Loading...
HomeMy WebLinkAbout090173_Routine Inspection_20220728SING ilavl�a Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: tAS1Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Farm Name: Arrival Time: 1.00 Departure Time: Owner Name: Rill CAW Mailing Address: Physical Address: :70 Owner Email: Phone: County: bi l Region: fieM Facility Contact: Dill C VUI Wl Onsite Representative: b(//j m2 Certified Operator:3 6jI S4L �j Back-up Operator: Location of Farm: Title: Mai Latitude: Integrator: Phone: �mItn f reed Certification Number: Certification Number: Longitude: $$• p asW.6$B#p{y�+�p }}�{ �`bb� �49xi#M4#4�Yj 9#««K»��I25Ys=tpnnoYil�....asa$'k#RAi4044k §b&b9aad@D} �A $P#'S '4f aar�sWxma`��aaa"$aa'a�*ra�egs�aa3'a'.� utr°aaaap e}ng.ia4imimaaas lulG,:�&#'aa#axat.ea�4` `°a ��.�tlVse:va 3'a•..�xsvaa�$xp #� A b'nxt�RN'b$X+d$WY$8C8%. 45 k4Da Ba $ff.}4ae0$}$k##"4�OA lfi9 a.F=ro• Wean to Finish -- a»f Layer 1 a Dai Cow ==' Wean to Feeder --If Non -La er i •Dair Calf It. Feeder to Finish --#xaffasm#rx$a-a$' ;. Da Heifer Farrow to Wean--t*%; t# ! nt i�DryCow �s # �--" Farrow to Feederinisha„ �n@�s' *r j4$4u o- fresC ' i Non-Dai s : ult g :f I . tD 1$y - : Farrow to Finish --,* Layers -- a ate' Beef Stocker --g*j `.� Gilts Non -Layers #r Beef ==p& Boars Pullets Pullets Beef Brood Cow <3S aaa a$$9 a+aav 5a Turkeys +ap ae###4##9&nae «}ss a V... Turkey Poults .u#4nse#°a �ass+°da#a t$.+m+P}s $ktrffx aa�a,#}s#, arrkrwe.mpaam��kamaanan g$p*xa$wd$ si� ffigp. 'aaa kra## tiak: #&6 $S� I1 14y �a Other giryagaµ°a@+$4 ya 'iRtxkN'.fi'r'sn+tr.u}"a¢&PkA.nA iia !ta9aA'}aX... ^'$. Al lkbbx. ai Fd•%.L.t='i'8.'a1iS! Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes T No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes 1e No El NA El NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes I e N No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes n No ❑ NA ❑ NE of the State other than from a discharge? ❑Yes cNo ❑NA ❑NE Page 1 of 3 5/12/2020 Continued Facility Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Identifier: rw -H fed F3 -PI Spillway'?: Designed Freeboard (in): Observed Freeboard (in): t-7 *Hi iqb 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? ❑ Yes ❑ Yes If any of questions 4-6 were answered yes, and the situation poses an immediate public health or envir 7. Do any of the structures need maintenance or improvement? 8. Do any of the structures lack adequate markers as required by the permit? (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. No ❑ NA ❑ NE No ❑ NA ❑ NE Structure 6 NI Na 7O !w No ❑NA ❑NE IS] No ❑NA ❑NE onmental threat, notify DWR ❑ Yes 0 Yes O Ye No ❑ NA ❑ NE No ❑ NA ❑ NE s I \ No 0 NA ❑ NE ❑ Yes fNo ❑ NA ❑ NE ❑ Yes [JNo ❑NA ❑NE ❑ Excessive Ponding ❑ Hydraulic Overload 0 Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 9I r I UN W ' 0\ I-7Ts ��E d � 13. Soil Type(s): v 0tum, Cate, FU{W 14. Do the receiving crops differ from those designated in the CAWMP? 15. Does the receiving crop and/or land application site need improvement? 16. Did the facility fail to secure and/or operate per the irrigation design or wettable acres determination? 17. Does the facility lack adequate acreage for land application? 18. Is there a lack of properly operating waste application equipment? Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑ WUP ['Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Yes �No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No El Other: ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NA ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE ❑ NE 21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes No 0 NA ❑ NE 0 Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall 0 Stocking 0 Crop Yield ❑ 120 Minute Inspections ['Monthly and 1" Rainfall Inspections El Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes t No ❑ NA 0 NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No 0 NA 0 NE Page 2 of 3 5/12/2020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes No ❑NA ❑NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ] No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes cl No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes m No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE t ueshon p hug t�i i6 ix9aie*cominei ° ° 0. 1at�li9 Fut Seed on the, IagoonS but BIN hot \Aar isnr f { pfNg_ KW? UP -K wDtK firm LooKS great Reviewer/Inspector Name: Reviewer/Inspector Signature: Ka e For --not K*Vat �-Ks Phone:91 /q�, F0-9745 Date: 1 2 Page 3 of 3 5/12/2020