HomeMy WebLinkAbout20140851 Ver 1_More Info Received_20140905Homewood, Sue
From:
Jake Byers <JByers @mbakerintl.com>
Sent:
Friday, September 05, 2014 9:52 AM
To:
Homewood, Sue; mwilliams @mountairy.org
Cc:
Williams, Andrew E SAW; Scott Hunt
Subject:
RE: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID
SAW - 2014 -01609 Mt. Airy Greenway Connector Project (UNCLASSIFIED)
Sure. To keep you in the loop, I have sent Marla Chambers (NCWRC) an electronic copy of the permit package. I have
yet to speak with her though. Tried her office, mobile and email. The other main outstanding issue is the ESA
compliance. We have a field survey scheduled for the Schweinitz's sunflower for the week of October 6th during the
blooming window. NCDOT already has our complete (pending sunflower survey results) Programmatic Categorical
Exclusion which should be approved once the results are provided. This will satisfy remarks 3 and 4 of the incomplete
status letter. There will be no temporary or permanent jurisdictional stream impacts. Both crossings will be bridged.
Please let me know if you need any additional information for the time being. I expect to reply to USACE comments the
week of October 6th or the next week depending on the survey date.
Thanks,
-Jake
Jacob "Jake" Byers, PE I Lead Ecosystem Engineer I Michael Baker Engineering, Inc., a unit of Michael Baker
International
797 Haywood Road, Suite 2011 Asheville, North Carolina 28806 1 [O] 828 - 350 -1408 EXT 20011 [M] 919 - 259 -4814
Ibyers @mbakerintl.com I www.mbakerintl.com
- - - -- Original Message---- -
From: Homewood, Sue [ mailto:sue.homewood @ncdenr.gov]
Sent: Friday, September 05, 2014 9:43 AM
To: mwilliams @mountairy.org; Jake Byers
Cc: Williams, Andrew E SAW
Subject: RE: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID SAW- 2014 -01609 Mt. Airy Greenway
Connector Project (UNCLASSIFIED)
Would you please send me an electronic copy of your response to the USACE. Thank you.
Sue Homewood
NC DENR Winston -Salem Regional Office
Division of Water Resources - Water Quality Programs
585 Waughtown Street
Winston - Salem, NC 27107
Voice: (336) 771 -4964
FAX: (336) 771 -4630
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
- - - -- Original Message---- -
From: Williams, Andrew E SAW [mailto: Andrew .E.Williams2 @usace.army.mil]
Sent: Tuesday, September 02, 2014 4:43 PM
To: mwilliams @mountairy.org; Jake Byers
Cc: Homewood, Sue; Williams, Andrew E SAW
Subject: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID SAW- 2014 -01609 Mt. Airy Greenway
Connector Project (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Mr. Williams and Mr. Byers:
We currently still need some additional information in order to process your Nationwide Permit (NWP) application
received on August 8, 2014. Please see the attached notification for the specific information that we need. Please
contact me if you have any questions. Thanks.
Andrew Williams
Regulatory Project Manager
U.S. Army Corps of Engineers
Raleigh Regulatory Field Office
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
919 - 554 -4884 extension 26
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /.
Classification: UNCLASSIFIED
Caveats: NONE