Please find below responses to the comments for Holt Farm (20-085) provided on July 21,
2022 via email in bold green italics:
Vallowable for the swales (Prior Comment 1,b,ii) - The provided swales matting
(and associated maximum allowable velocity) is temporary (since NAG-SC150 is a
temporary matting) but the swales must remain stable/nonerosive in perpetuity.
Please revise the Vallowable values in the table (and calculations if needed) to
reflect the permanent conditions of the vegetated conveyances and ensure that they
will be stable in permanent conditions.
The EZ and swale calculations have been revised to provide permanent
conditions information along with supporting information for the values
chosen/used. All ditches are in a Vmax condition of less than 5ft/sec and
therefore will hold up with a suitable stand of turfgrass.
2. Deed Restriction document BUA reallocation (per our phone conversation today).
You are allowed to allocate a maximum allowable BUA per lot to each individual lot
(or group of lots). If you are changing the amount of BUA for this project by
changing the per lot BUA allocations, you will need to provided revised (original)
deed restriction documents (showing the new BUA allocations), recalculate the BUA
for the site, BUA breakdown by type, and %BUA for the site (Section IV, 8 & 10 of the
Application and Lines 8, 9, 10, 12, & 18 of the Drainage Areas Page of the
Supplement-EZ Form).
Deed restriction, EZsupplement, and storm water application have been revised
to reflect the values per our discussion.
3. Please revise the table in Section IV, 10 of the Application to match the information
shown in the Supplement-EZ Form. The BUA allocated to the individual lots should
be listed on the "On -site Buildings/Lots" line and not broken down by type.
Impervious Surface Area (Section
IV, 10 of the Application)
Equivalent Line of the Drainage Area
he Su lement-EZ Form
On -site Buildings/Lots
Line 9 (For subdivisions only, otherwise,
Line 12, Roo
On -site Streets
Line 12, Roadways
On -site Parking
Line 12, Parkin
On -site Sidewalks
Line 12, Sidewalks
On -site Other
Line 12, Other
Future
Line 12, Future
Off -site
Line 11
Existing BUA
Line 15
Total
Line 8
Stormwater application has been revised.
2537E. LYON STATION RD, STE 102
DESIGN & PO BOX361
ENGINEERING, RLLC CREEDMOOR, NC27522
919 230-0996
CLIENT -FOCUSED • COMPREHENSIVE • COST-EFFECTIVE
Please provide the following:
4. 1x hard copy & 1x electronic copy of the revised swale calculations (if applicable)
S. 1x hard copy & 1x electronic copy of an original, revised deed restriction document.
6. 1x hard copy & 1x electronic copy of the revised pages of the Application Form.
7. 1x hard copy & 1x electronic copy of the revised pages of the Supplement-EZ Form.
8. 1x hard copy (2x hard copies for plans) & 1x electronic copy of anything else needed
to address these comments.
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
Hand Delivery: Please reach out to me prior to hand delivering a submission to make sure
that I (or someone else in my group) will be able to receive the submission. Do not leave
the package in the foyer with the security guard.
All the documents for 4-7 will be provided. The plan and other documents in 8 will
not be provide since there are no revision on those.
C3 Design & Engineering, PLLC sincerely appreciates the opportunity to respond to these
comments and looks forward to discussing them with you further as needed. Please don't
hesitate to contact me with any further questions or comments you may have.
7 Re ds
,
Chad E. Abbott
C3 Design & Engineering, PLLC
chadP c3designeng.com