Loading...
HomeMy WebLinkAbout20200504 Ver 2_Revised Approval Letter Email_20220527Strickland, Bev From: Cohn, Colleen M Sent: Friday, May 27, 2022 5:01 PM To: Kevin Martin; Ashley Yarsinske Cc: Mark Tipton; Ellinwood Properties; Jon Callahan; Robert Bugg Subject: RE: [External] The Pointe at Town Center / Raleigh / Wake County DWR 20-0504v2 Attachments: 20-0504 v2 The Pointe at Towne Center_NBR_Wake_revised.pdf Apologies, Kevin, this one slipped off my radar. Revised Buffer Authorization with the additional Mitigation Banks attached. Colleen Cohn Environmental Specialist II North Carolina Department of Environmental Quality Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 Office: 919-791-4258 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kevin Martin <kmartin@sandec.com> Sent: Wednesday, March 2, 2022 10:32 AM To: Ashley Yarsinske <ayarsinske@wildlandseng.com>; Cohn, Colleen M <colleen.cohn@ncdenr.gov> Cc: Mark Tipton <mark.tipton@whistlerinvestmentgroup.com>; Ellinwood Properties <harrison@ellinwoodproperties.com>; Jon Callahan <jon_callahan@jaeco.com>; Robert Bugg <rbugg@wildlandseng.com> Subject: [External] The Pointe at Town Center / Raleigh / Wake County DWR 20-0504v2 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Coleen, the mitigation bank where we are buying buffer credits has requested that you adjust the authorization letter to remove North Fork Little River Mitigation Bank and instead list Catfish Pond II Mitigation Bank and Perry Hill II Mitigation Bank to cover the full amount (see below). We first got an SOA from them back in October 2021 and since then their availability has changed. The project did not require stream or wetland mitigation, only buffer. If you need more information or have questions please contact Ashley at Wildlands (copied on this email). Thank you Kevin C. Martin Principal Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone 1 (919) 846-9467 Fax (919) 270-7941 Mobile kmartin@sandec.com Visit us at SandEC.com! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you From: Ashley Yarsinske [mailto:ayarsinske@wildlandseng.com] Sent: Wednesday, March 2, 2022 10:08 AM To: Kevin Martin <kmartin@sandec.com> Cc: Mark Tipton <mark.tipton@whistlerinvestmentgroup.com>; Ellinwood Properties <harrison@ellinwoodproperties.com>; Jon Callahan <jon callahan@jaeco.com>; Robert Bugg <rbugg@wildlandseng.com> Subject: RE: The Pointe at Town Center / Raleigh / Wake County Good morning Kevin, Thank you for sending over the authorization letter! Attached is the requested invoice for The Pointe at Town Center (DWR # 20200504 v2) project. Please note that the buffers are stemming from two of our mitigation banks under Wildlands Holdings V, LLC on the invoice. North Fork Little River Mitigation Bank did not have buffer credits available to meet this request, so I included Catfish Pond 11 Mitigation Bank and Perry Hill 11 Mitigation Bank buffer credits. Can you please reach out to DWR to have them adjust the authorization letter to remove North Fork Little River Mitigation Bank and instead list Catfish Pond 11 Mitigation Bank and Perry Hill 11 Mitigation Bank to cover the full amount? Please let me know if you need anything further from me for this effort. Best, Ashley Ashley Yarsinske I Marketing & Credit Sales 0: 704.332.7754 x124 M: 757.572.5269 Wildlands Engineering, Inc. 1430 S. Mint St, Suite 104 Charlotte, NC 28203 From: Kevin Martin <kmartin@sandec.com> Sent: Wednesday, March 2, 2022 8:53 AM To: Ashley Yarsinske <ayarsinske@wildlandseng.com> Cc: Mark Tipton <mark.tipton@whistlerinvestmentgroup.com>; Ellinwood Properties <harrison@ellinwoodproperties.com>; Jon Callahan <jon callahan@jaeco.com> Subject: The Pointe at Town Center / Raleigh / Wake County Ashley, we finally have the buffer authorization for this one (see attached) please email an invoice for the buffer mitigation (no stream or wetland mitigation was required) and copy all on this email. Thank you Kevin C. Martin 2 Principal Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 846-9467 Fax (919) 270-7941 Mobile kmartin@sandec.com Visit us at SandEC.com! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you 3