Loading...
HomeMy WebLinkAbout20071254 Ver 1_More Info Received_20070917Subject: [Fwd: Howland Rock Property Owner's Assocation] From: Joanne Steenhuis <Joanne.Steenhuis@ncmail.net> Date: Mon, 17 Sep 2007 10:09:02 -0400 To: bev Strickland <bev.strickland@ncmail.net> this is for 07 1254 Subject: Howland Rock Property Owner's Assocation From: Shannon Jenkins <shannon.jenkins@ncmail.net> Date: Thu, 30 Aug 2007 08:54:00 -0400 To: Joanne Steenhuis <Joanne.Steenhuis@ncmail.net> CC: Daniel Govoni <Daniel.Govoni@ncmail.net> Joanne, Thanks for the copy of your letter to Lionel Gilgo in reference to the Howland Rock Property Owner's Association. After speaking recently with Daniel Govoni with DCM, the property owners are proposing to delete the three boat slip additions from the project. Attached is a letter from the Homeowner's Assocation. If the three additional boat slips are deleted from the project, a re-classification of waters will not be necessary, and our office would not have any comments on the dredging and riprap portion. Please give me a call if needed. thanks Shannon Shannon Jenkins <shannon.jenkins@ncmail.net> NC Dept. Environment & Natural Resources Shellfish Sanitatation & Recreational Water Quality __ Content-Type: message/rfc822 ;Howland Rock Property Owner's Assocation Content-Encoding: 7bit D00070829.pdf' Content-Type: application/pdf Content-Encoding: base64 Howland Rock Prop_ erty Owners Association PO Box 693 Beaufort, NC 28516 To: Dough Huggett Major Permit Processing Coordinator From: HRPO c ~i F~ ~ xre~ ~~ t f'~+`° AIJG ~ ~ Z00~ M®reh~~~ ~j~y ®CM Ref: Telephone Conversation between Daniel Govoni and Lionel Gilgo on Aug. 24`" 2U07 Sub: CAMA/ Dredge & Fill Permit Application, ER 07-1525 Reference Telephone conversation advised action to be taken by HRPO for subject permit change. It is our understanding in order to proceed with reference permit we must request the three (3) boat slips be pulled from this project, due to poor water quality in this area. In order to proceed at this time with the remaining two (2) increments in this permit, dredge/ rock bulkhead, it is requested by HRPO three boat slips be deleted from the subj. permit allowing HRPO to proceed with others. Please advice of any further action allowing HRPO to proceed with dredging and rock placement in the HRPO marina in reference permit. ~. Herm Meyer President Lionel Gilgo Marina Chaihnan