Loading...
HomeMy WebLinkAbout20140942 Ver 1_FINAL PLAN AND ELEV_2014090512' 0" TOB....� EL.-G.86 CL 30' 0" ROW 30' 0" ROW I 27' 0" 27' 0" 15' 0" 12' 0" 10' 0" 17' 0" EL.-I.32 EL. -0.66 /EL. 0.00 o EL.-7.86 PROPOSED TOE & ROW i i i i i i TOB ... . . .. .. N i i i TOE & R0W�i I yl OI I 15' 0" -,- Ln I ............. :TOB �" ELo -7086 � �8" PSNC = 3' 0" GAS MAIN CONDITION ,o rn � TOE & ROW 1 � 1 8" PSNC GAS \MAIN JOB T.O.B J I V I i RT. 3 " ,� TOE & ' , ROW �O �► l D �" PSNC GAS MAIN PSNC ADVISED GAS LINE 13 FEET BELOW THE SHOULER ELEVATION ROADWAY DESIGN I HYDRAULIC ENGINEER ENGINEER 22'-6" in I 1 N I --------- _ ELo -7.14 12' 3" END VIEW INLET HEADWALL 1.11 22' -611 12' 3" END VIEW OUTLET HEADWALL NOTES - Designed to meet or exceed HL -93 loading with a minum fill of V -4" and max fill of 4' -0" not including paving structure. Design for surcharge @ headwalls. - 1Ea. 54' -0" of (12' -3" span X 4' -5" rise) Aluminum Bos Culvert w/ full aluminum invert - 2 Ea. 21' -3" wide fully welded aluminum structural plate headwalls. PROPOSED COND T ON WAKE COUNTY_ OPTIMIST ROAD. (SR 1390)