HomeMy WebLinkAboutSW4210801_Supplement-EZ Form_20220818SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION •�. w_......-�_�-�M-��T���M•�-M-�•� -�-?m
1 Project Name Holt Farm
3 coastal wetland Area (ac)-----_- - -- 0
4 Surface Water Area ac 0
5 Is this project High or Low Density? _ _-_ - Low
6 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7 Width of vegetated setbacks provided (feet) _---. - — - 0
-A 1 Will the vegetated setback remain vegetated? NIA
9 If_B_UA is proposed in the setback, does it meet NCAC 021-1.10034�(c-d ? -- NIA
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
---------------..— _--_.---.---------
-------------__._-._.__ - __ -_
0
0
13
Wet Pond
--__- ..__._.-- 0
14
15
Stormwater Wetland
Permeable Pavement
0
0
16
Sand Filter
0
17-t!Rainwater
18
Harvesting(RWH)
(Green Roof
d__
0
19-
Levei Spreader -Filter Strip(LS—FSZ--,
0
20
Disconnected Impervious Surface (DIS)
_ _-- _-
0
0
----- --- 0 - _ ----
0
0
0
0
21 ' Treatment Swale
22 Dry Pond -- ---- - - --- --._ -_ _
T ----
23 StormFilter
24 Silva Cell
25 BIter_----__---- ----_____--
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 Name and Title:
28 j Organization: _
29-i Street address:
30 � City, State, ZP_-------------.__.
31 Phone numbers
32 Email:
Chad E. Abbott, PE
C3 Pas
jgn-and Engineering,
2537 East_Lyon Station Road,,,'
Creedmoor, NC 27522
919 230__0996
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications,
operation and maintenance agreements and other supporting information are consistent with the information provided here.
N R �i
sssj,-
036242 -
��� lip,
G I N 0, A, \..
Et tAVeo �\\.
I/t(Q/AZ-
DRAINAGE AREAS
1 Is this a hi h densitypro'e1 ct? _� No
2 If so, number of drainage areas/SCMs 0
3 Does this project have low density areas? Yes
4 If so, number of low densitydrainage areas_ 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site LD 1
4
Type of SCM NA
_
_
5
Total drainage area (sq ft974067
Onsite drainage areas ft974067��
_ 7
Offsite drainage area (sq ft) _ _ 0
Total BUA inproject (ssft ____ 158302 sf
New BUA on subdivided lots (subject to permitting)
(sq ft)... -- _ _ . 123302 sf
New BUA not on subdivided lots (subject to
(sf)— 35000 sf
Offsite BUA (sq ft) sf
Breakdown of new BUA not on subdivided lots:
- Parking (sq ft)
- Sidewalk (sq ft)
r6
8
_ 9
10_permitting)
11
12
- Roadway (sq ft) _
35000 sf
- Future (sq ft)
- Other, please specify in the comment box
below
New infiltrating permeable pavement on subdivided
lots (sq ft)
_
13
sf
14
New infiltrating permeable pavement not on
subdivided lots (sq ft)
sf
15
Existing BUA that will remain (not subject to
peEmittin (sqft)_
Existing BUA that is already permitted (s ft
Existing BUA that will be removed s(�c T__
sf
16
17
13816 sf
13816 sf_
18 Percent BUA
16%
19 Design storm (inches
20 Design volume of SCM (cu ft)
NA
NA
21 Calculation method for design volume
NA
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
Property has two drainage area (DA), but summarized in one DA since the
majority of the proposed impervious area are located in one specific DA.
LOW DENSITY
DESIGN -REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003
1 Is project below density thresholds set forth in the applicable stormwater rule?
2 Does project maximize dispersed flow and minimize channelization of flow?
3 Has the use of piping been minimized per .1003(2)(c)?
4 Side slopes of the vegetated conveyances (H:V)
_ . -- - -- ------ _..
5 Maximum velocity in the vegetated conveyances during the 10-year storm?
6 Are curb outlet swales proposed?
----- -- - -- -------
7 Maximum longitudinal slope of curb outlet swale(s) (°h)
8 Bottom width of curb outlet swale(s) (feet)
9 Ma)dmum side slope of curb outlet swale(s) (H:V)
--- -- -. _...___..__....
10 Minimum length of curb outlet swale(s) (feet)
11 Are treatment swales used instead of curb outlet $wales?
12 Is stormwater released at the edge of the setback as dispersed flow? _
13 Have stormwater outlets been designed to prevent downslope erosion? - -~
14 Are variations to rule .1003 proposed?
ADDITIONAL INFORMATION
15 Please use this space to provide any additional information about this low density project:
Swale#1 is DWD-1/PD-1
Swale#2 is DWD-2/PD-2
Swale#3 is DWD-3/PD-3
Swale#4 is DWD-4/PD-4
Swale#5 is CWD-1
Swale#e is CWD-2
Please refer to sheet C-1.1 for diversion/ditch schedule
Swale
Drainage Pervious
BUA p
C I
Aaca
81ops
VNr,, V.� a Flow depth
#
lac) aarea
(cis) !
(Nr)
(fps) (fps) (ft)
1
5.92
0.32
5.60 0.24
1018 I
1.85
5.00
3,55
0.98
2
6.16
0.07
6.09 0.21
918
1 88
5.00
3.24
0.97
3
2.91
0.25
2.66 0.26
5.50
1.98
5.00
2.33
0.89
4
5
--
1.64
7.74
--- --
0.07
0.00
-
1.57 0.23
7.74 0.20
- ----1
2.72
11.07
_ ----
1.85
1.17
_
5.00
5.00
---
1.49
--------
3.38
---
0.78
-- ---
1.05
8
5.97
0.00
5.97 0.20
8.54 I
1.77
5.00
3.10
0.98
s
10
11
12
-_
13
14
15
18
1-
j
1s
19
20
.____.--------_-.__._..__-
------.._._.__._-----..._.._._.__---------
----------.
_._._--------i-------------
---..._._.----.._.
27._...
22
----- -------- -
-
23
-- -- -
24
25
26
27
- -
- -
- -- ---
--------------
--------- -----
-------------- -
------- --
•------- --- ......_..._
28
29