Loading...
HomeMy WebLinkAboutSW6200904_Revised EZ Supplement Form_20220823SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Timberland Ranch 2 Project Area (ac)520.306 3 Coastal Wetland Area (ac) - 4 Surface Water Area (ac 5 Is this project High or Low Density? Low 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4 7 Width of vegetated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A _ _9 If BUA is proposed in the setback, does it meet NCAC 021-1.1003 4 (c-d)? _ No 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System _ Bioretention Cell 8 12 0 0 13 Wet Pond 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 0 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: _ Organization: Street address: City, State, Zip: Phone numbers : Email: Carlo Pardo, PE 28 Bowman North Carolina, Ltd. 29 4006 Barrett Drive, Suite 104 30 Raleigh, NC 27609 31 919-553-6570 32 cpardo@bowman.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here- C. Signature of Designer Date DRAINAGE AREAS 1 Is this a hi h density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 8 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 LD 2 LD 3 L 4 4 Type of SCM Infiltration Trench Infiltration Trench Infiltration Trench Infiltration Trench 5 Total drainage area (sq ft 22664530 sf 212925 80165 111705 185040 6 Onsite drainage area (sq ft 22664530 sf 212925 80165 111705 185040 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 1009888 sf 113469 sf 48933 sf 81750 sf 117141 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 894000 sf 84000 sf 36000 sf 72000 sf 96000 sf 10permitting) New BUA not on subdivided lots (subject to s 115888 sf 29469 sf 12933 sf 9750 sf 21141 sf 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft Sidewalk (sq ft 6046 sf 4702 sf 1344 sf Roof (sq ft Roadway s ft 104497 sf 24767 sf 11589 sf 9750 sf 15796 sf Future (sq ft Other. please specify in the comment box below (sq ft 5345 sf 5345 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existina BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 4% 53% 61% 73% 63% 19 Design storm (inches) 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 9397 cf 4004 cf 6597 cf 9557 cf 21 Calculation method for design volume 1 Simple Method Simple Method Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): CD-4 Other: Mail Kiosk Impervious DRAINAGE AREAS 1 Is this a hi h density r9ject? No 2 If so number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so, number of low density drainage areas 8 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 5 LD 6 LD 7 LD 8 4 Type of SCM Infiltration Trench Infiltration Trench Infiltration Trench Infiltration Trench 5 Total drainage area (sq ft 22664530 sf 96006 113711 182260 201552 6 Onsite drainage area (sq ft 22664530 sf 96006 113711 182260 201552 7 Offsite drainage area (sq ft 8 Total BUA in.project (sq ft 1009888 sf 81698 sf 24000 sf 134033 sf 167080 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 894000 sf 72000 sf 24000 sf 120000 sf 150000 sf 10permitting) New BUA not on subdivided lots (subject to s Offsite BUA (sq ft Breakdown of new BUA not on subdivided lots: 115888 sf 9698 sf 14033 sf 17080 sf 11 12 - Parkin S -Sidewalk (sft 6046 sf Roof (sq ft Roadwa sq ft 104497 sf 9698 sf 14033 sf 17080 sf Future (sq ft Other, please specify in the comment box below (sq ft 5345 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft 18 Percent BUA 4% 85% 21% 74% 83% 19 Design storm inches 1.0 in 1.0 in 1.0 in 1.0 in 20 Design volume of SCM cu ft 6527 cf 2274 cf 10812 cf 13371 cf 21 Calculation method for design volume Sim le Method Simple Method Simple Method Simple Method INFORMATION Please use this space to provide any additional information about the 22 ldrainaq_e are_a(s): LD4 Other: Mail Kiosk Impervious INRLTRATION SYSTEM ' 1 Drainage area number 1 2 3___] 4 2 Minimum re uired treatment volume (cu ft) 9397 cf 4004 cf 6597 cf 9557 cf GENERAL MDC FROM 02H .3050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10 ear storm)? Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes Yes 9 jWhat is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump (preferred) Pump (preferred) 10 1 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? N/A N/A N/A NIA 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes Yes 16 1 Does the SCM follow the devicespecific MDC? Yes Yes Yes Yes 17 lWas the SCM desi ned by an NC licensed p rofessional? Yes Yes Yes Yes INFwatATION 5Y5TENt MQC FRom 0214 -insi 18 Proposed slope of the subgrade surface (%) 0% 0% 0% 0% 19 Are terraces or baffles provided? No No No No 20 Type of pretreatment: Forebay Forebay Forebay Forebay 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes Yes Yes Yes 22 JSHWT elevation fmsl 374.00 374.50 378,00 378.00 23 Depth to SHWT per soils report (in) > 120 > 120 > 120 > 120 24 Ground elevation at boring in soils report (fmsl) 384.00 384.50 388.00 388.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A N/A N/A N/A 26 Soil infiltration rate in/hr 39.00 2.17 2.17 43.00 27 Factor of safety (FS) (2 is recommended): 2.00 2.00 2.00 2.00 29 1 Bottom elevation fmsl 380 ft 381 ft 384 ft 384 ft 30 Istorage elevation (fmsl) 384. ft 383. ft 386. It 387. f. 31 1 Bypass elevation (fmsl) N/A N/A NIA NIA For Basins Only 32 jBottom surface area (ft) 33 IStorage elevation surface area 34 Len th (ft) 163 ft 170 ft 291 ft 196 ft 35 Width (ft) 6 ft 5 ft E ft 6 ft 36 Perforated pipe diameter, if applicable (inches) N/A NIA N/A N/A 37 Number of laterals N/A N/A N/A N/A 38 Total length of perforated piping N/A N/A N/A N/A 39 Stone type, if applicable N/A N/A N/A N/A 40 Stone porosity % N/A NIA N/A NIA 41 Is stone free of fines? N/A NIA NIA N/A 42 Is the stone wrapped in geotextile fabric? Yes Yes Yes Yes 43 Has at least one inspection port been provided? Yes Yes Yes Yes Volumes/Drawdown 44 IDesign volume of SCM (cu ft) 9397 cf 4004 cf 6597 cf 9557 cf 45 1 Time to draw down (hours) 72 hrs 72 hrs 72 hrs 72 hrs 7d ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration systeln(s): Infiltration 1 2:22 PM 11/2/2021 INFILTRATION SYSTEM 1 Dralnage area number 5 6 7 8 2 Minimum re uu-ed treatment volume(co ft 6527 cf 2274 cf 10812 cf 13371 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? 3:1 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- ear storm)? Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes Yes 9 jWhat is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? NIA N/A N/A N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes Yes 16 IDoes the SCM follow the device specific MDC? Yes Yes Yes Yes 17 lWas the SCM designed by an NC licensedprofessional.? Yes Yes Yes Yes INFILTRATION SYMM MDC FROM 02H .1051 18 Proposed slape of the subgrade surface 0% 0% 0% -:J 0% 19 Are terraces or bafflesprovided? No No No No 20 Type of pretreatment: Forebay Forebay Forebay I Forebay 21 Was the soil investigated in the footprint and at the elevation of the infiltrations stem? Yes Yes Yes Yes 22 JSHWT elevation fmsl) 379.50 373.50 379.00 387.00 23 1 Depth to SHWT per soils report (in) > 120 > 120 > 121Y > 120 24 Ground elevation at boring in soils report (fmsl) 389.50 383.50 389.00 297.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? N/A N/A N/A N/A 26 Soil infiltration rate (in/hr) 5.50 2.17 2.17 2.17 27 Factor of safety (FS) (2 is recommended): 2.00 2.00 2.00 2.00 1 G1-#t- 29 Bottom elevation (fmsl) 384 ft 378 ft 383 ft 389 ft 30 Storage elevation fmsl 387. ft 380. ft 386. ft 392. ft 31 Bypass elevation (fmsl) N/A N/A N/A N/A C- I1..h. 34 Length (ft) 190 ft 114 ft 338 ft 298 ft 35 Width (ft) 6 It 5 ft 7 ft 8 ft 36 Perforated pipe diameter, if applicable (inches) NIA N/A N/A N/A 37 Number of laterals NIA N/A N/A N/A 38 Total length of perforated piping N/A N/A N/A N/A 39 Stone type, if applicable N/A N/A N/A N/A 40 Stoneporosity (%) N/A N/A N/A N/A 41 Is stone free of fines? N/A N/A N/A N/A 42 Is the stone wrapped in geotextile fabric? Yes Yes Yes Yes 43 Has at least one inspection port been provided? Yes Yes Yes Yes Volvmea(Drawdown 44 Desi n volume of SCM (cu ft) 6527 cf 2274 cf 10812 cf 13371 cf 45 1 Time to draw down hours 72 hrs 72 hrs 72 hrs 72 hrs ADDITIONAL INFORMATION 46 Please use this space to provide any additional information about the infiltration system(s): Infiltration 2 2:22 PM 11/2/2021 LOW DENSITY 7ESIGN REQUIREMENTS FOR LOW DENSITY S FROM 02H 1003 1 is project below density thresholds set forth In theapplicablestormwater rule? Yes 2 Does project maximize dispersed FlOw and minimize rhannelization of flow? Yes Yes 3 Has the use of piping been minimized per .1003(2)(c)? sf 4 Side slopes of the vegetated conveyances (H:V) 3.71 5 Maximum velocity In the vegetated conveyances during the 10-year storm? No 6 Are curb outlet swales proposed? 7 Maximum Ionghudinal slope of curb outlet swales) (%) _ 8 Bottom width of curb outlet swele(s) (feel) 9 Maximum side slope of nub outlet swales) (H:V) _ 10 Minimum length of curb outlet swales) (feet) - 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? yes 13 14 Have sWrnwaler outlets been designed to prevent d_ownslope erosion? Are variations to rule 1003 proposed? T Yes No ADDITIONAL INFORMATION 15 please use this space to provide any additional information about this low density project: Swale 0 Drainage Pervious BUA O Slope V„a, � V� � Flow depth Arse (ae) area C (efs) (%1 (hft) ups) (ft) sac ac 1 2 S 4 6 11 7 _ 8 9 0.17 0.15 1.72 0.21 0.67 0.12 7.81 0.24 2.85 0.37 0.32 0.25 8.39 0.08 - 0.38 - - - 0.08 0,02 1.51 0.52 -1.57 0.80 0.30 0.80 _ 0.30 0.30 0.80 - 0.30 1.10 4.12 -4_06 1_87� 6.83 2.02 20.07 2.97 3.00 L- 2297 4.00 2,97 -1 4.00 0.94 4.00 1-34 4-00 1-34 3-00 0.92 4.00 0.92 3.111 0.50 3.00 2.62 3.71 -3.71 3.47 0.25 0,47 0.47 0.94 2.49 0.07 _ 8.32 3.15 0.71 2.31 CiAl 3.51 0.98 0.31 0.80 Z44 2.09 0.48 0.93 - 5.52 0.15 5.37 0.30 13.20 2.52 10 0.33 0.07 0,27 0.80 2.13 0.50 2.00 - 1.61 0.52-� 11 12 - - -- 14 18 17 18 4ti 20 I 21 _ - 23- 24 -- 25 ^� 26 27 - 28 -- - 29 30 M