Loading...
HomeMy WebLinkAbout20220958 Ver 1_More Info Received_20220803 (2)12. Please approximately sketch the following Information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) 80.►�k FFga' 44o I ��P�aP 1830= Full P nd/ Normal Water Level Bylaw �� Shoreline A6oye -193 x 3 = imrY%pa.c+: Ttrees-h:)4 1, 4srula5s , w `3o a ies��s' 3diseased ar,d W i N replace" w�a.i ntctl n 0.5 vrgwTeee' '1 0 7xmPCLC+in Zav,e 2— oJras s r vYccds r rio i— IO I L, to II ' ZOrt2 2 ir�Gdi r — I VCi �1 resecd avid lor ry%L&It Plan View lox2`yZ'o+9r'" - + lox2o- Lake tk aa„mwmrwn.v.n EAR Dods can EXAM P L F Plan View FORM: SSGP 02-2017 Page 3 of 4