Loading...
HomeMy WebLinkAbout20220143 Ver 1_USACE Permit_20220714Strickland, Bev From: Hopper, Christopher D CIV USARMY CESAW (USA) <Christopher.D.Hopper@usace.army.mil> Sent: Thursday, July 14, 2022 3:43 PM To: andrew.ross@floyddevelopment.com; Harbour, Jeff W; Graham, Rhiannon J Cc: Cohn, Colleen M; Dailey, Samantha J CIV USARMY CESAW (USA); Kim Browning; Ashley Yarsinske Subject: [External] SAW-2021-00788 / Floyds Landing / US Highway 70 Business / Smithfield / Johnston County, NC - NWP 29 VERIFICATION Attachments: SAW-2021-00788_Floyd Landing_US Hwy 70 Bus_Smithfield_Johnston County NC_NWP 29 Verification.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good Afternoon, Mr. Ross: Please find the attached Nationwide Permit (NWP) 29 for Residential Developments for: SAW-2021-00788 / Floyds Landing / US Highway 70 Business / Smithfield / Johnston County, NC Please note the attached Mitigation Responsibility Transfer Form must be retuned signed by the Mitigation Sponsor prior to any ground disturbance. This electronic copy is an official Department of the Army Notification. However, if you wish to receive a paper copy, one will be mailed upon request. Please let me know if you have any questions or concerns. Christopher D. Hopper Regulatory Specialist U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 0: (919) 554-4884, Ext. 35 M: (919) 588-9153 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://regulatory.ops.usace.army.mil/customer-service-survey/. Thank you for taking the time to visit this site and complete the survey. 1 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-00788 County: Johnston U.S.G.S. Quad: NC-Powhatan GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: Floyd Landing Holdings, LLC. Andrew Ross Address: PO Box 1328 Cary, North Carolina 27512 Telephone Number: 919-460-3027 E-mail: andrew.ross"ovddevelopment.com Size (acres) 180 Nearest Waterway Swift Creek USGS HUC 03020201 Nearest Town Smithfield River Basin Neuse Coordinates Latitude:35.536883 Longitude:-78.378815 Location description: The Flovds Landing project is located on the south/west side of US 70 Business, approximately 2,800 feet northwest of its intersection with M. Durwood Stephenson Parkway in Smithfield, North Carolina. The site comprises agricultural fields, forested buffers along streams, and broad forested floodolains of Swift Creek. Description of projects area and activity: This verification authorizes the use of Nationwide Permit 29 to impact stream and wetland resources associated with development of the US 70 Business Assemblaee (Flovd Landing) in Smithfield. Johnston County, NC. Specifically, this verification authorizes the permanent loss of 193 linear feet (lf) (723 square feet (sf)) of Stream Tl (Impact Sl) to construct a road crossing between developable portions of the tract. The road crossing would also install 55 If (207 sf) of riprap stabilization (Impact S2) downstream of the crossing, and work would be performed within a temporary dewatering area of an additional 20 If (75 sf) (Impact S3), with ten feet on either side of the crossing temporarily impacted. A second impact area associated with road and parking fill would require the permanent loss of 4,664 sf of Wetland Wlb (Impact WD. An additional 305 sf of temporary impact would be required during construction. No other impact to jurisdictional resources is authorized. Applicable Law(s): ® Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 29: Residential Developments. SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 1/25/2022, and the enclosed plans Floyd Landing impact exhibits (9 pages), undated DATE. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. SPECIAL CONDITIONS a. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Form. The requirements of this form, including any special conditions listed on this form, are hereby incorporated as special conditions of this permit authorization. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Christopher Hopper at (919) 554-4884 (05) or christopher.d.hopper(a)usace. army.mil. Corps Regulatory Official: R Date: 07/14/2022 Expiration Date of Verification: 3/15/2026 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.anny.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Terracon Jeff Harbour Address: 2401 Brentwood Road, Ste 107 Raleigh, North Carolina 27604 Telephone Number: 919-805-4208 E-mail: ieff.harbourAterracon.com Action ID Number: SAW-2021-00788 County: Johnston Permittee: Floyd Landing Holdings, LLC., Andrew Ross Project Name: Floyd Landing Date Verification Issued: 07/14/2022 Project Manager: Christopher Hopper Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Christopher Hopper Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or christopher.d.hopper@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date MEMORANDUM FOR RECORD U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: Floyd Landing Holdings, LLC., Andrew Ross Project Name: Floyd Landing Action ID: SAW-2021-00788 County: Johnston Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements: Permitted Impacts Requiring Mitigation* 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal .107 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03020201, Neuse River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal .22 Mitigation Site Debited: Falling Creek Stream and Wetland Umbrella Mitigation Bank: Falling Creek Mitigation Site (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Version 10 June 2020_updated CESAW-RG (File Number, SAW-2021-00788) Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: A letter from Wildlands Holdings, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility, dated 1/20/2022 was included with the preconstruction notification. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC27587 (or by email to SAWMIT@usace.army.miD. Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: Christopher Hopper USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: christopher.d.hopper@usace.army.miI 07/14/2022 USACE Project Manager Signature Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mil. /j II �/ C O / 1 1 � f - ACT # �a RESTORATION NOTES FOR TEMPORARY IMPACTS: WETLANDS ARE TO BE RETURNED TO ORIGINAL GRADE AND SEED WITH WETLAND SEED MIX. STREAMS SHOULD BE RETURNED TO ORIGINAL CONTOURS AND CORE FIBER MAT EMBANKMENTS AS NEEDED. I M PACT TOTAL ZONE 1 ROAD IMPACT 15,027 SF ZONE 2 ROAD IMPACT 7,254 SF ZONE 1 BUFFER IMPACT 2,299 SF ZONE 2 BUFFER IMPACT 1,597 SF WETLAND ROAD IMPACT 4,664 SF PERMANENT STREAM IMPACT 723 SF 193 LF PERMANENT STREAM IMPACT — NO LOSS(RIP RAP) 182 SF 55 LF TEMPORARY IMPACT TOTAL ZONE 1 UTILITY IMPACT 1,298 SF ZONE 2 UTILITY IMPACT 903 SF TEMPORARY STREAM IMPACT 41 SF 10 LF WETLAND ROAD TEMP. IMPACT 305 SF SHEET 1 _ REVISIONS: CE GROUP FLOYD LANDING 301 GLEAVE. OVERALL KEY MAP suIT�rE220 NORTH US HWY 70 BUS W RALEIGH,NC NC 27603 400' 0 400' 800' PHONE: 919-367-8790 FAX 919-322-0032 SMITHFIELD, NC SCALE: 1" = 400' i � /ice.% � • \ VA � P �a� \ � )� �A � �\ �a� / 0 f 8 . .150 GO I firs � f —160 114500 45 /�� M� o ;t1AS�LV\II r Ing it s� o 4�� /, o .Ds c� �� v n _✓ �✓ o \� ` 1 ) r-'^ r} jJ 0 C�rl REVISIONS: CE GROUP w 301 GLENWOOD AVE. SUITE 220 RALEIGH,NC 27603 400' 0 NORTH 400' 800' PHONE: 919-367-8790 FAX 919-322-0032 SCALE: 1" = 400' FLOYD LANDING EXISTING CONDITIONS US HWY 70 BUS W SMITHFIELD, NC SHEET 2 g•, EXISTING FARM ��6- f-1176'si gill .I�� �'1��r,������� •• �i' �I► ��?► �p�`�. III � �� �►®��►'e:�:�::'� •• ..� �� ill �-.�.,.,..•,.., ,,.1, , : � ,� ............. �:,�a�► :. �� r� � �.. � ♦ � {'%_C�•� j h I Ili ���\ ��� �•�•�•�•�•�•�•� • -. � � � � � �2'��Gli�=��I''�I''IIIII'1' ���'III�/1� .,.:: '. ♦ ��`'�` .� ', �I I ♦, .Doan ' loohIMPACT #1 ROAD CROSSING FLOYD LANDING son NORTH 1 11 .1 . - - US W I M PACT TOTAL ZONE 1 ROAD IMPACT 15,027 SF ZONE 2 ROAD IMPACT 7,254 SF PERMANENT STREAM IMPACT 723 SF 193 LF PERMANENT STREAM IMPACT - NO LOSS(RIP RAP) 182 SF 55 LF 45 40 PROPOSED GRADE 145 140 COVER MAIN 35 30 25 I 8" DIP GRAVITY SEWER ------------------------------------------------ -------------------- --------------------- 8' x8'I0RnY��,,, - - "vLvEKI STREAM OTTOM 135 130 125 PAD G � � DWALL IN=123.60 SEE PL N VIEW FOR ENDWALL WING CONSTRUCTION (TYP.) ENDWALL INV OUT=121.90 CLASS "_" RIPRAP RIPRAP D50=-DMAx= E INV — — — — — CHANNEL GEOMETRY) 21 cc (-o v 00 f*- rpl. C0 Ln N v r C.0 ul) 4 N v r 0")r u� qt o N r ti O o M r N ti O o M r N r LnV� O of M v r N 0) 01) r-� N v r 0 N ti 4 N v r N It N N v r O Cl N N N v r N ; N N v r 00 r N r 121 10+00 11+00 12+00 13+00 SHEET 4 REVISIONS: FLOYD LANDING CE GROUP 30' 0 30' 60' IMPACT # 1 ROAD CROSSING 301 GLENWOOD AVE. SUITE 220 _ PROFILE RALEIGH, NC 27603 SCALE: 1" - 30' PHONE:919-367-8790 US HWY %O BUS W FAX 919-322-0032 SMITHFIELD, NC - I RCCLIIVC I LIIVII I Vr — — - DISTURBANCE (TYP.) / I M PACT TOTAL WETLAND ROAD IMPACT 4,664 SF TEMPORARY IMPACT TOTAL WETLAND ROAD TEMPORARY IMPACT 1 305 SF WETLAND ROAD IMPACT WETLAND ROAD TEMPORARY IMPACT SHEET 5 c REVISIONS: CE GROUP FLOYD LANDING 301 GLEAVE. IMPACT #2 ROAD CROSSING RALEIGH,E suIT�r220 20 30 0 NORTH 30' 60' US HWY 70 BUS W NC 27603 ' PHONE: 919-367-8790 FAX 919-322-0032 SMITHFIELD, NC SCALE: 1" = 30' � I � I 1 Y if / PROPOSED TREELINE I DISTURBED LIMIT LINE (TYP.) ' r� CLASS "B" ZIPRAP PAD 201 x 8'W x 24"D 1)50 DMAx=12" I/ EXISTING TOP OF BANK (TYP.)—\ / / 00- B o i� ZONE 2 IMPACT �447SF ZONE1IMPACT 671 SF ORDINARY HIGH WATER MARK (TYP.) / 1 IMPACT TOTAL ZONE 1 UTILITY IMPACT 671 SF ZONE 2 UTILITY IMPACT 447 SF ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT SHEET 6 c REVISIONS: CE GROUP FLOYD LANDING 301 GLENWOOD AVE. I M PACT #3 BUFFER I M PACT RALEIGH,NC 27603 ' su�r20 30 0 NORTH 30' 60' US HWY 70 BUS W PHONE: 919-367-8790 FAX:919-322-0032 SMITHFIELD, NC SCALE: 1" = 30' 1 I IMPACT TOTAL ZONE 1 BUFFER IMPACT 2,299 SF ZONE 2 BUFFER IMPACT 1,597 SF 6' CONCRETE f \\\ VA \ \ \✓ \ \ I / SIDEWALK / (TYP.) A)A/,p / & PEDESTRIAN BRIDGE ZONE 2 ROAD IMPACT / STREAM CROSSING \ / 945 SF ZONE 1 BUFFER IMPACT ZONE 1 ROAD IMPACT 1,133SF �� \\ \\ V A \ �o� \c�✓���th \ ZIV A ZONE 2 BUFFER IMPACT 30, VAA �rypFR V A�,A\\VA� A V A \ \ \ PROPOSED TREELINE I DISTURBED LIMIT \ \ \ \ \ \ \ \ \\ \ \ \ LINE (TYP.) ORDINARY HIGH WATER MARK (TYP.) ZONE 1 ROAD IMPACT\\ \ \ \\ \\ \ �\ \ \ \ \ EXISTING TOP 1,166 SF / / OFBANK (TYP.) ZONE 2 ROAD IMPACT 653 SF \ \ EXISTING TREELINE 6'CONCRETE SIDEWALK (TYP.) J \ �� REVISIONS: SHEET 7 CE GROUPqp FLOYD LANDING 301 GLENWOOD AVE. I M PACT #4 BRIDGE CROSSING RALEIGH,NC 27603 ' su�r20 30 0 NORTH 30' 60' US HWY 70 BUS W PHONE: 919-367-8790 FAX.919-322-0032 SMITHFIELD, NC SCALE: I = 30' IMPACT TOTAL ZONE 1 UTILITY IMPACT 627 SF ZONE 2 UTILITY IMPACT 456 SF ZONE 1 BUFFER IMPACT ZONE 2 BUFFER IMPACT I SHEET 8 REVISIONS: CE GROUP FLOYD LANDING 301 GLENWOOD AVE. I M PACT ##5 BUFFER I M PACT RALEIGH,NC 27603 ' su�r20 30 0 NORTH 30' 60' US HWY 70 BUS W PHONE: 919-367-8790 FAX 919-322-0032 SMITHFIELD, NC SCALE: 1" = 30' PUMP -AROUND PRACTICE PLAN VIEW Silt Bag as shown iri detail 3.25, ettream diversion pumps P1nae—iMU D PBACTICZ 'Elbe work eketalal ooaciot of 1.2.sl lfag a temperary pump around extd eurm-,:rth‘g xoaanum to avert f Z:Nruael tr —sta ra hoestroalter. etas. ItEPLailfralfATION SEQTJE41 : Sea—a—aonfrel nsassures, pump—ervuaad prect'se es, l ausnziestad obe.ez.61 cad irk cn asszraciziean 7,1-0v1sl be completed- fn. the feafla ing ecgra-tee :[refer Sea Ce teRl ii`S ij: 1 C toilsti:r: rill act batta. autatl. a ill celiman.t sat5a4roatahr. Brat: i maAsa r.en 7: '; a _ . w: -s_, e Z,:aa .e. o xgh l L pumps should discharge onto a stable velocity dise[pator made of rip rap WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY SECTION A -A Impervious sheeting sump —hole or pool (12" to 18° deep w/ 2. diameter) base flow + i foci (2 foot minimum) cross section of sondbeg dike the eacavedlon, a,xri _ c as their xaL ceder. fa AR come:ract w.Cj taf-ta Once durls7g e'l:ranxD low f]vev. The laugh of oaI1e'anaction- time ehou1.d. lne fSlihdtee. fav :ataaitaaxee of 2 clays for each ra.ossiag. O Water from. the ra.-.1t be pumped to a dewaterkig bag as shown isx detail 3.25. 7:be roan/ars ehna1.1 Iwo Nxi. such that the wa.t,z le latex the amine' below the dlomzseareaam handbag aka. 7 Tmareihg a eiaahtf.ei reech with. event within the rPcare. area where mot work le propoeed sb.auld bsavetdad. 1 ecgolgimast has troveree sarea a reob :pox sWIees tic XSLYAT:I.S7 exec, thax t imir xxs ex • abid ex maH.e aha thJ. pat c/.5V.1 ::llariurbs:uco t:• the as t:moel. ne rpo:rery etrmaa7m arraeatags a'ha ld Fie ceesi znay when meneaaat- eat l rratly wrisaana :mated Dr: kaa ralaapae ar egesified. & exasra meiterartfnn szsessaxrs lihaxild la; ts.ealIeel mac irra:5 ab sl by the plane akTd aa beabh greelad lz, es000rdaaaee with. the gr thus piano eaci trp:los.1 17.7as e--eacetleane. ill 6.mii.743 =not Le e:giirfikcied at Ma end each day adth 21e51. MLA mulch or seed end YI'lattfarf eip+seEffa6.. . the plane. 9 F.thFz ato &rat io eraapieted. sued etcal/idled. the deem wetav dare should. be removed. er hffi }S-st r lament flush, s. mew dieezt. water aka abohld. be aatel]3ehea eapstreaia. fo a c t aealvaao dike. FYoally, upaoax setehlienx a t now sediment a bellow tha BEd. o-e, Lb -a tale asdirLiwat dare shcsulc Ess rserdn d. 1i9 'au; a.t.I.L.cLes.d.or ig rehachalble fur ax:o Lt.. rreraibtse„s eE ssrasiran ree; sa.3sxtivak oontroi. devious moth ihu oad.3rsxent oontrei in_sresstor aypa+avee their removal. • SHEET 9 CE GiOUP 301 GLENWOOD AVE. SUITE 220 RALEIGH,NC 27603 PHONE: 919-367-8790 FAX: 919-322-0032 REVISIONS: FLOYD LAN D I N G DETAI LS US HWY 70 BUS W SMITHFIELD, NC