From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Monday, August 15, 2022 3:42 PM
To: Jennifer Burdette; pm@piedmontconservation.org
Cc: Homewood, Sue
Subject: [External] Provisional NWP 13 Verification, SAW-2022-01533, Rock Creek Stream
Stabilization / 6441 Burlington Road / Whitsett / Guilford County
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
All,
This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general
permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will
provide you with a final general permit verification. Your proposed work shall not commence until after the 401
Certification has been issued or waived AND until a final general permit verification has been provided to you. Note that
additional special conditions may be added to the final general permit verification.
It appears that an Individual 401 Water Quality Certification (WQC) is required from the North Carolina Division of Water
Resources (NCDWR) for this project.
For NCDWR: After review of the submitted PCN for the above referenced project, and NWP 13 Water Quality General
Certification No. 4245, dated 12/18/2020 (https://saw-reg.usace.army.mil/NWP2021/NWP13 GC4245.pdf), it appears
an Individual 401 Water Quality Certification (WQC) is required from the NCDWR for the proposed activities. The PCN
received by our office provided the 9 required elements for an individual WQC and constitutes the Corps initial receipt
of the WQC application. The reasonable period of time (RPOT) for you to act on this WQC request is 120 calendar days
from the date of the complete WQC request. Unless NCDWR is granted a time review extension, the date upon which a
waiver of the WQC will occur if you do not act on the certification is 11/9/2022.
Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory
program.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Office: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
1
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
2