Loading...
HomeMy WebLinkAboutSW6220802_Supplement-EZ Form_20220816SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT. INFORMATION 1 iProject Name Champs Convenience Stare 2 _ ProjectArea (ac) 3.46� 3 Coastal Wetland Area (ac) 0 4 Surface Water Area ac 0 5 Is this rop ject High or Low Density? High _ 6 _ Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) NA 8 Will the vegetated setback remain vegetated? N/A . 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 1 12 Sioretention Cell 13 Wet Pond Y 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip_(LS-FS) 20 Disconnected Impervious Surface (DIS 21 Treatment Swale 22 Pry Pand I _ 23 StormFilter 24 Silva Cell 25 BaLfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Johnny Glenn Tew / Project Engineer 28 Organization: ECLS Global Inc. 29 Street address: 19 North Mckinley Street 3o _ City, State, Zip: Coats, N.C. 27521 31 Phone number(s): 910-897-3267 Ext. 105 32 Email: JohnnyT@eclsgloballnc.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. �r��rrr`'•�� H CA R'''�4,� of ESS1, SEAL r•• 14580 y'••...V NEES GL '�1!!111119IAI)t1j11 Lot iigno of Design �— �a,� Date 07 113L17/ 4 DRAINAGE AREAS 9 Is this a high densityrqj Yes 2 F1 If so, number of drains a areas/SCMs 1 3 Does this project have low densi areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION ` Entire Site -1 4 Tvpe of SCM Infiltration 5 Total drainage areas ft 155,509.20 87,120.00 6 Onsite drainage area (sq ft 150,717.60 82,328.40 7 Offsite draina a area (sq ft 4,791.60 4,791.60 8 Total BUA inA ro'ect (sq ft 78408 sf 67518 sf 9 New BUA on subdivided lots (subject to permitting) s ft NA NA 10permitting) New BUA not on subdivided lots (subject to s 78408 sf 67518 sf 11 Offsite BUA (sq fi sf sf 12 Breakdown of new BUA not on subdivided lots: Parkin s ft 8086 sf 8086 sf Sidewalks fE 10271 sf 4608 sf Roofs ft 6600 sf 6600 sf Rom (sq ft) 48027 sf 42800 sf - Future (sq ft NA NA Other, please specify in the comment box below s ft 5424 sf 5424 sf 13 New infiltrating permeable pavement on subdivided lots_(sq ft) NA mm NA 14 New infiltrating permeable pavement not on subdivided lots sq ft NA NA 15 Existing BUA that will remain (not subject to ermittin ) (sq ft)NA NA 16 Existing BUA that is alread permitted (sg ft NA NA 17 Existing BUA that will be removed (sq ft NA NA 18 Percent BUA 50% 78% 19 Desi n storm inches 1.0 in 20 Desi n volume of SCNi cu €t 6327 cf 21 ADDITIONAL Calculation method for design volume INFORMATION Simple Please use this space to provide any additional information about the 22 drainage area(s): "Other' impervious came from big fuel island (3,360sf), small fuel island 1,056.00 so, big slab over fuel tanks ( 528 so, small slab over fuel tanks ( 96 so, dumpster pad and apron ( 384 so. IPIFILTRATION SYSTEM 1 IDrainage area number 1 2 Minimum required -treatment volume cu ft GENERAL MDC FROM 62H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 6534 cf No 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V or enter "Vertical' for trenches)? vertical 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the des i n volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If le, will the SCM be cleaned out after construction? Yes 11 Domaintenance access comply with General MDC (8)? Yes 12 Dodrainage easement comp) with Generat MDC (9)? Yes 13 If tis on a single family lot, does (will?) the plat comply with GeDC 10 ? L NIA 14 Is tO&M Agreement that complies with General MDC (11)? Yes 15 Is tO&M Plan that complies with General MDC (12)? 16 DoCM follow the device specific MDC?L LNo 17 IWIITRATION 18 WaCM desi ned b an NC licensed rofessional? YSTcAARA 1 cor-A 2H .1051 Proposed slope of the subgrade surface (%} 19 Are terraces or baffles provided?7 7No 20 Soils Pat& Type o€ pretreatment: Forebay the soil investigated in the footprint and at the elevation of the ations stem? Yes *23Depth T elevation (fmsl 326.00 to SHWT er soils repo 24.00 nd elevation a# burin in soils report (fmsl) 328.00 etailed hydrogeologic study attached if the separation is between 1 and 2 feet? NIA 26 Soil infiltration rate (inlhr)e 0.60 27 Factne): 1.31 29� 113oftom elevation (fmsi 328 ft 334 32 Bottom surface area ft2 ) 4189 ft 33 Storage elevation surface area ftz1 4189.4 )r Trenches Only 34 Len the (ft) 35 Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if ap licable rosif (°/a) 7308 ree of fines?ne wrapped in eotextile fabric?ast one ins ection ort been provided? 44 Deslgn volume of SCM (cu ft) tnnti� a 45 1 Time to draw down hours DDITIONAL INFORMATION 46 please use this space to provide any additional information about the tion system is a network of underground storm chambers with isolator rows to as torbays. Infiltration 1 951 AM 7/27/2022