Loading...
HomeMy WebLinkAboutNCC213486_NOT Closeout Documents_20220815North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Barrington Phase 1 Gas Main Extension River basin: Neuse Person financially responsible: Public Service Company of North Carolina, Project #: WAKE-2021-060 Inc. - Shaun Randall Address: PO Box 1398, Gastonia, NC 28053 1. Project Location: 1499 Old Bunn Road, Zebulon Pictures: No 2. Weather and soil conditions: rain, partially workable, wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Title: Date given/sent: July 11, 2022 Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Date of inspection: June 29, 2022 Time arriving on site: 2:30 PM Time leaving site: 2:40 PM cc: