HomeMy WebLinkAbout20200504 Ver 2_Revised Approval Letter_20220527DocuSign Envelope ID: 6FE3BBBC-1914-46E7-8947-FA12A7AO8E5E
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
May 27, 2022
NORTH CAROLINA
Environmental Quality
DWR # 20200504 v2 - revised
Wake County
Triangle Town Center Holding, LLC
Attn: Mark Tipton
2013 Rolling Rock Road
Wake Forest, NC 27587
(via email mark.tipton@whistleinvestmentgroup.com)
Subject: APPROVAL OF NEUSE RIVER BASIN RIPARIAN BUFFER IMPACTS WITH
ADDITIONAL CONDITIONS
The Pointe at Town Center
Dear Mr. Tipton:
You have our approval for the impacts listed below for the purpose described in your application dated
November 17, 2021, received by the Division of Water Resources (Division) November 17, 2021, and
payment received November 29, 2021, with additional information received on January 16, 2022. This
Certification replaces the Certification issued on February 18, 2022. These impacts are covered by the
Neuse River Buffer Rules and the conditions listed below. Please note that you should get any other
federal, state or local permits before proceeding with your project, including those required by (but not
limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This
Authorization shall expire when the corresponding Water Quality Certification Approval DWR
#20200504 v2 expires.
The following impacts are hereby approved, provided that all of the Conditions listed below, and all of
the conditions of the Neuse River Buffer Rules are met. No other impacts are approved, including
incidental impacts. [ 15A NCAC 02B Neuse .0611(b)(2)]
Type of Impact
Amount Approved
(units) Permanent
Amount Approved
(units) Temporary
Buffers — Zone 1
B1: Crossing/Culvert/ Bride
9,550
s are feet
0
(square feet
132: Crossing/Culvert/ Bride
7,400
(square feet
0
(square feet
133: Utility Lines
1,250
(square feet
0
(square feet
Buffers — Zone 2
B1: Crossing/Culvert/ Bride
6,350
s are feet
0
(square feet
132: Crossing/Culvert/ Bride
5,400
(square feet
0
(square feet
133: Utility Lines
950
(square feet
0
(square feet
D
-
E Q�� North Carolina Department of Environmental Quality I Division of Water Resources
Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609
NORTH CAROLINA
o.Pemm.ntoiemlroameowlaual,ty4% /`� 919.791.4200
DocuSign Envelope ID: 6FE3BBBC-1914-46E7-8947-FA12A7AO8E5E
The Pointe at Town Center
DWR# 20200504 v2
Buffer Authorization Certificate
Page 2 of 3
Compensatory Mitigation Using a Private Mitigation Bank
Mitigation must be provided for the proposed impacts as specified in the table below. The Division has
received a Statement of Availability letter from Wildlands Holdings V, LLC and the North Fork Little
River Nutrient Offset & Buffer Bank, the Catfish Pond II Mitigation Bank, and the Perry Hill II
Mitigation Bank to meet this mitigation requirement located in HUC 03020201. Until Wildlands
Holdings V, LLC receives and clears your payment, and proof of payment has been provided to this
Office, no impacts specified in this Certification shall occur. For accounting purposes, this Certification
authorizes payment to Wildlands Holdings V, LLC to meet the following compensatory mitigation
requirement [15A NCAC 02H .0506 (b)(6)]:
Compensatory Mitigation
Bank Sponsor
River & Sub -basin
Required
Number
Buffer -Zone 1
28,650 (square feet)
Wildlands Holding V, LLC
Neuse: 03020201-Upper
Falls Watershed
Buffer -Zone 2
9,525 (square feet)
Wildlands Holding V, LLC
Neuse: 03020201-Upper
Falls Watershed
Total:
38,175 (square feet)
Justification: A project that affects waters shall not be permitted unless the existing uses, and the water
quality to protect such uses, are protected. In determining that the proposed activity will comply with
state water quality standards (including designated uses, numeric criteria, narrative criteria and the
state's antidegradation policy), the project must provide for replacement of existing uses through
compensatory mitigation.
This approval is for the purpose and design described in your application. The plans and specifications for
this project are incorporated by reference as part of this Authorization Certificate. If you change your
project, you must notify the Division and you may be required to submit a new application package. If
the property is sold, the new owner must be given a copy of this Authorization Certificate and is
responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)]
If you are unable to comply with any of the conditions below, you must notify the Raleigh Regional
Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee
becomes aware of the circumstances.
The permittee shall report to the Raleigh Regional Office any noncompliance with the conditions of this
Authorization Certificate and/or any violation of state regulated riparian buffer rules [I 5A NCAC
02B .0714]. Information shall be provided orally within 24 hours (or the next business day if a weekend
or holiday) from the time the applicant became aware of the circumstances.
This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Upon the
presentation of proper credentials, the Division may inspect the property.
This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General
Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of
Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set
forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina
Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms
may be accessed at htlp://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000.
DocuSign Envelope ID: 6FE3BBBC-1914-46E7-8947-FA12A7AO8E5E
The Pointe at Town Center
DWR# 20200504 v2
Buffer Authorization Certificate
Page 3 of 3
One (1) copy of the Petition must also be served to the North Carolina Department of Environmental
Quality:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
If the party filing the Petition is not the permittee, then the party must also serve the recipient of the
Authorization Certificate in accordance with N.C.G.S 150B-23(a).
This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any
lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any
person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does
it create any prescriptive right or any right of priority regarding any usage of water. This Authorization
Certificate shall not be interposed as a defense in any action respecting the determination of riparian or
littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization
Certificate to possess any prescriptive or other right of priority with respect to any other consumptive
user.
This letter completes the review of the Division under the Neuse River Riparian Buffer Rules as described
in 15A NCAC 02B .0714. Please contact Colleen Cohn at Colleen.CohnAncdenr.gov or 919-791-4258 if
you have any questions or concerns.
Sincerely,
EDocu Signed by:
suwsm
To' D825D4A46D...
Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: Kevin Martin, Soil & Environmental Consultants, PA (via email)
Lyle Phillips, USACE Raleigh Regulatory Field Office (via email)
DWR 401 & Buffer Permitting via Laserfiche