Loading...
HomeMy WebLinkAbout20181034 Ver 1_AsBuilt_2022_20220823Mitigation Project Information Upload ID#* 20181034 Version* 1 Select Reviewer: * Erin Davis Initial Review Completed Date 08/23/2022 Mitigation Project Submittal - 8/23/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Email Address: * Paul Wiesner paul.wiesner@ncdenr.gov Project Information ID#:* 20181034 Existing ID# Project Type: Project Name: County: Version:* 1 • DMS Mitigation Bank UT to Rush Fork Stream Mitigation Project Haywood Document Information Mitigation Document Type: * Mitigation As -Built Plans File Upload: Signature ............................................ Print Name: * Signature:* Existing Version UT to Rush Fork_100068_AB_2022.pdf 6.46MB Please upload only one PDF of the complete file that needs to be submitted... Paul Wiesner BETSEYS GAP RD • N.T.S. PROJECT AREA VICINITY MAP INDEX OF SHEETS 1 TITLE SHEET 1-A STREAM CONVENTIONAL SYMBOLS GENERAL NOTES STANDARD SPECIFICATIONS VEGETATION SELECTION 1-B NCDOT CONVENTIONAL SYMBOLS 2 - 2F DETAILS 3 - 10 PLAN VIEW 11 - 15 PROFILES 16 BMP DETAIL r Y GRAPHIC SCALES 20 0 20 40 20 PLANS 0 20 40 PROFILE (HORIZONTAL) 5 0 10 20 PROFILE (VERTICAL) fr 1 1 1 1 1 NORTH CAROLINA DIVIS7OIV OF MITIGATION SERVICES HAYWOOD COUNTY LOCATION: FROM EXIT 24 ON INTERSTATE 40, TRAVEL NORTH FOR 5.75 MILES ON NC HWY 209 RUSH FORK ROAD TYPE OF WORK: RECORD DRAWINGS BEGIN UT3 STA. 10+00.38 --t MITIGATION S UMMAR Y STREAM STREAM STREAM REACH RESTORATION ENHANCEMENT I ENHANCEMENT II UT1 R1 0 206.41 0 UT1 R2 0 0 275.00 UT1 R3 0 600.86 0 UT1 R4 1224.37 0 0 UT2 0 0 78.16 UT3 1577.53 0 0 UT4 41.90 0 0 TOTAL 2843.80 807.27 353.16 BEGIN UT1 REACH 1 STA. 10+98.02 ter.-- -----'--- - --- 1 1 1 1 1 END UT,'1 REACH 3 BEGIN UT'1 REACH 4 ST. 22+50.94 11 BEGIN UT4 STA. 10+00.00 END UT1 REACH 1 BEGIN UT1 REACH 2 STA. 13+25.00 END UT1 REACH 2 BEGIN UT1 REACH 3 STA. 16+00.00 BEGIN UT2 STA. 10+05.88/ END UT2 STA. 10+84.04 TOB UT1 REACH 3 PREPARED FOR THE OFFICE OF: NCDEQ NC DIVISION OF MITIGATION SERVICES 217 WEST JONES STREET, SUTIE 3000a RALEIGH, NC 27603 END UT3 STA. 26+24.54 TOB REACH UT1 REACH 3 & 4 END UT4 STA. 10+41.90 TOB UT1 REACH 4 ♦ • • • STATE BARER PROJECT REFERENCE NO.SHEET NO. TOTAL SHEETS NC 166680 1 24 END UT1 REACH 4 STA. 37+80.92 Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 CONTACT: PAUL WIESNER PROJECT MANAGER LETTING DATE: KATHLEEN M. MCKEITHAN, PE PROJECT ENGINEER NCDMS ID NO. 100068 PROJECT ENGINEER ,o\.N.CARp.•/ L% FSSIp'.9'� SEAL l •' 028432 •'FNGI NE:'P�: P.E. SIGNATURE: ST NV �NTION SYM 11)i OLS ST NDA I6 SPECI ICATIONS i PROJECT REFERENCE NO. SHEET NO. % 166680 1-A PROJECT ENGINEER c 0-1 c.n m cn Q CO CO Co i c 0_ 0-1 m 7- c a) 0 7- L O CC CO CO i N U a) O 0 i N. Q l9/ L(:1� OO o ilCCI000 J-HOOK VANE EAM C SUP GRADE CONTROL J-HOOK VANE 017709 ROCK VANE OUTLET PROTECTION ROCK CROSS VANE DOUBLE DROP ROCK CROSS VANE LOG AND ROCK STEP / POOL (4-1-TEMPORARY ROCK DAM ipflers • O® 00 ROOT WAD LOG J-HOOK VANE GRADE CONTROL LOG J-HOOK VANE LOG VANE LOG STEP 0 0 0 0 LOG CROSS VANE LOG ROLLER CONSTRUCTED RIFFLE BOULDER CLUSTER BOULDER STEP 0 SAFETY FENCE TF TAPE FENCE - -WLB- - JURISDICTIONAL WETLAND BOUNDARY ARC - T(� AS SH 1- I FP 100 YEAR FLOOD PLAIN CE CONSERVATION EASEMENT ----435---- EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR -------------- LIMITS OF DISTURBANCE PROPERTY LINE 0-0 FOOT BRIDGE TEMPORARY STREAM CROSSING PERMANENT STREAM CROSSING 40) TRANSPLANTED VEGETATION TREE REMOVAL TREE PROTECTION DITCH PLUG CHANNEL FILL SOD MAT WITH WOOD TOE GEOLIFT WITH BRUSH TOE 1 // munmumum -EMEMMI -• albswip x • O ROOT WAD REVETMENT WITH LIVE BRUSH BOULDER TOE PROTECTION PROPOSED WETLAND RE-ESTABLISHMENT PROPOSED WETLAND ENHANCEMENT PROPOSED WETLAND REHABILITATION **NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT MONITORING WELL RAIN GAUGE CREST GAUGE IN STREAM FLOW GAUGE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL MARCH 2009 (REV 2013) 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 6.24 RIPARIAN AREA SEEDING 6.60 TEMPORARY SEDIMENT TRAP 6.62 TEMPORARY SILT FENCE 6.63 TEMPORARY ROCK DAM 6.70 TEMPORARY STREAM CROSSING 6 �:OFESS.I ;y% �% SEAL •- 028432 APPROVED BY: DATE: Michael Baker INTERNATIONAL Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 License #: F-1084 NCDMS ID NO. 100068 G ENE AL NOTES 1. THE CONTRACTOR IS REQUIRED TO INSTALL IN -STREAM STRUCTURES USING A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE BOULDERS (3'x2'x2'), LOGS AND ROOTWADS. 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE CONTRACTOR SHOULD MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. 3. CONSTRUCTION IS SCHEDULED FOR THE SPRING OF 2020. 4. CONTRACTOR SHOULD CALL NORTH CAROLINA "ONE -CALL" BEFORE EXCAVATION STARTS. (1-800-632-4949) 5. BOULDER SIZES FOR IN -STREAM STRUCTURES SHALL BE A MINIMUM OF 3'x2'x1' AND CAN BE CHANGED PER STRUCTURE OR THE DIRECTION OF THE ENGINEER. 6. ALL ON -SITE ALLUVIUM SHALL BE HARVESTED AND STOCKPILED PRIOR TO FILLING ABANDONED CHANNELS. 7. TOPSOIL SHALL BE EXCAVATED TO A DEPTH OF 8" AND STOCKPILED SEPARATELY FROM UNDERCUT SOIL. 8" OF TOPSOIL SHALL BE PLACED ON ALL BANKFULL BENCHES AND AS DIRECTED BY THE ENGINEER. 8. ALL DISTURBED EMBANKMENTS SHALL BE MATTED WITH COIR FIBER MATTING OR AS DIRECTED BY THE ENGINEER. 9. ALL STREAM BANKS SHALL BE LIVE STAKED. 10. UNLESS THE ALIGNMENT IS BEING ALTERED, THE EXISTING CHANNEL DIMENSIONS ARE TO REMAIN UNLESS OTHERWISE NOTED. 11. CONTRACTOR WILL ENSURE THAT FENCING IS INSTALLED ON OR OUTSIDE THE CONSERVATION EASEMENT AS SHOWN ON THE PLANS BUT NO MORE THAN 1' OUTSIDE. 12. WHERE PROPOSED FENCE CROSSES EXISTING STREAMS, THE CONTRACTOR SHALL UTILIZE A SECTION OF BREAK AWAY FENCE, A FLOOD GATE, OR ELECTRIFIED CHAINS AS DIRECTED BY THE ENGINEER. 13. ANY BORROW OR WASTE ASSOCIATED WITH THIS PROJECT MUST COME FROM OR GO TO A PERMITTED SITE AND/OR FACILITY. d a i Z Proposed Bare -Root and Live Stake Species UT to Rush Fork Mitigation Project - NCDMS Project No. 100068 Botanical Name Common Name % Planted by Species Wetland Tolerance All Buffer Plantings at 680 stems/acre using 8' X 8' spacing General Riparian Zone - Overstory/Canopy Species Betula nigra River Birch 10% FACW Platanus occidentalis Sycamore 10% FACW Liriodendron tulipifera Tulip Poplar 10% FACU Betula lenta Sweet Birch 10% FAC Quercus alba White Oak 10% FACU Tilia americana American Basswood 0% FACU Aesculus flava Yellow Buckeye 7.5% FACU Nyssa sylvatica Blackgum 5% FAC Fraxinus americana White Ash 5% FACU Diospyros virginiana Persimmon 7.5% FAC Ulmus americana American Elm 5% FACW General Riparian Zone - Understory/Shrub Species Rhododendron maximum Rosebay 0% FAC Lindera benzoin Spicebush 2.5% FAC Ilex verticillata Winterberry 5% FACW Carpinus caroliniana American Hornbeam 5% FAC Sambucus canadensis Elderberry 2.5% FAC Magnolia tripetala Umbrella Tree 0% FACU Halesia carolina Carolina Silverbell 5% FAC PERCETAGES SHOWN IN RED ARE T. „ , , , `1-/ , , "",". , I NO VEGETATION SELECTION Wetland Zone - Overstory/Canopy Species Betula nigra River Birch 15% FACW Platanus occidentalis Sycamore 15% FACW Betula alleghaniensis Yellow Birch 10% FAC Quercus imbricaria Shingle Oak 5% FAC Nyssa sylvatica Blackgum 5% FAC Acer negundo Box Elder 5% FAC Fraxinus pennsylvanica Green Ash 5% FACW Ulmus americana American Elm 5% FACW Wetland Zone - Understory/Shrub Species Alnus serrulata Tag Alder 15% OBL Ilex verticillata Winterberry 5% FACW Lindera benzoin Spicebush 5% FAC Cephalanthus occidentalis Buttonbush 2.5% OBL Comm amomum Silky Dogwood 2.5% FACW Xanthorhiza simplicissima Yellow -root 2.5% FACW Aronia arbutifolia Red Chokeberry 2.5% FACW Streambank Live Stake Plantings Salix sericea Silky Willow 25% OBL Sambucus canadensis Elderberry 20% FACW Cephalanthus occidentalis Buttonbush 10% OBL Comm amomum Silky Dogwood 25% FACW Salix nigra Black Willow 20% OBL Proposed Permanent Seed Mixture No. 100068 UT to Rush Fork Stream Mitigation Project - NCDMS Project Botanical Name Common Name % Planted by Species Density (lbs/ac) Wetland Tolerance Agrostis perennans Autumn Bentgrass 10% 1.5 FACU Elymus virginicus Virginia Wildrye 15% 2.25 FACW Panicum virgatum Switchgrass 15% 2.25 FAC Tripsacum dactyloides Eastern Gamma Grass 5% 0.75 FACW Polygonum pennsylvanicum Pennsylvania Smartweed 5% 0.75 FACW Schizachyrium scoparium Little Blue Stem 5% 0.75 FACU Juncus effusus Soft Rush 5% 0.75 FACW Bidens frondosa (or aristosa) Beggars Tick 5% 0.75 FACW Coreopsis lanceolata Lance -Leaved Tick Seed 10% 1.5 FACU Dichanthelium clandestinum Tioga Deer Tongue 15% 2.25 FAC Andropogon gerardii Big Blue Stem 5% 0.75 FAC Sorghastrum nutans Indian Grass 5% 0.75 FACU Total 100% 15 Note: Final species selection may change due to refinement of site conditions or to availability at the time of planting. If species substitution is required, the planting Contractor will submit a revised planting list to Baker for approval prior to the procurement of plant stock. PROJECT REFERENCE NO. SHEET NO. 166680 1-B NCDMS ID NO. 100068 c 01 CO cn m cn CO CO CO m i c 01 a) 0 L O LL CC CO CO CO CO N O N 0 N O L Q Q N/ a *S.U.E = SUBSURFACE UTILITY ENGINEER BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel/Sequence Number Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence 0 EIP x 0 x x Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Sign Well Small Mine Foundation Area Outline Cemetery Building School Church Dam Tank Cap HYDROLOGY: Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 Flow Arrow Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch False Sump *LB *LB EAB EPB 0 0 s O t Js BZ 1 BZ 2 J < FLON ST VISI • c+r Ir H C OL N AYS CONVENTIONAL SYMBOLS RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RIGHT OF WAY: Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement — Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement CSX TRANSPORTATION 0 MILEPOST 35 SWITCH 0 A Proposed Temporary Utility Easement Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement - Existing Curb - Proposed Slope Stakes Cut Proposed Slope Stakes Fill Proposed Wheel Chair Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal VEGETATION: Single Tree Single Shrub Hedge Woods Line Orchard Vineyard E E TDE PDE PUE TUE c F T T T T n n n n n n n z C3 Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End MINOR: Head and End Wall Pipe Culvert Footbridge Wall - Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole Recorded U/G Power Line Designated U/G Power Line (S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) — Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable Designated U/G Fiber Optics Cable (S.U.E.*- CONC CONC WW CONC HW 0 CB O S WATER: Water Manhole Water Meter Water Valve Water Hydrant UN, •.`� 0N . •% 9. SEAL • 039201 . • FNG I F•• Recorded U/G Water Line Designated U/G Water Line Above Ground Water Line TV: TV Satellite Dish -< TV Pedestal b P T T- TC TC- T FO T FO TV Tower (S.U.E.*) U/G TV Cable Hand Hole Recorded U/G TV Cable Designated U/G TV Cable (S.U.E.*) Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*)_ GAS : Gas Valve Gas Meter Recorded U/G Gas Line Designated U/G Gas Line (S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil U/G Test Hole (S.U.E.*) Abandoned According to Utility Records End of Information APPROVED BY: DATE: A/G Water HH TV -TV- TV FO - — — — TV F 0 — — — G A/G Gas O SS A/G Sanitary Sewer FSS --FSS---- • 0 0 ❑s ?UTL AATUR E.O.I. revised OZ/UZ/ TYPICAL RIFFLE, POOL, AND BANKFULL BENCH CROSS SECTIONS PROJECT REFERENCE NO. SHEET NO. 1 166680 2 PROJECT ENGINEER c 0-1 CV cn O- m cn CO CO CO 0-1 c / m / c a) 0 / L 0 LL CC CO CO i N 0 N 0 N 0 L Q Q (NJ/ Wbkf RIFFLE or PLUNGE POOL //\//X//\�,2, CFO s<\ O O Wb Wbkf POOL (MEANDER) S\ w/i �i //in VARIES but z 30' VARIES but z 30' Wbkf Wb RIFFLE WITH BANKFULL BENCH POOL WITH BANKFULL BENCH TOP OF TERRACE VARIES but Z 30' BENCH LIMITS TOP OF TERRACE BENCH LIMITS WIDTH OF BANKFULL (Wbkf) AVERAGE DEPTH MAXIMUM DEPTH (Dmax) W/D (Wbkf/Dbkf) BANKFULL AREA (Abkf) BOTTOM WIDTH (Wb) RIFFLE SIDE SLOPE (X:1) INSIDE POOL SIDE SLOPE OUTSIDE POOL SIDE SLOPE /44. ;••FFSSIp. '•9'• 11, : SEAL �' 028432 .#0�7%•'FNGINE ..• -• APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 UT1 R1, R2, & R3 UPPER 10+00-19+50 UT1 R3 LOWER 19+50-22+61 UT1 R4 UPPER 22+61-28+00 UT1 R4 LOWER 28+00-37+95 UT2 UT3 UPPER 11+50 - 16+50 UT3 LOWER 16+50 - 26+45 UT4 RIFFLE POOL RIFFLE POOL RIFFLE POOL RIFFLE POOL RIFFLE POOL RIFFLE POOL RIFFLE POOL RIFFLE POOL 9.00 11.50 10.00 12.50 12.50 16.50 13.00 17.50 4.50 6.60 7.50 10.00 8.50 12.00 5.80 7.50 0.65 1.11 0.70 1.40 0.90 1.70 0.95 1.80 0.45 0.70 0.57 1.10 0.65 1.30 0.45 0.70 0.80 1.50 1.00 2.00 1.20 2.50 1.30 2.50 0.60 1.00 0.70 1.70 0.85 1.80 0.50 1.00 13.80 10.40 14.30 9.20 13.90 9.50 13.70 9.80 13.00 9.50 13.10 8.90 13.10 9.50 12.90 10.30 5.90 12.80 7.00 17.00 11.30 28.80 12.10 31.30 2.20 4.60 4.30 11.20 6.00 15.10 2.60 5.50 5.80 5.50 5.00 4.50 8.10 6.50 8.50 7.50 4.00 2.60 4.70 3.20 4.90 4.80 3.60 3.50 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 N/A 2.00 i a TYPICAL STRUCTURE PLACEMENT ROOT WADS COVER LOGS GRADE CONTROL LOG J-HOOK VANE (SEE SHEET 2-D) i 7 CONSTRUCTED RIFFLE (SEE SHEET 2-D) TOP OF BANK MAT BANKS WITH COIR FIBER MATTING o z -0\77 GPI. ONO off` GEOLIFT WITH BRUSH TOE (SEE SHEET 2-D) STRUCTURE NOTES: 1. GENERALLY CONSTRUCTED RIFFLES, ROOT WADS, LOG VANES AND COIR FIBER MATTING WILL BE INSTALLED IN THE LOCATION AND SEQUENCE AS SHOWN. 2. ANY CHANGES TO NUMBER OR LOCATION OF STRUCTURES DURING CONSTRUCTION MUST BE APPROVED BY THE DESIGN ENGINEER. 3. COIR FIBER MATTING TO BE INSTALLED ON ALL RESTORED STREAMBANKS, FLOODPLAIN BENCHING, AND TERRACE SLOPES AS DESCRIBED IN THE TECHNICAL SPECIFICATIONS. 4. ROOTWADS MAY BE REPLACED WITH GEOLIFT. z of LULL SIN J- Ow O,LJ a Jl=� vowCO .00 / // i 1/2 - 2/3 TOP OF BANK SILL B FLOW 1/3 BOTTOM WIDTH NO GAPS BETWEEN BOULDERS VANE ANGLE 20° TO 30° PLAN VIEW 1/2 - 2/3 TOP OF BANK ROCK CROSS VANE NOTES FOR ALL VANE STRUCTURES: 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS. 2. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 3. CONSTRUCT ANGLE AND SLOPE SPECIFICATIONS AS SHOWN. 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 5. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 6. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION 2"-4" BELOW THE THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. FILL SHOULD BE CONCAVE BEHIND THE VANE ARM TO ALLOW POOLING OF FLOW. 8. ON -SITE ALLUVIUM SHALL BE INCORPORATED INTO THE STONE BACKFILL WHERE AVAILABLE. 9. START SLOPE AT 2/3 TO 3/4 TIMES THE BANKFULL STAGE. 10. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. TOE OF BANK BANKFULL STAGE FLOW STREAM BED ELEVATION FLOW RIFFLE \ i\° °OSCOUR FILTER FABIC FLOW FILTER FABRIC CHANNEL BED ,". 6' MINIMUM 2' MIN-Pil 1.11. CHANNEL BED Pon SECTION A - A WELL GRADED MIX HEADER ROCK STREAM BANK / \ \ \/\�\ \�\/ \/ FOOTER ROCK B' PROFILE VIEW B - B' VANE ARM CROSS VANE INVERT/GRADE POINT RUN / \\/\\/\///\%//\//�� POOL RIFF�F //, \//, \//, \ 7\�\//// /\/\ PROFILE VIEW C - C' c 0-1 CV cn m m cn Q co cO c0 i c ro 0 i m i c 01 0 i L 0 LL_ m CO c0 i ("N 0 N 8) 0 -) N 0 L QQ e ROCK VANE ( PROJECT REFERENCE NO. SHEET NO. 1 BOULDER STEP 166680 2A TOP A TOE PROJECT ENGINEER O� O���, C p R-I/l�'� : i9',' 1/3 BOTTOM WIDTH OF CHANNEL OF BANK p o °o°o, °r,.� o® ° °o t. ��° r ° °8 °O �.� FESSIp •: :' �0 '1'y'•. - _ APPROVED BY: SEAL e F. •039201 • •• ••'••A Fc% i �� .�,�9C .,GIN•,,. �c�,,�� FLOW g t oo �o ��� o °°$ t B' ,,,,�� i'� i�� ,,, DATE: M (V STONE BACKFILL HEADER ROCK J °•� 11 Joel ,00 �; °°I' 20° TO 30° _Yips00 S: A�� � Oo. • 0 Q•�' .I ISCOUR N, vi '4 NO GAPS BETWEEN \ POOL / ..'---- ROCKS STREAM BED ELEVATION BANKFULL FLOW -� SLOPE HEADER ROCK v °O o0oo oO 67a' o o o 0 o � �O� B o opt•' � .° �08 �O� 8 ob,: 8�� �o �� �C ae Baker 9 9 M oh egeBa PerkEngineering a , S ee sono Inc. 8Cary, NORTH CAROLINA 27518 Phone:919.463.5488 g o,�°OB o® o o �., & 58 o°00 08 �.:� 000�a Fax: 919.463.5490 INTERNATIONAL License #: F-1084 ®oB°%f%� o°o °000 000°is ;Da o° °' o� ° °° ° °° °$°„ o° N C DMS I D N O. 10006 8 o® :•�° °•°° ° -•OO~ fi••° ��"`� �� �� BOULDERSill ` -- -- HEAD OF RIFFLE A' BOULDER SCOUR POOL (EXCAVATED) 4% TO 7% FOOTER ROCK �� PER DIRECTION OF ENGINEER ---- -___ 0 o ,0oo PLAN VIEW CL\DE •••••: •• /� •. • �. ow,@®� •. ; o .•�: ►, . IFFY :ok..!oo °••°g°�°o0o O• ., 0,o oo° °•• �)8o��t°� 0 o.o o q� w. BOTTOM PLAN VIEW WIDTH STONE BACKFILL� FOOTER ROCK GEOTEXTILE FABRIC (EXCAVATED) SCOUR POOL EXCAVATED PROFILE VIEW 80.'-c' �1 POOL rin NOTES FOR ALL VANE STRUCTURES: BACKFILL SHOULD BE CONVEX STREAMBED HEADER ROCK STONE BACKFILL PROFILE A - A' NOTES: GEOTEXTILE FABRIC 1. HEADER AND FOOTER BOULDERS MUST BE AT LEAST 1' X 2' X 3'. 2. FOOTERS SHALL BE INSTALLED SUCH THAT 1/4 TO 1/3 OF THE LENGTH IS DOWNSTREAM OF THE HEADER. 3. SOIL SHALL BE WELL COMPACTED AROUND BURIED PORTION OF FOOTERS WITH THE BUCKET OF EXCAVATOR. 4. INSTALL NON -WOVEN FILTER FABRIC UNDERNEATH FOOTER BOULDERS. 5. UNDERCUT THE RIFFLE ELEVATION 12 INCHES TO ALLOW FOR A LAYER OF STONE. 6. INSTALL EROSION CONTROL MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION. 7. FILL TRENCH WITH GRADED MIX OF CLASS A, CLASS B, AND #57 STONE TO THE BED ELEVATION OF THE CHANNEL. 8. BOULDER STEPS MUST BE EXTENDED TO A MINIMUM OF 2' INTO THE BANK. USE SILL BOULDERS IF NECESSARY. 9. THALWEG AND STEP INVERT WILL BE CONCAVE AND SHAPED PER DIRECTION OF THE DESIGNER. 10. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. 0 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS. 0o °0800°°080°00°080° 2. START AT BANK AND PLACE FOOTER ROCKS FIRST 3. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL AND THEN HEADER (TOP) ROCK. ooQo°O600Qo°O6000000° AND SLOPE SPECIFICATIONS. Q0o0°°Q0C°�0°°Q0C�0°°o FOR HABITAT IMPROVEMENT. 00 00 00 0 5. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM 6. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER MINIMUM OF SIX FEET. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL SIDE OF HEADER AND FOOTER ROCKS. OF THE HEADER ROCKS AND EXTEND GEOTEXTILE FABRIC ROCK, AND THEN UPSTREAM TO A IN THE UPSTREAM SIDE OF THE STRUCTURE FOOTER ROCK WITH WELL GRADED MIX OF CLASS B, CLASS A, & THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM CONCAVE BEHIND THE VANE ARM TO ALLOW POOLING 8. START SLOPE AT 2/3 TO 3/4 TIMES THE BANKFULL #57 STONE TO THE ELEVATION 2"-4" BELOW THE WHERE AVAILABLE. FILL SHOULD BE OF FLOW. STAGE. 10' MINIMUM SECTION A - A 9. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. GRADE CONTROL ROCK J-HOOK VANE ROCK J-HOOK VANE 1/3 BOTTOM 1/3 BOTTOM 1/3 BOTTOM 1/3 BOTTOM STONE BACKFILL WIDTH OF CHANNEL 20° TO 30° WIDTH OF CHANNEL FLOW LEAVE GAPS (OPTIONAL) PER DIRECTION OF ENGINEER STREAM BED ELEVATION BANKFULL HEADER ROCK WIDTH OF �� WIDTH OF CHANNEL CHANNEL FLOW 20° TO 30° _ �-) Dri o°QOQQ o°QoCXJ .� OOO O CCo O CCo ���°°*.�o.ft.Cao `i.o ROo,0 �- •,/0° �Oa STREAM BED ELEVATION STONE BACKFILL BANKFULL [HEADER ROCK . o FLOW -i- r i0 o�OV 4% TO 7% SLOPE J°° •�� 'o FLOW��. SLOPE o 4% TO 7% q �8C�o0 0�. - - - - - - - cu °' °°Qo 0 D °QoQQ Lu q oJO�t�. ���000 ! �v 000 ° CQ 00 �O LL .A' .�cn°/ ,o°ko �.- �O•//• • off. %' STONE BACKFILL'� FOOTER ROCK GEOTEXTILE FABRIC (EXCAVATED) SCOUR POOL EXCAVATED cn _, _, o3 co N 'O �U, A �' �\ goo i j%•� ooQ: %' '\ �/S'�'' %. \ co STONE BACKFILL FOOTER ROCK GEOTEXTILE FABRIQ���`%cu PROFILE VIEW x N o11 �. SCOUR ,� SCOUR POOL (EXCAVATED) I o0�1 / POOL \ PER DIRECTION OF ENGINEER •, ` PROFILE VIEW 3... �. 10NO Qo'r' )•I1 o °o J°p o o�J`' HEADER I I \ 1 ` ,, FOOTER ROCK GAPS BETWEEN ROCKS BACKFILL SHOULD BE CONVEX STREAMBED ROCK HEADER ROCK STONE BACKFILL PLAN VIEW N oo° o. CIO•/ QQ'1� )000°° j�� �o� �Oo• �8i POOL ; Y i z \ �'•- - co FOOTER ROCK SCOUR POOL (EXCAVATED) PER DIRECTION BACKFILL SHOULD BE CONVEX STREAMBED HEADER ROCK STONE BACKFILL OF ENGINEER 0�8o000t8o000�8�° °OQoq 00Qoo °0Qo0o° NO GAPS BETWEEN ROCKS �9o°°Ooo°°°oo°°Qo HEADER ROCK GEOTEXTILE FABRIC PLAN VIEW FOOTER ROCK 0°O0°o8000°080� ° �BoOOo 0 ooQ00000°o080,0% 0, (- °000° °000° °o NOTES FOR ALL VANE STRUCTURES: 10' MINIMUM � SECTION A - A NOTES FOR ALL VANE STRUCTURES: 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS. GEOTEXTILE FABRIC 2. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 3. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. FOOTER ROCK 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS. 2. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 3. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 5. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 6. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION 2"-4" BELOW THE THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. FILL SHOULD BE CONCAVE BEHIND THE VANE ARM TO ALLOW POOLING OF FLOW. 8. START SLOPE AT 2/3 TO 3/4 TIMES THE BANKFULL STAGE. 9. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. 5. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 6. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. 10' MINIMUM SECTION A - A 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION 2"-4" BELOW THE THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. FILL SHOULD BE CONCAVE BEHIND THE VANE ARM TO ALLOW POOLING OF FLOW. 8. START SLOPE AT 2/3 TO 3/4 TIMES THE BANKFULL STAGE. 9. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. A LOG AND ROCK STEP / POOL PROJECT REFERENCE NO. SHEET NO. 1 166680 2B PROJECT ENGINEER c m CV cn m m CO CO CO c 0 0-1 m i c a) 0 i L 0 LL 0 CC CO CO i N 0 N 8) 0 -) (NI0 L QQ N/ PROTECT BANK USING TRANSPLANTS PROTECT BANK USING GEOLIFT dirN • ♦ so u0 ° t)8(0• 0 gpcl EXCAVATE pp�qq rioo0A POOL SOUO ��Uc> 000go°000•- o 000o 000 coo00000i 8C5o0t)0DC5c 00 000000 g�Q °00 % . 00 oO 00' j EXCAVATE IpOpt)�0o'I n00 0°000• ' POOL ;i�°O�o,0°g82° 0 0.0° 0, ♦ -t ifiste - A' PLAN VIEW PROTECT BANK USING ROOT WADS + BANKFULL 0,q0 )0 00 0 PI noon -STONE BACKFILL 0IN GEOTEXTILE FABRIC SECTION A - A' BASE FLOW HEADER LOG 1% SECTION B - B' FOOTER LOG �.sAlt\\ CAR07i1'. .,� O<cESSjo. Yy'1.: SEALN9e • 039201 ••FNG• I F�' s��. APPROVED BY: DATE: Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 Michael Baker NCDMS ID NO. 100068 NOTES: 1. LOGS SHOULD BE AT LEAST 8" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED AND EXTENDING INTO THE BANK 3' ON EACH SIDE. 2. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOG. 3. GEOTEXTILE FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 4. BOULDERS SHOULD BE 1' X 2' X 3' AND PLACED ON TOP OF HEADER LOG FOR ANCHORING. 5. TOEWOOD OR TRANSPLANTS CAN BE USED INSTEAD OF BOUDERS, PER DIRECTION OF ENGINEER. 6. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. a LOG BURIED BELOW STREAMBED 2/3 PLAN VIEW GRADE CONTROL LOG J-HOOK VANE STONE BACKFILL HEADER LOG ANY GAPS BETWEEN LOGS MUST BE FILLED WITH OTHER RECENTLY HARVETED BRANCHES OR COBBLE AND GRAVEL BEFORE INSTALLING FILTER FABRIC AND BACK FILLING ARM 1/3 20°-30° FILTER FABRIC ROOTWAD LOG BURIED IN STREAM BANK AT LEAST 6'. BOULDERS CAN ALSO BE USED. FOOTER LOG 1/2 - 2/3 BANKFULL 6' MINIMUM SECTION A - A' ROOTWAD GEOTEXTILE FABRIC FLOW STREAMBED HEADER LOG NOTES: 1. LOGS SHOULD BE AT LEAST 10" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, RECENTLY HARVESTED, AND FOOTERED. 2. BOULDERS MUST BE AT LEAST 2' x 2' x 1'. 3. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOG. 4. ROOTWADS SHOULD BE PLACED BENEATH THE HEADER LOG AND PLACED SO THAT IT LOCKS THE HEADER LOG INTO THE BANK. SEE ROOTWAD DETAIL. 5. BOULDERS SHOULD BE PLACED ON TOP OF HEADER LOG FOR ACHORING. 6. HEADER BOULDERS TO BE PLACED 0.5 TO 0.75 FEET APART. 7. FILTER FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 8. TRANSPLANTS OR BOULDERS CAN BE USED INSTEAD OF ROOWADS, PER DIRECTION OF ENGINEER. 9. BOULDER SILL MUST BE A MINIMUM OF 6'. 10. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. ��iy% ;%--/i%' ii,��% may _' /i /---- - - '''' ,•- --- -- ---.' - --.. \ C----;J:----;1.---:-;1"-- ..-.1-; -------;;:-.;:15:7----71,;;;;I:;:3-";'?' v�f -- ANY GAPS BETWEEN LOGS MUST BE FILLED WITH OTHER RECENTLY HARVETED BRANCHES BEFORE INSTALLING FILTER FABRIC AND BACK FILLING ARM 11paiL - ,e t„, L f�14 PROFILE VIEW FOOTER LOG LOG BURIED BELOW STREAMBED A - • EXCAVATE POOL POOL / 0 2/3 PLAN VIEW ♦ 1/3 BANKFULL ♦ ♦ • • • • • • • • • LOG VANE GEOTEXTILE FABRIC ROOTWAD LOG BURIED IN STREAMBANK AT LEAST 5' NOTES: 1. LOGS SHOULD BE AT LEAST 10" IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED. 2. BOULDERS MUST BE OF SUFFICIENT SIZE TO ANCHOR LOGS. 3. SOIL SHOULD BE COMPACTED WELL AROUND BURIED PORTIONS OF LOGS. 4. ROOTWADS SHOULD BE PLACED BENEATH THE HEADER LOG AND PLACED SO THAT IT LOCKS THE HEADER LOG INTO THE BANK. SEE ROOTWAD DETAIL. 5. BOULDER SHOULD BE PLACED ON TOP OF HEADER LOG FOR ANCHORING. 6. GEOTEXTILE FABRIC SHOULD BE NAILED TO THE LOG BELOW THE BACKFILL. 7. TOEWOOD OR TRANSPLANTS CAN BE USED INSTEAD OF ROOTWADS, PER DIRECTION OF ENGINEER. 8. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. STONE BACKFILL HEADER LOG FOOTER LOG 1/2 - 2/3 BANKFULL FLOW STREAMBED BOULDER HEADER LOG GEOTEXTILE FABRIC 6' MINIMUM SECTION A - A' ROOTWAD 010 I IS ,d0*° PROFILE VIEW 4 pig 07). . FOOTER LOG t✓ ROCK DOUBLE DROP CROSS VANE BEGIN HEAD OF RIFFLE INVERT ELEVATION AND STATION CONSTRUCTED RIFFLE PROJECT REFERENCE NO. SHEET NO. 1 166680 2C PROJECT ENGINEER c LJ CV cn 0- m cn CO CO CO i In c 0_ i m In 0-1 i c a) 0 i L 0 LL In m CO CO 7- (Nl 0 N a) 0 -) (NI 0 L Q Q 1/3 1/3 BOTTOM BOTTOM WIDTH OF WIDTH OF CHANNEL CHANNEL 1/3 BOTTOM WIDTH OF CHANNEL W CD LI 0u) • co _13 �.•,. (NJJ _/ O. ' 00 ►s z -Podr o O" )0 D% JO O& J0 Jo t� NO GAPS BETWEEN BOULDERS ,O°-,000 FLOW 20° TO 30° JooOVoQooOU ooJ� A o °800e00800::000t-' �0 °°000� � °0%.� 4 °0� 00000 °0C 0000 • ,Oo • 100OC "08� )00\ 00 ii0Occ 0 - . Ac 8L i v� SCOUR POOL PLAN VIEW NOTES FOR ALL VANE STRUCTURES: STREAM BED ELEVATION 1/2 - 2/3 OF BANKFULL FLOW STONE BACKFILL 080oo0 / 00000 0 f°1°-,n��r°ir GEOTEXTILE FABRIC SCOUR POOL (EXCAVATED PER DIRECTION OF ENGINEER) 1. DIG A TRENCH BELOW THE BED FOR FOOTER ROCKS. 2. START AT BANK AND PLACE FOOTER ROCKS FIRST AND THEN HEADER (TOP) ROCK. 3. CONTINUE WITH STRUCTURE, FOLLOWING ANGLE AND SLOPE SPECIFICATIONS. 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 5. USE HAND PLACED STONE TO FILL GAPS ON UPSTREAM SIDE OF HEADER AND FOOTER ROCKS. 6. INSTALL GEOTEXTILE FABRIC BEGINNING AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO A MINIMUM OF SIX FEET. 7. AFTER ALL STONE BACKFILL HAS BEEN PLACED, FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH WELL GRADED MIX OF CLASS B, CLASS A, & #57 STONE TO THE ELEVATION 2"-4" BELOW THE THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM WHERE AVAILABLE. FILL SHOULD BE CONCAVE BEHIND THE VANE ARM TO ALLOW POOLING OF FLOW. 8. START SLOPE AT 2/3 TO 3/4 TIMES THE BANKFULL STAGE. 9. ALL REACHES, BOULDER SIZE 1' x 2' x 3' TO 2' x 2' x 4'. STREAMBED STONE BACKFILL GEOTEXTILE FABRIC HEADER ROCK 4% TO 7% SLOPE FOOTER ROCK SCOUR POOL (EXCAVATED) PROFILE VIEW BACKFILL SHOULD BE CONVEX oo 080 000 0O �00 °' 8000 80•< o°o0oO00 0°00o0O) 80000°o o.. %oo %oo 0� 6' MINIMUM SECTION A - A HEADER ROCK FOOTER ROCK TOP OF BANK A 0 J u_ uc�s vu uc�o (Nu ,o�r00 °,�00 °O�c�l%° 9i 0 0 0 •00g06 B i� o� 00 - 0dp000sCX)00 n.O IP 9il oo Oo o0%oo0o 410C )"c9c8:60C UOoe°0g;O o°Oo00 °oS0o 1, °O OOO °O .0 000000 • , 000 41• 1p00o °O OOo O .O ��ii o�°080 0��•; o � �gp00O o °0' OOo°00D0 OOcQO�O•Oo0!roc tail °o°°O,��O°O�OiC •'QU0 ro(�°o011 BEGIN TAIL OF RIFFLE INVERT ELEVATION AND STATION a A' PLAN VIEW 0( TOE LARGER STONE MAY BE PLACED TO REDIRECT LOW FLOW AT DIRECTION OF ENGINEER STONE BACKFILL NOTES: 1. UNDERCUT CHANNEL BED ELEVATION AS NEEDED TO ALLOW FOR LAYERS OF STONE TO ACHIEVE FINAL GRADE. 2. INSTALL COIR FIBER MATTING ALONG COMPLETED BANKS SUCH THAT THE EROSION CONTROL MATTING AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUT ELEVATION. 3. INSTALL STONE BACKFILL, COMPACTED TO GRADE. 4. FINAL CHANNEL BED SHAPE SHOULD HAVE THE ELEVATION OF THE BED 0.2 FT DEEPER IN THE CENTER THAN AT THE EDGES. 5. STONE BACKFILL SHALL CONSIST OF 10% CLASS I, 20% CLASS B, 40% CLASS A, AND 30% ON -SITE ALLUVIUM BY VOLUME OR #57 STONE. 6. CONSTRUCTED RIFFLES SHALL BE 12" THICK. 7. LARGER CLASS I & B STONES MAY EXTEND ABOVE THE BED SURFACE, BUT NO HIGHER THAN HALF BANKFULL AND SHOULD PROVIDE A "NATURAL LOOK". ENGINEER SHALL HAVE FINAL APPROVAL OF EXTENDING ROCK. 8. SATURATED WOODY DEBRIS THAT IS EXISTING WITHIN THE CHANNEL CAN BE RELOCATED INTO THE NEW RIFFLE AREAS. COIR FIBER MATTING RIFFLE D-max BANKFULL OfO Q)oC\n STONE BACKFILL TOE SECTION B - B' 1/4 OF GLIDE LENGTH o O_ 000 D00000� (- n� .� 4�FFSSIp•.9'A : SEAL �•'r. 028432 APPROVED BY: DATE: BEGIN HEAD OF RIFFLE INVERT ELEVATION AND STATION STONE BACKFILL 000 PROFILE A - A' RUN Michael Baker INTERNATIONAL Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 License #: F-1084 NCDMS ID NO. 100068 1/4 OF RUN LENGTH POOL BEGIN TAIL OF RIFFLE INVERT ELEVATION AND STATION i a CHANNEL PLUG CHANNEL TO BE PLUGGED CHANNEL PLUG PLAN VIEW COMPACTED BACKFILL CHANNEL INVERT UNCOMPACTED BACKFILL 1.5' MINIMUM 1 FINISH GRADE NOTES: 1. COMPACT BACKFILL USING ON -SITE HEAVY EQUIPMENT IN 10 INCH LIFTS. 2. BACKFILL OF PLUGS SHOULD INCORPORATE ANY OF -SITE CLAY AVAILABLE. FINISH GRADE COMPACTED BACKFILL SECTION A - A' LOG WEIR oDi oDi COIR LOG A - --• / SCOUR POOL I \ PLAN VIEW TRANSPLANTS LOG DROP B' oDi TRANSPLANTS OR LIVE STAKES +n COIR LOG HEADER LOG 1 i FOOTER LOG CROSS SECTION VIEW B - B' TOP OF STREAMBANK FLOW STREAMBED STONE BACKFILL- GEOTEXTILE FABRIC 4' MINIMUM SECTION A - A' NOTES: OUR PO HEADER LOG FOOTER LOG 1. LOGS SHOULD BE AT LEAST 10 INCHES IN DIAMETER, RELATIVELY STRAIGHT, HARDWOOD, AND RECENTLY HARVESTED. 2. TOP OF HEADER LOG SHOULD BE SET AT SAME ELEVATION AS THE STREAMBED. 3. USE GEOTEXTILE FABRIC WITH COIR LOGS TO SEAL GAPS BETWEEN LOGS. 4. PLACE TRANSPLANTS ALONG BANKS TO PROTECT AGAINST BANK EROSION. 5. THE HEADER LOG SHOULD BE NOTCHED 2 - 3 INCHES DEEP IN THE CENTER AND FOR 20 - 30% OF THE CHANNEL WIDTH. c n CV cn m m cn Q co cn cn i c ro 0 i m in 0-1 c a) 0 i L 0 LL_ m CO cn i CV 0 CV a) 0 -) N 0 L 'vQ (Nd/ Lc) PLUNGE POOL PROJECT REFERENCE NO. SHEET NO. GEOLIFT WITH BRUSH TOE 166680 2D FLOW PROJECT ENGINEER NOTES: SEAL _ APPROVED BY: • - I . 039201 •••••FNGI LOWEST ELEVATION OF CROSS 1. LIVE BRANCH CUTTINGS SHALL BE THE SAME SPECIES AS THE LIVE STAKES AND SHALL BE INSTALLED DURING VEGETATION DORMANCY. '�i NF��''•• �'4 �/-1C ••••... ••' �Sss CULVERTV VANE SHOULD BE SLIGHTLY \y\y\\\y\y\y\y\y\y\N ////% j\//\//\//\//\//\//\//\//\//\//\/ • LOWER THAN INVERT OF CULVERT / 2. LIVE BRANCH CUTTINGS SHALL BE INSTALLED AT A DENSITY OF 20-30 CUTTINGS PER LINEAR FOOT AND A MAXIMUM DIAMETER OF 2.5 INCHES. 3. NUMBER OF SOIL LIFTS MAY VARY IN GENERAL LIFTS SHALL EXTEND TO THE ������ iii'i goNk y �,, DATE: \ /\//\//\//\//\//\//\//\//\//\//\//\ / DEPTH /\/\ / FOOTER BOULDERS /jj EXTEND BELOW DEPTH OF SCOUR FLOW / / / / / / / / / / / \/\/\/\/\/\/\/\/\/\/\/\ \ %\//\//\//\//\//\//\//\//\//\//\//\//\ \ / / / //\ \ TOP OF BANK OR BAN KF U L L STAGE. Michael Michael Baker Engineering Inc. ry, g y arkway, Suite 600 Ca NORTH CARD LI NA 27518 919.463.5488 PhLu \ H/// cc j j j j j\\//\\//\\//\/�\�//\/\ / / / / / / / / //\/\/\/\/\/ 'i\//i\//i\//i\//i\%i\%i\%i\%i\%i\%i\//i\//i\//i\//%\//%\//%\//%\//%\//%//%\//%//%//%� /\ /\//%//%//" z's 72 STAKE TOP LAYER 4' DEEP (TYP)INTERNATIONAL TOP OF BANK / BANKFULL STAGE Faxxn919. 63.5490 License #: F-1084 D A x48 x36 OF MATTING IN 6" TRENCH ► (SEE MATTING DETAIL) NCDMS ID NO. 100068 SECTION A - A WIDTH •� TRANSPLANTS OR TEMPORARY SEED AND MATTING FLOODPLAIN COIR FIBER MATTING ENCOMPASSES LIFT SEE CROSS B .• B UNDISTURBED ir EARTH LIVE BRANCH CUTTINGS (SEE LIVE„, PLANTING PLAN FOR SPECIES) VANE DETAIL TOP OF TERRACE 1.0' LIFT OF COMPACTED ON -SITE SOIL (TYP) / q/ VARIES ►� Wbkf ►� VARIES ► m O Y z _, z _, �`��` /` /` i m 0 7 /` I�` L'=- '� BASEFLOW Lt Nm m m D m I N m m N - D-Max �� j� ����/ FINISHED BED �'ti ,jam ♦��- �� FOUNDATION APPROX. 1 FT ���iC BELOW FINISHED BED ELEVATION PLAN VIEW NOTES: Wb SECTION .- B - B BRUSH CAN BE LIMBS, BRANCHES, ROOTS OR ANY OTHER WOODY VEGETATION APPROVED BY THE ENGINEER. 1. WHEN GEOLIFTS ARE BUILT ABOVE ROOTWAD CLUSTER, USE LARGE STONE BACKFILL BEHIND ROOT MASS TO BUILT FOUNDATION. 2. CLASS I STONE MAY BE USED AT THE DIRECTION OF THE ENGINEER TO BUILD THE FOUNDATION IN LIEU OF BRUSH MATERIAL. PERMANENT STREAM CROSSING BOULDER HEADWALL / ENDWALL TOP COURSE OF BOULDERS (TYP.) - EARTHEN BACKFILL 0.5:1 SIDE SLOPE GEOTEXTILE FABRIC COVER FILL MATERIAL WITH 6 INCHES #57 STONE _� �� �� 1 � : _._ .2' . ` B f FLOW 1 ` I GEOTEXTILE FABRIC - ‘ .CULVERT - 1 ' ' II ; - 4 '\ . - i - - ' - ; _ _ O BASEFLOW `, ` . I I ' STREAM BED _ \ / - - - - - - , - Y z a m Q cc 1— 0 B+ EMBEDDED BOULDERS EACH CULVERT FOOTER INCREASE OFFSET OF COURSE TO ACHIEVE 0.5:1 SIDE SLOPES PLAN VIEW ; ' - , ; ' - , .� CHINK AND WEDGE 4-INCH STREAM BED z MINUS ROCK, AS NECESSARY, TO a LEVEL THE BOULDER COURSES CULVERT SHALL BE EMBEDDED m Q BOULDER PLACED BELOW TO DEPTH INDICATED IN TABLE cc EXISTING CHANNEL BOTTOM USE LARGEST BOULDERS 1— TO A DEPTH OF AT LEAST 2'. FOR FOOTER COURSE N SECTION B - B' -4OO • 3O • oob% •'moo. :i uM ���.� /\/j\j/\ X�M ° •:•• P,,;;l�' \\\\\\\\\\\\\ 1 M // //\//\//\//\//\//\//;2' a. .v • •• i\r\i\r\i\i\i\i\i �.. .� /\/\/\/\/\/\/\\/\\/\\/\/ • ocoQO�' j�/�\/�\/�\/�\/�\/�\/��\/�\/�\/� 'mo o:•\��\�\\�\�\�\�\�\�\�\�ji\/\ 0:1° - / /\j/\j/\/\/\ \j/\j/\j/\j/\j/\j/\\j/ :.!! °•' �\\%\\�% \%�����%\ ° , l%\�l%\�l%\ >\ >\�l%\mil% /l%\ l%\fit>\�1\� \��\\��\\�/ � \\j\/\j\\/\- \�i\\\\i\- /�\/�\//\//\//\/v \r\ \/\/�\/�\/�\/�\/�\/�\/�\/��\/\'-ii \ \\\\\�j\�j\��\\��\\��\\��\\�j\�j\�j\�j\�j\°o•�•co \ \j/\\j/\\j/\\j/\\j\\j/\\j/\\ •.. -rol• 8. .:�;►,� 1 M 4/'••�•� SLOPES MAY VARY > MU � �.• .. • /(rj °% \j\\j/\\j/\\j/\ / -.� 0•:•, \%�\%�\%�\%�\% \%\\ \�\%�\%�\i�\i�\i\\i\ '•va% j\\ j\\/ \/\/\/\ . /�\/\/\/\/\/\\ •.t : ai iy. ,._ l l\ N.> '\//�//// �%� �� �� �� ��i��i,�� !.��%�%�%�%" \��\��� < \ D \\\�/ //\ //\//\.\. %%�%�i.� ���%�i��i��i��i��i��%�%�%\/\,\/�%! 12" OR AS SPECIFIED FILL MATERIAL FLOODPLAIN CULVERT STREAM CHANNEL CULVERT (SEE PLANS FOR TYPE CROSS SECTION VIEW EXISTING GROUND FLOODPLAIN CULVERT / SIZE) STAGGER JOINTS B REACH BOULDER SIZE CULVERT SIZE EMBEDMENT UT1-R1 1'x2'x2' 4 FT 12 IN / UT1-R4 1'x2'x2' 5 FT 12 IN Q ( ` �-4ak a UT3 1'x2'x2' 4 FT 9.61N m. UT4 1'x1'x1' 3 FT 12 IN NOTES: Q w ' - ;_; CULVERT - -_ Q STREAM BED Lu cc wiwa r WiI4-4V MAKE TOP OF FOOTER COURSE 1. SIZE DIMENSIONS SHOWN ON PLANS. 2. APPLY SUFFICIENT FILL (2' MIN) OVER CULVERT TO PREVENT COLLAPSE. 3. STABILIZE SIDE SLOPES WITH EROSION CONTROL MATTING AND FILL AROUND CULVERTS WITH CLASS II STONE. 4. INSTALL HEADWALLS AND ENDWALLS AS SHOWN ON THE PLANS AND IN THE DETAILS. 5. PRIMARY CULVERT SHOULD BE INSTALLED 12" OR AS SPECIFIED BELOW CHANNEL ELEVATION. EMBEDDED FOOTER B AS LEVEL AS POSSIBLE NOTES: BOULDERS EMBED TO DEPTH 1. BOULDERS SHALL BE TOUCHING SO THAT VOID SPACE IS MINIMIZED. SHOWN IN TABLE 2. BOULDERS SHOULD EXTEND BELOW SCOUR DEPTH. FOOTER BOULDERS SHALL BE AT LEAST 2' BELOW THE EXISTING BED 3. GEOTEXTILE MATTING SHOULD BE PLACED BETWEEN BOULDERS AND SOIL. SECTION A - A' 4. BOULDERS SHOULD BE BACKFILLED AND COMPACTED. VOID SPACE BETWEEN FABRIC AND BOULDER OR ROCK FILL MATERIAL, SHOULD BE MINIMIZED. 5. BOULDERS SHOULD NOT BE HIGHER THAN THE TOP OF CROSSING ELEVATION. 6. FILTER FABRIC SHOULD BE PLACED BEHIND BOULDERS, BURIED BELOW BOULDER DEPTH, AND EXTEND INTO THE BANK. 1 c 01 w CV cn m cn Q CO CO CO CO i c ro w m 0-1 i c 0 0 i L 0 LL_ m CO CO CO i N 0 N 8) 0 -) (N 0 L Q 0_ Lc) LIVE STAKING TRANSPLANTED VEGETATION ( PROJECT REFERENCE NO. SHEET NO. 166680 2E TOP OF STREAMBANK TRANSPLANTED VEGETATION, ROOTMASS, AND SOIL MATERIAL PROJECT ENGINEER ,sivin mplos' .`4)0..' Cp***':4',#'• TOP OF STREAMBANK �oFESSI _ .%p�f.. -• = � SEAL ! : APPROVED BY: 039201 '• •��'% �� • � TOE OF SLOPE TOP OF BOTTOM OF CHANNEL � � � • II • • PLANT JUST JUSTII DIAMOND STAKES ON TOP OF BANK AND BELOW BANKFULL LINE IN A SHAPED STAGGERED PATTERN , r ,,,�����BGMNg�� �` �,,, ►►►����' DATE: I I t • ` '`, .,, 14 / , TRANSPLANTED VEGETATION, ROOTMASS, AND SOIL MATERIAL TOE OF BANK Michael Baker INTERNATIONAL Michael Baker Engineering Inc. c �y, NORTH CARLIN OA275680 Phone: 919.463.5488 Fax: L cens a #: F-10840 TOE OF SLOPE CROSS SECTION VIEW PLAN VIEW SQUARE CUT TOP BUDS FACING UPWARD * BOTTOM OF CHANNEL NCDMS ID NO. 100068 NOTES: 1. EXCAVATE A HOLE IN THE BANK TO BE STABILIZED THAT WILL CROSS SECTION VIEW ACCOMMODATE THE SIZE OF TRANSPLANT TO BE PLACED. LIVE CUTTING 6'-8' SPACING MIN. 1/2" DIA 2' 3' LENGTH BEGIN EXCAVATION AT THE TOE OF THE BANK. 2. EXCAVATE TRANSPLANT USING A FRONT END LOADER. EXCAVATE E RE AL SOIL MATERIAL AS POSSIBLE. IF ENTIRE ROOT MASS CAN NOT BE EXCAVATE INONEBIUCKE ROOT T E. IFAD, ENTIRE THE TRANSPLANT IDSDTOON LARGE ,..:.:♦=♦=.=♦:.::.` - •����� I�����1 2'-3' SPACING �--______-_----_ - _-_-- TRANSPLANTED VEGETATION - -1 r - - --_-_ _----- ��` � ...... AND ROOTMASS - --_____-��` �.�`` AND ANOTHER SHOULD BE SELECTED. 3. PLACE TRANSPLANT IN THE BANK TO BE STABILIZED SO THAT VEGETATION IS ORIENTATED VERTICALLY. 4. FILL INANY HOLES AROUND THE TRANSPLANT AND COMPACT. 5. ANY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. 6. PLACE MULTIPLE TRANSPLANTS CLOSE TOGETHER SUCH THAT THEY TOUCH. 44+ ''�i 1 ANGLE CUT 30 - 45 DEGREE LIVE STAKE DETAIL oDi // ��,/'TOP OF BANK 611 iINO 0 LIVE STAKES 41), i, N ON POINT BAR I\ /�r ,`% r```TOE OF BANK \�!♦�•/NOTES:'�1 �♦I��1. STAKES SHOULD BE CUT AND INSTALLED ON THE SAME DAY.--6D�6�� '����===�����, 2. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT. 3. STAKES MUST BE INSTALLED WITH BUDS POINTING UPWARDS. PLAN VIEW 4. STAKES SHOULD BE INSTALLED PERPENDICULAR TO BANK. '��` y� ,__�'� ���____ -�� `---____ � �����. �-� '� PLAN VIEW 5. STAKES SHOULD BE 1/2 TO 2 INCHES IN DIAMETER AND 2 TO 3 FT LONG. 6. STAKES SHOULD BE INSTALLED LEAVING 1/5 OF STAKE ABOVE GROUND. PLANTINGS PLANTING SPECIFICATIONS COIR FIBER MATTING �.;) NOTES: 2.5 INCH ROOFING NAIL PLACE COIR FIBER MATTING IN 6 INCH DEEP �Cp \� �Cp \� 1. PLANT BARE ROOT SHRUBS AND TREES TO THE WIDTH OF THE BUFFER AS SHOWN ON THE PLANS. 2. LOOSEN COMPACTED SOIL. TOP OF STREAMBANK 3. PLANT IN HOLES MADE BY A MATTOCK, DIBBLE, PLANTING BAR, OR OTHER APPROVED MEANS. TRENCH, STAKE, BACKFILL, AND COMPACT NOTES: 1. BANKS SHOULD BE SEEDED PRIOR TO PLACEMENT OF MATTING. - - 2. INSTALL COIR FIBER MATTING PER SPECIFICATIONS ALONG STREAM TOP OF STREAMBANK BANKS OR IN OTHERS LOCATIONS SPECIFIED BY ENGINEER. 3. LARGE STAKES SHOULD NOT BE SPACED FURTHER THAN 36" APART. �_/•• LARGE / STAKES 4. PLACE LARGE STAKES ALONG ALL SEAMS, IN THE CENTER OF BANK, AND TOE OF SLOPE. 5. MATTING SHALL BE PLACED ON BANKS, STAKED, AND TRENCHED PRIOR • TO INSTALLING CONSTRUCTED RIFFLE MATERIAL. 6. ALL MATTING STAKES MUST BE 100% BIODEGRADABLE. TOE OF SLOPE !• 1, BOTTOM OF CHANNEL TYPICAL LARGE MATTING STAKE 4. PLANT IN HOLES DEEP AND WIDE ENOUGH TO ALLOW THE ROOTS TO SPREAD OUT AND DOWN WITHOUT J-ROOTING. 5. KEEP ROOTS MOIST WHILE DISTRIBUTING OR WAITING TO PLANT BY MEANS OF WET CANVAS, BURLAP, OR STRAW. 6. HEEL -IN PLANTS IN MOIST SOIL OR SAWDUST IF NOT PROMPTLY PLANTED UPON ARRIVAL TO PROJECT SITE. BOTTOM OF CHANNEL PLACE COIR FIBER MATTING AT TOE OF SLOPE. SECURE MATTING WITH LARGE MATTING STAKE LEG LENGTH 17.00 IN (43.18 CM) (TAPERED TO POINT) CROSS SECTION VIEW OF BARE ROOT PLANTING CROSS SECTION VIEW WIDTH 1.5 IN (3.81 CM) THICKNESS 1.5 IN (3.81 CM) PLANTINGS NOTES: i TRENCH 7 TRENCH �/ fsp yf'yf'/ �/ p 1. WHEN PREPARING THE HOLE FOR A POTTED PLANT OR SHRUB fep DIG THE HOLE 8 -12 INCHES LARGER THAN THE DIAMETER OF THE POT AND THE SAME DEPTH AS THE POT. g/`� 2. REMOVE THE PLANT FROM THE POT. LAY THE PLANT ON ITS SIDE TOP OF STREAMBANK IF NECESSARY TO REMOVE THE POT. 3. IF THE PLANT IS ROOTBOUND (ROOTS GROWING IN A SPIRAL AROUND THE ROOT BALL), MAKE VERTICAL CUTS WITH A KNIFE TOP OF STREAMBANK �O�A ��A OR SPADE JUST DEEP ENOUGH TO CUT THE NET OF ROOTS. ALSO MAKE A CRISS-CROSS CUT ACROSS THE BOTTOM OF THE BALL. 4. PLACE THE PLANT IN THE HOLE. 5. FILL HALF OF THE HOLE WITH SOIL (SAME SOIL REMOVED FOR BACKFILL). 6. WATER THE SOIL TO REMOVE AIR POCKETS AND FILL THE REST OF THE HOLE WITH THE REMAINING SOIL. BOTTOM OF CHANNEL TOP OF STREAMBANK • • • • • • • 0 0 0 0 0 0 0 0 0 0 0 0 TYPICAL SMALL MATTING STAKE LARGE STAKES • • • • • •/ • • • • • • • • • • • e STAKES COIR FIBER MATTING LEG LENGTH 11.00 IN (27.94 CM) TO BEEXTENDED TO HEAD WIDTH 1.25 IN (3.18 CM) • • • • • • • • • • • • TOE OF SLOPE O HEAD THICKNESS 0.40 IN (1.02 CM) LEG WIDTH 0.60 IN (1.52 CM) (TAPERED TO POINT) LEG THICKNESS 0.40 IN (1.02 CM) TOTAL LENGTH 12.00 IN CM) (30.48 PLAN VIEW LARGE CROSS SECTION VIEW OF CONTAINER PLANTING STAKES 1 c 01 LL° CV Cn t1 m Q CO CO CO CO C ro t2 m C 01 N n L O LL_ CC CO CO CO CO (N O N 8) 0 -) N 0 L Q 0_ N/ BARB WIRE FIELD FENCE STEEL GATES ( PROJECT REFERENCE NO. SHEET NO. 1 END POST 166680 2F PROJECT ENGINEER SEAL I APPROVED BY: 028432 �'G•, 5/F GNE� �Q' .ti DATE: 4"� SEE PLANS FOR SPECIFIC LENGTH Michael Baker Michael Baker Engineering Inc. c 0y, NORTH CArkway, 2756800 Phone: 919.463.5488 Fax: 919.463.5490 6 INCH DIAMETER BY 8 FOOT LONG BRACE POST [6INCHDMETER BY 8 FOOT LONG BARB WIRE 3 INCHES INTERNATIONAL License#: F-1084 (TYP.) x x x x x x x x ' '�" DI N C DMS I D N O. 10006 8 i �� 1 GRADUATED IN SIZE FROM TOP TO BOTTOM GETTING LARGER IN SIZE TOWARD THE TOP.i r '—� VARIABLE . . 48 INCHES x x x x x x x x m ~ O 0 Q z " -,_ z E >� X X X X X X X X ISILLJ 9 T STEEL FRAME GATE r - x x x x x x x N V LJ q M VARIES BARB WIRE GROUND LINE X X X X X X X L V NOTES: — Y /i \ \ �� Y/ ) 1 / / i \ 1\ \ \ \ \ \ \ \ ?.�� / 1 24 INCHES (TYP.) 1 / / / / / / / / / / / \ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ NOTE: 1. POST HEIGHT DIMENSION SHALL BE THE SAME AS REQUIRED FOR THE ADJACENT FENCE. 2. CONSTRUCT AN END OR STRESS PANEL, AS REQUIRED IN THE SPECIFICATION, ON EACH SIDE OF GATE. 3. HINGES AND LOCKS SHALL BE INSTALLED AS SPECIFIED BY GATE MANUFACTURER. 1. END POSTS SHALL BE INSTALLED AT A SPACING OF 10-15 FEET. 2. ALL FENCING AND FENCE POSTS SHOULD BE SET 1-2 FEET OUTSIDE OF THE CONSERVATION EASEMENT FOR FENCE LINE MAINTENANCE ( LIKE HERBICIDE SPRAYING ). AP 1 BAKER PROJECT REFERENCE NO. SHEET NO. 166680 3 PROJECT IENGINEER t\Plans\166680_QSB-PSH 03.dgn m c 0-1 a) 0 L 0 CC CO N 0 N 0 N 0 L Q 0_ N/ 5 CONTROL POINT #305 4-' GROUND COORDINATES N: 713456.03' E: 830566.09' ELEV: 3065.15' \ \ \ ROCK CROSS VANE (TYP.) / / / o GRADE CONTJDLRaC J-HOOK VA fE(TYN BEGIN UT1 REACH 1 STA. 10+98.02 18" CMP INV IN: 3048.07' // INV OUT: 3046.94' / / 1 I 148"CMP / 1 I I INV I N :13046.47' �/ ,INV OUT:)3046.36 BOULDER STEP INSTALLED IN PLACE OF LOG DROP RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN / N \\\ N \ \ \ • \ \ N \ \\ 4'GATE WE KIRK FARMS NORTH, LLC PIN: 8731-33-5998 DB: 838 PG: 400, TRACT IV REFERENCE: DB: 562 PG: 286, TRACT II AND DB: 158 PG: 305 PC: C SL: 6260 2 - 8' GATES INSTALLED IN PLACE OF 16' GATE WE KIRK ' FARMS NORTH, I1LC PIN: 8731-33-5998 DB: 838 PG: 400, (TRACT IV REFERENCE: bp: 5 2 1/ G:/286, TRACT II AND Dp: /'f58/ P : 305 \\PC7 C/ SL/ 6 60 / / / 1 \ \ \ / //// ' §TA./12/+3,33.1/b / FLOC DOUBLE DR s P I x I1 / / / / CRO S V/AN(E/ TY".) J /� / /// / / �\ I / / ir. / y / / 1 i / / J8'`{YALN 'r,/ I ` \ ` / c)\ v \ ?fir 1\8" CMP 4 Q INV I N : 3047 95 c INV OUT: 3046.90' 2 - 8' GATES INSTALLED IN PLACE OF 16' GATE \ \ \ END UT1 REACH 1 BEGIN UT1 REACH 2 STA. 13+25.00 ipel._ AS -BUILT\ `N, \`\�\\ \\ \\ \ TOP OF BANK (T�'-P.)N\\ \\ `� \\ \\ \\ BARBED WIRE FENCE (TYP.) AS -BUILT THALWEG (TYP.) 0 \ I nn»uiel uiir \ \ • \ \\ N \ ANN PA MEF in COOTROL ND P ORD 304ES N\` N \\ FAMIL PR PE \TIES\,\L.P �\ N: 713312.24' \ \ I N� 72-72-�837 \ \ E:830259.50 \ \ \ \ ELEV:3038.02' \ \ DB. 4 9 Pk: 163 \ • �.` :�ESSIp4/ • �:. • y• • ▪ '.�� SEAL � ' 1. • 028432 • %� �''•FNGINt 'Qom: APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 FILL EXISTING CHANNEL CHANNEL PLUG NCDMS ID NO. 100068 c• W LLI V) w w N w Z I -- a UT to RUSH FORK UT1 RECORD DRAWING 20 0 20 40 SCALE (FT) CV CV BAKER PROJECT REFERENCE NO. SHEET NO. % 166680 4 PROJECT 1ENGINEER t\Plans\166680_QSB-PSH 04odgn m c 0-1 a) 0 L O CC CO CO CO CO N U C V a) CO V i O_ rr/ WE KIRK FARMS NORTH, LLC PIN: 8731-33-5998 DB: 838 PG: 400, TRACT IV REFERENCE: DB: 562 PG: 286, TRACT II AND DB: 158 PG: 305 PC: C SL: 6260 BARBED WIRE FENCE (TYP.) \� ROCK SILL INSTALLED IN PLACE OF LOC. p.ROP STA. V+78.69 �, e / y / fota, lliE►i—.-i1 gri ;I:_i�ii�l� • 1 END UT1 REACH BEGIN T1 RE CH \ STA. 16+00 1 0 12' GATE / / 4' GATE \ AS -BUILT TOP OF BANK (TY RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN BEGIN UT2 STA. 10+05.88 12" CMP INV IN: 2997.97' 15" CPP INV OUT: 2996.61' AS -BUILT X --THALWEG (TYP.) - X- \ \ \ \\ \\ \\ \\ \ \ GRADE CONTROL ROCK \ ROCK CROSS\VA�E MYR) 4 GATE INSTALLED NOT IN ORIGINAL DESIGN ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 1683 EXIST NG GATE R. HUNG IN TH S LO „'orRON N I IN G1 GINAL DE 12" CMP X INV IN: 2997.70' INV OUT: 2997.63' GRAVE, ROAD \ \ \ NHOOK\yANE (TYP.) CONFIAJENCE STA)`ION UT1 REACH3 STA.19+54.61= UT2 STA. 10+92.40 END UT2 WE KIRK PIN: 8730-09-3258 DB: 838 PG: 404 REFERENCE: DB: 562 PG: 286, AND DB: 158 PG: 305 PC: C SL: 6260 & PC: C SL: TRACT II 7314 SOUTHERN APPALACHIAN HIGHLANDS CONSERVANCY (CONSERVATION EASEMENT) DB: 917 PG: 978 PC: C SL: 7314 84.04 >TOB UT1 REA 3 L000 4' GATE BARBED WIRE FENCE (TYP.) C \ 1 • \CARO/I • �.` :�FSSlp.:••9.• • y • ▪ ••�� • SEAL . 028432 ••'•F•NG I NEB' • Qom: '#41Ak- , i� lai i ►�\.:�,` APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 4 FILL EXISTING CHANNEL CHANNEL PLUG r 4, UT to RUSH FORK UT1 RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 166680 5 t\Plans\166680_QSB-PSH 05odgn m in c 0-1 a) n L 0 CC CO CO CO CO N 0 C V a) O CV s- o_ ram/ a i Z / / / / / 4<, N• / / / / / / / / / / I / I 1 I / / \\\\ROCK SILL I T; LED\ N \\\I.NIDLAGE_OF LOGLo �'6 �?F 2990 \\ / N / WE KIRK PIN: 8730-09-3258 DB: 838 PG: 404 REFERENCE: DB: 562 PG: 286, TRACT II AND DB: 158 PG: 305 PC: C SL: 6260 & PC: C SL: 7314 SOUTHERN APPALACHIAN HIGHLANDS CONSERVANCY (CONSERVATION EASEMENT) DB: 917 PG: 978 PC: C SL: 7314 CONFLUENCE STATION UT1 REACH 4 STA. 24+19.91= UT4 STA. 10+50.55 AS BUILT THALWEG (TYP.) UT1 REACH 3 --B-E-GTN_ T 1_ REACH 4 Sfk -22+-50 94 -_C0N_FWENEE- STATION - U T3_ iTA_._ 26_3 5o0 CONTROL POINT #500 STATE PLANE COORDINATES N: 712855.04' E: 829608.53' ELEV: 2989.63' . FILL EXISTING CHANNEL CHANNEL PLUG —LOG- DROP- INSTALLED — — --NOT-1 -_ BO U C D Ems-R (T 74--y <•.„, / Z+ 77 i /1 //•'j/ 77 77 �/ 77 / 77 / END UT4 STA. 10+41.90 TOB UT1 REACH 4 % BE-G I N UT4 BARBED WIRE FENCE (TYP. X�X / T /X� / / / / XiigARBy� / // / // / / / / Xr I n n o �► o /TJ�7 n / / / / / / 21-72 6837 -STA. 10+00.00 �I -PLOW GA E #3 INV 4 2967.76' / 7/NV OUT: 2965.26 (BROKEN) 36".�N1P IN: 2969�. INV OUT�296 �// GATES N PLACE o 7 TALLED 16' GATE 3 --- —____ _ ___ ___ ___ 20- POPLAR 77 AS-B U1-LT - = _ _ TOP OF BANK (TYP.) 3-- ,vic_c-r( ELE�TRI 3 PROJECT 1ENGINEER 01111/1/14 �.` :•.tSSIp�:9':. • y• , '•�� SEAL T. '• MN 1. 028432 ••'•ENG I NE`c: '> APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 1NTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 x x xT—x 7 i i / ddif 11111. d�4k'dll U_ ,��uniil ------------ __—--S96Z d - NC N K OROPD RUSH FOR RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN r 3 •o w tn LLI d UT to RUSH FORK UT1 & UT4 RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 166680 6 t\Plans\166680_QSB-PSH 06.dgn m c 0-1 a) 0 L O CC CO CO CO N U NQa O \ i \ O_ ram/ a i Z w LLI cn LLI W LLI Z J X PIN: 8730-09-3258 AS -BUILT TOP OF BANK (TYP.) D LOG \DROI�1 \ ')ROCKISOLIBLE O6K INSTALLC RO9KD9 CROSS . . STA.'28+00.77 A 60" CMP y INV IN: 2940.06' I I INV OUT: 2937.31' I 1 PP RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN FENCE ENCROACHMENT WAS CORRECTED AFTER THE AS BUILT SURVEY WAS COMPLETED. SS VAN E IN PL CE OF UBLE DI OP ANE (ThP BOULDffR STEP)(TYP.) \ \ I N \\( r I \ I I PINE " IN IN: 2 40.13'CMP\ INV 0 7: 29 k38' • \ ------ \�\\—. \ — �\ FORK 9 / 1 OPT / PIN: 8721-72-6837 N X ::._____ /�///Ji----:----/ % / —W / - %�- Et-\"' G AN.� OCK � :d4 ne1 1t„ �� ::;.l.o Z�� ,7�� -� 18„\ \IN: 2928. : 2928,2 IN :2 INV-OUT2927 \ ,c* N N \ CONTROL P INT #3 GROUND COO DI%A N: 712091.05' E: 829287.74' ELEV: 2934.51' AS -BUILT THALWEGYI \�X • / FILL EXISTING CHANNEL CHANNEL PLUG PROJECT 1ENGINEER �.` : ��ESSIp�:•9 �:..:*';.. • '.q4SEAL ' G. 028432 ,,,,,i"l iiiii ►���-,` ,, APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 / WLB�/— / / / i / // / r 8721-72-683 4" UT to RUSH FORK UTI RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 166680 7 t\Plans\166680 _QSB-PSH 0 7odgn m i c 0-1 0 i L O LL CC CO CV O CV 0 (NI 0 L Q Q CV x x SEE SHEET 6 x x WE KIRK PIN: 8730-09-3258 DB: 838 PG: 404 REFERENCE: DB: 562 PG: 286, TRACT II AND DB: 158 PG: 305 PC: C SL: 6260 & PC: C SL: 7314 SOUTHERN APPALACHIAN HIGHLANDS CONSERVANCY (CONSERVATION EASEMENT) DB: 917 PG: 978 PC: C SL: 7314 SOIL ROAD PIN: 8721-72-6837 AS -BUILT / TOP OF BANK (TYP.) // ROCK VANE (TYP.) / BOULDER STEP (TYP.) / / / / / / // / x CONTROL POINT #307 - - GROUND COORD-I-NATES v f788.Q1' E: 829041.22' ELEV: 2917.97' Soil road extinguished. /1/ ,f1"*Ii4R\ / /// / WI BARB 1/ ,/� X/X 22"/� —// DOUBLE CHERRY// / / / GKJ-I�(bCSK VANE (TYP.) - ENI ///• 18" CHE14 / / \ / 7 7 // /////� /// \/II/ //// Il(//. END UT1 REACH 4 STA. 37+80.92 , / / / / / / I I/ i 7 I / / / r ROCK CROSS VANE (TYP.) --LOG J-HOOK VANE INSTALLED IN PLACE OF GRADE CONTROL ROCK J-HOOK VANE AS -BUILT THALWEG (TYP.) PIN: 8721-72-6837 SOIL ROAD - _-39 +_00- PROJECT IENGINEER ����\ ICI AR0//4• c▪ �f �.` : �)E$ S 1p� :•9 •• • • SEAL T. ▪ • MN 1. 028432 t ••••`NGINF.�l'•Qom; APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 CONTROL POINT #308 GROUND COORDINATES N:711505.47' co E: 828898.77' ELEV: 2918.81' RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN FILL EXISTING CHANNEL CHANNEL PLUG UT to RUSH FORK UTI RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 1 166680 8 PROJECT IENGINEER t\Plans\166680_QSB-PSH 08odgn m c 0-1 a) 0 L 0 LL CC CO N 0 N 0 N 0 L Q 0_ N/ a BARBED WIRE FENCE (TYP.) / / / / ROG R 9 Pk)� ROCK SI1414I -Ti i '� IN PLACE c ID/ROPI I III ' 'Ill 11111/// j// 1 1 1 1 III AS -Big T /�//,i TOP OF BANK “?,Y//. <4,-)_7;v7v'v,4)„,v(;// / / /// - - ^ I BEGIN U-6 / / ///,� STA. 10+00.3 7 \ \ \ \ \ \ \ \7 7� �ii/z//// / /// 1/ / / /✓ LINED\\ I RFLOW \/ CHANNEL / \ 1- FOYR BMP \ % '/ \ \ _ _ \ CbNTR LROLNLT 3 3 ,GROUND COORDINATES N 74423.87' \ E: 829121.90' �E€EV -3097 1' 7 _ / ANNE PALMER FAMILY PROPERTIES, L.P. PIN:8721-i2 DB: 489.P9:J68-3 _ / �� / / i // / / / / / / // / / / / �01 / / / / �'L / / / / / // / / 777 7 \\ \\ \ \ \ 4' GATE AS -BUILT THALWEG (TYP.) ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 1683 • 3060 ----- =H-0-01(ykT'YP4- BOULDER STEP (T x—�— CONTROL POINTV302\\ \ \ GROUND COORDINATES N: 713975.07' E: 829341.61' ELEV: 3058.92' BARBED WIRE FENCE (TYP.) RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN *14111111111111 SIO�:•9�:. • i'• • ••�� SEAL• • 1. 028432 • � �•'•FNG I NF.�' • Qom:441.,1111110 APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 / / - _�/ / / / / 7 7 \ W LLI w w Z FILL EXISTING CHANNEL CHANNEL PLUG UT to RUSH FORK UT3 RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 166680 9 PROJECT 1ENGINEER t\Plans\166680_QSB-PSH 09odgn m c 0-1 0 L 0 CC CO CO N U N O 0 i N Q l9/ i ENI / / / / / / / ///// /30 / \ \ \ I I \ \ \ \ \/\1/>\ \ \ \ )r \ \ \ \ \ \ \ � / / / / / / / BARBED WIRE FENCE (TYP.) / 1 \ \ N \ \ N \ \\ \\ \\ XIV RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 1683 AS -BUILT TOP OF BANK (TYP.) o_ X \ - .� - a - \ \\ ROCK CROSS VANE (tY\P.) ° — \\ \ -* \ \ o \ \ors \ \ \A AN`T�YP ` \\ \7 \ \OGTE AND RRTYF \ HOC -H00 y fR .) \ \ N STEPROOL(T`YP) \ \ 7 \ \ \ // °zo \-SURVEYED VEG � /, 7 i i N� PLOT -CORNER ���' /- /� / IN VTR 7 £ O DIGI-ATS I N S1`AL \ \\ \ i/ \ \ \ \ \ \ APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 M FLO�/ C�AUC3E #y/ / FrOf anakmalMmEIII In n�r%Gf!�l� \-(TTYP.) BOULDER STE (TYP.) \ \ \ \ \ \ \ 7-00 \ \ \\ \ \ 7. 7. 7 \ \ \ \ ED \ \ I N7P-LAC E O FGE O L I F�` \ \ \ \ \ \ N. \ \ \ 7 \ \ \ \ \ \ \ \ N \ N N ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 1683 \ \ \ - \ \ \ 1 N CONTROL POINT #301 GROUND COORDINATES N: 713530.52' E: 829447.33' ELEV: 3021.99' \ \ \ I T. TO'R� OF BANK` `\ N_ \ \ LSD FO BARBED WIRE FENCE (TYP.)7. • FILL EXISTING CHANNEL CHANNEL PLUG \ \ \ \ \ \ \ \ r W I/) W v) UT to RUSH FORK UT3 RECORD DRAWING 20 0 20 40 SCALE (FT) BAKER PROJECT REFERENCE NO. SHEET NO. 166680 10 t\Plans\166680_QSB-PSH 1P.dgn m c 0-1 a) 0 L 0 0 CC CO CO CO N 0 N 0 N 0 L Q Q a 1 W 77 �\ 77 77 77 77 77 ▪ 77 77 \ \ 77 77 77 77 AS -BUILT TOP OF BANK (TYP.)— BARBED -WIRE FEN GE-£a'-P .) 77 ---— _---- LOG DROP 7 ROCK J-F OOK VANE4TTYP.) 77 77 77 77 77 77 77 77 • 7 77 77 77 77 77 RECORD DRAWING LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 4/14/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SUBMITTED WITH THE MITIGATION PLAN 77 77 ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 18113 48" CMP INV IN: 2988.02' INV OUT: 2986.84' 12" CPP INV IN:989.28' z 4.N,V OUT: 88:60'.' // STA. 22+i25.5 •�, i SOCK CROS. VANE (f YP4 CONJROL POINT #300 GR ND COORDINATES N: 13167.63' E• 29461.72' EV: 3014.21' 12" CPP INV I N : 2989.09' INV OUT: 2988.62' 2 - 8' GATES INSTALLED IN PLACE OF 2 - 16' GATES RELOCATED ACCESS ROAD LIVESTOCK WATER SYSTEM DRINKER & HARDENED PAD #1 ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-6837 DB: 489 PG: 1683 / xJ xi/WA E WAjER SYSTEM W�tLL LIVESTOCK WATER SYSTEM DRINKER &HARDENED PAD #2 I � ATES INS ALL • ACEOF2/16 141I1iti7a ---- ES ANNE PALMER FAMILY PROPERTIES, L.P. PIN: 8721-72-683 G: 1683 •2990----- ROCK DOUBLE DROP CROSS VANE (TYP.) 2985/ /8" "/R ~ \- \ \��_ \ \ -iv '• L h ----- \ 3 STA22+72.1� \ \ :c\O\NF:447\-\\--= - 77 ��� \ \ 7 �77 \ �77 \ \ �7 \ \\ \ \ \ \� \ \ 77 + _ \ \ \ \ \ ' i \ 77 \ \ 4' GATE kS-BBUILT THALWEG ����� �� �� \ 77 \ �� N BARBED WIRE FENCE (TYP.) • ♦ I OLD SILO ♦ ♦�_-i - - 5960 FILL EXISTING CHANNEL CHANNEL PLUG PROJECT IENGINEER APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 Lci 2 4v UT to RUSH FORK UT3 RECORD DRAWING 20 0 20 40 SCALE (FT) 1 3,060 l BAKER PROJECT REFERENCE NO. 166680 PROJECT ENGINEER SHEET NO. 11 c 0-1 -J LL 0_ m U) co c9 co co 7 C 0 m c 01 n i O 0 L CC CO CO N 0 CV N O L CV O i� Q-[1- CV/ E Ln�0 3,050 3,040 _ • . . N ti . L AS -B U L T OEN T 46 HA L CMr WEG • • _ ♦ ♦ N UT1 ♦ F SI HA VAF ,FYi'Tinlr r.i nl inn ;. ••�� SEAL e • • t. 028432 APPROVED BY: DATE: Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 Michael Baker NCDMS ID NO. 100068 iiiliiiiiiiiiliiiiiiiii� 1< ---, - 3, 030 .— 3, 030 3, 020 3, 020 10+00 3,020 3,010 3,000 2,990 2,980 11+00 12+00 13+00 14+00 15+00 • • • • AS-B U L T T H • AL WE G • • D Nam ES • GN • • UT1 • _ 3,020 a •� • _ 10. • i EXI STING RO U 16+00 17+00 18+00 19+00 1 D • • • 20+00 21+00 3,010 3,000 2,990 2,980 1 BAKER PROJECT REFERENCE NO. 166680 PROJECT ENGINEER SHEET NO. 12 m CV CV C Q1 CV -J LL t2 m U) co co co i C 0 7 m c 01 n i O L_ L (11 CC CO CO CV 0 CV OQ 0 -) CV Q LC \ i� CV/E Ln�Er% 2,980 — 2,970 2,960 2,950 A • s- BU IL T T H • ALW E G - D UT1 E SI G N TH AL ti W • E G • XI ST N G Gp< 0 U N • D _ _ MINN 040 ;. • SEAL e 028432 'mot:%•.4/G1NE% '•• • APPROVED BY: DATE: Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERN ATION AL License #: F-1084 Michael Baker NCDMS ID NO. 100068 — 2,960 2,950 1< 2,940 2, 960 2,950 2,940 2,930 2,920 • 0' • _ 22+00 X TI N ••- • G 0 0 U N D 5 b • JI 1 f • AL / W- 27+00 28+00 / / / 6 0 P 23+00 • • • • • MEN • • • • • A • 29+00 Ssa • 24+00 UT1 • ,- 30+00 • 2,940 25+00 • 1 DE 26+00 SIG A 2,960 2,950 2,940 2,930 • • • 2,920 1 l BAKER PROJECT REFERENCE NO. 166680 PROJECT ENGINEER SHEET NO. 13 c 0-1 LL m U) co co co m c 01 0 i O LL -C CC CO CO CO CO (11 CV 0 N OQ 0 -) CV OCT ad - CV/ LnEr% 2,930 UT1 T NG C 0 U D k% SEAL • 028432 • APPROVED BY: DATE: 2, 920 - •-_.._ Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 Michael Baker ` NCDMS ID NO. 100068 [IIIIIIIIIIIIIIIIIII1iir 1< — - - ►■I; �_1WOI - _ 1 � .T -•"-- 2, 910 = . �•-. _..�_ 2, 910 _ _ • 2,900 -"�'�= • • =•�-�___ 2,900 •_ 2,890 2, 890 33+00 34+00 35+00 36+00 37+00 38+00 1 BAKER PROJECT REFERENCE NO. N. 166680 PROJECT ENGINEER SHEET NO. 14 m csi CV CV c 01 LL m U) (s) co CO CD c o_ 7 m Q 7 c 01 a) 0 i O 0 L CC CO CO CO CO CV 0 3,000 iLC u 0 3,080 3,070 3,060 3,050 3,040 ♦ ♦` N.. • ♦ D E S G . N TH A /. LVVE G • A B UI L T T H A LWE G . _ UT3 0 E XI S TI • NG G RO U N D • 040 ti. 9' •� SEAL � • 028432 ''-,-t7):,i:f•fe./vNGmiN\ttc,%\k''::\•:::l APPROVED BY: DATE: Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 Michael Baker NCDMS ID NO. 100068 3,060 3,050 . 10+00 11+00 12+00 13+00 14+00 3,040 3,040 3,030 . . . a • • ., . • C XIv T IN C C R . O U ND UT3 46, • 3,020 3,010 . A . B U . I LT IA . 4.r LWC G . . Y .. ., . 3,040 3,030 D CI`J TH • L WEG • • . 1 . • • 3,020 3,010 14+00 15+00 16+00 17+00 18+00 3,000 1 BAKER PROJECT REFERENCE NO. 166680 SHEET NO. 15 3,010 3,000 2,990 2,980 UT3 • • D E SIG • N - T H A L W EG • EXISTI N G GROU N C Mmi PROJECT ENGINEER ,,�N� C A R p�/.,' • :� SEAL '1 1: � I 44 APPROVED BY: G. 1. 028432 ,,��wiiiiiu� ���,, DATE: Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 1NTERNATIONAL License #: F-1084 Michael Baker 1< NCDMS ID NO. 100068 19+00 20+00 • • —, • 21+00 • - A S- BU L T T H ALW E G • • • • 8" AMP 2,990 L. 2,980 22+00 23+00 24+00 3,000 UT3 3,000 c 01 Lri -J LL m m cn Q CO C9 CO CO i c CO c 01 0 i O L_ L CO CO CO CO CV 0 2960 CV/„\ 2,990 2,980 2,970 • • • • D E S G N TH \ A L WE — • G • • Or- • • XI S Ci Ci N (DU N U 2,990 2,980 • - 1, - • • • Was WEE 1 N 2,970 23+00 24+00 25+00 26+00 2,960 BAKER PROJECT REFERENCE NO. SHEET NO. 166680 16 PROJECT IENGINEER t\Plans\166680_QSB-PSH 16 BMPodgn m c 0-1 a) 0 L 0 LL CC CO N 0 N 0 N 0 L Q 0_ N/ a M op a Z •� \ / 1 VN ; ' / / / / / / / / II II 1`\\\\\ / \ �� �/ ,/ /� // // // 1 ``\ \ \ \\ / / / / / — — I \ \ \ \ \ ,� / i / / / / a II \ \ ,` — / / / I I I I `� \ \ \ \ �� � / // I I 1. \ Th � / I O� I‘4 b • .Vc<, \ S � ,.,, I J 1 �\ - - N j I I \ ( \ \ 1 \ \ \ 1 \ \\ \ I I I 1 I I / / I I / / I I / 1 I / I I I I I I 1 \ 1 I I I I I 1 I 1 \ I \ I 1 I I I I I I I I I I I I I I I I \0 \C c Proposed BMP Planted Species UT to Rush Fork Mitigation Project - NCDMS Project No. 100068 Botanical Name Common Name % Planted by Species Wetland Tolerance Shallow Water Zone (50 Herbaceous Plants per 200 ft2) Juncus effusus Common Rush 10% FACW Peltandra virginica Arrow Arum 10% OBL Pontederia cordata Pickerelweed 10% OBL Sagittaria latifolia Broadleaf Arrowhead 10% OBL Saururus cernuus Lizard's Tail 10% OBL Scirpus cyperinus Woolgrass 10% FACW Carex vulpinoidea Fox Sedge 10% OBL Sparganium americanum Bur -reed 10% FAC Carex lurida Shallow Sedge 10% OBL Polygonum pensylvanicum Smartweed 10% FACW Temporary Inundation Zone (8 shrubs per 200 ft2) Alnus serrulata Tag Alder 10% OBL Cephalanthus occidentalis Buttonbush 10% OBL Cornus amomum Silky Dogwood 10% FACW Ilex verticillata Winterberry 10% FACW Rhododendron viscosum Swamp Azalea 10% FACW Physocarpus opulifolius Ninebark 10% FACW Sambucus canadensis Elderberry 10% FACW Leucothoe fontanesiana Highland Doghobble 10% FACW Vaccinium corymbosum Highbush Blueberry 10% FACW Xanthorhiza simplicissima Yellowroot 10% FACW Notes: -Final species selection may change due to refinement of site conditions or to availability at the time of planting. If species substitution is required, the planting Contractor will submit a revised planting list to Baker for approval prior to the procurement of plant stock. - Shallow Water planting zone is from basin bottom to elevation 3085.5' while Temporary Inundation planting zone is from elevation 3085.5' to 3086.5'. - Embankments and perimeter fill slopes will be planted with non -clumping turf grasses (no trees or woody shrubs). o,.\N1CAR4(S y• , • .�� SEAL ! 028432• ••••FNG I NEB • Q`� APPROVED BY: DATE: Michael Baker Michael Baker Engineering Inc. 8000 Regency Parkway, Suite 600 Cary, NORTH CAROLINA 27518 Phone: 919.463.5488 Fax: 919.463.5490 INTERNATIONAL License #: F-1084 NCDMS ID NO. 100068 UT to RUSH FORK AS - BUILT RECORD DRAWING 10 0 10 20 SCALE (FT)