y69 / \ \ \ \ \ _— \� °69\ ` 764,PG_�9 t \ f > /// j / / r 18" -RCP-I / { I \ j / -I�W� �— i9 —690- — — — � RF,IOIovE j'�RCP-` 36. ' T LO ,1.2" RCP/ °O n / W / \ ���— —,J—i/ /b85 // / / / �� ELEC`RONIC/i �O r �o PDE WW \ — B JSH �� v \ \ \ \ — / / b 21CK SI N ' n 112Q� ��N �� r PRODOT6H�h 18 BCCS — G\ ��� \ \ \ \ 'REMOVV / / / _— _ _ __--F Vi /5/ Ci c c �/ / 1/ 1 RC - C I — o =� B USH \ \\ \ \ \ \ \ �` / �3Q�83T \� / j \ BCC'\ \ \ \48"-B CS \ ` \ sa �8 1 CCS \ "48 BCCS� � — — 10 nra -069�-- — ��— J C �� 9 15"RCP P / C) 30" C6 \ b C VE "RCP CB 15" RCP = „ O 3 — 69 \� SR 228/ N 155 36' B &T T �— , REMO� 0 - 0 O MAYODAN SR 228/ NC /55 B� lES _ �_Y _ ��L , Q/ MD�E CB\ \ �� � E CB5 8115" RCPND C) — _ -� / _ _ 54" RC ISL UNK -{- / 0 30" C&G 695— — 30" C&G / ~ f" C&G CB CB 30" C GREM E 15" CP / (BY PLANS) 15" R - —CB T IV TOP�6-9308 \CB _— �--S69 --_--_ — — v— _ — \�-� I „RCP- _ � \\-690. �7 � _`� --- ���Qj �— _— 7� �_ ���-R ( \ Q / EXISTIN R/W / /Opb� — \ — I \\ 00L� N — \ 5 \\ \ ` — C CCB IN G _ —� CAA \ / I l // ii \ \'��(j (�(� _ c \ / - \ 15-� �\ w = \ - . \ \ \ — — /�e�` G o CON \ \ \ \\ \ \ I l C \ t \ \ \ \ I 1 \ \ROBESON ASSISTED LI\(ING 9s VAULT (I I I I r \ l�OODs ) ,/ 40.�00 RTC E -- l ,� / E 1 \ I I \ I P C er, / I \ \ \ \ 9E ROCKINGHAM, INC \ \ \ _ 11 I I I ( / �' I _ I_ \ l - - \ \ 1- c H Y \ 6��o9sF R P FSE B IA AI� i- \ DB 1331 -PG-2390 \ \ \ 11III I \ / J `� /36"CONLZ'o > (� Z GR1 1 ( \ STONE' \ 65.�ORR\% \ IE)P IP J cola c 9Ftir T/ m I N / , i I P PB 18 PG 4$� \ \ 1C0 C .� � � � � / I 48"GONG ( �o G � \ l I \ / LT RDS IBL JB 3.5 BST \ \ \ \ \ I I \ 690. \ 6°05'34" / I - - I \ r �� \ I �V�ALL \ B�T I I\ N / 1 \ \LO ATION �P I II� \ lf� �_ (r��5 III W EIP 71' ) EIS N 65. 0 RT I---- Jf �\ �' \ \ \ WQ� S I \ r �—i CB F� F L Z 90o SA EL RICHARDS o° JOSE DIAZ I — I / FjJ4K ST�tAVI�h /� Lc) \ISF I, I / 1 I►N w I J 1 \ U Lo n o J r- N �_ �� `° O �-746 PG 70 I L° �N�KSTI� T C� INC O I / \ / /ICI\\� `fl m LLEWELLYN �, 0o � / B 48i PG 2995 W w PB 18 PG 48 O �� w I I / 1I1� �6f1N �n > N o PB 18 PG 48 6' 6, I�Bll35 P�/1356/ �� `^�� �� M. CG4PL�E I d Nc�/ r `�\\� I = �69 . — o PGR 8 r o��— Paz m m ( PB 18 P-G 48 \ �Z KA A. C E \ / /// — J ° I / III Z - C \ / ° a L— 1 D V 84"CONC \\ `v /(fU (� 7 2 \ 3 \ \ \co NI 0 A� D. LII \ / ) / z I \ I 0 \ I �- \ �I ���°°S 7 700_ _ I I 4 N DATI _�°�I° w °. Y NC l35/ U 3/l POTj STA 110+ 2. 5 I IPG 4 a41t�l/ III \ D 15 9 P 5 9'B To/I y \\ I / 1 -Y2 - SR 2177 DAN V ALLEY ROAD 0 STA. /0 + 9.02 I I I i I CANOP �/ I 1 �,'I1 / —� / ✓ \ ,� / \\�___; _—� / r I II �`� III v/ \\ Ljj - I�_ N 70°53'3"I E \ J \ I G 5 )1 11 l l \� I II I \ \�2.66 R o - I 1 ��i\�� /� 8.67' \ /' I / l w IIII y\ �I 86.5 RT III E E / I m .069� — 690 \ \\\ N do°49'19" E N 70°4 '49" E \ N 70°50'26" E 0° 8�5 ISBLKBUS— /`PP E 11076 EIP 101.7 El EIP 19.86' IP OOD , • 8 •c�8' EI \ / / / \\ / \ \ " 20' UTILI YUTILI Y & DRAINAG� EI ��/%�/� /"069� _ \ \\\�/ \ \ V EASEMENT C OPY v 2 \ -- \ \ \\\\\\ � / \ (� / -P'B 18 Pc 48 ��' I /� ��, / I\ I I I I I \ °°� \ �° I 1 ' / / /'/ / ��9 �' ' I I II 1 6 \\ � II II I / \\\ I \ \ I I �,I // / I �I / `�� o I I I III / I _ \ \\\II — I ° I \ J I I �' \ \ RUTH ANN MARTIN/ -� / ,`/ // ` ICl// 1 \III I I I / \ \ \ IIIII� I I (NOICURRENT DEED REFERENCE FObND) ��JR I I I CONSTRUCTION / \III II/ 11 I / I I I \ I \ I s > l DDB 7781 PG 7913 1 I , I % \ I I I / ( - + l/ al1 III o' \ 50' loo' �50' \ III I I ( I ( I / \ I I I \ Y/2L POT /SI// 25.00 I / I \ I / PB 18 PG 48 I/ \ -2GI & DO�N'O DISTURB as. / J I _I I I 1 0 \ ( \ II \\\ ��€ �PMENT �- 0 1 C/i91��(CHA L HIGH SC�IOOL & SR 2/77 (DAN VALLEY RD J < ) Ij �/ I/ / � � l I I ( ) \2oa 8 3 � / / J � \ �,� o \ \ \ \\ \\\�� —DD cY— 094 qH I�� ��I / I ♦ ��L bTA/#j URFA" WATER OL \ / /J���(° ✓/ I � / / /' \> \\\1 1 / / II \ <o 2, \ �/1151/( DENOTES IN1P CTS\ I'\ SURF WA I� / 375� I (l) f I '� '00-11 / — ,qh + / / / \ N °° I 1 \ l \\ I REO P — 1 _ \ ` f 589 f l �. / I I S9 q DB 3 la �6 \\\\ Y l 7 00 �� / / / / / �,s 9 w 8S 3 , — \ ��9 �\ 7\ \ 15,750 r I \ /\ l ��/I/ / \ �� ter/ 1 / 1 q� / 2 q°„Iw ��, I \ //�B \� 5 /oJ2/ 15,893 US �// / �/� N S n / \ / / / / / I / ( / q9' J / l \ , -��o%� 625 ( / I /—� /�(///f / ,� \1 ��� �� // �/ / / / / l/ (� I I I I I\�i��� 697 _/ a J / / _ /" �� // r/7 � I � / \\\ \ \ \ 5\ 200 — — / / 6 \ 5,�7/� \ _ / \ l \ \ \ L 4 ADT \\��\\\\� � (DAN VALLEY— �,/ \69 \—,\,/ /( 1 \ � ^ f -- —\ — ,— — �� r— // // / / / �l //l% SEE SH —09 fOR —Y— PROFILE SEE SHEET 13! FOR —Y2— PROFILE AP�ROX. VISUAL LOCATION 1N \\\ J \ I�I/ _ 0 JUNCTION BOXES J .695� \r — ` \\\\��\\as �� \ \ / qhf J / / / \ //�%�� ! \ ` 4\ RCP BENDS / ��\ko \\\\\ �.,,_ _ _ 1/ i \ \ \ -_ b tiS tN O w w 0- a US 220 & NC135 / US 3// US 220 15,975 21,904 1,550 /,875 NC l35 /3,750 � �- 17,150 -Y- 15,893 3,02 20,436 US 311 r_ 100 3,954 8,100 21,675 29,604 2024 ADT 2044 ADT US 220 Pls Sto 134+76.29 Os = 4° l0' 35.5" Ls = 537.50' LT = 225.06" ST = 112.56' -RP A - �w �_ Prepared in the Office of: PROJECT REFERENCE NO. SHEET NO. Pl Sto 112 +91.1 / „ PI Sto ll6 +23.66 PERMIT DRAWING m ,�' OHNSON MIRMIRAN & THOMPSON INC. l -5898 05 17 42' 02.1 (LT) A = 9 38 /7.5 (RT) �� �111� �® D = 4° 05' 33.2" D = 4° 05' 33.2' 0 SHEET 4 OF 10 1130 Situs Court, Suite 200, Raleigh NC, 27606 SHEET NO. L = 432.51' L _ 235.5/; s���a�P� / / S ROADWAY DESIGN HYDRAULICS s T = 2/7.99' T - 1/ .03 , ' 50' 0' 50' 100, 150' ENGINEER ENGINEER R = 1,400.00" R = I, 00.00' ����' �' Y��/� F F DENOTES IN DENOTES IMPACTS IN SURFACE WATER e = 0.040 e = 0 40 X GRAPHIC SCALE INCOMPLE E PLAINS O DENOTES EXCAVATION RO = 168' RO = 132' J���F ' Q���i' O �� IN WETLAND DENOTES TEMPORARY /l//,�l ® ®� ��� ®� ACQUISITION DS = 40m h DS 40m h �`�'� p��`ya��� �%�°� IMPACTS IN SURFACE WATER C/y CL B RIP RAP� EST 2 TONS // / / T�' % �� S 0°O D 7 SY GEOTEXTiLE f0 ,� ,' C� �/4/ 1 �EEl + GREU DOCUMENT NOT CONSIDERED FINAL / - L- (Existing) / a/,' � TL-3 °O'`/ SPECI / TERA� ' DITCH S` SEE All. 05A If UNLESS ALL SIGNATURES COMPLETED /y ST r � PI Sto 143+32.55 Pls Sto l5/+40.69 0 = 35° 37' 29.5" (RT) 6s = 4° /0' 35.5" i / / '' l/ / / / T OJ`3S� D = 2` 28' 29.9" Ls = 337.50' C ��QQ // / / / / O o \ � I 24Q CPAV E AL AT L A E DITCH L = 1,439.40' LT = 225.06 �°�� / / ,' O //a SEE DE AI P�05E/ T = 743.82' ST = 112.56' / / �cA / STA BEGIN 5 S0 -RpA- Rt / / CD // � / . // / Cl 5/ US3/1 POT STA 122 96.53 LATE\E EL ' DITCH i/� 2G1 / / / D I' c // �� v Q v POT STA 2l +15.85 / W S.TAIL 05B / _ P -SPECIAL LATE L V DITCH DETAIL D / l l/ /-� -P N 135/ US311 POT STA 122+ :93 o`' �l R -POT STA 2/+45.08 NN oe 133 y °l� 4� / o w P � USA m B P l P�Q N l l l /l - - l t 1 + I / � / 20 0, �a/MH �� 62 p C Z?s HC Z ��PJ o� / / o / / S S a. 32 5.23 / O � Q c s8 Pl Sto 17+19.25 / �� 11 ��/ /l�� y/ l A = 33 54' 56.0" (LT) J�' // /��' 17 / / L - US 220 POT Sto. l3/ +7 :78 = ? D = 22° 55' 05.9" � SEE LATERAL BL E DITCH ® / - / /- / / � � / - + / Q O / R A PC Sto. 16+43. Y NC l35/US 3/l T St ll9 6 . 5 8 L = 147.98ROCKINGHAM COUNTY SCHOOLS lr / _ _ // / // T - 76.231/ / Y NC135/ US l POT ST l 6�`50/ / l END USE WALL RT R = 250.00' = DB 764 PG 591 / -RP A- POT S A 17+59. , / / l // -L- STA. 133+12.60 CONVERT TO JB w/MH AND �.' / e = 0.040 ADD PIPE STUB -OUT C BG / END USE WALL LT RO = 76 - - - - 6+68.5 / l DS = 60mph 80.00 LT 80.00 LT A- Rt / I -L- SPA. 152 +33.59 4.5' 11 / l�=` / l l / F CAT-1 B� / H N - Q / / / / / l q8„ 8 8 L ADJ .-- �S3f1-P6T A 116 .26 l l y/ �l // "� / // / / � PECIAL LATERAL 'V' DITCH i / Ili � � EMOVE HW ,•% �, cry � JB w/MH � , \ �, �,m 0o� -RP A- POT STA l7+ l 11p �/ �/ TYPE III SEE DETAIL 05F a /� , �� Q 4T Q 48" 8 C •• + CR TYPE III /Q �p CAT-1 / Rcp C / C F N1y o / R RE VE -Y - PT Sta. 117 +41.13 / 11 l - - - ts �/ r GREU TL-2 _ o -l � - NC 35/US - _ EXISTING Riw - 1 CONC AT / _ CONC WW 4 -T -j G Cg V O TYPE G -1j / N C ISL n _ 3� & � - E -SERVICE ° - I 3.5R 1 CONC IS I l NC l35 2' BST �y MTL 0 N C F � 0� o _ CONC ISL � � - T � � � WALL SIG =1 SIG 0 • I MA �-Y- NC/35/ US3// POT STA /22+92.9I 0 ESTB 1RTONS\- 245G 5 S IGEOTXRP +32SEE DETAIL � / ; / EXISTING Riw INSTALL 244 LFjco �l CIPP LINER �f I l 1 CL B RIP RAP (� v • I \ I I EST 2 TONS RETAI IIJ� /J� / / I �/ Q'QSEE DETAIL '5G' � I I CDEP I 7 SY GEOTEXTILE � SYSTEI�I � / y � i STA_ 18+. Rp� BEGIN USE WALL LT l ��' l l/l -� / V ° \--�JOH � � Q cP I _ � �/ II .EGIN USE WALL RT CL IIP� NSON & CASE INC �� / I L- STA 130+52.9174.5 T l II 11 / / l l/ / O 614 `oLY DB 1517 PG 1984 m I I / II / -L - STA l3I +14.09 74.5' RT / /� / V . o " R P ; / / / X v DB 1341PG 2349 z 7 CL B RIP RAP"II I I -Y- NC135/ US3/l POT STA 11 4 .2 / y l PB 77 PG 55 o O EST 2 TON I / / _P 63 ,'PG _44-- 7 SY GEOTEXWfI E I I/ . i I� -RP B- POT STA l9 62.16 ti l -Y- NC135 US3/l POT STA 122+89.13 rn _ _ �,l / -RP C P T STA 19+27.07 k /PSIMAYODAN LLC ; 6 3.4 3 RT \ I H , I m -Y- NC135/ US31/ OT STA �6+31. II �� l _ / �� // / DB 1500 PG 18 Ui m Z 1 III I Q - - / - + / /JP / / DB 1493 PG 1240 / �L o 11= I I RP B POT ST 19+32.02�1/ o/ �� DB 1495 PG 277 ° ,�1� ICI / a rn L col o JI^ -RP C_ PC -Sta. l5 +5/.50 �P / I �� / /QO \,I II / 0",NOTE: 8 C&C,} / II Y�o I ` of w i II`� 1 / a THE PROPOSED T PORARY IMPACT \J� / y�Z i l I WILL BE FROM ND INSTALLATION / q, // \ B, / H c� __ i W / RETAIN OF SILT FENCE. OPOSED ACTIVITIES 4_11i�' / / 111fff / � SYSTEM WILL INVOLVE OOT TRAFFIC ONLY o �° AND NO HINERY WILL ENTER THE / ,� �� �� t? , �18°C&G -III / GREU TL-3 �sJURISDICT AL LIMITS. ANY CHANGE / i �e�o� � - l N z�HDPE I I l / /l �/ II / TO CHA NEL GEOMETRY AND/OR �, E m} RETAIN SYSTE / / �II VEGET TION WILL BE RESTORED BY Pi N 8 0 \ i /j/% HAN ONCE INSTALLATION OF SILT 829, /�' ��� m I _ / / /� SRETAIN YSTEM FE EIS COMPLETE. RIPRAP WILL BE 26S 9� 6° F / / / 1 ALLED ON THE SLOPE BY MACH ��,� / F OM THE WORK SIDE OF SILT F" SEES U STA. / � F a / // / /II / D NO IMPACT TO STREAM / �} MCMICHAEL MILLS INC. HEET 0,5 00°00 \\ / y� II l PROPOSED FROM THIS ACTIVI ./ / DB 1369 PG 128 / \\ / -� '��T // / / / / RETAIN4. / oo cb • / �/ SYSTEM 27 ° �0 3' 00.5" (LT) 49 /5.3 \ L - 359.92 y� F / T = 182.77' n ` S� R = 840.00 00 O )4 S e = 0.040 �� V OOO �� �� / / SEE OTE RO = 88' QD O J �o S� � � DS = 60mph -%A a �� / \ C / ROCK PLATING W/CL II RIP RAP SEE SHEET 09 FOR -Y- PROFILE STA 15 + 50 - 16 + 50 RpC Rt. SEE SHEET 11 FOR -RPA- PROFILE SEE SHEET 11 FOR -RPB- PROFILE N� CD -0 0 0 z� Qz� oo � SEE SHEET 12 FOR -RPC- PROFILE SEE SHEET 12 FOR -RPD- PROFILE SEE SHEET 14 FOR -L- PROFILE SEE SHEET 15 FOR -WALL- PROFILE XXO / o PAVEMENT TO BE REMOVED O to Z 0 w -% - PROJECT REFERENCE NO. SHEET NO. CT ` I US 22-Z -& -NCL35 Z� US 311 \_ ( �� ffil Prepared in the Office ofo Pl\St0 112 +gl•ll Pl S o- 116 +23.66 J � PERMIT D RAW I N G 11p , OHNSON MIRMIRAN & THOMPSON INC. _ 1=5898_05US 220 l7 42' 02.1 (LT) �= 9°38 /7.5 (RT)/ ��` �FI o � � \ � � „ � � � RAW SHEET NO. \ 15,904 / \ \ 4° 05' 33.2" D = 4 05 33.2 �� SHEET 5 OF 10 1130 Situs Court, Suite 200, Raleigh NC, 27606 ROADWAY DESIGN HYDRAULICS /_----- `�LIL 4\32.5%r� L = 235.5/', R_ �P� /i/ , s�s�` - ✓ 1,550 /,875 1 / \ �� -\ 2/7�9J T = - ll •eJ ' oo�� ,' , ,� '9 �� DENOTES FILL IN 50' 0' 50' 100, 150' ENGINEER ENGINEER _Y_ 75 \ Z /�\ , `f, 00.00 - = 1, 00.00 / �� WETLAND DENOTES IMPACTS IN / , SURFACE WATER C� 13,750 � 17,150 ,-Y� 1 / = 4 -. �Q / / 1,� S x GRAPHIC SCALE NC l35 J5,89 G US ll 1,"Z \_ 0 e 0 0 �� ,/// 6Q , \ ��T�® ��� ��,AI�T� \ - - ^ \ ' RO = l32' ��0� //%� QG Lam' / / O DENOTES EXCAVATION nn� DO NOT USE FOR % W ACQUIISITIION - [� / J 0 IN WETLAND DENOTES TEMPORARY - J 3,954 8,lOCs ( \</� DS 40mph �` // p ��;�� // / ��OO IMPACTS IN SURFACE WATER / " CL B U _ \ _ -RAP�S EST2 TONS 2/ 675 _7-,SY GEOTEXT(LE/ OO 0 �O � D \ 6a5 / 2604 S 24 9f 2044 ADT \ US�29 - - , - - \ \ / \\ \ \ ///� ,' G� % ✓ / 9 \ �- I I 1 \ \\\ \ Q� _/ TC/ /� • /� I�l/ �l//ll / DOCUMENT NOT CONSIDERED FINAL f ✓ / °� \\ ' '' RA DITCH / I S� /\ ti / I I Il 111/l / _ - - L- (Existing) SEE IL 05A / - ' i ST 111 1 I II / /// . UNLESS ALL SIGNATURES COMPLETED U i E ro U o� co( ^, c I `F o� CVO-F CV U CV L o-C CV az- oz- S5 Pls Sta_134+16.29 - -- - PI Sta 143+32.55 _ _ Pls Sta 151 +46. \\ \\\ a - _ /i�f/ % • _ • _ ,. - - � • \\\ \\ ,, -8s = 4 /0 35.5 = 3 37 29.5 (RT) �s = 4 /0 35 �5'`\ \ \� \� /ib��/// ' / /i / / // I / / I _� �% �` �� I I I ll� /► 111 ' D = 2° 28' 29.9" Ls� = 337.50' \ \\ e Q / //�/' (, / �/ / - / , - / % /'� / / 0� - J \ I 2 ¢� `i 1 N / 111 lll� / Ls 537.50 I \ , / / / / / I I / O /: ��k(�-���1 / l I �L RAL ASE D�CH LT = 225.06' L = 1,439.40' LT = -225.06� \ \� \� /i/ ,' i // / / / I / b / I /� �// O / / / / /// .// //a I / CIE AI �05E -- , �/ ,' / o / / BEGIN SB / l y I / / / I/ llllllll I / / % m - f156 _ _ T = 743.82 _ ST = 112.56\\ \ \ \ , / / ��, / b STA 15 + 0 -IAA J US3/1 POT STA 122+96.5,3 / I I II / I co // / ,1 //P / / 4 - IIII • a y � 1 z /TST A 21+t5.85 LATE DITCH 05E \�T% SPECIAL LATE + I I I I I01 I `° ,d5/ US31/ POT STA 122 _ J15" T_ STA 2/+45.08e �363 °jp� Ca qNC /.2360 �2S-RP A 4 S;132+5 -- + _-;' Pt §te-17 /9.25 --680 0 33 5 56.0 L - / / / I/ US 20 P T Sta. l3/+7 .78 • ,� - - L��TERAL� �1TH ® _/ D -22 55 059 _ / �- --SEE- i / / -R / A- PC Sta.l /61-43. / � NC / 5/US 311 T St L = 147.98 - - - ' \ / / /III /o T = 76,23 - - / / J / 50 / ' / 6�D MISS L -ao�Ic�a�AM cobn�tY se�roet�l / / / -Y- NC13,5/ S P' / R DB 7 �c 5�1- / / / / _ / - / / -b- A. l33 /� 0 74.5 : RT / RP A POT A --CONVERT s°us BOu 6N�- _ // / ,.'j \ / / Q / / / oa9 //� // // / c BG / END USE—- ALL LT_ // / // l / y I�/ �/% / I - - - \_ / l I I llI / 11 II , �� \ - 55 -6�h - - �- ��q A- Rt/ �/ / / / / I -L- SPA. 132 +3 .59 ll / _` / // / l � CAT-1/ - < / / J . � /f / ' 'Il / AD3 311-P6_T ,� ll .2� I yl �� // l �, _ _ ? TYP III /. PECIAL LATERAL V PITCH I < w/MH \ \ -- / 9 / / rr '• / % q/�� / !V°// 1 I RP A POT STA-47 l /�Q r �� ti/ / CAT �/ jSEC\DETAIL 05F \ \ RE�1 J - + \ \ / / l K Y P7 Sta. 1/7 l3 -Y PRC Sta. 5 +05.6 / „ ge�cs Fi / A 1 �� / �) R _ 48 / / I I s �REU Y C BCCS C / z S3 FLOW 9 � OINSET RE i4 NC 135/US 311 6.5BST / EkSTING R/W G-` J _ SE"LE' / \/ -v / / _ E / // // / / ISL i4C IS l C - N/3 .- q 235' BST -68 / ///l I/ll _Y_ 635/ Al" l POT �S l 2+9 /i/i _ 1�B RIP 1- / D 24 - - E-$E ILck v / / �6' / all / (� ///// 1IIII J / / �i EST _1-YONS� 2 c� / / / 5', GEOTEXT _ H _ _ o e III �l b �l ll II l 111 -RP / f +56.32 / / �\ \\ y, - �/ // I �L L ' xl IRIS Rf4µ ��sT�,rr�4 / �' l 1�/ / \ IG/ - I� RIP RAI� I / �%/ -� _-�6g0' - �-- •- I \ CB / EST 2 - 3E�DfTAIL 'SG' I\ DEP // �// / \ / - Z SY GEOTEXtILE // // �/ l l \ / /I I � l// l I '1 1 / / 1 / / /� �T 18� ova R 1�+ / ) / / / l L / l l �/ l / �- � / I I / // / / \ G - p \ l ( - BEGI N U E W A�LLI T �// /////I �`� la l l/// , // 4o / / / // �/ o AEGI M E/GV R / / I I I /b B\-�////ll _ - /a/ i/ E � 0 DB 1517 PG 1984 m x I / / / / /// / �/ ll l / - A � 1 *14 74 T/ P DB 1341 PG QI i \ / / / 1y. I // / / / I / // Ill l l/ /� / 3 .09/ l I / / // �% ///`' l // 2349 c� CL B RIP RAQ / / �b /� �� l l llllilll� / / // / / / l l / // / %/ // // / / / V 11 PB 71 G o U jsT 2 TON II i t I / / l l -Y - NC135/ 3/l / l 4 .2 // �j y - 1 P 63 ; PG-44----� \ 7 Y GEOTEVrI E /I \ \ i IW / // / R �- POT A� i6/ / / ;/ l ll/ 1�35 �15 1 OTi ST .lam I l / // I Q / •I � � \ � � Il l � � . , l \ l \ \ 1 \ l l l 11 �T-A�l .Oi I / / / / n� - - / \ I ► / / // � V �/ l l /Ill 1 z - / J l // / / / / / Fisl MAYODAN LLCM / -\ / 1 / // �, //'// l //III / _ / I �.") �/ �/ / / DB 150(iPc \ 1 �,� / II I I m / / Nil. / S lT // ,� J6 +3/. I \ ///' III ,� / / I / / /�/ 1/ / � � / 14 P 4 \ m o U III,,, lII II l/ll// / -R P / =c '`�� ��l / �IIIII 11 i -i / I /� /// J / / /, / / / �, IDB �3 G 0 _ \ � `' to a rto I�llll 1 III I � /// // / � \ \ s � � / �I l/ / �� � � /�// •ii%/� �A � � /DB �-�95 PG Z77 �I// \ -� ll jll 1 �P : t5�+51.5 o• I / OO �, P1FQP�ED T P�R�RY IM A T� % \ / �J //// y// /ems \ I Q ILL- -FROM Nn- IN -STALL Tro / / ( /b// / / /// %�. / J B, �..� O \ �- J / l/ �� tl// l I ll�/�/ / I / / / �/ l l \ o L� / III IIII / / // o \ . / // / / F' ILA FLOE. oPosED IwTIEs \ // / / / 141 MILL INVOLVE ^OT TRAF C hNLY 1 c' C`"` I II / �' IIII / / / /// / N6 NO HfN RE Y W1LL-ENTEk` T-RE� I J . / / / / / /S;/ �I , , ���-----s°I1'��lll/ l / 6 - 5 �l 8 C&G / / ✓ �/ II /JR4�SD+C AL 4Av11TS�AN CHANGE N_� T IS„HDP I III /l l / /� / // 111 �l 777 / / / l TLC �O CHA Imo% GEODE ND/OR / / / /j ° / j / o EJ IIII 1 IIII I / /. l 6//r`� // / /. , RETAIN syrSTE l / I s l/ II / / l l/ VEGET • ION -WILL BE RESTORED BY c� /Y III III /II \ / \ // / / // ��' / / / /// - HAN ONCE t-4STA4AT SILT �Cym/ / it III II c�a I / /// / / / / / / / Il l TAIN FE € I�Ct3MPLE. RIPRAP I L BE L/N / \ / // / / - /// � M I ALLIED ON THE SLOPE I 'MACH //�` /o \\ �` r eMJrWE WORK SIDE OF SILT JF � �} • / / ` � -� � EE S ° / F \ / / �% / / / / �// / / / / // // I DPI 10 r�nP �O STREAMS / / ° %/ / / / J�rCM'IA�L s INC. HE 0 / �� II l ROP SEp FROM HIS ACTIVI / / f / / I �-P � \ iQ �✓// / / / U Tk3/�� f _ _�-r_\ [�s In � � T \. �//llll l l /\\ , / l� l I / A 11 � � � / - � // /,(�' '/ � ei / / •i/� f � ° /�5" (LT) 3049 /5It .3 T=182.77 n T O 2�� S� \ /'ii ://�/ e = 0.040/1 � TS 8 OOO ��` ,p / // /%///�i0/E/ ,ATE RO = 8'l / COqA r' DS = 60m h �\ / // �,/ / ROCK-FLATING W/CL II RIP RAP S /��/ ST 15+50 - 16+50 R C Rt. SEE SHEET 09 FOR -Y- PROFILE �� / SEE SHEET 11 FOR -RPA- PROFILE INSE/ //r�; �� J /� SEE SHEET 11 FOR -RPB- PROFILE / °% / /� j? / / SEE SHEET 12 FOR -RPC- PROFILE X SEE SHEET 12 FOR -RPD- PROFILE /" OO q j/SEE SHEET 14 FOR -L- PROFILE °DO /l PAVEMENT TO BE REMOVE SEE SHEET 15 FOR -WALL- PROFILE V) z O w 6T cr co U L i E ro U or CO( ^, c I `F OF CV Q C\I L o—c CV --n C� �U Qz- i lP o 0 oz_ ` �e-0red n�h2 Office of PR( \ \\\ \ >3 PERMIT' DRAWII�\�v/ �7 - ��/\\� �� �exNSO „�r�xNrlx�ly, _ THo n�S0I / US 201 / 1) us 3// \ )22 \ \ \ Ileu I I ��� /5 0 / / 75 \ ems, z % �I-- \ 17,150 -Y - \ \ \ r\6 0,436 US 3// 100'-\ \ 2024 ADT 2044 ADT Pls St� 134+76.29 Os 4° 10' 35.5" Ls -- - 337.50 LT = 225.06" ST = 112.56' INSET REFERENCE ' ' SHEET NO. —,10 HEET NO. 30 8ia�iS�,��7605 — - --- 0 ROAD � Dal HENGINEERS DO NOT USE FOR cr At c. —J FE­ -T.-is t 'Ac0uisiON \� -N) %/�� i �� / _ // /� / / / '?S /��--��Sl7MEFNTNbTCO �° R f — - - �' \ �_ 5 //� / / %/ j / '� — ju L SHALL SIGNASI 11 00 — .725--- ;D FINAL MPLETED Ay 20 / ROCKINGHAM COIF L (Ex(stin ) I 1 \ \ J \\\�\\\ \~ \ — / . // / // r r 8i / / Pl S �� \ \\\\\\\ \\ / l43+3�.55 tb 9 —\\%o � 35 37 29.5 RT�\ IIl 5 � D = \ 28 2 9 �� l cL� 3 7 50 L = 1,)439.401 / �/ 1 L\7� - 5.06j / \ _ — // / // �,L �� / // / / /i 1 /11°/ / / I /// N r /y°\ �_ 56' \=\�\\�1v---��ij�ji�/i/i ///////'�--� ` / // 7`� / ///// 1. T = 743.82 I I ( 1 ST F 12. / / _ / / / //// % � /i / /i / / / / /y �/// GIN CONSTIRUCTION — R=,3/5.09 /� -RP D - PO ST A. l0 +00.00 °� P TV705 BEGIN CONSTRUCTION — _l _ — — — _ _ ti— + / // / �� �� //i/� / l / / / J I l / /// l O I / I -RP A- POT ST A. l0 +00.0 i 3 _° - - - _ -- _ _ - - / / // 7/ /0- ' \ / / j/ / ( ! / /` I /// WALMART REAL ESTATE �-— c,/_ /y �// �P / l //�� /% r� , • , � I � I / I DB 1227 Pc 1476 ' // / / � � � / / / oh�/ / /h // '/ / I 1 /// PB 55 PG 62 77 <v / / \ —� \ J / /� llllll / / /�i�/ T,j /l i� — / � l 111 l / / 695 l liil / / � \\\ \ � I , � , ///��/ �� � %/ /� \ � � �// � y �— i''/o''/ —'� ll ljl//I // /�/ �°� / I \ /� / � � ✓ 11 � \ \ %7Z_//'///0/i T �//°�� /,/�ii �� j 1/%llllll ' // /�/ / / /irl I I� 1/11I \ ARP D- \ l \ \\kZ_\ \� C - - - / // /i ,' (,' /i ///// /� / //,/ / .�// /// / —X 1./IIIII /� // J '/� `°/ \ %�\ — l Ql Sta27306' 47.0 �L�J /// 40 05' 33.2' Q >�\\� S• /i/ii� � ' r /// / �\ /��j/ l /jj�i' l/�llll / // l / �\ //� h�¢ lI // \\ s= 662.50' \\\\/��i�/' / �^ �� / /i J � l 11 l l 111 I /� //.'� � \ �, � _ � / yb_�\ \\\ \ / / /� /�ii / /� / /// / / /// y /�°/� / l IIII / // /% / \ Q� I 1 T 337.57� l �o�11l / ,r`/ R\= 1,400.00' \ /i/ / J z / / I l 11 /ll / �.✓ RO - ?08 %C� �rilesllllll/.1/� I \/� / � DS = 60m hybQ y / ,�//l llllll/ z�// p lb / l \� \ •___ / �1\ 69S. / / �` bqg �`/ l // �,. / l l i / / C 1 < < �/ (� l 1 �"\\ —569ex \ I: -HD D - P Sto. l6 +62.50 / / / \ CIAL- LATE L 'V' DITCH Q °y /// I I / SEE DETAIL 07A / / / //// �w\ip FALSE 07D �'1 // /// 1 L//w` / / \// ETAIL 07B — / jjEr%t LATERAL B E-DTTCHOVE�,�TAI 676 -ES �, ` 685� 2 �N�/,�///i/rl�/ � TI 4 / /R AI 1�1 • n/a I I//I,� / �/ / / / /c,l S `��' � a / � �'/ �' � , � II��I I// �'� ;ii _ _ -- _ -\ . / ' : i I IIIII/// I / /l/ll llll�l � l / •,>l//i/i / � /� (\ 50' o' So' loo 150)IIIII// -( �/ / / /SOECIAL LATERAL 'V' DITCH / P / ///I , ,% X / I / �b9W�� / EE DETAIL F IIIII�fi // / / \ GRAPHIC SCALE /y O \ // /// b r/ l /j$ _ee5— O '��// / REBf i l I l dJ�/ / / q DENOTESIN WETLAND �/ i \ I 1/ .g/ �/ /i lI I j� Q s �e �/' ///lob ) F DENOTES FILL IN �/ //� %%/// \ 4,'�2 WETLAND r % // — �// / \ see SEE SHEET 11 FOR -RPA- PROFILE O SEE SHEET 12 FOR -RPD- PROFILE �� \ Jc �O�DO -\\ SEE SHEET 14 FOR -L- PROFILE 0 OOO ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��■■■■■■■■■■■■■■■■n�r�r�n�■■■�in���n�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■� ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■[.■■■■■■■■■■■■■■■`�`GiJ■■`ir`ir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■1■■■■■■■�����������_��_��=_===__-_=__==��_�_�_�_�_�_■_■_■_■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■���=====�C�C������������c�:===7C��■■■r��`�=�s�����■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■Ii■■1■C!C�iir■■■■■■■■■■■■■■■■!*!*■■■■■■■■■■■■■■■�■■�C�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■��■■■CiI■■■■■■■■■■■■■■■■■■■■■■■J�dl■■■■■■■■■■■■■■■■■\,■■■\C�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■I■■■■■■■■■■■■■■■■■��■■■CI■L■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\��■■■■\C�\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■/■■\■I■■■■■■■■■■■■■■■��■■■CI■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■��■■■■■■\C�\■■■■■■�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ `■■■■■■■■■I■■■■■■■■rl�\C\■■■CI■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■C�■■■■■■■■■�C�i■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ MEN 1., pli] MENEM 0 111111 ONFAIRIUMME NONE NOR YLVAR WETLAND AND SURFACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) S1 -Y- 111+31 To 111+63 LT Roadway Fill < 0.01 30 S2 -Y- 111+31 To 111+63 LT 54in RCP w/ HW < 0.01 16 W 1 -RP D- 17+21 to 18+15 LT Roadside Ditch < 0.01 W2 -RP D- 17+21 to 18+15 LT Roadside Ditch < 0.01 S3 -RP D- 19+18 to 21+03 LT 30in RCP 0.02 211 S4 -RP C- 10+00 to 18+69 RT Rip Rap Outlet Stabilization < 0.01 < 0.01 7 5 S5 -RP C- 14+90 to 15+56 RT Roadway Fill < 0.01 66 TOTALS: < 0.01 < 0.01 0.02 < 0.01 234 101 0 *Rounded totals are sum of actual impacts NOTES: S5: THE PROPOSED TEMPORARY IMPACT WILL BE FROM HAND INSTALLATION OF SILT FENCE. PROPOSED ACTIVITIES WILL INVOLVE FOOT TRAFFIC ONLY AND NO MACHINERY WILL ENTER THE JURISDICTIONAL LIMITS. ANY CHANGE TO CHANNEL GEOMETRY AND/OR VEGETATION WILL BE RESTORED BY HAND ONCE INSTALLATION OF SILT FENCE IS COMPLETE. RIPRAP WILL BE INSTALLED ON THE SLOPE BY MACHINE FROM THE WORK SIDE OF SILT FENCE AND NO IMPACT TO STREAM IS PROPOSED FROM THIS ACTIVITY. 2018 Feb Action ID Number: SAW-2019-00578 County: Rockingham Permittee: NCDOT (Attn: Jerry Parker) Project Name: NCDOT / I-5898 / improve US 220 at NC 135 Interchange / Bridge 74 Date Verification Issued: 08/23/2022 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAW-2019-00578 A. Determination of Jurisdiction: ❑ There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters, including wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ® The jurisdictional areas within the above -described project area have been identified under a previous action. Please reference jurisdictional determination issued 8/12/2021. Action ID: SAW-2019-00578.