Loading...
HomeMy WebLinkAbout20140851 Ver 1_More Info Received_20140905Homewood, Sue From: Jake Byers <JByers @mbakerintl.com> Sent: Friday, September 05, 2014 9:52 AM To: Homewood, Sue; mwilliams @mountairy.org Cc: Williams, Andrew E SAW; Scott Hunt Subject: RE: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID SAW - 2014 -01609 Mt. Airy Greenway Connector Project (UNCLASSIFIED) Sure. To keep you in the loop, I have sent Marla Chambers (NCWRC) an electronic copy of the permit package. I have yet to speak with her though. Tried her office, mobile and email. The other main outstanding issue is the ESA compliance. We have a field survey scheduled for the Schweinitz's sunflower for the week of October 6th during the blooming window. NCDOT already has our complete (pending sunflower survey results) Programmatic Categorical Exclusion which should be approved once the results are provided. This will satisfy remarks 3 and 4 of the incomplete status letter. There will be no temporary or permanent jurisdictional stream impacts. Both crossings will be bridged. Please let me know if you need any additional information for the time being. I expect to reply to USACE comments the week of October 6th or the next week depending on the survey date. Thanks, -Jake Jacob "Jake" Byers, PE I Lead Ecosystem Engineer I Michael Baker Engineering, Inc., a unit of Michael Baker International 797 Haywood Road, Suite 2011 Asheville, North Carolina 28806 1 [O] 828 - 350 -1408 EXT 20011 [M] 919 - 259 -4814 Ibyers @mbakerintl.com I www.mbakerintl.com - - - -- Original Message---- - From: Homewood, Sue [ mailto:sue.homewood @ncdenr.gov] Sent: Friday, September 05, 2014 9:43 AM To: mwilliams @mountairy.org; Jake Byers Cc: Williams, Andrew E SAW Subject: RE: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID SAW- 2014 -01609 Mt. Airy Greenway Connector Project (UNCLASSIFIED) Would you please send me an electronic copy of your response to the USACE. Thank you. Sue Homewood NC DENR Winston -Salem Regional Office Division of Water Resources - Water Quality Programs 585 Waughtown Street Winston - Salem, NC 27107 Voice: (336) 771 -4964 FAX: (336) 771 -4630 E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. - - - -- Original Message---- - From: Williams, Andrew E SAW [mailto: Andrew .E.Williams2 @usace.army.mil] Sent: Tuesday, September 02, 2014 4:43 PM To: mwilliams @mountairy.org; Jake Byers Cc: Homewood, Sue; Williams, Andrew E SAW Subject: INCOMPLETE NOTIFICATION US Army Corps of Engineers Action ID SAW- 2014 -01609 Mt. Airy Greenway Connector Project (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Mr. Williams and Mr. Byers: We currently still need some additional information in order to process your Nationwide Permit (NWP) application received on August 8, 2014. Please see the attached notification for the specific information that we need. Please contact me if you have any questions. Thanks. Andrew Williams Regulatory Project Manager U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 919 - 554 -4884 extension 26 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. Classification: UNCLASSIFIED Caveats: NONE