HomeMy WebLinkAboutSW6220302_Plansheet DA1 - Proposed Drainage Area_202203311
1
I
I
I
I
i
EX HANG
\ 1 CI '8777 ARMY & AIR FORCE EXCHANGE SERVICE
L
HOOD 388.59 80
\ INV OUT 38
\\ I 1
41#�W"M M
L
SEAL
LUL.i"'L
025483
3-16-22
GRUBER ROAD
101
BMP AREA (AC)
INFILTRATION BASIN 3.77
LEGEND
■ M ■ DRAINAGE AREA
275--- CONTOUR
111Calibre
DATE
1-30-21 REVISED PER BASE COMMENTS RLW
3-16-22 REV. PER DEQ SW COMMENTS RLW
ICONSTRUCTIO
SET
20 OCT 2021
DRAWN BY:
RLW
CHECKED BY:
HSR
COORDINATION: DATE:
XXX
RECOMMENDED: DATE:
APPROVED: DATE:
PROJECT:
CONSTRUCT NEW
GRUBER MINI -MALL
FT. BRAGG,
NORTH CAROLINA
DRAWING TITLE:
INFILTRATION BASIN
DRAINAGE AREA
DATE: I SCALE: I SHEET:
20 OCT 21 AS NOTED DA1
DRAWING/PROJECT NO:
0530-11-000004
0 15 30 60
1 inch = 30 ft. Horizontal
Calibre Engineering, Inc.
PO BOX 4041
Wilmington, NC 28406 (910) 791-4441
www.calibre-engineering.com
Construction Management Civil Engineering Surveying