Loading...
HomeMy WebLinkAboutNCC203141_Annual Fee Unpaid Email with NOD_20220817Georgoulias, Bethany From: laserfiche@ncdenr.gov Sent: Wednesday, August 17, 2022 3:21 PM To: ggamet@csenergy.com Cc: Holloman, Tevye L; Georgoulias, Bethany; Tran, Kieu M; ggamet@csenergy.com Subject: Notice of Deficiency: Unpaid Permit Fee for NCC203141 Attachments: Notice of Deficiency.pdf This email is to convey a Notice of Deficiency for failure to pay the 2022 annual permit fee per the requirements of NC General Statute 143-215.3D(a)(4). Please be sure to coordinate payment with other parties copied on this e-mail to avoid duplicate payments. Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because the annual fee payment (Invoice No. NCC203141-2022) was not received. The payment is 16 day(s) overdue. A Notice of Deficiency is attached. Please contact the Stormwater Program at kieu.tran@ncdenr.gov or (919) 707-3640. Please reference: COC no. NCC203141 This COC is for Zuma Solar, LLC Solar Electric Power Generation Facility in Caswell County, issued to CS Energy, LLC. Annual fee payment can be made through this website: https://deq.nc.gov/sw-epayments If this project has been closed -out, it is important that you submit a Notice of Termination request here: https://edocs.deq.nc.gov/Forms/NCGOI-Termination Please visit https://deg.nc.gov/NCG01 for more information about this permit. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.