Loading...
HomeMy WebLinkAboutSWA000163_Fast Track ATC App Comp Review Checklist_20220817Fast -Track ATC Application Completeness Review Checklist ^� Project Name: /tAad.3o, � Pen4,� Date Delivered to CO: /ITZZZ Street Address: uwFh ?yv: dt A4p po,,n BIMS Received/Accepted Date: City&county: X AkX,J &Aj (/M,b*., b. *BIMSAcknowledged Date: Rule(s): ®Phase II F—IORW/HQW F-1WSWS Goose NSW Other Permit Action: (9/New Replacing/Major Mod/Transfer **New Permit#: Od� Existing Permit #: MPE Cert on File? Permit Type: / LD / HD & LD Combo SCM Type(s): Ve% poh G( Development Tubdivision mmerci Residential / Other Subdivided?: Sor Single Lot For New or Transferred Permits Permittee is: Special Stream classification: Property Owner(s) DDeveloper Lessee ❑Purchaser ❑HOA Tr ❑+/@/*/# Other Paperwork Emailed Engineer on: ©ATC Application Form (original signature & sealed & notarized) MY For Corp/LLC: Sig. Auth. per (SoS, Signature Authorization letter/report) �22 5/IQ (Accepted Add Info (i cc� /Returned) ©$505 (within 6mo) Check#(s): loOoZ Email Address: Design Engineer ©USGS Map (project location) ©Email Address: Property Owner ©Property Deed Construction Sequence II-- ��®Deed I / IEmail Address: Lessee �r--�®Lease Designer's Certifiaction (if required) Agreement [ZlEmail Address: Purchaser MPurchase Agreement Email Address: Developer Email Address: HOA Representative Plans r712 Sets (signed, sealed, folded) Project Boundaries (bearing & distance) ©Location of SCMs ©Surface Waters & Vegetated Setbacks ®Wetlands (del ineate owetlan REVIEWER NAME: NOTES TO REVIEWER: *Enter BIMS Acknowledged Date on this Sheet **FOR NEW Projects -Enter New Permit # on Supplements & Deed Restriction Templates.