Loading...
HomeMy WebLinkAboutNCC212124_NOT Closeout Documents_20220816ROY COOPERS Governor ELIZABETH S. BISER ` Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely, Land Quality Section Mooresville Regional Office North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Mooresville Regional office 1 610 East Center Avenue, Suite 301 E Mooresville, North Carolina 28115 704-663-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cleveland Project: M-201- De -Rate Kings Mountain River basin: Broad Person financially responsible: Public Service Company of NC, Inc. - Shaun Project #: CLEVE-2021-026 Randall Address: PO Box 1398, Gastonia, NC 28053 1. Project Location: Benton Road, Kings Mountain Pictures: No 2. Weather and soil conditions:. sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: no one on site at time of inspection 1f Yes, where? (check all that apply) Title: Date given/sent: October 11, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.nc.gov/FormsiNCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Matthew Gigante Others present: Date of inspection: October 05, 2021 Time arriving on site: 10:40 AM Time leaving site: 10:50 AM cc: