HomeMy WebLinkAbout20070484 Ver 1_Certification of Completion_20070917Certifcate of Completion ~T ~~
DtiyQ ProjectNo. '
-T ~~ - U~~ ~. County: ~~I~X~.~C~(e~- ~a
Applicant: ~ p h yl ~ y ~ro w~ +
Project Name: Lt~t .~ 3 L~~,y.s '~~~ n~-
~ ~orsv~Ii~. , L~I~
Date. of Issuance of 40I Water Quality Certification: .~ ~ b ~ ~ C kv
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Ralei h
NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized
agent, or the project,engineer.. It is not necessary to send certificates from all of these.
Applicant's Certification
I, ~unn~y ~ro~/r1 ,hereby state that, to the best ofm abilities d
. diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance. and intent of the 401 Water Quality Certification and
Rules, the approved plans and specifications, and other supporting materials. ~ ~~~~~
O
Signature:. (/ytiYj~ .,~ c~~
. Date:' `~ r~ G 7 S k P 1 7 2007
Agent's Certification ~ ~ ~~ ~~i? - ~warER OuAI~ i~'
. 4YETI,MIt;~A32G S'(N?'::,{,TF.i~ 3RANCH
I' ~ , herebystate that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
If this projecf was designed by a Certifced Professional
I' , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time} the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: Registration No.:
Date: