Loading...
HomeMy WebLinkAboutSTA 351+00 Through 354+50 Erosion Control Sheet PROJECT REFERENCE NO. SHEET NO. R-3421B EC-l9/CONST.l DETAIL AB DETAILAL BERM BASE DITCH FALSE SUMP .5 DETAIL Al RM/ SHEET NO. TOE PROTECTION ROADWAY DESIGN HYDRAULICS ( Not to Scale) � (Not to scale, o � Not to Scale) ENGINEER ENGINEER Outside Ditch {� Natural7D = / rL\ Traffic Flow \ 20;t �2.01 00a'e� D 2� of ape RDWY c o�d b ti`��\S` Modified Silt Basin 47 x 20 x 3 B GEOTEXTILE% FS- etc. Ft. ' S = Ditch Slope PI"OpOsed Ditch _�d Type B . Ft. Q h 1.5 inch Skimmer d= 1.5 Ft. Max. d = 1.0 Ft. STA. 346+50 -L- (RT) b= 3.o Ft. Geotextile 47 x 20 x 3 O� b = 10 Ft. STA. 349+50 -L- (RT) �c with 1 .0 inch Type of Liner = CLASS "B" RIP RAP Type of Liner= CLASS "I" Rip-Rap 7 ft. weir 0 STA. 344+25 to 346+50 -L- (RT.) Tiered Skimmer Orifice Diameter (EST 77 TONS; 172 SY GEOTEXTILE) FROM STA. 350+68 -L- TO STA. 354+65 -L- RT.(Est.Qty. 130 Tons; 267 SY GEO �� �.JQ 7 ft. weir FROM STA. 352+30 -L- TO STA. 355+90 -L- LT.(Est.Qty. 125 Tons; 245 SY GEO EXTILE) Basin Detail) ==Q ; DETAILAM DETAIL AN X (See Tiered Skimmer FALSE SUMP I D B-1 7 7 (Not t Sc lei FALSE SUMP �, . Basin Detail) , ; Ig N 1 n ft (Not to Scale) o ; O Z Tr fic I D B-177 0 II Outside Ditc ��, _S ee Cn rt Below 0'�i e c 20� 2�i 2'�►- N T ,N AL P P S C E I J RIS ICTI L ( o 0 S=Ditch lope I O O opoaed DI eh ( Z Ditch rode L Dltcn Grade L �5_ @��• T E A E O BE BU IE 20 OF PIP 0.0% O 2.0% z Over e.O% 1 6.0% I T P T 1 FT D E P O Over .0% To .O% Over 6.0% 50' Prop 05 d Dit h S=Ditch Slope I ' ST . 3 +5 -L- ) A. 49+ 0 -L- (C A. 46+50 -L- (LT) L Ln ST . 351 50 - - (C ) 90 x 40 x 3 2.0 inch Skimmer MCRAE FAM L 'I -L- POT TA.355+00.00 R- I ; Modified Silt Basin with 2.0 inch IDE 559-1 TOE PROTECTION -L- PX STA<355+00.00)(R 21 ' Type 'B' Orifice Diameter -� SEE DETAIL "AI" EN STATE PROJECT (R-3 ); ; END CONS T CT ION 90 x 40 x 3 27 ft. weir RIPRAP I Q• , , S TO ' ----- ; (See Tiered Skimmer LINE TSD WITH STONE FOR EST 1�GE ILE _ ------------- Basin 2 7 ft. weir _ --- -------- _ o , (See Tiered Skimmer Basin Detail) EROSION CONTROL CL B � � -------- -- W/GEOTEXTILE LINER !NV=352� V=3 2.15 Detail) ID B-175 P W FENC ID B-175 RIP P NERG TE BASI 2 --- ---- -- SEE DETAIL "Z" PR FENCE IN - 0.53 - 91 CL I RAP WW E SBC P. E T 7 TO BEG. SH LID A. 358 ERM G ER T GEOTEXTI E A. 32+ 5 - - L Q i V ; i1 1904 C TD - 1915 owe CD 00 � 1 ------ ----- ------ ----- ----- ----- --- ----- ---. U o k7 o v C i OTH S W -- -- ---- ---- ----- ---- � - -- --- -- ---- ---- -- ----- --- ----- ------- ------ ----- ------ - -r--;- -T- j 1 ' W o 19 9 19 Q 1 4� Fg a W 2G F 0;" RC -I 2 I 18" RCP- IV Ln - ND SB ; R P.DOUBLE FACE ti A, I ST 35 +70 -L- R . �z I FS CABLE GUI FRAIL __ _ _:: ------- ------------ L ONS RU ION , �n �' o /�O •d < BY THE S 1 �< O __ _____ ____ __ __y_� -___- ---- --L - - ___-- ----- `L_f 2�L ->-' - --- --- ------- 2 N i 1902 GRAU t I / I 350 17 E-J 2 G S v U \� IFS ad ; 0 L3 3 _ p ; J O 0 0 --------- ------ ; •CC)M _ ------ n a� C '► C S OUL ER ; v�i -- -_-- ���aoiN 350+�0 L- T � 3RT 1 12JES" S T XTILE -- - 19 4 1 I - 9.2 ' IN - - - - - - - --- C PRO W N - -- - - - - - - - C ~ 190 \ ; C�D ROP. WW F NCE OE PR TE N BERM BASE D SEE TAIL "Al" -- , SEE DETAIL "AB" -- _ - 4 D BRA . W LILAC ET AL B 7 8 PG 823 LAT SLIDE 580- 06� , , I D IL RIP-RAPP EN GY SIPATOR BASIN j D 0 9 L�O� Qj P E 5 IM. RIP P BASIN RIP RA oT s11owN _ �'� ', 26 .13' A 1. 1.5 1 %��' I ;' ; N76" 1'06" 1.0 CULVERT 2:1 C 1.0 - - - - � 1 FI- - - 4 I I • D 1.5 1.5 �/ �• I I , 1 \ Q 6.0 7. F 16 ' RI P NOT G 12 13 CLEAN WATER DIVERSION ( L DIMENSIONS A OXIMATE LAN -L- CWD CWD CWD CWD , w PI Sto 338+47"89 PlS Sto 350+9/.34 (Not to Scale) NOTE: SIPATOR POOL APRON PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B 0 = 17°47'46" (RT) 8S 0`45'00" STABILIZE EXCAVATEDNATEBIAL AND TEMPORARY ROCK SILT CHECKS TYPE - A AT F ' D = 0'45' / c00"0" LV 200.00 SOIL STABILIZATION GEOTEXTILE DRAINAGE OUTLETS. N w L - 2,372.81 ST - 66.67SIN # LOCATIO AT O ET cuLVERr - '/'GROUND N ' OFFSITEOFFBITE CLEAN WATEP+ 1 - , 32CATI -L- RT W. - � NATURAL PLAINS PREPARED BY M V T = 1,196.04 LT = 133.33 N 2 347+26 -L- LT D C/ N R = 7,639.44 - "N - CLEARING AND GRUBBING A 0 SE = 0.03 EROSION CONTROL FOR GkTSECTION D.S. = 70 mph CONSTRUCTION SHEET 19 7/08 C� RUMMEL, KLEPPER & KAHL, LLP STA. 347+26 -L- RT 900 RIDGEFIELD DRIVE SUITE 350 (EST 15 TONS CLASS I RIP RAP; 27 SY GEOTEXTILE; 23 CY EXCAVATION) RALEIGH, NORTH CAROLINA 27609-3960 o NC LICENSE NO. F-0112 • (919) 878-9560