Loading...
HomeMy WebLinkAboutNCC222871_NOI Signed Certification_20220822NCGO1 Notice of Intent (NOU) Certification Form Print this form, complete, scan and upload to the electronic NOi Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at: Division ofEnergy, Mineral & Land Resources StonnxvaterProgram S12N.Salisbury Street, G*Floor (Office 64OK) 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM OR PAYMENT UNTIL YOUR APPLICATION HAS BEEN ACCEPTED AS COMPLETE. Per NCGeneral Statute 143-215.6B (i), any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, orother docmnentfiledor required tobmmaintained under this Article nrorule implementing this Article ... shall beguilty ofoClass 2misdemeanor which may include mfine not Co exceed ten thousand dollars ($2D,UDO). Under penalty of law, I certify that (check all boxes to indicate your agreement): [-,| lam the person responsible for the construction activities of this project,for satisfying the requirements ofthis permit, and for any civil or criminal penalties incurred due to violations of this permit. [v-! The information submitted in this NOI is, to the best of my knowledge and belief, true,accurate and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. | will abide byall conditions ofthe NCGO10000 General Permit and the approved Erosion and Sediment Control [v-� Ifthe approved Erosion and Sediment Control Plan is not compliant with Part 11 (Stormwater Pollution Prevention Plan) ofthe NCGO10000 General Permit, | will nonetheless ensure that all conditions ofPart ||ofthe permit are met on the project at all times. [-1 | hereby request coverage under the NCGO10000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Project Name (must match Ala): Pathway Triangle Specific Lot Numbers (must match Alb): N/A Perm ittee (must match Bl): BE&K Building Group, LLC �BViO Lloyd LegallyResponsible Title of Legally Responsible Person (must match B3b): Sr. Project Manager Name 8'Title ofSigned ifAuthorized Individual Differs from Legally Responsible Person: Phone Number. `- �q1,-A\7�1'OO54 *' - Signature 6f 1-4ga-Ily- Responsible Pprs"6n or Authorized Individual Date IMPORTANTNOTE. This form must be signed byoresponsible corporate officer that owns or operates the construction activity, such as a president, secretary; treasurer, or vice president, or a manager that isauthorized /naccordance with Part IV, Section D,