HomeMy WebLinkAbout20140952 Ver 1_Riparian Buffer Authorization_20140905J* HAMAINDSOVVER Environmental Engineers & Scientists September 4, 2014 NC DWR 401 & Buffer Permitting Unit Attn: Karen Higgins 1617 Mail Service Center Raleigh, NC 27699 -1617 20140952 Hazen and Sawyer, P.C. 4011 WeslChase Blvd. Raleigh, NC 27607 919 - 833.7152 Fax: 919 -633 -1828 Re: Riparian Buffer Authorization, Southeast Pressure Zone Project — Page Road Extension Area, City of Durham, Durham County, North Carolina Dear Ms. Higgins, Please find attached the Riparian Buffer Authorization Form for the above referenced project. The City of Durham is installing a new interconnection pipeline to allow the City of Durham to create a new water pressure zone that will improve system pressure and fire protection. The main will be installed close to the intersection between Page Road Extension and Glenwood Avenue. The most recent version of the published County NRCS Soil Survey Map shows several streams in the project area. An Ephemeral /Intermittent/Perennial Determination was performed by DWR and the features shown on the soil survey to be within the project area were determined to be ephemeral streams. A copy of the Surface Water Determination Letter is attached. Minimal, temporary disturbance of the riparian buffer within the Neuse River basin will occur in association with the proposed project. Temporary impact to 14 square feet of Zone 2 of the riparian buffer, which is allowable per 15A NCAC 0213.0233, will occur during construction of the proposed project. No temporary or permanent impacts to Zone 1 of the riparian buffer are proposed. The maintained corridor associated with the transmission line, as required by the North Carolina Department of Environment and Natural Resources, will not be located within Zone 1 or Zone 2 of the riparian buffer. If you have any questions or require additional information, please contact me at 919.863.9256. Thank you for your assistance. Sincerely, HAZEN AND SAWYER, P.C. Linda Diebolt Senior Principal Scientist Attachments New York, NY • Armonk, NY • Woodbury, NY . Detroit, MI • Raleigh, NC • Chadotte, NC • ABanta, GA • Fairfax, VA. Hollywood, FL • Boca Raton, FL • Fort Pierce, FL • Sarasola, FL • Miami, FL • Philadelphia, PA DWR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) — Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: Southeast Pressure Zone Project — Page Road Extension Area 1 b. County: Durham 1 c. Nearest municipality: Durham 1 d. Subdivision name: 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer If below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ❑ No 2. Owner Information 2a. Name on Recorded Deed: N/A 2b. Deed Book and Page No. 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): 2d. Responsible Party (for Corporations). 2e. Street address: 2f. City, state, zip: 2g. Telephone no.: 2h. Fax no.: 2i. Email address: 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ® Other, specify: Municipality 3b. Name: Don Greeley, Director 3c. Business name (if applicable): City of Durham 3d. Street address: 1600 Mist Lake Drive 3e. City, state, zip: Durham, NC 27704 3f. Telephone no.: 919.560.4381 3g. Fax no.: 919.560.4479 3h. Email address: I dgreeley @durhamnc.gov FORM: BA 10 -2013 Page 1 of 6 INTERNAL DRAFT- NOT FOR PUBLIC USE Section A. Applicant Information, continued 4. Agent/Consultant Information (if applicable) 4a. Name: Linda Diebolt, Senior Principal Scientist 4b. Business name (if applicable): Hazen and Sawyer 4c. Street address: 4011 WestChase Boulevard, Suite 500 4d. City, state, zip: Raleigh, NC 27607 4e. Telephone no.: 919 833 -7152 (main), 919.863.9256 (direct) 4f. Fax no.: 919.833.1828 4g. Email address: Idiebolt @hazenandsawyer.com FORM: SSGP3080 8 -13 Page 2 of 6 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0759 -04- 71- 0976.DW 1b. Site coordinates (in decimal degrees): Latitude: 35.929056 Longitude: - 78.808382 1c. Property size: 0.95 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Little Brier Creek 2b. Water Quality Classification of nearest receiving C, NSW water: 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The existing landcover is undeveloped wooded with industrial and residential areas in the vicinity. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8'/ x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 1,300 ft 3e. Explain the purpose of the proposed project: The purpose of the project is to install a new interconnection pipeline to allow the City of Durham to create a new water pressure zone, which will improve system pressure and fire protection. 3f. Describe the overall project in detail, including the type of equipment to be used: The project will install new waterlines and an elevated storage tank to expand the current network and create a new pressure zone The main will be installed close to the intersection between Page Road Extension and Glenwood Avenue. Equipment anticipated to be used during installation of the waterlines are anticipated to include backhoes, front -end loaders, bulldozers, dump trucks, compaction rollers, flatbed haul trucks, and a jack and bore guided auger machine. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ® Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property/ Comments: EIP Determination performed. project (including all prior phases) in the past? No wetlands are present onsite and no stream impacts are proposed. 4b. If yes, who delineated the jurisdictional areas? Agency/ Consultant Company: NCDWR Name (if known): Cherry Smith Other: 4c. If yes, list the dates of the Corps Jurisdictional determinations or State determinations and attach documentation The Surface Water Determination Letter, dated August 6, 2014, is attached. 5. Project History 5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain and detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain FORM. BA 10 -2013 Page 3 of 6 C. Proposed Impacts Inventory 1. Buffer Impacts 1 a. Project is in which protected ® Neuse ❑ Tar - Pamlico ❑ Catawba basin? ❑ Randleman ❑ Jordan El Goose Creek 1 b Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Buffer impact Reason for Type of impact Stream name Buffer Zone 1 Zone 2 number — impact (exempt, allowable, mitigation impact impact Permanent (P) allowable w/ required? (sq ft) (sq ft) or Temporary mitigation) T B1 ❑ P ® T Pipe installation Allowable UT to Little ❑ Yes ® No 0 14 Brier Creek B2 ❑ P ❑ T Pipe installation Allowable ❑ Yes ❑ No B3 ❑ P ❑ T Pipe installation Allowable ❑ Yes ❑ No B4 ❑ P ❑ T Pipe installation Allowable ❑ Yes ❑ No B5 ❑ P ❑ T Pipe installation Allowable ❑ Yes ❑ No B6 ❑ P ❑ T Pipe installation Allowable ❑ Yes ❑ No Total buffer impacts 0 14 1 c. Comments. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Prior to and during design of the project, wetland and stream determinations were performed to assess the presence of jurisdictional wetlands and streams within the proposed pipe corridor. As many components of the project as is feasible have been sited away from jurisdictional areas. The pipe has been sited to avoid and minimize impacts to streams and riparian areas. Several options relative to access roads were assessed and the options chosen were those that provide access to the site without impact or with minimal impact to jurisdictional resources. 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Construction of the transmission line will not require traversing the onsite stream. No jurisdictional wetlands are present on the project site Impacts to the onsite stream during construction will be avoided and minimized to the extent feasible. Best management practices, and sedimentation and erosion control methods will be used during all construction activities. No equipment refueling or maintenance activities will occur adjacent to the jurisdictional areas. FORM: SSGP3080 8 -13 Page 4 of 6 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation s uare feet Zone 1 of public (federal /state) land? Manual and attach a BMP Supplement Form. 3 (2 for Catawba) If you answered "yes" to the above, does the project require preparation of an Zone 2 environmental document pursuant to the requirements of the National or State (North 1.5 Carolina) Environmental Policy Act (NEPA /SEPA)? Total buffer mitigation required: 1c. 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form 1a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ❑ Yes ® No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP of public (federal /state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal /state /local) funds or the use ❑ Yes ® No of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) Comments: 2. Violations 2a Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No FORM: SSGP3080 8 -13 Page 5 of 6 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Linda Diebolt 4Sep14 Applicant/Agent's Printed Name pplicant/Agent's Signature Date (Agent's signature is va' only d an authorization letter from the applicant is provided.) Send 3 complete sets of this form and accompanying documents to the following: For government transportation projects sent For government transportation projects sent by First Class Mail via the US Postal Service: by delivery service (UPS, FedEx, etc): NC DWR, Transportation Permitting Unit OR NC DWR, Transportation Permitting Unit 1650 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 For all other projects sent by First Class Mail For all other projects sent by delivery service via the US Postal Service (UPS, FedEx, etc): Karen Higgins OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center 512 N Salisbury Street Raleigh, NC 27699 - 1650 Raleigh, NC 27604 FORM: SSGP3080 8 -13 Page 6 of 6 Q� wv QW Z0 Oa F. zZ �O x N ww o� O ww C7 a CL (' N w w Z � H C7 O t s Z X 0 n Q m LL V _N O N II A �a Proposed Water Line Proposed Permanent Easement Proposed Temporary Easement Intermittent Stream Buffer Zone 1 Buffer Zone 2 14 square feet of impacts to Zone 2 1 .e DURHAM 0 100 200 N FIGURE 3 HAZENAND SAWYER Feet w ' E PAGE ROAD EXTENSION AREA Environmental Engineers & Scientists a a v S SOUTHEAST PRESSURE ZONE PROJECT _. 1 inch = 200 feet North Carolina Departmer Pat McCrory I%',' � V` Governor st 6, 2014 Linda Diebolt Hazen and Sawyer 4011 Westchase Blvd., Ste. 500 Raleigh, NC 27607 and Natural Resources John E. Skvarla, III Secretary Subject: Surface Water Determination Letter NBRRO# 14 -269 Durham County Determination Type, Buffer Call Isolated or EIP Call ® Neuse (15A NCAC 2B.0233) Start@ ❑ Tar - Pamlico (15A NCAC 213 0259) ® Ephemeral /Intermittent/Perennial Determination USGS ❑ Isolated Wetland Determination El Jordan (15A NCAC 2B .0267) Project Name: Southeast Pressure Zone Location/Directions- Subject property is undeveloped forested land. Subject Stream: Tributaries to Little Briar Creek Determination Date: July 31, 2014 Staff. Cherri Smith Stream E /1 /P* Not Subject Subject Start@ Stop@ Soil USGS Survey To o UT2 E X — entire X length of reach UT3 E X — entire X length of reach UT5 E X — entire X length of reach Main I X — from DWQ DWQ flag X X Channel flag throughout (Intermittent ro ect area start) 'h // /F = Ephemera t /tntermrttent/Perennial NohCarolina No North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699 -1628 Phone (919) 791 -4200 Intemet. www ncwaterauahty org Location 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788 -7159 An Equal Opportunity /Affirmative Action Employer — 50% Recycled /10% Post Consumer Paper dst Pressure Zone drham County August 6, 2014 Page 2 of 2 Explanation: The feature(s) listed above has or have been located on the Soil Survey of Durham County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and /or to the Division of Water Resources (DWR). This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and /or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR WeBSCaPe Unit, 1650 Mail Service Center, Raleigh, NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner /future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919) -807 -6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919 )-554 -4884. If you have questions regarding this determination, please feel free to contact Cherri Smith at (919) 791 -4251. in rely, Dann y Smith Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy r 1 O Z { r U E m 5 (fi CC � S h 1 i 1 t' limul T L 9 1 �s i Cd M d 2 S i � c J T o r 1� q