Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3210302_Design Calculations_20220823
COOKE RENTALS Maiden, NC TABLE 1 - PROJECT AREAS sf ac Total Project Area 443,291 10.18 On -site Drainage Area 338,879 7.78 Off -site Drainage Area 5,058 0.12 Drainage Area (Total) 343,937 7.90 Proposed Impervious Area 290,479 6.67 % Impervious Area of Project Area 66% Impervious of Drainage Area 84% TABLE 2 - IMPERVIOUS AREAS Location Area (sf) Buildings: Bldg 1 (Main) 13,000 Bldg 2 12,000 Bldq 3 2,000 Total 27,000 On -site Streets 18,384 On -site Sidewalks - On -site Parking 6,822 Other (Equip. Storage/Access): Equip. Storage-1 61,420 Equip. Storage-2 52,708 Equip. Storage-3 124,146 Other (Equip. Storage/Access) - Total 238,273 Total (sf) 290,479 Total (ac) 6.67 SHABELDEEN File: Cooke Calcs 2022-08-22.xlsx !,7;1 ENGINEERING Date: 8/22/2022 Page 1 Ethics • Integrity • Engineering COOKE RENTALS Maiden, NC Table 3 - Treatment Volume Calculation using Simple Method Rv = 0.05 +0.9 * IA Where: Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless IA = Impervious fraction [impervious portion of drainage area (ac)/drainage area (ac)], unitless. IA = (Imprev. Area)/(Total Area) Dv = 3630 * Rp * Rv * A Where: Dv = Design Volume of runoff that must be controlled for the design storm (ft3) Rc = Design storm rainfall depth (in) (1.0") A = Watershed area (ac) Parameter Wet Detention Basin Total Drainage Area (ac.) 7.90 Impervious Area (ac.) 6.67 I� 0.84 Rv (Runoff Coefficient) 0.81 Rp (Design Storm; 1") 1.0 A (Watershed Area; ac.) 7.90 Req'd Treatment Vol. (Vol. betwn Perm. & Temp pools; ft3) 23,219 Design Treatment Vol. (ft) 24,246 Ref.: BMP Design Manual Sec. 3.3.1 Table 4 - Piedmont and Mountain SA/DA Table % Imprevious Cover SA/DA Table 4.0 5.0 6.0 80% 2.41 2.07 1.82 85% 2.53 2.19 1.93 90% 2.64 2.31 2.04 Table 5 - Permanent Pool (PP) Surface Area Drainage Area (ac.) (ac) 7.90 (sf) 343,937 Impervious Area (ac.) (ac) 6.67 (sf) 290,479 Percent Impervious Cover 84.5% Depth (ft) 5.10 SA/DA Ratio (Interpolated) 2.15 Req'd PP SA (sf) 7,395 Desi n PP SA sf 7,526 Cooke Calcs 2022-08-22.xlsx Date: 8/22/2022 Page 2 SHABELDEEN ENGINEERING Ethics • Integrity • Engineering COOKE RENTALS Maiden, NC able 6 - Eauation 2 A ✓erage Depth (Da g) Da„g = Average Depth (ft) PP (Avg. Area Method) VPP = Volume of Permanent Pool (co Top Area (APP; Permanent Pool Surface Area) Vol. (% of Perm. Pool Vol.) Design PP Vol. (co Min. Forebay Vol. (co Design Vol. Percent of VPP Davg = VPP/APP 5.1 VPP (based on Stage -Storage Volume) 38,008 7,526 EL.940.00 15% to 20% 24,246 15% 3,637 5,713 23.6% Table 8 - Discharge Rate for 2-5 day drawdown Q = Cd x A x (2gHo)10.5 Cd 0.6 Orifice Diameter (in.) 2.50 Area (so 0.034 g 32.2 Permanent Pool SA Elev. 940.00 Treatment Vol. SA Elev. 942.00 H (Top of Treat. Elev. - Perm.Pool) 2.00 Use H/3 0.67 Q (cfs) per orifice 0.13 No. of orifices 1 Total Q (cfs) 0.13 Treatment Vol. Design (co 24,246 Drawdown (sec.) = V/Q 181,010 Drawdown (days) 2.10 Note: Ref.: BMP Design Manual Sec. 3.5.2 Cooke Calcs 2022-08-22.xlsx ��1 SHABELDEEN Pa e 3 �� ENGINEERING Date: 8/22/2022 g Ethics •Integrity •Engineering COOKE RENTALS Maiden, NC Table 7a - Wet Pond Stage -Storage Incremental Incremental Depth (ft) Elevation Area (so Storage (co 0 940.00 7,526 1 939.00 6,834 7,180 2 938.00 6,174 6,504 3 937.00 5,546 5,860 4 936.00 4,950 5,248 5 935.00 4,386 4,668 6 934.00 3,854 4,120 7 933.00 3,354 3,604 7.25 932.75 3,234 824 Total Volume 38,008 Table 7b - Forebay Stage -Storage Cummulative Incremental Depth (ft) Elevation Area (so Storage (co 0 940.00 2,059 1 939.00 1,675 1,867 2 938.00 1,323 1,499 3 937.00 1,003 1,163 4 936.00 715 859 4.5 935.50 583 325 Total Volume 5,713 Table 7c - Treatment Volume Stage -Storage Cummulative Incremental Depth (ft) Elevation Area (so Storage (co 0 940.00 9,810 1 941.00 12,429 11,120 2 942.00 13,823 13,126 Total Volume 24,246 943 15,274 944 16,781 SHABELDEEN File: Cooke Calcs 2022-08-22.xlsx !,7;1 ENGINEERING Date: 8/22/2022 Page 4 Ethics • Integrity • Engineering