Loading...
HomeMy WebLinkAbout20140942 Ver 1_email notification_20140905 Ridings, Rob From:Ridings, Rob Sent:Monday, September 08, 2014 8:34 AM To:Montague, Heather W; Eric.C.Alsmeyer@usace.army.mil Cc:Murray, Christopher A; Bell, Kathleen J; Pearson, Donald R Subject:RE: Non-reporting NWP 3 and NWP 13 with corresponding WQC No. 3883 and WQC No. 3885 on SR 1390 (Optimist Farm Road) in Wake County Heather, I agree the proposed work can fall under the GC’s 3883 and 3885 and are exempt from getting a Buffer Authorization. Proceed as planned. Thanks, Rob Ridings Transportation Permiting Unit, Division of Water Resources, Wetlands Branch rob.ridings@ncdenr.gov Phone: 919-707-8786 From: Montague, Heather W Sent: Friday, September 05, 2014 1:54 PM To: Ridings, Rob; Eric.C.Alsmeyer@usace.army.mil Cc: Murray, Christopher A; Bell, Kathleen J; Pearson, Donald R Subject: Non-reporting NWP 3 and NWP 13 with corresponding WQC No. 3883 and WQC No. 3885 on SR 1390 (Optimist Farm Road) in Wake County Rob and Eric- Wake County Maintenance/Bridge Maintenance has a cross line in need of replacement on SR 1390 (Optimist Farm oo Road), north of Fuquay-Varina 35.65803N, 78.72339W. The pipe site involvesThis an existing 48” CMP that is 47ft long. structure has deteriorated causing the roadway to fail. The replacement structure will be at 12’-3” X 4’-5” Aluminum Box Culvert that is 54ft long with headwalls. Rip rap will be installed underlined with geotextile along the stream banks surrounding the pipe ends and adjacent to the new headwall for long term stability. Note site will be temporarily dewatered (20ft upstream and 17ft downstream) of existing pipe to maintain dry work area, while stream flow will be pumped around the site. This cross line is within the Neuse River Basin, but the minimal activity here is EXEMPT from buffer rules. Work will be done from the roadway with new disturbance in buffers limited to rip rap armoring on the stream banks for long term stabilization. Although this crossing is mapped as having hydric soils (Wo), no wetlands exists within the construction footprint. under a non-reporting NWP 3 and NWP 13 with corresponding WQC No. 3883 and WQC We propose to work No. 3885. For maintenance sites such as this one, NCDOT Division 5 has a procedure in place to provide our construction crews with print outs of the general conditions along with a letter head cover sheet explaining the intent to operate under a non-reporting permit as long as all applicable conditions are meet. Oversight from both the Environmental Staff and REU Field Operations Unit will ensure compliance with the permit conditions are met and that standard BMPs are followed. This work is scheduled to begin sometime within the several weeks. I’ll let you know once this work is underway. Heather W. Montague NCDOT DIV 5 Environmental Specialist hwmontague@ncdot.gov (252)492-0111 office 1 (919)691-1596 cell Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 2