Loading...
HomeMy WebLinkAboutSW5201101_Supplemental Info Review_20220815Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/15/2022 4:10:11 PM (Supplemental Submittal) Submit by Tran, Kieu M 8/17/2022 7:51:38 AM (Supplemental Info Submittal) • The task was assigned to Tran, Kieu M 8/15/2022 4:10 PM Submittal from 8/15/2022 Permit Information: Please provide specific permit details below. What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit • State Stormwater (Post -Construction) Permit Other Permit Number* SW5201101 Begins with "SW", "NCG", or "NCS' What DEQ Office is Reviewer: Please correct if misidentified, close this review form, and reassign task to the appropriate contact. the Primary Contact? • Central Office * Washington Regional Office (Attn: Carl Dunn) Wilmington Regional Office (Attn: Christine Hall) Project Name* Louisburg Capacitor Bank 115kV Owner/Operator* Duke Energy Progress, LLC County: Franklin Submitter Name: * Elizabeth Steffens Who is submitting this information? E-mail Address:* esteffens@dewberry.com Phone Number* 9842326795 Additional E-mail for reuben.jones@duke-energy.com Submittal (Optional) Confirmation: State Stormwater (Post -Construction) Information Uploads Choose file type and upload attachment (Reviewer may remove unnecessary submittals) File Type* As -Built - Certification File Upload Click the upload button, or drag and drop files to attach 1. Asbuilt Permittee Cert SIGNED.pdf 97.61KB Only PDF files are accepted. File Type* As -Built - Certification File Upload Click the upload button, or drag and drop files to attach 2.Asbuilt Designers Cert - signed.pdf 641.5KB Only PDF files are accepted. File Type* As -Built - Certification File Upload Click the upload button, or drag and drop files to attach 3.Asbuilt Designers Cert For Low Density-signed.pdf 421.99KB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button, or drag and drop files to attach 4.20220228-AGREEMENT-Louisburg O and M- 107.65KB 001. pdf Only PDF files are accepted. Uploads contain • NO Confidential YES Information * NOTE: The following information cannot be claimed as confidential: the name and address of any permit applicant or permittee, permit applications, permits, effluent data, information required by NPDES application forms provided by the Director inclusive of all forms and attachments [Ref. 40 CFR 122.7(b) and (c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: o I have given true, accurate, and complete information on this form; o I agree that submission of this Supplemental Information form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Elizabeth Steffens Signature: �s Date Submitted: 08/15/2022 Initial Review Verify Permit No.* IMPORTANT. REVIEWER SHOULD VERIFY and revise here if necessary. S W5201101 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jim Farkas Any Comments or Added Info for CO Staff Reviewer? Review Date* 08/17/2022