HomeMy WebLinkAbout20220958 Ver 1_More Info Received_20220803 (2)12. Please approximately sketch the
following Information on this plan and provide dimensions for
each
item:
a.
All proposed
vegetation clearing
b.
Location
of rip rap or fill to
be placed above the Full Pond/ Normal Water Level elevation
c.
Location
of rip rap or fill to
be placed below the Full Pond/ Normal Water Level elevation
d.
Location
of any proposed structures such as buildings, retaining walls, docks, etc.
e.
Location
of any excavation
or dredging below the Full Pond/ Normal Water Level elevation
Lake
(At Full Pond/ Normal Water Level)
80.►�k FFga'
44o I ��P�aP 1830=
Full P nd/ Normal Water Level Bylaw ��
Shoreline A6oye -193 x 3 =
imrY%pa.c+: Ttrees-h:)4 1, 4srula5s ,
w `3o a ies��s' 3diseased ar,d
W i N replace" w�a.i ntctl n 0.5 vrgwTeee' '1
0
7xmPCLC+in Zav,e 2—
oJras s r vYccds r rio i— IO I L, to II ' ZOrt2 2
ir�Gdi r — I
VCi �1 resecd avid lor ry%L&It
Plan View lox2`yZ'o+9r'" -
+ lox2o-
Lake
tk aa„mwmrwn.v.n EAR Dods
can
EXAM P L F
Plan View
FORM: SSGP 02-2017 Page 3 of 4