September 3, 2014
Lenoir County
DWR Project No. 20140926
TIP B -4565
APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr. Jay Johnson
North Carolina Department of Transportation
P.O. Box 1587
Greenville, NC 27835
Dear Mr. Johnson:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of widening turn
lanes to accommodate an increase in traffic due to an off -site detour associated with the replacement of bridges 42, 43, 26, and 28 in
Lenoir County:
Wetland Impacts in the Neuse River Basin
Site Number
Wetland Fill
(ac)
1
0.0497
2
0.0364
3
0.0363
Total
0.1224
The project shall be constructed in accordance with your application dated received August 21, 2014. After reviewing your
application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification
corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or
local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non - Discharge and
Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project
change, you must notify the DWR and submit a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project
(now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory
mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory
mitigation as described in 15A NCAC 2B .0242(9). For this approval to remain valid, you must adhere to the conditions listed in the
attached certification.
Transportation and Permitting Unit
1617 Mail Service Center, Raleigh, NC 27699 -1617
Location 512 N. Salisbury St, Raleigh, NC 27604
An Equal Opportunity \ Affirmative Action Employer
Phone: 919 - 707 -6300 \ FAX. 919 - 733 -1290
Internet: www.ncwater mg
Page 2 of 4
1. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or
ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not
limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc.
2. The Permittee shall ensure that the final design drawings adhere to the certification and to the drawings submitted for approval.
3. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be
clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited
unless otherwise authorized.
4. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected
riparian buffers.
5. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this
certification.
6. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of
stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
7. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation
and operation and maintenance of such Best Management Practices in order to protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in
accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design
Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they
equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion
Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor -owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in
accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of
the Sedimentation Pollution Control Act.
8. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this certification.
9. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this certification
without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands
or streams, compensatory mitigation will be required since that is a direct impact from road construction activities.
10. Native riparian vegetation (ex. list trees and shrubs native to your geographic region) must be reestablished within the
construction limits of the project by the end of the growing season following completion of construction.
11. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards
(including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate
requirements of State and Federal law. If DWR determines that such standards or laws are'not being met (including the failure to
sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to
assure compliance, DWR may reevaluate and modify this certification.
12. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery.
13. Upon completion of the project (including any impacts at associated borrow or waste site), the NCDOT Division Engineer shall
complete and return the enclosed "Certification of Completion Form" to notify DWR when all work included in the 401
Certification has been completed.
14. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In addition, the Water
Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on -site
project manager.
Page 3 of 4
If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may
obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative
Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of
Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday
between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed
with the Office of Administrative Hearings.
The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings
within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699 -6714
Telephone: (919) -431 -3000, Facsimile: (919) -431 -3100
A copy of the petition must also be served on DENR as follows:
Mr. John Evans, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any
questions, please contact Garcy Ward at (252) 948 -3922 or garcy.ward @ncdenr.gov
oq erely,
C�� ----
for mas A . Reeder ,