Loading...
HomeMy WebLinkAbout20140771 Ver 1_Revised Impacts Table_20140908 Table 2. Stream Impacts Table Stream Type of Permanent Temporary Stream Proposed Replaced Impact ID Impact Impact (lf) Impact Nationwide Permit 3/Water Quality Certification N 3883 Impacts o 9’W x 6’H RCBC (West) 7’W x 9’H RCBC Stewart Culvert (2) 7’W x 7’H S1 (P) (Middle) Creek Replacement Box Culvert 24 (Sheet 7) 9’W x 7’H RCBC Tributary #2 (72 lf) (East) with headwalls (96 lf) Stewart Rip Rap S2 (P) Creek (Stabilization) - - 30 (Sheet 7) Tributary #2 UT to Stewart 6’W x 4’H RCBC S3 (P) Culvert 48” RCP Creek with headwalls 14 (Sheet 9) Replacement (67 LF) Tributary #2 (81 lf) UT to Stewart Rip Rap S4 (P) Creek Apron - - 24 (Sheet 9) Tributary #2 (Stabilization) Stewart Fill S5 (T) Creek (Temporary - - - 27 (Sheet 7) Tributary #2 Access Road) Stewart S6 (T) Creek De-Watering - - - 25 (Sheet 7) Tributary #2 UT to Stewart S7 (T) Creek De-Watering - - - 25 (Sheet 9) Tributary #2 Stream Impacts: 92 77 Nationwide Permit 27/Water Quality Certification N 3885 Impacts o S8 (Sheet 11 Stewart Stream through Sheet Creek - - 985 - Restoration 15) Tributary #2 Stream Type of Permanent Temporary Stream Proposed Replaced Impact ID Impact Impact (lf) Impact Stewart S9 Stream Creek - - 790 - (Sheet 15 & 16) Enhancement Tributary #2 UT to S10 Stewart Stream - - 580 - (Sheet 17 & 18) Creek Enhancement Tributary #2 Stream Impacts: 2,355 -